You are on page 1of 9
fornew systems Part B: Grid operator questionnaires Data questionnaire for grid operators of new systems ee Certification) of a generating system Pat ° Overview TOS, Aner Part A: BDEW Medium voltage Guideline 2008 (VG 208), questionaire Ft Part B: Data questionnaire for grid operators (TG 8, Arnex , Part B) Name of generating Registration number of grid operator Name of rd connection point Project data: See Checklist TG 8, Annex C, Part A (F1) Document supplied ‘Dloocument not supplied ‘Oiher Remar THis QUeSRONTTS I a0 1 DE USER Tor FSNSONGI SPE (COMMISSIONS BEMEEN (1 January 2000 anc 31 March 2011). Exper reposts are permitted unti 20 September 2011 reprosucion. cr seize processes only wit wenen permision of the publisher. Data questionnaire for grid operators of new systems 168, Annex C, Par] Certification of a generating system 8 20 1. The setting values ofthe protective devices atthe grid connection point Bass: MUG 2108 anaervon cucees 1.1 Short-cireuit protection devices (ates sriebe) ibistance protection: ype Pressed seipsniaes Serre Cates ‘New (seein ST Oeerrent exclaim) = > TST YTS eee erotaton ve Zero phase [> extiton [aa Tine overcurrent protection: pe ‘Seng parareier ———— c= _ Caacaa ‘New (point a a Darth fault protection: pe ‘Seting parameter Prescrbed setpont valves 0 aaa ial ‘New (setpoint) pesca or = Sheoenret > OD sae = os we Remarts we ‘Mote; for all physical variables. PRIMARY VALUES are to be incioated (eg P> 360 A ‘athe than D> 12: UCG AV rater han U se meter = Zion nn aan — 200s Toerotage ste oe TSU te tims aan Darekar os: Toe seoon age © ms ‘ier remarks (Note: for all physieal varables. PRIMARY VALUES are to be inciested (=p D> 350A ‘atherthan D> 12: UC 1EKV ramertnan UD U,) ‘Stings on the bas othe VON pce Fepenis,reproducton or sia processes ony with writen perission ofthe pubisher "Data questionnaire for grid operators of new systems fre 8, Annex C, Part Certification of a generating system B 40) Connection tothe MV grid tote taken rom TAB. of ‘Sepoint values” in) Prescribed Setting Function ecordance” | setpoint values parameter | th MG | New (stpotnt) 2o0e = wo 115 UE pect > = 00s we — we preecton a Bis = arse rotecton = iar a wae peetecton % itis ‘Other remarks: ‘Note: for all physical variables, PRIMARY VALUES are to be indicated (eg >> 360 A father thani>> 1.2 bi UC HBRV ratherthan UCO.8 U,) epee, reproduction, or sma processes oy with rten permission ofthe publisher ‘Dita questionnaire for grid operators of new systems 78 Annex, Curtfcation of generating system Part 560) 13 System protection [I Connection tothe HIVIRY ord Cito then tom TA. hci Pascbed separ ae Setng | Seti ‘alu’ New pooner | anor ‘cepom) Tyee Uayas osu a Resse poner Tosa 1. sep- tigger tnsenet “ ‘0m prosor esis PSUs ae 1s sep. tape conta st reece ‘ier remarks [iconnestion tothe MV gaa [tobe taken fom the TAB ‘Seat Wore in| Presstted seit Fescton Seta, | Soria | "ates ter eva | “een 0 Tyaenoige esse power | US many Gio rt oe nsenctage ca Trager eesti sams reer ihe PeCer PSU ‘ier emake Mote: for ll physical variables, PRIMARY VALUES are tbe indiosted (eg D> 360 A rather than b> 12 hc Uc 46 kV rather than Ue 0.2 U.) > Satings onthe bas ofthe FAN speciation “Rescve power undervoage protection (O- protection? * Wh regard to system protect or new systems he T2007 resumen apy nhs espe Ua fest sup musthave an etecton fe Sel POUS. For ths deve comertors ee Indvail RGUs are necessary Rare connectens do net mest he requrermants wi eg 12 Spee fsa tarsal The votage atthe PCC sf be erated fortecamecton. Rpts reproduction, or simiar processes oy with writen parmision ofthe publisher. — Secort sue Prescribed Seong | Recor) | merreene8) | SePoet ee pamuee [Saremee” |Semeeree” | aver Soa case haa = 12 115 (ewan is * Sage wl eon be ees vals, rome Bat es ont pace inher acon ot te PGU_ Where prescribes etpont values ae nt comasble wih te nheret prcecion othe PSU Sener consuzason mn be GO ws Deregaree * Segortyes wb sonatas ye one As. realy in eahhighoagn one ater of generating syste wilbe spaced fom he ged ate 13 5 anda bre quer er Woedisacassapecney, * Indicators of he MG 2008 guiseine weto be ctsered at pone tn rere comactn te geoang nate aane wih atomae ‘Sequanoy ached lead shedang muss be ker i cosas FReprns, epeoducion or sar processes any wih wien permission of fe publisher nex C: Question for new systems ‘Atternatvey, the following LVRT-mnode may be selecte LRT mode see: ‘no eactwecurent feesin, reactive power feesinin case ofa faut actuate be tiled by cerian POU, 1s option cannot be ies bythe POU, the thi point must be Sgr Upen Wit th od ‘peat, ‘Data questionnaire for grid operators of new systems 76.8. Annexc, CCatification ofa generating system Pats 78) 722 Dynamic ord suppor - low-voltage-idethrough (LVRT) mode Freserbed é sttpont aloes by arid pera WRT mode ste: reactwe cue feed cependent pon the ceth of the tetoge oup wna seetoesact ee ietactorn accordance wth SOLWindY ~Setpont | Clactvate range k= 810 ners b= Diietsctorin accordance wih TC 2007 ~ Setpcintrange m2 ‘Other Remarks This LVRT meds nota requirement rom SDLWindV, MVE 2008 or TC 2007, This mode ean erly "The Kactor must be adhered oa the PCC, tus be inated whether he Kfatertas been ‘Seected n ooersance with te TC 2007 er te SOLWingV FRepins, reproduction, or simi processes oly with rten permission ofthe publisher ‘Data questionnaire for grid operators of new systems 1G, Annex, Pan B Certification of a generating system 80) 3. Static reactive power performance: Ty wivesy [EITCaET,vaaeon + ()TeROmT varaeon2? CITCOMT,Varaion am 7 untested ep reguaton) Ti were |E] 0S uerrctesio 09s oerertes ae per VG 2008 1 taeeate oversea (eparteregaten) Tequremenia | (Jem p- ame gis come pore] Gilera | oooh “tierce rose power | oy gererctesta... veered seme | fom ‘Ded sipoint ate of eacbv power ang procedure 1 tone taken Rom TAB nn Oh - 1) sesairaernce [Dieu arate oy rect onto syn” aT 2) aspacemant ear 8069 6° =m were Si = OR +3 ere 3) Besmaavepone Dae wna mar (variate oy rate conta sytem 4) escve power vonage Tacos win =) Susu a ‘ne Saree i aE ware (eit wa mn 5) Amusing ime Dhcoase win 05 acoate wth... tates 106) "The gi operator must include specications ofthe remate conto syste / hey are oe taken fom ‘Be gs operators TAS lena’ somnecton oonsons), "Js byte setpoint ange given above Regrets, reproduction, or sia processes ony with writen pemnsion of he publisher. ‘Ober remarks Data questionnaire Tor grid operators of new Systems = Certification of a generating system Pan 20) 4. Grid data Paramener vale ie Nerina pert velage Ue Ww Aare supp veloge Us Ww (Gd shone power at gd cernecton port” Sw a ‘Ged impedance angle sgn cannesten Bort O, : Fer MV connections ‘Apparent power of fe upsveam ord Fansoome™ 5 wn Rol be upsveam ra ransoomer Oe ele wpsrean gid warstome Oe Fer HV connections Feeenoe power ™S, pis col Remuera = Other remarks: aes Sigratare of gad operator "Fer the dating ofthe syste cerca exper report. the gape wil spy gr data fe the hid shortest poner S.yand the gid impedance phase angie su ate gre connecton port iba detmince Tes cats ws em tse Sons tr ne contomatcn oe puseine compton! ehwout of ee geneeaing systems The evensonng of stem corganens Sr shonorcat rithsand willbe Qovemed by mere srngentrequrernens, mn accorcance wih the echnich tenneston sosesons of the gra opera "The system operators provided wth San and S, by he GO. The ea apparent pow ofthe PGS lobe Weed heres engaged Shan The shat cwed ibe PS cearnneciah Be aes Nanded ovr "the ganeratng unt is connected to a seston betmeen wo ratonmes substan, be thermat

You might also like