Bushing Failure
Tony McGrail
Doble Engineering Company
Configuration
D-Y
Coolant
Mineral Oil
KV
43.8kV 12.47/7.2kV
VA
15/20/25 MVA
Manufacturer
Kulmann
Situation (Continued)
H3 Bushing
Test Procedure
B phase shift
Test Procedure
Inverse resonant
Conclusion
SFRA traces show inconsistencies which indicate
possible winding damage.
Excitation current test may also indicate this
problem.
A follow up Leakage Reactance test may verify
this winding damage.