I. Background
Currently Telkomsel has many layer of spectrum/Technology, GSM and DCS as blanket coverage,
UMTS with F1+F2+F3 as data capacity enhancement, Micro and Pico as capacity and coverage
improvement and Femto UMTS as coverage enhancement and application enabler.
This multi technology & multi spectrum network owned by Telkomsel will raise the complexity to
manage and monitor the whole network manually.
Routine drive testing that impact to inefficiency in time & human resource should be minimized.
We need detailed L3 message of the device for detailed analyzed of our network performance. To
drive test all coverage, it is costly for implementation.
Necessary to quick handling for VIP complain. Requirement to analyze network performance per
spot area with the aim of solving the network problem correctly. Need automatic testing to get
the real experience of VIP coverage and this is costly to us
Requirement to analyze network performance per spot area with the aim of solving the network
problem correctly.
8. RNC_Cikupamas
9. RNC_Meruya
10. RNC_Meruya2
11. RNC_Simatupang1
12. RNC_Simatupang2
13. RNC_Simatupang3
14. RNC_Simatupang4
15. RNC_Simatupang5
16. RNC_Simatupang6
17. RNC_SimatupangMetro1
18. RNC_TTCBSD1
19. RNC_TTCBSD2
20. RNC_TTCBSD3
21. RNC_WismaMulia1
22. RNC_WismaMulia2
RNC list that cover Bandung are as follow :
1. RNC_SoekarnoHatta1
2. RNC_SoekarnoHatta3
3. RNC_Dago
4. RNC_Dago2
5. RNC_Dago3
6. RNC_Cianjur
7. RNC_KaryaMulya2
8. RNC_KaryaMulya
9. RNC_KarangPawitan
10. RNC_KaliJati
RNC list that cover Surabaya are as follow :
1. RNC_Anteve1
2. RNC_Gayungan1
3. RNC_Gayungan2
4. RNC_Gayungan3
5. RNC_Manyar1
6. RNC_TTCHRMuhammad1
The solution must be able to be integrated with other application via Northbound
Interface.
2
3. Professional Report:
Deliverable report list :
Analysis & Recommendation RF Report on grid map :
RSCP (per carrier, per service, per handset type top three, indoor,
outdoor)
Ec/No (per carrier, per service, per handset type top three, indoor,
outdoor)
Pilot Pollution (polluted & pollutant)
SHO Overhead
Analysis & Recommendation KPI & Performance Report on grid map :
Call failure (CS & PS)
Call drop (CS & PS)
Handover attempt and handover failure analysis (intra frequency, inter
frequency, inter RAT)
Throughput (per service, per carrier, per user density, per hand set type)
Roamer analysis
Analysis & Recommendation Traffic & User Profile Report on grid map :
Traffic & payload per service
Unique subscriber density
Handset distribution
Analysis & Recommendation Hotspot & PoI on grid map :
Top 50 highest payload (Jabotabek)
Top 20 highest payload (Bandung)
Top 20 highest payload (Surabaya)
How to report :
Data source & Access :
The solution must be able to store raw data at least for 7 days
The solution must be able to show layer 3 message for analysis
The solution must be able to record all call trace data from NE
Telkomsel has full access to the system
Report time delivery :
Scheduled report (weekly) for 6 months
B. Time line