You are on page 1of 3

COMPUTATION OF LOADS

Roof: Corr. G.I. Sheet #26 = 0.043 KN/m3


Purlins: 4 Deep Channel @ 0.4m O.C. = 10.79 kg/m
Ceiling: Marine Plywood attached to 2x2 studs spaced @ 0.4 O.C both
ways = 5.7 KN/m3
Roof Live Load: 1.9 KPa
Bay length: 4.0m
LIVE LOAD
=1.9 ( 4 ) =7.6 kN /m
=7.6 ( 1.5 )=11.4 kN

F1=7.6 (1.5 )=11.4 kN


F 1 11.4
=
=5.7 kN
2
2

ROOF SLOPE
tan =

3
4.5

=33.69

TOP CHORD LENGTH


x= 4.52 +32 =5.408 m
mT =

5.408
=1.803 m
3

WEIGHT OF GI SHEET
F1=1.803 ( 4 ) ( 0.043 )=0.31kN

WEIGHT OF PURLINS
W =10.79 kg/m ( 9.81m/ s2 ) =105.85 N

no . of purlins=

F1=105.85

5.408
=13.5 13
0.4

1
1
( 1000
)( 4) ( 13) ( 5.408
) ( 1.803)=1.835 kN

WEIGHT OF CEILING
plywood :1/4 =0.00635 m
P=0.00635 ( 9 )( 4 ) ( 0.4713 )=0.108 kN
studs=2 ( 2 )=4 2=0.00258 m 2
5 ( 12 )=60

P=

lbs 0.571 kN /m
=9.426 kN /m3
3
3
ft
1lb / ft

9
9
(4 )+
( 4 ) ( 0.0258 )( 9.426 )=4.377 kN
0.4
0.4

F1= ( 0.108+4.377 )

( 19 ) (1.5 )=0.7475 kN

WEIGHT OF TRUSS
3
L
W = aL 1+
; a=4 m=13.12; L=9 m=29.53
4
10

3
29.53
0.4536 kg
W = ( 13.12 ) ( 29.53 ) 1+
=1148.64 lbs
4
10
1 lb

W =521.07 kg ( 9.81 m/s 2) =5.11 kN

F 1=

( 1.5 )=0.85 kN
( 5.11
9 )

DEAD LOAD
@ TOP CHORD
DLT =0.31+1.835=2.145 kN
DL T 2.145
=
=1.073 kN
2
2
@ BOTTOM CHORD

DL B=0.7475+0.85=1.596 kN
DL B 1.596
=
=0.798 kN
2
2

WIND LOAD
p=q h G C N (section 207.5 .13 .2 of NSCP 2010)
Where:
q h=0.0000473 ( 2502 )=2.95 kPa(table 2071of NSCP 2010)
G=0.85 ( section 207.5.8 .2 of NSCP 2010 )

Load case A (Figure 207-18b of NSCP 2010)


C NW =1.3( windward)
C NL=0.3 ( leeward )

pW =2.95 ( 0.85 )( 1.3 )=3.26 kPa(windward )


pN =2.95 ( 0.85 ) ( 0.3 )=0.75 kPa(leeward)

WLW =3.26 (1.803 )( 4 )=23.51kN ( windward )


WL W 23.51
=
=11.755 kN
2
2
WL N =0.75 ( 1.803 ) ( 4 )=5.41 kN (leeward )
WL W 5.41
=
=2.705 kN
2
2

You might also like