Professional Documents
Culture Documents
Step by step
1. Go to T-code SPRO
2. Open path: Materials Management Inventory Management and Physical
Inventory number assignment Define Number Assignment for Article
and Phys. Inv.Docs
3. Add interval in Article document in KEP production (no need to transport from
KED)