Pre--Commissioning and
Pre
C
Commissioning
i i i
Engineering
STANDARDS
IPS
IPS-C-SF:
IPSSF: Standard for Installation, Inspection and testing
of firefighting systems
IPS--M-PPIPS
PP-125:
125: Material and Equipment
q p
Standard for
Firefighting
IGS
ASME
ANSI
ASME VIII
VIII:: Pressure
P
V
Vessels
l
ASME IV
IV:: Heating Boiler
ANSI B31.
31.3: Process Piping
API
API--610:
API
610: Centrifugal Pump for General Refinery Service
Page 2
Commissioning Description
System
A system is a major subdivision of an installation, being
either process or utility, that performs a major
operational function of the plant. The system includes
all the various equipment that allows it to operate. The
firewater pumps, power generation, control systems,
telecommunications oil,
telecommunications,
oil gas,
gas water processing,
processing etc.,
etc
are typical examples of systems.
Sub-System
SubSystem::
A subsystem is a further subdivision of a system, that
performs a p
p
partial operational
p
function to the system,
y
,
with no or little interference from the other subsystems.
Several equipment with the same function in the
system main packages are typical examples of
system,
subsystems.
Page 3
Time Schedule
Precommissioning
Commissioning
Start up
R ti
Routine
Operation
O
ti
Performance
Test
Time
Ready For
Commissioning
Ready For
Start Up
Page 4
Ready For
O
Operation
ti
Final
Acceptance
Certificate
OICO Commissioning Dept.
Page 5
Pre--Commissioning
Pre
g
Th Precommissioning
The
P
i i i
physical
h i l scope off work
k
consists, as previously said, in:
in:
tests
of
equipment
Commissioning
g
The Commissioning physical scope
consists, as previously said, of:
of:
of
work
Page 7
Start Up
p
The StartStart-up scope of work includes activities
preparation and witnessing of the commissioning
activities
activities.
ti iti . After
Aft
th t the
that,
th operational
ti
l activities
ti iti
properly speaking are split prior to and after
oil/gas introduction
introduction..
Operational
p
activities after oil/gas
/g
in.
in.
Page 8
48
72
shut down
.
Production Test
21 28
.
OICO Commissioning Dept.
Page 9
Discipline
p
Electrical
Instrument
I t
t
Piping
Mechanical
Process
Page 10
Electrical Tests
Energizing & Functional Test
.
Solo Run
.
OICO Commissioning Dept.
Page 11
Instrument Tests
Loop Test
.
Functional
u ct o a Test
est
Page 12
Piping
p g Tests
Leak Test
) ( %95
:
7 bar
7 bar
.
Pickling
...
Inerting
.
OICO Commissioning Dept.
Page 13
Mechanical Tests
Chemical & catalyst Loading
.
Oil Flushing
.
... .
Fan Adjustment
.
..
Final Alignment
solo run
.
Final Box Up
...
.
Page 14
Process Tests
Dry Out
OTP
.
Dehydration
y
7C .
Degreasing / BoilBoil-Out
Page 15
17 18
OICO Commissioning
Dept.
Page 16
Off h
Offshore
Four Wellhead Facilities
Two 32
32 undersea pipelines
o 4 p
pipeline
pe e ((MEG
G Piggyback
ggybac line)
e)
Two
Onshore
Two Phases, each phase has two trains
Page 17
Offshore Facilities
Offshore operation:
Water
Water--Gas Separation
Multiphase
M lti h
Transportation
T
t ti to
t the
th Pl
Plantt
MEG injection for Hydrate Inhibition
Page 18
Page 19
Page 20
Page 21
System
59
Subsystem
782
BOQ
66000
Electrical:
Piping:
Instrument:
Mechanical:
Process:
9200
1000
53000
1400
950
Page 22
On--Shore
On
Utility Units
Process Units
Offsite Units
Miscellaneous Units
Page 23
Utility
y Units
Polishing water
Potable water
Cooling Water
Waste Effluent Disposal
Fire water system
Diesel Oil
Page 24
Process Units
Reception facilities
G ttreating
Gas
ti
unit
it
MEG Regeneration & injection
Condensate Stabilization
Dehydration & Mercury Guard
Ethane Recovery
y
Export Gas Compression & Metering
NGL Fractionation
Sulfur Recovery (SRU & TGTU)
Sour Water Stripping
B
Back
Backk-up Stabilization
St bili ti
Propane Refrigeration
Caustic Regeneration
Propane / Butane / Ethane treatment & drying
Page 25
Offsite units
Page 26
Miscellaneous Unit