MULTIPLE CHOICE QUESTIONS

Subject- Basic Civil and Environmental Engineering


Unit-I Introduction to Civil Engineering
ans
we
r

Sr
No.

Question

Catchment area survey is done


for

construction of
Road

Construction
of DAM

Construction of
Railway

water shed Ridge line separates

Two Basins

Two River

Two Dam's

None of
above
None of
above

concrete

Earth/Soil

Sand

Stone

concrete

Soil/Earth

Sand

Stone

construction of
road
To pass
overflow water
in DAM
generation of
power

Expressway

None of
above

all the above

3
4

Gravity DAM constructed with


the help of
Earthen DAM are constructed
with the help of

Stone pitching are provided on

Up stream of
DAM

Down stream
of DAM

Spillway are used to

Stop excess
water in DAM

To guide water
flow in canal

7
8
9
10
11
12
13
14

Multipurpose reservoir are


constructed for
In earthen DAM core are
constructed with help of
Runoff are calculated with the
help of
Gangapur dam is
In arch DAM stability can be
obtain by
Hydraulic design is done for
Preparation of layout of open
plot it a role of civil engineer in
construction of

Irrigation/Wate To avoid flood


r supply
on D/s
concrete

sand

River flow

Avg. Rainfall

Earthen DAM

Gravity DAM

Arch action

gravity action

DAMS

K. T. weir

Roads

flyovers

Black cotton
soil
HydroAnnual Rainfall
graph
None of
Arch DAM
above
Both arch and
None of
gravity action
above
Reservoirs
all the above
stone

B
A

D
D
A
C
D

Building

all

A and B

None of
above

the before
after the
Building planning and estimation
construction of construction of
and designing is done
Building
building