MCL Site,
Kind Attn : Mr. L. Venkateshwaran
Sub : 4th Boiler Feed Pump for MCL
The problems and limitations for installation of 4th
1)
2)
The steam supply circuit to the dearator has been made such that two boiler
and
two turbine cannot run in a totally unitised manner. Therefore keeping the 4th
pump connected to the common header does not give any added
advantage.
3)
Considering the load fluctuation in the cement plant, it is very often necessary
to
run one turbine with 2 boiler at part load. Taking into view the Feed Heater
arrangement, a common boiler Feed Pump discharge header is technical a
better option.
4)
In case HP heater for one of the turbine is out of service, utilising a common
boiler Feed Pump discharge header will help achieving relatively high Feed
water temparature at the economiser inlet. This helps in keeping low flue gas
temparature corrossion under control.
5)
There is serious space constraint and major modification in the piping and
layout
arrangement is required for installation of the 4th Feed water pump.
6)