For Question 3 : Data file

For Question 3 : Mod file

For Question 4

For Question 5

It can be summarized that the maximum profit came when the profit per ton of coil
was $36. So now, first the maximum limit of coils(i.e. of 4000) will be reached and
then in the remaining time bands will be produced in order to attain max profit.
Before this scenario, when profit of coil per ton was $30, it is suggested to make
the bands upto the limit i.e. 6000, and then start making coils in the remaining
time in order to get the maximum profit.

For Question 6

For Question 7

For Question 8 : A

For Question 8 : B

For Question 8 : C

For Question 8 : D
In order to schedule an overtime shift, there are two things which has to be taken
into account. Firstly which can be seen from the A, B and C part of this question,
that the maximum profit will occur when additional hours for rolls are available.
So additional hours(overtime shift) should be spent on rolls only. Secondly, the
total profit should always be greater than the cost of the overtime shifts. Keeping
these two things into consideration, one may use this for a maximum benefit.