Professional Documents
Culture Documents
Navision Interview Questions
Navision Interview Questions
A bill of materials (BoM) is a list of the parts or components that are required to build a product.
The BoM provides the manufacturer's part number (MPN) and the quantity needed for each
component.
At its most complex, a BoM is a multi-level document that provides build data for multiple subassemblies
(products within products) and includes for each item: part number, approved manufacturers list
(AML),
mechanical characteristics and a whole range of component descriptors.
A production bill of materials (BOM) is a list of all components that are required to produce a
parent item. The list includes the description, quantity, and unit of measure of each component, in
addition to other information.
Executed
OnInitReport Trigger
OnPreReport Trigger
Before the report is run, but after the RequestForm has been run.
OnPostReport Trigger
After the report has run, but not if the report was stopped manually or by
the Break function.
OnCreateHyperlink
Trigger
OnHyperlink Trigger
Executed
OnPreDataItem Trigger
OnAfterGetRecord (Data
Items) Trigger
OnPostDataItem Trigger
When the data item has been iterated for the last time.
Section Triggers
The following table lists triggers that apply to each of the sections of a data item.
Triggers
Executed
OnPreSection Trigger
OnPostSection Trigger
ETC.
other than this NAV 13 configurational questions can be asked by mr shyamal. not pretty sure
about it.