Professional Documents
Culture Documents
pkn
Name of work :1
2.50
3.00
3000
mm
1.20
mtr
1200
mm
Risers
0.15
mtr
150
mm
Treads
0.25
mtr
250
mm
Conrete
M-
20
cbc
fy
5.00
wt. of concrete
25000
13.33
415
st
230
N/mm2
Effective cover
30
mm
N/mm2
N/m3
Steel
Nominal cover
25
Reinforcement
Main Bottom slab
10
mmbars
100
mmbars
Strirrups
mmbars
270
10 mm 200
mm c/c
2050
1750
1200
150
1.20
250
1200
10 mm 100 mm c/c
3.00
150
8 mm 270 mm c/c
250
1.80
10 mm 200 mm c/c
180
mm
1050
1050
pk_nandwana@yahoo.co.in
2.75
1200
mm c/c
Nos.
mm c/c
2.50
3.00
1.20
0.15
0.25
M- 20
cbc
7
fy- 415
25
x
m
m
m
m
5.00
1200
150
250
wt. of concrete
m
st
Effective cover
N/mm2
mm
mm
mm
mm
25000 N/mm2
13.33
230 N/mm2
30
mm
=
=
=
=
=
=
1.50
12
11
2.75
1.20
1.05
m minimum 1.8
No. in 1st flight.
No. in 1st flight.
m
m
m
=
=
=
=
8
No. in 2nd flight.
7
No. in 2nd flight.
1.75 m
m
m which is heigher
0.289
0.5
0.904
0.904
x 0.289 =
0.913
3 Loading Each Flight :The landing slab is assume to span in the same direction as stair, and is considered
as acting together to form a single slab. Let the bearing of landing slab in wall be
= 160 mm
The effective span =
2.75 +
1.20 +(
0.16 /
5.00 x
0.2
x
40
1
1
2
R2+T2
T
150
1000
)'= 4.03 m
5000
###
say
25000
150
+ 250
250
2
4.00
=
=
200
5000
mm
N/m2
5831
N/m2
1875
N/m
= 7706
N
= 100
N
= 2500
N
Total weight
= 10306
N
Note. The load w on the landing portion will be 10306 - N, 1875
since weight
=
8431
of step will not come on it. However,
a uniform value of w has been adopted here.
pk_nandwan@yahoo.co.in
150
BM x 100
st x j x D
Ast =
using
### mmbars
Nomber of Bars
Spacing
Hence used
=
10
=
Distribution steel
using
Hence used
=
8
20612000
0.904 x
3.14xdia2
=
4 x100
x 1.20
230 x
A
660
78.50
1200 /
11
mm bars
0.12
8 mmbars
Spacing
wl2
10306 x 4.00 2
=
8
8
20612000
=
=
0.913 x 1000
Rxb
2x cover = 25
=
150 x
100
3.14xdia2
A
=
4 x100
50
x 1000
180.31
mm bars
=
150
150
mm
175
mm
659.91
mm2
3.14 x
4
11
10
x
= 20612
N-m
say =
180
x 10
100
79
x 8
100
50
No
=
109 mm c/c
100 mm c/c
1000
=
=
=
180
3.14 x
4
279
270 mm c/c
mm2
8
x
mm c/c
pk_nandwana@yaho.co.in
ich is heigher
s considered
e on it. However,
mm
mm2
mm2
2.50
1.20
UP
5.00
2.75
1.05
1.20
11
10
8 mm c/c
270
9
8
7
### mm c/c
###
6
250
5
150
4
3
2
1
Foor level
1.20
2.75
1.05
2050
1750
1200
150
1.20
250
1200
10 mm 100 mm c/c
3.00
0
8 mm 270 mm c/c
0
180
mm
1.80
1050
1050
pk_nandwana@yahoo.co.in
2.75
1200
M-15
18.67
M-20
13.33
M-25
10.98
M-30
9.33
M-35
8.11
M-40
7.18
cbc N/mm2
m cbc
8.5
10
11.5
13
93.33
93.33
93.33
93.33
93.33
93.33
kc
0.4
0.4
0.4
0.4
0.4
0.4
jc
0.867
0.867
0.867
0.867
0.867
0.867
Rc
0.867
1.214
1.474
1.734
1.994
2.254
Pc (%)
0.714
1.214
1.429
1.643
1.857
Grade of
concrete
kc
0.329
0.329
0.329
0.329
0.329
0.329
M 15
(a) st =
140
N/mm2
(Fe 250)
(b) st =
190
N/mm2
(c ) st =
230
N/mm2
(Fe 415)
(d) st =
275
N/mm2
(Fe 500)
Grade of concrete
bd (N / mm2)
jc
0.89
0.89
0.89
0.89
0.89
0.89
M 20
Rc
0.732
1.025
1.244
1.464
1.684
1.903
M 25
Pc (%)
0.433
0.606
0.736
0.866
0.997
1.127
M 30
kc
0.289
0.289
0.289
0.289
0.289
0.289
M 35
jc
0.904
0.904
0.904
0.904
0.904
0.904
M 40
Rc
0.653
0.914
1.11
1.306
1.502
1.698
M 45
Pc (%)
0.314
0.44
0.534
0.628
0.722
0.816
M 50
kc
0.253
0.253
0.253
0.253
0.253
0.253
jc
0.916
0.916
0.916
0.914
0.916
0.916
Rc
0.579
0.811
0.985
1.159
1.332
1.506
Pc (%)
0.23
0.322
0.391
0.46
0.53
0.599
M-15
0.18
0.22
0.29
0.34
0.37
0.40
0.42
0.44
0.44
0.44
0.44
0.44
0.44
tv N/mm2
M-35
0.2
0.23
0.31
0.37
0.42
0.45
0.49
0.52
0.54
0.56
0.58
0.60
0.62
M-40
0.2
0.23
0.32
0.38
0.42
0.46
0.49
0.52
0.55
0.57
0.60
0.62
0.63
c.max
M-15
1.6
M-20
1.8
M-25
1.9
M-30
2.2
M-35
2.3
M-40
2.5
Grade of
concrete
M
M
M
M
M
M
M
M
M
10
15
20
25
30
35
40
45
50
M-15
0.6
M-20
0.8
M-25
0.9
M-30
1
M-35
1.1
M-40
1.2
M-45
1.3
H.Y.S.D. Bars
bd (N / mm2)
kd = Ld
bd (N / mm2)
kd = Ld
0.6
58
0.96
60
0.8
44
1.28
45
0.9
39
1.44
40
35
1.6
36
1.1
32
1.76
33
1.2
29
1.92
30
1.3
27
2.08
28
1.4
25
2.24
26
M-50
1.4