You are on page 1of 19

PREDIMENCIONAMIENTO DE COLUMNAS.

1) DATOS PARA PREDIMENCIONAMIENTO DE COLUMNAS:


CONCRETO ARMADO
f'c = 210 kg/cm2
fy = 4200 kg/cm2
r = 2400 kg/m3

(Resistencia del concreto)


(Limite de fluencia del acero)
(Densidad de concreto)

2) METRADO DE CARGAS:
P. Aligerado =
P. Acabado =
P. Tabiqueria =
P. Viga
=
P. Columnas =
S/C
=
TOTAL

350.00 kg/m2
120.00 kg/m2
120.00 kg/m2
100.00 kg/m2
60.00 kg/m2
350.00 kg/m2
=

###

Numero de pisos =

Pg = Carga muerta + Carga viva = ###


Criterio de dimencionamiento en columnas
Pg = 1100 * ( 3 - N ) * Area Tributaria
COLUMNA C1 (Columna Central)
Area Tributaria = 43.20 m2

bd=

1. 1Pg
f ' c0. 30

Piso
N

Pg
(kg)

1
2
3
4
5
6

95040
47520
0
0
0
0

b*d = t2
(mt2)
1659.43
829.71
0.00
0.00
0.00
0.00

b=d=t
(cm)
40.74
28.80
0.00
0.00
0.00
0.00
(0.45 x 0.45) m.

C1

###

COLUMNA C2 (Columna Lateral)

(0.30 x ### m.

0.70)

Area Tributaria = 23.40 m2

bd=
Piso
N
1
2
3
4
5
6

1. 25Pg
f ' c0. 25
Pg
(kg)
51480
25740
0
0
0
0

b*d = t2
(mt2)
1225.71
612.86
0.00
0.00
0.00
0.00

b=d=t
(cm)
35.01
24.76
0.00
0.00
0.00
0.00

(0.40 x 0.40) m.

C2

(0.35 x ### m.

###

COLUMNA C3 (Columna en esquina)


Area Tributaria = 12.29 m2

bd=
Piso
N
1
2
3
4
5
6

1. 50Pg
f ' c0. 20
Pg
(kg)
27027
13514
0
0
0
0

b*d = t2
(mt2)
965.25
482.63
0.00
0.00
0.00
0.00

b=d=t
(cm)
31.07
21.97
0.00
0.00
0.00
0.00

(0.35 x 0.35) m.

C3

###

(0.35 x ### m.

h ladrillo
12 cm
15 cm
20 cm
25 cm

2100

1659.43

h de losa
17 cm
20 cm
25 cm
30 cm

Peso
280 kg/m2
300 kg/m2
350 kg/m2
420 kg/m2

PREDIMENCIONAMIENTO DE COLUMNAS.
1) DATOS PARA PREDIMENCIONAMIENTO DE COLUMNAS:
CONCRETO ARMADO
f'c = 210 kg/cm2
fy = 4200 kg/cm2
r = 2400 kg/m3

(Resistencia del concreto)


(Limite de fluencia del acero)
(Densidad de concreto)

2) METRADO DE CARGAS:
P. Aligerado =
P. Acabado =
P. Tabiqueria =
P. Viga
=
P. Columnas =
S/C
=
TOTAL

300.00 kg/m2
120.00 kg/m2
120.00 kg/m2
100.00 kg/m2
60.00 kg/m2
200.00 kg/m2
=

###

Numero de pisos =

Pg = Carga muerta + Carga viva = 900.00 kg/m2


Criterio de dimencionamiento en columnas
Pg = 900 * ( 4 - N ) * Area Tributaria
COLUMNA C1 (Columna Central)
Area Tributaria = 34.20 m2

bd=

1. 1Pg
f ' c0. 30

Piso
N

Pg
(kg)

1
2
3
4
5
6

92340
61560
30780
0
0
0

b*d = t2
(mt2)
1612.29
1074.86
537.43
0.00
0.00
0.00

b=d=t
(cm)
40.15
32.79
23.18
0.00
0.00
0.00
(0.45 x 0.45) m.

C1

###

COLUMNA C2 (Columna Lateral)


Area Tributaria = 23.40 m2

bd=

1. 25Pg
f ' c0. 25

(0.35 x ### m.

0.60)

bd=
Piso
N
1
2
3
4
5
6

1. 25Pg
f ' c0. 25
Pg
(kg)
63180
42120
21060
0
0
0

b*d = t2
(mt2)
1504.29
1002.86
501.43
0.00
0.00
0.00

b=d=t
(cm)
38.79
31.67
22.39
0.00
0.00
0.00

(0.40 x 0.40) m.

C2

(0.35 x ### m.

###

COLUMNA C3 (Columna en esquina)


Area Tributaria = 12.29 m2

bd=
Piso
N
1
2
3
4
5
6

1. 50Pg
f ' c0. 20
Pg
(kg)
33170
22113
11057
0
0
0

b*d = t2
(mt2)
1184.63
789.75
394.88
0.00
0.00
0.00

b=d=t
(cm)
34.42
28.10
19.87
0.00
0.00
0.00

(0.35 x 0.35) m.

C3

###

(0.35 x ### m.

h ladrillo
12 cm
15 cm
20 cm
25 cm

2100

1612.29

h de losa
17 cm
20 cm
25 cm
30 cm

Peso
280 kg/m2
300 kg/m2
350 kg/m2
420 kg/m2

CUANTIA MINIMA Y MAXIMA EN VIGA

CONCRETO ARMADO
f'c = 210 kg/cm2
fy = 4200 kg/cm2
2400 kg/m3

(Resistencia del concreto)


(Limite de fluencia del acero)
(Densidad de concreto)

DIMENSION DE VIGA
Se sabe que:
b = 0.30mt
h = 0.50mt

d = 0.44 m

Verificacin de Acero Minimo

A s min=

14
.b.d
fy

Segun Reglamento ACI

Asmin =

4.44 cm2

Verificacin de acero maximo


C = 3/8 x dt =
a =

1 . C =

DIAM.
PULG.
mm.
1/4"
6.35
3/8"
9.53
1/2"
12.70
5/8"
15.88
3/4"
19.05
1"
25.40
1 1/4"
31.75

16.65 cm
0.85 x 16.65 = 14.15 cm

0. 85 .f c .. a. b
As max =
fy

Segun Reglamento ACI

Asmax =

0
0
3
0

1/2"
5/8"
3/4"
1"

18.04 cm2

0.635714286

AREA
(cm2)
0.32
0.71
1.27
1.98
2.85
5.07
7.92

0.00
0.00
8.55
0.00

8.55 cm2

OK!

CUANTIA MINIMA Y MAXIMA EN COLUMNA


1) DATOS PARA OBTENER LOS MOMENTOS Y CORTANTES MAXIMOS:
CONCRETO ARMADO
f'c = 210 kg/cm2
fy = 4200 kg/cm2
2400 kg/m3

(Resistencia del concreto)


(Limite de fluencia del acero)
(Densidad de concreto)

DIMENSION DE COLUMNA
Se sabe que:
b = 0.25mt
h = 0.50mt

d = 0.44 m

Verificacin de Acero Minimo

A s min .=0 . 01 . b . d

Segun Reglamento ACI

Asmin =

12.50 cm2

Verificacin de acero maximo

A s max=0 . 08. b . d

Segun Reglamento ACI

A s max=0 . 04 . b . d

Recomendable

Recomendable

Asmax =

50.00 cm2

DIAM.
PULG.
mm.
1/4"
6.35
3/8"
9.53
1/2"
12.70
5/8"
15.88
3/4"
19.05
1"
25.40
1 1/4"
31.75

0
4
0
4

1/2"
5/8"
3/4"
1"
27

NA

AREA
(cm2)
0.32
0.71
1.27
1.98
2.85
5.07
7.92

0.00
7.92
0.00
20.27

28.19 cm2

OK!

PREDIMENCIONAMIENTO DE VIGAS;
USO:
S/C:

HOTEL
###

VIGAS PRINCIPALES:

h=

Ln
#REF!

V-101,V105

h=

9.60
11

0.87

b=

3.15
20

0.16

Cambio de dimenciones:sib

o=

###
3

bh =b oh

ho =
USAR VIGA DE:

0.67 m

ho =

V-102,V103,V104

h=

9.60
11

0.87

b=

6.40
20

0.32

Cambio de dimenciones:sib

ho =

o=

###

0.85 m

ho =

0.35 * 0.85

VIGAS SECUNDARIAS: V-106,V107,V108


h=

6.40
11

0.58

b=

3.15
20

0.16

USAR VIGA DE:=

0.70 m

0.35 * 0.70

VIGAS PRINCIPALES:

USAR VIGA DE:

o3

ho =

* 0.60

0.85 m

b=

B
20

PREDIMENCIONAMIENTO DE COLUMNAS.
1) DATOS PARA PREDIMENCIONAMIENTO DE COLUMNAS:
CONCRETO ARMADO
f'c = 210 kg/cm2
fy = 4200 kg/cm2
r = 2400 kg/m3

(Resistencia del concreto)


(Limite de fluencia del acero)
(Densidad de concreto)

2) METRADO DE CARGAS:
P. Aligerado =
P. Acabado =
P. Tabiqueria =
P. Viga
=
P. Columnas =
S/C
=
TOTAL

350.00 kg/m2
120.00 kg/m2
120.00 kg/m2
100.00 kg/m2
60.00 kg/m2
350.00 kg/m2
=

###

Numero de pisos =

Pg = Carga muerta + Carga viva =

###

Criterio de dimencionamiento en columnas


Pg = 1100 * ( 6 - N ) * Area Tributaria
COLUMNA C1 (Columna Central)
Area Tributaria = 26.10 m2

bd=

1. 1Pg
f ' c0. 30

Piso
N

Pg
(kg)

1
2
3
4
5
6

143550
114840
86130
57420
28710
0

b*d = t2
(mt2)
2506.43
2005.14
1503.86
1002.57
501.29
0.00

b=d=t
(cm)
50.06
44.78
38.78
31.66
22.39
0.00
(0.55 x 0.55) m.

C1

Para el 1 al 5 nivel usar columna de:

(0.30 x ### m.

0.50)

COLUMNA C2 (Columna Lateral)


Area Tributaria = 23.40 m2

bd=
Piso
N
1
2
3
4
5
6

1. 25Pg
f ' c0. 25
Pg
(kg)
128700
102960
77220
51480
25740
0

b*d = t2
(mt2)
3064.29
2451.43
1838.57
1225.71
612.86
0.00

b=d=t
(cm)
55.36
49.51
42.88
35.01
24.76
0.00

(0.60 x 0.60) m.

C2

(0.35 x ### m.

###

COLUMNA C3 (Columna en esquina)


Area Tributaria = 12.29 m2

bd=
Piso
N
1
2
3
4
5
6

1. 50Pg
f ' c0. 20
Pg
(kg)
67568
54054
40541
27027
13514
0

b*d = t2
(mt2)
2413.13
1930.50
1447.88
965.25
482.63
0.00

b=d=t
(cm)
49.12
43.94
38.05
31.07
21.97
0.00

(0.50 x 0.50) m.

C3

###

(0.35 x ### m.

h ladrillo
12 cm
15 cm
20 cm
25 cm

1500

2506.43

h de losa
17 cm
20 cm
25 cm
30 cm

Peso
280 kg/m2
300 kg/m2
350 kg/m2
420 kg/m2

PREDIMENCIONAMIENTO DE ZAPATA.

METRADO DE CARGAS:
P. Aligerado =
P. Acabado =
P. Tabiqueria =
P. Viga
=
P. Columnas =
S/C
=
TOTAL

300.00 kg/m2
120.00 kg/m2
120.00 kg/m2
100.00 kg/m2
60.00 kg/m2
200.00 kg/m2
=

900.00 kg/m2

Numero de pisos = 05
Pg = Carga muerta + Carga viva =
Area Tributaria =

10.90 m2
Ps =

0.90 Tn/m2
(max.)

9.18 m2

49.05 Tn
1.98 kg/cm2

19.80 Tn/m2

DIMENCIONAMIENTO DE ZAPATA

Az=(1.05Pserv.)/0.
9

Az = 2.89 m2 = T x T
T = 1.70 m
Usar:

T =

1.80 m

CALCULO DE CUANTIA MINIMA EN ZAPATA

Asminimo = 0.0018.b.d =
Asminimo = 0.0018.d
=
5/8''

9.90 cm
@ 0.20 m

( Para un b=1.00m )

h = 0.60 m

h ladrillo h de losa
12 cm
17 cm
15 cm
20 cm
20 cm
25 cm
25 cm
30 cm

Peso
280 kg/m2
300 kg/m2
350 kg/m2
420 kg/m2

(min.)

r = 0.050 m
d = 0.55 m

(recubrimiento)