) Capacity Increase
Capacity increase on Production environment
- upgrade 3 half Nodes to 3 full Nodes
- Increase from 4 CPUs to 8 CPUs per Node
- Upgrade Memory from 60 GByte to 188 GByte per Node
- Install 1 x 10-Gbps dual-port NIC Card per Node
- Install 1 x dual-port HBA card for SAN storage per node
- Configure all Hardware and Software
OneLink Order:

Direct order through Kate Besso:

Capacity Increase - Frame Upgrade Details


AP976P (PO 0000026367

AP977P (PO 0000026367)

2.) STORAGE EXPANSION Phase I


Additional storage for Production, Test & Development environment Phase 1 (August 2013 purchase)
- Check if we need more HBA Cards to accommodate additional storage in every Data Center
- Environments: Production in Napa Data Center (NDC)
Test in Irvine Data Center (IDC)
Development in Silver Spring Data Center (SSDC)

Original storage purchase November 2012


IMG Backfill

47 TByte

Storage purchased in August 2013


PO 0000029104

47 TByte

Total storage

94 TByte

3.) STORAGE EXPANSION Phase II


Additional storage for Production & Test environment Phase 2 (November 2013 purchase)
- Check if we need more HBA Cards to accommodate additional storage in every Data Center
- Environments: Production in Napa Data Center (NDC)
Test in Irvine Data Center (IDC)

Original storage plus August 2013 purchase


Original & PO 00000029104

94 TByte

Storage purchased in November 2013


PO 0000028883, 0000029143

42 TByte

Total storage

136 TByte

4.) NETWORK EXPANSION


Upgrade Oracle DB environment from 1 GBps to 10 GBps Network
OneLink Order:

Order Details:

Order Details cont.:

NETWORK EXPANSION