You are on page 1of 4

TABLE OF FIGURES

FIGURE 1. . LAYOUT OF MEDICAL GAS PIPELINE SYSTEM..........4


FIGURE 2. COLOUR CODING CHART..5
FIGURE 3. FLOW DIAGRAM CSSD...6
FIGURE 4. LAYOUT PLAN..6
FIGURE 5. CSSD DEPARTMENT....7
FIGURE 6. HVAC SYSTEM.....8
FIGURE 7. DUCTING....9
FIGURE 8. SPRINLER SYSTEM.11
FIGURE 9. FIRE FIGHTING MACHINERY12
FIGURE 10. MACHINERY ROOM..14
FIGURE 11. GOOGLE MAP (SITE LOCATION)

.......21

FIGURE 12. SITE PLAN..21


FIGURE 13. ZONING PLAN...21
FIGURE 14. ENTRANCE LAYOUT...21
FIGURE 15. GROUND FLOOR PLAN...22
FIGURE 16. DETAILED PLAN FIRST FLOOR22
FIGURE 17. FIRST FLOOR PLAN.22
FIGURE 18. SECOND FLOR PLAN..23
FIGURE 19.BUILDING SERVICES LAYOUT.23
FIGURE 20. WATER MANAGEMENT FLOW CHART .24

CONTENTS
CHAPTER I....................1
1. INTRODUCTION1
1.1 HISTORIC CONTEXT..1
1.2 MODERN CONTEXT..2
CHAPTER 2..2
2. TYPES OF SERVICES2
2.1 MEDICAL GASES3
2.1.1 INTRODUCTION:..3
2.1.2 DEFINITIONS3
2.1.3 OBJECTIVES.3
2.1.4 FUNCTIONS..3
2.1.5 DESIGN AND CONSTRUCTION.4
2.1.6 PHYSICAL LAYOUT4
2.1.7 ACCOMODATION5
2.1.8 DESIGN CONSIDERATIONS..5
2.1.9 CONCLUSION...5
2.2 CSSD5
2.2.1 INTRODUCTION....5
2.2.2 DEFINATION..6
2.2.3 AIM..6
2.2.4 OBJECTIEVES....6
2.2.5 KEY PLANNING AND DESIGN PARAMETERS7
2.2.6 CONCLUSION.7
2.3 HVAC7
2.3.1

INTRODUCTION7

2.3.2

FUNCTIONS8

2.3.4

ROLE OF BUILDING ENVELOPE8

2.3.4

NEED FOR HVAC..9

2.3.5

COMPONENTS OF HVAC9

2.3.6

KEY PLANNING AND DESIGN PARAMETERS9


2.3.6.1 HEATING.9
2.3.6.2 VENTILATION - EXHAUST AIR.10
2.3.6.3 VENTILATION - OUTDOOR AIR10
2.3.6.4 AIR HANDLING SYSTEMS.10

2.3.7

CONCLUSIONS.11

2.4 FIRE FITTING12


2.4.1

INTRODUCTION..12

2.4 2 PHILOSOPHY OF FIRE12


2.4.3 CLASSIFICATION/CATEGORIZATION..12
2.4.4 KEY PLANNING AND DESIGN PARAMETERS.12

2.4.4.1 PREVENTIVE MEASURES13


2.4.4.2 FIRE DETECTION AND ALARM SYSTEM.13
2.4.4.3

ADDRESSABLE SYSTEMS...13

2.4.4.4

INTELLIGENT SYSTEMS.14

2.4.4.5

RESTRICTION OF SPREAD.14

2.5.4.6

FIRE EXTINGUISHING SYSTEMS..15

2.4.4.7

FIRE FIGHTING EQUIPMENT......16

2.4.5 CONCLUSION..16
2.5 LIGHTING SYSTEM.16
2.5.1

INTRODUCTION...16

2.5.2 HOSPITAL ELECTRIC SUPPLY


SYSTEM..16
2.5.3 KEY PLANNING AND DESIGN
PARAMETERS.17
2.5.4 LIGHTING CONSIDERATIONS FOR VARIOUS AREAS..
.17
2.5.4.1
EMERGENCY
SUPPLY..17
2.5.4.2
SPOT POWER
IMPROVEMENT.18
2.5.4.3
RENAL
DIALYSIS..18
2.5.4.4
PHARMACY..18
2.5.5
CONCLUSION..18
2.6 SOLID WASTE
MANAGEMENT.18
2.6.1
INTRODUCTION18
2.6.2
DEFINITIONS..18
2.6.2.1
HOUSEKEEPING18

2.6.3

2.6.2.2

SANITATION.18

2.6.2.3

BLO-MEDLCAL WASTE.18

OBJECTIEVE.19
2.6.4
IMPORTANCE..19
2.6.5
FUNCTIONS 19
2.6.6
LOCATION..20
2.6.7 KEY PLANNING AND DESIGN
PARAMETERS..20
2.6.8
CONCLUSION:
..20
3. CASE
STUDY.21
3.1 FORTIS MULTISPECIALITY HOSPITAL, AMRITSAR.
.21
4. COCLUSION AND INFRENCES:
..24
5.
INFRENCES.25

You might also like