Standard Form Number:
Revised on: May 24, 2004
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Negros Occidental 4" District Engineering Office
BagoCity, Negros Occidental
Notice of Award
July 15, 2013,
FOUR SG ENTERPRISES
Bray.Taloc, Bago City, Neg. Oce
Fax Number ~ 732-4804
Dear Sir,
We are happy to notify you that your submitted Bid dated July 2, 2013 of Procurement of
Various Materials for the Repair/Rehal ‘ion_of Multi Building at
ntral T: lladolid, Phase I, V: lid, Ne; idental- for
the Contract Price of equivalent to FOUR HI TI
HUNDRED SEVENTY FOUR PESOS AND 80/100 (P 495,474.80) is hereby accepted.
You are hereby required to provide within ten (10) days the performance security in the form
and the amount stipulated in the Instructions to Bidders. Failure to provide the performance
security shall constitute sufficient ground for cancellation of the award and forfeiture of the bid
security.
Very truly yours,
Conforme: \
RICARDO C. GUEVARRA
FOUR SG ENTERPRISES
Date:_oey 16 2043bp TH1NEG.00C ENGINEERIN STRICT S
BAGO CITY, NEG. OCC.
. EN
‘Standard Form Number: SF-G¢
Revised on: May 24, 2004
‘Standard Form Title:
RECEIVED
PURCHASE ORDER MATE 2b 3
‘DPWH, 4TH NEG. OCC, ENGINEERING DISTRICT W—__4—
BAGO CITY, NEG. OCC,
me mp. pep Ald CAB
|Supplier ENTERPRISES P.O. No. ? Boe
address Pago Gi: Negros Ossdental Date : Boe
E-Mail Address 2 Mode of
| Telephone No. 72 Procurement : Public Biddin
lr 168-278-492 Public Bidding _
Contino
Please furnish this office the following articles subject to the te
[Place of Delivery DPWH, Neg, Oce. 4th Dist. Engineering Office, Bago City ‘Delivery Term. “within ten (30) C.D.
‘after supplier's.
HDECOMPOUND JOBSITE xsotion acceptance of po:
[Date of Delivery: 2 Payment Term
lPurpose 7: rt ae Materials forthe Repair/Rehabilitation
of Multi-Purpose Building @ Central Tabao, Valladolid,
Phase 1, Valladolid, Neg. Occ. (19600336)
IPRNNO. DATED,
stockNo.|_ UNIT DESCRIPTION ony. unrrcosr,
1.5¢4.| ft. _|Tarpaulin’ 32.00_|P 50.00 | P
2547| bf [Brace (Lumber) "37.00 "55.00
3197 | pe. [Marine Plywood 1/4 «4x8 1.00 400.00.
“4 [2T| tgs. [Common Wire Nails 2.00 00
5.542 | kgs. [50mm x 50mm x 6.25mm angle bar 1,312.66 "55.00
6577 | kgs. [25mm x 25mm x 6/25mm angle bar, 079.32 5.00
Geo |_kgs. [20mm dia x 6.0m DSB web member [i786 50.00
$ (o2.| kgs. |1omm dia x 6.0m DSB web member 610.50 — 50.00
060) | kgs. [10mm dia. X 6.0m sag rod 92.50 50.00
1003 | _kgs. |12mm dia x 6.0m DSB Sway Brace 79.92. 50.00
“1604| pes. 12mm dia. Turn Buckle 8.00 50.00,
12, pes. [o.30m x 0.55m x 12mm thk. Base Plate 6.00
3 06 [ pes. asm diax200mm Machine Bolt w/ nut 8 vase 736.00 seeoo |
14249 | __kls.__ [Welding Rod_ 22.00 100.00
15981] gals. [Red Lead paint 12.00 "570.00
16204 gals. [Paint Thinner 23.00, 270.00
x7S@i]” tank |Aeytviene 2.00 ‘960.00 | ~
38.¢1| tank [Oxygen 4.00 720.00
19171] kgs. [16mm dia. X 6m. 28.42 "50.00
20 [73] kes. _|iomm dia x 6m 33:30 50.00 |
2124 | kgs. —[ox6 Te Wire 0.82 "70.00
22 If oes ond ‘Cement 00, 235.00
LG[ cum [Sand 035 aaa
P
Tn case failure to make the full delivery within the time specified above, a penalty of one-tenth (1/10) of
lone (1) percent for every day of delay shall be imposed.
‘Very truly yours,
oig-
“ALOBS No. TRIOS OF COOS TEDPWH, 4THNEG. OCC. ENGINEERIN {STRICT
BAGO CITY, NEG. OCC.
EN
‘Standard Form Number: SF-Gt
Revised on: May 24, 2004
Standard Form Title:
PURCHASE ORDER
‘DPWH, 4TH NEG, OCC, ENGINEERING DISTRIET
‘BAGO CITY, NEG. OCC.
ach. 2nn- oC mh dtd tbls
supplier FOUR 9G ENTERPRISES P.0. Ko. 2 1-6
| Address + Bago City, Negros Occidental Date} > pr we2
| E-Mail Address Mode of
Ee mt ai
lnm 168-278-402
Gentlemen:
Please furnish this office the following articles subject to the te
20f2
herein: page:
lace of Delivery > DPWH, Neg. Ocz 4th Dist. Engineering Office, Bago City Delery Term within ten (30) GD.
after: Ss
1HDE COMPOUND JOBSITE xStation “acceptance of po.
Datcofvetvers = ayalia-el lia Payspent Term
Purpose f ‘Various Materials forthe Repair/Rehabilitation
of Multi Bi Central Tabao, Valladolid,
of ee fd, Neg. Oe Gaon igGooggG)
IPRNO. DATED
[STOCKNO,|_UNTT DESCRIPTION ory ‘cost AMOUNT
24 G07| cum [Screened Gravel 0.30 |P 1,360.00 | P 408.00,
7 bf [Coco Lumber 40.00 25.00 3,000.00
26 [2)| kgs. Asst. CWN 1.00 80.00 80.00
27 [ib | pe. _|1/4" x4’ x8 Ordinary Plywood 3.00) 3370.00 370.00
28 (62 | sq.m_|o.4omm thk G.I Corr. RFG Sheets x 3.0m 12150) 430.00 245.00
29604] _sq.m_|o.4omm thk G.I Corr. RFG Sheets x 2.70m 218.70 1430.00 94,041.00
(0 G{0| 1m |o.4omm thk Shop bended False Gutter 50.40 390.00, 9:576.00
31G/[ | Lm [0.4 mm thk Shop bended Ridge Roll 16.80 190.00, '3:192.00
S[i|__pes._|Teckscrew [1,742.00 00 ~ 5,226.00
‘pes. [Blind Rivets 440.00 2.00 880.00
sat ‘grt. |Valea Seal 1.00 350.00 150.00
.m [1/2 thk Roof Insulation 1, Slide Alum. Foil 230.40, 195.00 23,888.00
36 ra ‘Kgs. _[#a6Te Wire 12.00 70.00 840.00
37324] gals. [Roof Paint 21.00 690.00 14,490.00
38 | gals. [Steel Trusses Paint [1.00 570.00) 6,270.00
fromerxsecxex fF | 210,656.00
“Total of page 1_P 248,818.80 :
“2 210,656.00
+ [ L
[FOUR HUNDRED NINETY FIVE THOUSAND FOUR HUNDRED SEVENTY FOUR PESOS AND,
Tn ease of failure to make the full delivery within the time specified above, a penalty of
lone (1) percent for every day of delay shall be imposed.
T AUS No.
Toi@Os -04- 0008