CONQUAS 21
C ON QU A S 2 1
THE BCA
CONSTRUCTION QUALITY ASSESSMENT
SYSTEM
CONQUAS 21
ii
CONQUAS 21
CONTENTS
1.0
INTRODUCTION..................................................................................1
1.1
1.2
1.3
2.0
CONQUAS 21......................................................................................3
2.1
2.2
2.3
2.4
3.0
Objectives of CONQUAS
Scope of CONQUAS 21
Derivation of CONQUAS
Components to be assessed
The Weightages
CONQUAS Assessor
Sampling
THE ASSESSMENT.............................................................................6
3.1
3.2
3.3
3.4
3.5
Assessment Approach
Structural Works Assessment
Architectural Works Assessment
M&E Works Assessment
Computation of CONQUAS Score
APPENDICES
Appendix 1
Appendix 2
Appendix 3
Appendix 4
Appendix 5
Appendix 6
iii
CONQUAS 21
1.0 INTRODUCTION
1.1 Objectives of CONQUAS
The Construction Quality Assessment System or CONQUAS was
developed by the Building and Construction Authority (BCA) in
conjunction with the major public sector agencies and the various
leading industry professional bodies to measure the quality level
achieved in a completed project.
CONQUAS was designed with three objectives:
(a)
(b)
(c)
Structural Works,
Architectural Works and
Mechanical & Electrical (M&E) Works.
Page 1
CONQUAS 21
Page 2
CONQUAS 21
2.0 CONQUAS 21
2.1 Components to be assessed
The CONQUAS assessment is divided into three main components Structural Works, Architectural Works and M&E Works.
(a)
Structural Works.
The structural integrity of the building is of paramount importance
as the costs of failure and repairs are very significant. The
assessment of Structural Works comprises:
(i)
(ii)
(iii)
Architectural Works.
Architectural Works deals mainly with the finishes and
components. This is the part where the quality and standard of
workmanship are most visible. The assessment covers:
(i)
Page 3
CONQUAS 21
(ii)
Material & functional tests such as on window watertightness, wet area water-tightness test and adhesion of
internal wall tiles. There is also in-process assessment on
installation of waterproofing for internal wet areas.
Site
inspection
of
installed
works
before
embedded/concealed. Such items include ACMV
ductworks, electrical conduits, concealed pipes, etc.
(ii)
Site inspection of final installed works such as the AirHandling Unit (AHU), cooling tower, fire alarm control
panel, etc.
(iii)
Page 4
CONQUAS 21
CAT A
CAT B
CAT B
CAT C
CAT D
Components
Commercial,
Industrial,
Institution
& others
Commercial,
Industrial,
Institution
& others
Private
Housing
Public
Housing
Landed
Housing
Structural Works
25%
30%
25%
35%
30%
Architectural Works
55%
60%
65%
60%
65%
M&E Works
20%
10%
10%
5%
5%
CONQUAS Score
100%
100%
100%
100%
100%
Note : In general, projects with central cooling system having cooling tower, chiller
system, etc are classified under CAT A. Otherwise, it will be classified under
CAT B. Appendix 5 provides a guides with listing of buildings under the various
categories.
2.4 Sampling
As it is impractical to assess all elements in a building, CONQUAS 21
uses a sampling system for the assessment. The sampling system,
which is mainly based on the gross floor area of the building, will ensure
that the assessment adequately represents the entire building.
Page 5
CONQUAS 21
Page 6
CONQUAS 21
Weightage %
Formwork
15
Rebar
20
Finished Concrete
25
Concrete Quality
15
15
Total
100
* If total precast concrete volume exceeds 20% of total structural concrete volume,
assessment will be carried out for precast concrete construction. The points will be
distributed proportionately between formwork/rebar assessment and precast
concrete assessment based on the respective concrete volume percentage.
Page 7
CONQUAS 21
GFA per
Sample
Min
Sample
Max
Sample
Remarks
Structural Elements
500 m2
30
150
1a
Structural Elements
1500 m2
30
50
Concrete Compressive
Strength
100%
Declaration by Qualified
Person
100%
Declaration by Qualified
Person
5,000 m2
2
sets
20
sets
NDT - Electro-Covermeter
test for concrete cover
5,000 m2
2
sets
20
sets
Page 8
CONQUAS 21
Structural Steelwork
Weightage %
40
Metal Decking
20
Erection Tolerances
10
10
20
Total
100
Pre-stressed Concrete
Weightage %
25
Sheathing
25
25
Debonding
25
Total
100
Min
Sample
250
Metal decking
250
Erection Tolerances
500
500
Items
Structural Elements
Page 9
CONQUAS 21
Weightage %
Breakdown
Total
56
16
16
6
6
6
6
4
4
12
12
6
6
22
1
10
2
4
100
Page 10
CONQUAS 21
GFA per
Sample
Min
Sample
Max
Sample
Remarks
Internal Finishes
500 m2
30
150
1a
Internal Finishes
70 m2
30
800
1b
Internal Finishes
70 m2
30
600
External Wall
50%
External Work
Pre-packed Plaster
5a
5b
1,000 m2
20
100
25%
6a
20
100
6b
100%
10,000 m2
1 Set
5 Sets
7
8
Conducted by BCA
Self-Testing with declaration
by Qualified Person
10% of all bathrooms and/or
toilets (by location)
all will be tested if < 20 nos
not required for non-housing
project if < 20 nos
Self-Testing with declaration
by Qualified Person
Including flat roof
In-process assessment based on
approved Method Statement
Page 11
CONQUAS 21
CAT A
CAT B
CAT C
CAT D
Non-Housing
Public
Housing
Landed
Housing
40%
60%
40%
40%
15%
40%
15%
40%
40%
25%
20%
25%
20%
20%
Commercial
Industrial
Institution
Others
Housing
Principal
60%
Service
Circulation
Locations
Link-way / Shelter
- 10m length section per sample and minimum 2 samples
Apron & Drain
- 10m length section per sample and minimum 2 samples
Roadwork & Carpark - 10m length section per sample and minimum 1 sample
Footpaths & Turfing - 10m length section per sample and minimum 2 samples
Playground
- 1 location
Court
- 1 location
Fencing & Gate
- 10m length section per sample and minimum 1 sample
Swimming Pool
- 10m length section per sample and minimum 1 sample
Club House
- 1 location
Guard House
- 1 location
Electrical Substation - 1 location
Each item in the External Works will be assessed separately and all the
locations listed above must be assessed where applicable.
Effective date: 1st Jan 2005
Page 12
CONQUAS 21
Under the material & functional tests, self-testing items like field window
water-tightness test for 25% of windows and 100% wet area watertightness test (including flat roof) and the use of pre-packed plaster for
all plastering works are based on declaration by the project Qualified
Person (QP). In general, declaration on passing for self-testing is based
on first-time-right basis.
Page 13
CONQUAS 21
CAT A
CAT B
CAT C
CAT D
10
10
80
100
100%
_
100%
The assessment of Basic M&E Fittings will be carried out during the
Internal Finishes assessment.
Page 14
CONQUAS 21
Electrical
1. Embedded conduit
2. Main cables
3. Surface conduits
4. Cable tray, ladder & trunking
5. Distribution board
ACMV
1. Air handling unit
2. Pump
3. Cooling tower
4. Chiller
5. Pipework
6. Split unit / Window air conditioner
7. Air-con comfort
8. Ductwork
9. Fire-rated duct
10. Dampers
11. Fire Dampers
12. Flexible ducts
13. Flexible connectors
Fire Protection
1. Wet / Dry riser
2. Sprinkler
3. Fire Alarm
4. Hosereel
Plumbing & Sanitary
1. Concealed pipes
2. Exposed pipes
3. Water tank
4. Pump
Minimum Samples
Maximum Samples
CAT A
CAT B
CAT C
CAT D
1,000 m2 per
sample
1,500 m2 per
sample
3,500 m2 per
sample
3,500 m2 per
sample
2+
1
1+
1+
2+
2+
1
1+
1+
2+
1+
1
1
1
1
2+
1+
3+
1
1+
1
2
1
2+
1+
1+
2+
1+
1
1
1
1
1+
1
1
3+
2+
1+
1+
1
1+
1+
1
1
1+
1+
1+
4+
1
1
1+
4+
1
1
4+
1
1
35
70
25
50
10
20
1+
10
20
Page 15
CONQUAS 21
Roofing System
Nos of Toilet
External Wall
- Commercial (CAT A)
- Reinforced Concrete system with 31% precast
concrete volume and steelworks at 75% to 25%
cost ratio
- Flat Roof
- 10 nos
- Full Glass Curtain Wall
Weightage
%
0.69X35% = 24.1%
0.31X35% = 10.9%
25
5
5
15
15
100
Structural Works
(Structural Steelwork)
Main Member/Partially Assembled Component
Metal Decking
(not used)
Erection Tolerances
Corrosion & Fire Protection
Welding Test Reports
Total
= (100-80)
Pro-rated Total
= (71/80)
Weightage
%
40
10
10
20
80
100
Score
22.3
8.0
20.5
5.0
5.0
10.5
12.5
83.8
Score
33.2
NA
8.3
10.0
19.5
71
88.8
(A)
Individual Score
83.8
88.8
(B)
Cost Proportion
75%
25%
(A) X (B)
62.9
22.2
85.1
Page 16
CONQUAS 21
Weightage %
Score
Floors
Internal Walls
Ceilings
Doors
Windows
Components
Roof
External Walls
External Works
Pre-packed Plaster
Field Window Water-tightness Test (WTT)
- BCA Testing
- Self-Testing
Wet Area Water-Tightness Test
- BCA Testing (NA as <20 nos & for non-residential)
- Self-Testing
Internal Wet Area Waterproofing Process
Pull-Out-Test for Internal Wall Tiles
Sub-total
= (100-4)
Pro-rated Total
= (68.7/96)
16
16
6
6
6
6
4
12
6
1
9.3
9.0
5.8
3.6
4.1
4.6
2.5
10.1
4.5
1.0
8
2
6.6
1.4
1
2
4
96
100
NA
1.0
2.0
3.2
68.7
71.6
Cat A
Score
15%
20%
10%
15%
15%
75%
50%
12.2
18.4
8.8
11.2
12.8
63.4
42.3
100%
50%
100%
86.9
43.4
85.7
Page 17
CONQUAS 21
(A)
Actual
Score
85.1
71.6
85.7
(B)
CAT A
(A) X (B)
25%
55%
20%
100%
21.3
39.4
17.1
77.8
Page 18
Appendix 1a
Item*
1
Formwork
1a
Formwork dimensions
and openings for
services
1b
1c
Condition of formwork,
props & bracing
Reinforcement
(cast in-situ & Precast)
2a
Standards
1)
2)
3)
1)
2)
3)
4)
1)
2)
3)
4)
1)
2)
Page 19
Appendix 1a
Item*
Standards
2b
1)
2c
Cover provision
1)
2d
1)
2)
1)
2)
1)
2)
Tolerance for opening: +10 for size and 25mm for location
3)
4)
5)
2e
Rebar Condition
Finished Concrete
(cast in-situ & Precast)
3a
Page 20
Appendix 1a
Item*
3b
3c
Exposed surface
Precast Specific
Requirements
4a
Lifting points/inserts
4b
Sleeve
system/connections
Standards
6)
7)
1)
2)
3)
4)
5)
1)
2)
3)
4)
5)
No cracks or damages
1)
2)
1)
2)
3)
4)
Page 21
Appendix 1a
Item*
4c
4d
Interface/joint
requirements
Cast-in steel
items/welded & bolted
connections
Standards
1)
Joint taper:
Over 3m length: 6mm
Maximum for entire length: 9mm
2)
3)
4)
5)
1)
2)
3)
Structure Quality
5a
1)
5b
Reinforcement (Rebar)
1)
2)
3)
Page 22
Appendix 1a
Item*
Standards
Non-destructive testing
6a
6b
Electro-Covermeter test
for concrete cover
1)
2)
3)
4)
1)
2)
3)
For each reading, full point for 5mm and half point for
>5mm to 8mm. For each location, no point will be
awarded if any of the 4 readings exceeds 12mm.
4)
For the assessment of concrete cube test results, the percentage of points shall be awarded based
on the percentage of non-compliance as tabulated in the table below :
Percentage of Points awarded
Percentage of non-compliance
100%
0 - 2.5%
75%
2.6 - 5.0%
50%
5.1 - 7.5%
25%
7.6 - 10%
0%
> 10%
* An item is deemed to have failed if any one of the standards is not met.
Page 23
Appendix 1b
Item*
1
Main member/Partial
assembled component
1a
Physical dimensions
1b
1c
1d
Welding
Bolting
Standards
1)
2)
3)
1)
2)
3)
1)
Weld size, length and profile shall meet the structural steel
specifications and drawings
2)
3)
4)
1)
2)
3)
4)
Page 24
Appendix 1b
Item*
Metal decking
2a
2b
Shear studs
Standards
5)
6)
1)
2)
3)
4)
5)
6)
1)
2)
3)
4)
1)
2c
Erection tolerances
3a
Column verticality
1)
3b
Column position
1)
3c
Beam level
1)
Page 25
Appendix 1b
Standards
Item*
2)
1)
3d
Beam position
4a
Thickness of coating
1)
4b
Condition
1)
No visible damages
2)
1)
2)
# For test records, the following table would be used to determine the points awarded:
Points awarded
20
15
10
5
0
* An item is deemed to have failed if any one of the standards is not met.
Page 26
Appendix 1c
Item*
1
Standards
1)
2)
Installation of sheathing
Debonding
1)
2)
3)
4)
1)
2)
3)
1)
2)
3)
* An item is deemed to have failed if any one of the standards is not met.
Page 27
Appendix 2
Item*
1
Floors
1a
General Requirements
1b
1c
Screed finish
Tiled finish
Standards
1)
Finishing
No stain marks
Consistent colour tone
2)
3)
4)
Hollowness / Delamination
No hollow sound when tapped with a hard object
No sign of delamination
5)
Jointing
Consistent skirting thickness and no visible gap
between wall & skirting
1)
3)
1)
2)
3)
Joints are aligned and consistent with skirting and wall tiles
4)
5)
6)
Page 28
Appendix 2
Item*
1d
1e
1e
Timber floor
Carpet
Raised Floor
Standards
1)
No warpage
2)
3)
4)
1)
2)
3)
1)
2)
Page 29
Appendix 2
Item*
2
Internal Walls
2a
General Requirements
2b
2c
2d
2e
Plaster Finish
Tiled Finish
Cladding
Architectural Coating
Standards
1)
Finishing
No stain marks
Consistent colour tone
No rough / patchy surface
2)
3)
4)
Hollowness / Delamination
No hollow sound when tapped with a hard object
No sign of delamination
5)
Jointing
Straightness of corners and joints
1)
2)
3)
1)
2)
3)
4)
1)
2)
3)
4)
1)
2)
Page 30
Appendix 2
Item*
2f
2g
2h
2i
2j
Painting
Pre-cast concrete
planks
Wall Paper
Glass Blocks
Standards
1)
2)
3)
4)
5)
1)
2)
3)
1)
2)
3)
4)
1)
2)
3)
1)
2)
3)
4)
No warpage
Page 31
Appendix 2
Item*
3
Ceilings
3a
General Requirements
3b
3c
Standards
1)
Finishing
No stain marks
Consistent colour tone
No patchy surface
2)
3)
4)
Roughness
No rough surface
5)
Jointing
Consistent, aligned and neat
1)
2)
3)
4)
1)
2)
3)
Page 32
Appendix 2
Item*
4
Doors
Standards
1)
2)
3)
4)
Functionality
Ease in opening and closing
No squeaky sound during swinging the leaf
5)
Accessories Defects
Lock sets with good fit and no stains
No sign of corrosion in ironmongery
No missing or defective accessories
Page 33
Appendix 2
Item*
5
Windows
Standards
1)
2)
3)
4)
Functionality
Ease of opening and closing
No sign of rainwater leakage
No squeaky sound during swinging the leaf
5)
Accessories Defects
Lock sets with good fit & aligned
No sign of corrosion
No missing or defective accessories
Rivet at hinges in stainless steel
Page 34
Appendix 2
Item*
6
6a
6b
Components
General Requirements
Railings
Standards
*
**
1)
2)
3)
4)
Functionality
Functional, secured and safe
5)
Accessories Defects
No missing accessories
No sign of corrosion
No visible damages / defects
1)
2)
* An item is deemed to have failed if any one of the standards is not met
Effective date: 1st Jan 2005
Page 35
Appendix 2
Roof
1a
General requirements
1c
1c
Flat Roof
Pitched Roof
Standards
1)
Stain / Painting
No stain marks
Good paint works
2)
3)
4)
5)
Chokage / Ponding
No sign of chokage and ponding
6)
Construction
No sign of leaking
Proper dressing for any protrusion
Neat & secured installation of fixtures
1)
2)
3)
4)
5)
1)
No leaking
2)
No rust or stains
3)
4)
5)
Page 36
Appendix 2
Item*
1d
1e
Waterproofing
(exposed)
Gutters
Standards
6)
7)
1)
2)
3)
4)
5)
6)
No paint defects
1)
2)
3)
4)
5)
* An item is deemed to have failed if any one of the standards is not met
Page 37
Appendix 2
General Requirements
Standards
1)
Evenness / Roughness
Overall surface should be even, not wavey & not
patchy
2)
Staining / Painting
No visible stain marks
Good paint works
2)
Cracking / Damages
No visible damage / defects
3)
Jointing / Alignment
External features visually in alignment
Corners of wall maintained at right angles and straight
Consistent joint width, neat & aligned
Plaster Finish
1)
As above
Tiled Finish
1)
2)
1)
2)
3)
4)
5)
1)
2)
3)
4)
No efflorescence
Claddings / Curtain
Walls
Facing Brickwork
Page 38
Appendix 2
Item*
6
Architectural Coating
Painting
Standards
1)
2)
3)
1)
2)
3)
* An item is deemed to have failed if any one of the standards is not met
Page 39
Appendix 2
Item*
1
1a
1b
General Requirements
(basis for assessment)
Link-Way / Shelter
Standards
1)
2)
3)
4)
5)
6)
7)
1)
2)
3)
4)
5)
1)
Drain
- Free flowing and no ponding of water
2)
Drain Cover
- level and do not warp or rock
- Gaps between drain covers and side of drain between 510mm wide
- Drain grating properly painted
3)
Apron 1
- Bitumen joints with neat edges and sufficient length
- No ponding
4)
5)
Inspection Chamber
- Inspection chambers are level with surrounding without
depression and with tolerance of 20mm for protrusion
- Covers to be level with frames
Page 40
Appendix 2
Item*
1c
1d
1e
Playground
Standards
1)
2)
Road Surface
- No ponding
- Road painting according to drawings; dimensional
tolerance of 5mm
- Gaps between aeration slabs properly filled up with sand
- Aeration slabs stable and not broken
3)
4)
Road Sign
- Provided according to specifications
- Firm and secured at base with footing if required
- Metal parts below ground are corrosion treated
5)
1)
2)
Turfing
- No depression or bald patches
- Turfing done evenly, no dead grass or weeds
3)
4)
5)
Other Fixtures
- as per Internal Finishes - Components
1)
2)
3)
4)
5)
Page 41
Appendix 2
Item*
1f
1g
1h
1i
Court
Swimming Pool
Club House
Standards
1)
2)
3)
4)
5)
1)
2)
3)
4)
5)
1)
2)
3)
4)
5)
1)
2)
3)
4)
5)
Page 42
Appendix 2
Item*
1j
1k
Guard House
Electrical Substation
Standards
1)
2)
3)
4)
5)
1)
2)
3)
4)
5)
* An item is deemed to have failed if any one of the standards is not met
Page 43
Appendix 2
Item*
Standards
Plastering
1)
1)
2)
: 300mm/hr
: 1 litre/min/m of joint
Wind Pressure
: 240 Pa
Nozzle inclination : 90o to window
1 sample = 2m length of joint
Spray duration : 10 mins
3
1)
2)
1)
1)
For the assessment of the field window water-tightness test, the number of points shall be
awarded based on the percentage of non-compliance as tabulated in the table below :
Points Awarded for
BCA Field Test (80%)
Percentage of non-compliance
0%
(15-x)* 8/15
(15-x)* 2/15
15%
Page 44
Appendix 2
For the assessment of the wet area water-tightness test, the number of points shall be awarded
based on the percentage of non-compliance as tabulated in the table below :
Percentage of non-compliance
0%
(2-x)* 4/2
(2-x)* 1/2
0% < x < 2%
2%
Note:
* An item is deemed to have failed if any one of the standards is not met.
Page 45
Appendix 3
Standards
Embedded Conduits
Installation
1)
2)
3)
4)
5)
Secured Properly
6)
Bent Properly
7)
Properly Supported
1)
Fire Stop
2)
Spacing of Cable
3)
1)
2)
3)
4)
5)
6)
No visible damage
Main Cables
No visible damage
Surface Conduits
Installation
Support
Page 46
Appendix 3
Item*
Standards
Fire Stop
7)
No Visible Damage
8)
1)
2)
3)
4)
5)
6)
1)
2)
3)
4)
5)
Support
Fire Stop
No visible damage
Distribution Board
Circuit Diagram
Cable Termination /
Earthing
No visible damage
* An item is deemed to have failed if any one of the standards is not met
Page 47
Appendix 3
Part 2 : ACMV Works
Standards
Item*
1
Ductwork
Location & Installation
1)
Paints
2)
Support
3)
1)
2)
3)
1)
Support
2)
Sufficient Radius
3)
1)
2)
No Visible Damage
Fire-Rated Ducts
Location & Installation
Access Panel
No Visible Damage
Flexible Ducts
No Visible Damage
Flexible Connectors
Location & Installation
Page 48
Appendix 3
Item*
Length Limit
Standards
3)
1)
2)
3)
1)
2)
3)
4)
1)
2)
3)
4)
5)
No Visible Damage
Dampers
Location & Installation
Access Door
No Visible Damage
Fire Dampers
Location & Installation
Access Door
No Visible Damage
Seal Penetration
Page 49
Appendix 3
Standards
Item*
No Leakage
6)
Temperature
1)
Air Flow
2)
Relative Humidity
3)
1)
2)
3)
4)
5)
6)
1)
2)
3)
4)
No Visible Damage
Air-Con Comfort
Support
No Visible Damage
10
Pump
Location & Installation
Page 50
Appendix 3
Item*
Electrical Termination
Standards
5)
Self-Earthing System
1)
2)
3)
No Visible Damage
4)
Pipework
including Chilled water, Hot
water, Steam, Condenser
water, Condenser drain,
Cold
Water make-up, water
treatment and refrigerant
1)
2)
Fire Stop
3)
No Visible Damage
4)
1)
2)
3)
4)
No Visible Damage
11
12
13
Cooling Tower
Chiller
Location & Installation
Page 51
Appendix 3
Item*
Pipe Support & Label
No Leakage
Standards
5)
6)
7)
No sigh of leakage
No Visible Damage
* An item is deemed to have failed if any one of the standards is not met
Page 52
Appendix 3
Part 3 : Fire Protection Works
Item*
1
Standards
1)
2)
3)
4)
Landing valve painted red for wet riser / yellow for dry riser
5)
6)
7)
8)
9)
1)
2)
3)
4)
Pipe Support
5)
Wall/Floor Penetration
6)
Wall/Floor Penetration
No Visible Damage
Sprinkler
Location & Installation
No Visible Damage
Page 53
Appendix 3
Item*
3
Standards
Fire Alarm
Location & Installation
1)
2)
3)
Paints
4)
5)
1)
2)
3)
3)
Paints
4)
No Visible Damage
5)
No visible damage
No Visible Damage
Hosereel
Location & Installation
* An item is deemed to have failed if any one of the standards is not met
Page 54
Appendix 3
Item*
1
Concealed Pipes
Location & Installation
Alignment
1)
2)
3)
Proper joints
4)
5)
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
No Visible Damage
Exposed Pipes
Location & Installation
Alignment
Clearance
Page 55
Appendix 3
Item*
No Visible Damage
13)
14)
No visible damage
1)
2)
3)
4)
5)
Netting
6)
Clearance
7)
No Visible Damage
8)
No visible damage
9)
1)
2)
3)
4)
Water Tank
Location & Installation
Standards
Electrical Termination
No Visible Damage
* An item is deemed to have failed if any one of the standards is not met
Page 56
Appendix 3
Part 5 : Basic M&E Fittings
Standards
Item*
1
General Requirements
2a
2b
1c
Pipes
Fittings
1)
2)
3)
4)
Functionality
Functional and safe
5)
Accessories Defects
No missing accessories
No visible damage / defects
1)
No damage or chokage
2)
3)
1)
2)
3)
No leakage at joints
4)
5)
6)
1)
2)
No leakage at joints
Page 57
Appendix 3
Item*
M&E Fittings
2a
Installation
Standards
3)
No chipping or cracks
4)
5)
6)
7)
8)
9)
10)
2)
No stains
3)
2b
Safety
1)
2c
Damages
1)
No visible damage
* An item is deemed to have failed if any one of the standards is not met
Page 58
Appendix 4
Defects Grouping
Defects Description
Floor
Wall
Finishing
Alignment & Evenness
Crack & Damages
Hollowness / Delamination
Jointing
Finishing
Alignment & Evenness
Crack & Damages
Roughness
Jointing
Ceiling
Door
Window
Component
M&E Fittings
Joints, Pointing
Page 59
Appendix 5
CAT B
CAT C
CAT D
Commercial, Industrial,
Institution & others
Private Housing,
Commercial, Institution,
Industrial & others
Public Housing
Landed Housing
of building without
Semi-Detached
Terrace House
Bungalow
Cluster Housing
e.g.
e.g.
Bank
Condominium
Office Building
Apartments
Shopping Complex
School
Hotel
Factory
Supermarket
Warehouse
Airport
Hospital
Mixed Development
University
Regional Library
Conference Hall
Arts and Cultural Centre
Mixed Development
with Central Cooling
Note: The above is only meant to be a general guide in determining the Category of project. The
actual grouping might vary depending on the project details in the application.
Page 60
Appendix 6
Points Allocated
Electrical
1. Embedded conduit
2. Main cables
3. Surface conduits
4. Cable tray, ladder & trunking
5. Distribution board
ACMV
1. Air handling unit
2. Pump
3. Cooling tower
4. Chiller
5. Pipework
6. Split unit / Window air conditioner
7. Air-con comfort
8. Ductwork
9. Fire-rated duct
10. Dampers
11. Fire Dampers
12. Flexible ducts
13. Flexible connectors
Fire Protection
1. Wet / Dry riser
2. Sprinkler
3. Fire Alarm
4. Hosereel
Plumbing & Sanitary
1. Concealed pipes
2. Exposed pipes
3. Water tank
4. Pump
2
1
2
2
4
2
1
1
1
1
3
2
4
1
2
1
3
1
2
2
1
2
2
5
1
1
Page 61