Module 2
Content
Module 1
Getting started
Configuring Actix
Learning Actix
Module 3
Practical exercises /
Module 2
Working with Actix in
practice
Module 4
Advanced features
Site Verification
Cluster verification
Network verifiaction
Pre-Launch Optimization
Pre-Launch Optimization is done when Network is built
and integrated, but there is no commercial traffic in it
In GSM coverage is an issue. In UMTS interferance is
critical
Realiability of equipement migh not be as good as in
GSM
Standard process
SITE
VERIFICATION
CLUSTER
VERIFICATION
NETWORK
VERIFICATION
Global settings
Actix MainUser is in charge of defining:
Thresholds for map plots
Templates for measurement report forms
Many people in different regions using the same tool.
Process is needed
Dominance plot
Ec/Io plot (interferance should be very low if only one site is on air)
Tracer
Ec/Io plot
UE TX power
10
Dominance plot
Ec/Io plot (this should not be worse than -9 if there is no traffic in the NW
Tracer
11
Ec/Io plot
UE TX power
12
Network Verification
Final stage
Problem should be fixed in the
two previous stages
Many measurement routes
which can be combined by
superstreaming
13