Agenda

1. Air Interface (Cell) Dimensioning


2. Abis Interface Dimensioning
3. BSC Dimensioning
4. Ater CS Dimensioning
5. Ater PS Dimensioning
6. GPU/GP Dimensioning
7. Gb Interface Dimensioning
8. Location Area Dimensioning

BSS Dimensioning Methods in B10

Overview

Assessment of
traffic values for
SDCCH, TCH and
PDCH channels

Assessment of
basic and bonus
Abis nibbles from
TRX and BTS
configuration

Check the traffic


capacity limits based
on BSC configuration

TC

Assessment of
CS and PS traffic
over AterMux

MT120
SMU

TRCU TRCU TRCU

speech

MT120

Air

SMU

A-bis
CS
traffic

TRX 1
TRX 2

PS
traffic

MxBSC

TCH
TCH
G C H B asic

M -E G C H lin k 1

TRX 3

M -E G C H lin k 2

TRX n

M -E G C H lin k n

D yna m ic
A b is
a lloc a tion

B TS

CCP
board

CCP
board

SSW
board

TP
board

LIU
board

LIU
board

G C H B asic
G C H B on u s
G CH Extra

G CH Extra

CS

TRCU TRCU TRCU

CS

A-ter mux
CS+ PS

MxMFS
GP board

PS

3 | Presentation Title | Month 2008

Calculate the needed


extra Abis TS for real
traffic on Abis Itf and
the number of needed
Abis links

Calculate the total


number of Ater
channels and the
required number of
AterMux links

All Rights Reserved Alcatel-Lucent 2008, XXXXX

data
SGSN

DSP DSP DSP DSP

GP board

Calculate the needed


radio TS for SDCCH,
TCH and PDCH,
then nb of TRXs

Check the load


and conectivity on
DSP and GPU
boards of MFS

DSP DSP DSP DSP

Evaluate the
required number
of GPU/GP
boards per BSC

Gb
Evaluate the
required number
of Gb 64K TS
per GPU

Air Interface (Cell)


Dimensioning

4 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Air Interface (Cell) Dimensioning

Target
 Find the needed number of RTCH and TRX for one Cell
 Input (counters values):

CS Traffic
PS Traffic
SDCCH Traffic
CS Congestion
PS Congestion
SDCCH Congestion
Customer requirements for blocking probability

Nb of SDCCH channels
Nb of TCH
Nb of TRX
Real blocking

 Output:

5 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Air Interface (Cell) Dimensioning

Method for SDCCH:


 Erlang B
 Needed counters for SDCCH:
 MC400 or GSDTRT (SDCCH_occy_total)
 MC04 or GSDNACGN (SDCCH_assign_cong)
 MC148 or GSDNACAN (SDCCH_assign_allocated)
INPUT

METHOD

OUTPUT

Erlang B

Nb of required
SDCCH sub-channels
/ timeslots

Required
SDCCH Traffic

GoS:
% SDCCH blocking

6 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Air Interface (Cell) Dimensioning

Method for SDCCH:


Measured _ SDCCH _ traffic =

%SDCCH _ cong =

MC 400
3600

MC 04
100 %
MC 04 + MC148

Re quired _ SDCCH _ traffic =

Measured _ SDCCH _ traffic


1 Min(%SDCCH _ cong , 30%)

Nb of Re quired SDCCH subchannels = InverseErlangB (Required_SDCCH_traffic; 0.5% )

For BCCH not-combined cell:


Nb _ required _ SDCCH subchannels
Nb _ required _ SDCCH _ TSs =

For BCCH combined cell:


Nb _ required _ SDCCH subchannels 4
Nb _ required _ SDCCH _ TSs =

7 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Air Interface (Cell) Dimensioning

Method for TCH and PDCH:


 Kaufmann-Roberts.
 Needed counters for TCH:
 MC380a, MC380b, MC703, MC812.

 Needed counters for PDCH:


 P451a, P451b,
 P38e, P39f,
 P14, P27,

CS_FR service

CS_HR service

 P62x (x=a-c),
 P438c, P507,
 P91x (x=a-f),

Required Traffic
PS_DL service

getMax

PS_UL service

 P505.

8 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

KaufmannRoberts
Algorithm

Nb RTS
needed for
CS and PS
traffic

BSS Dimensioning Methods in B10


Air Interface (Cell) Dimensioning

Method for TCH and PDCH:


 Kaufmann-Roberts.
 Needed counters for TCH:
 MC380a or GTCTRFT (RTCH_full_occy_total)
 MC380b or GTCTRHT (RTCH_half_occy_total)
 MC703 or GTCNACAN (RTCH_assign_allocated)
 MC812 or GTCNACGN (RTCH_assign_cong)

9 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Air Interface (Cell) Dimensioning

Method for TCH

CS_Real_Co ng =

RTCH_Assig n _ Cong
MC812
=
RTCH_Assig n _ Request MC 812 + MC 703

CS _ Cong = min( 30 %, CS _ Real_Cong)


FR _ Cong =

MC 380 a
CS _ Cong
MC 380 a + MC 380 b

HR _ Cong =

MC 380 b
CS _ Cong
MC 380a + MC 380 b

Re quired _ FR _Traffic =

FR _ Successful _Traffic
MC380acell
=
1 FR _ Cong
3600 ( 1 FR _ Cong )

Re quired _ HR _Traffic =

HR _ Successful _Traffic
MC380bcell
=
1 HR _ Cong
3600 ( 1 HR _ Cong )

10 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Air Interface (Cell) Dimensioning

Method for TCH


 The Required traffic for FR and HR is used together with Required traffic for
PS as input for Kaufmann-Roberts algorithm.
 The blocking probability used for CS services is 2%.
Note:
Required CS Bandwidth is:
 1 TS for FR
 0.5 TS for HR

11 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Air Interface (Cell) Dimensioning

Method for PDCH


 Needed counters for PDCH:
 P451a or GARPDCTUBUT (GPRS_PDCH_used_UL_TBF_overall_time)
 P451b or GARPDCTDBUT (GPRS_PDCH_used_DL_TBF_overall_time)
 P38e or GARPDCUDBUT (GPRS_PDCH_DL_traffic_time)
 P38f or GARPDCUUBUT (GPRS_PDCH_UL_traffic_time)
 P14 or GQRDTECGN (GPRS_DL_TBF_estab_fail_radio_cong)
 P27 or GQRUTECGN (GPRS_UL_TBF_estab_fail_radio_cong)
 P62a+P62b+P62c- P438c+ P507 or GTRUTERQN (GPRS_UL_TBF_request)
 P91a + P91b + P91c + P91d + P91e + P91f + P505 or GTRDTERQN
(GPRS_DL_TBF_request)

12 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Air Interface (Cell) Dimensioning

Method for PDCH


Measured _ DL _ PS _ traffic =

P 451b
3600

Measured _ UL _ PS _ traffic =

P 451a
3600

%DL _ TBF _ radio _ cong =

P14
100 %
P 91a + P 91b + P 91c + P 91d + P 91e + P 91f + P 505

%UL _ TBF _ radio _ cong =

Re quired _ PS _ traffic =

P 27
100 %
P 62 a + P 62 b + P 62 c P 438 c + P 507

Measured _ PS _ traffic
1 Min(%TBF _ radio _ cong , 30%)

Final value for Required PS traffic is Max between required DL and UL PS traffic.

13 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Air Interface (Cell) Dimensioning

Method for PDCH


 Based on TBF usage:
 For calculation 98% quantile and 0.01s delay are used.
Note:
Required PS Bandwidth (minimum number of TS per a request on
each direction) is coming from:
 Average Nb of DL TBF per PDCH = P451b/P38e
 Average Nb of UL TBF per PDCH = P451a/P38f

If indicators are available, the required bandwidth is given by:


 GARPDCTDPIN = GPRS_DL_TBF_Pilled_avg
 GARPDCTUPIN = GPRS_UL_TBF_Pilled_avg

14 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Air Interface (Cell) Dimensioning

Final aggregation:
 Total nb of RTCH =
= 1 TS for BCCH + 1 TS for CCCH (if case) +
+ Nb of Required SDCCH TSs +
+ Nb of Required TSs for FR, HR and PS,
coming from Kaufmann-Roberts algorithm.

 Total nb of TRX = Roundup [(Total nb of RTCH)/8]

15 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Air Interface (Cell) Dimensioning

Method for PS throughput


 Input (counters values):
 DL PS Traffic
 UL PS Traffic

 Output:
 DL PS Throughput
 UL PS Throughput

16 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Air Interface (Cell) Dimensioning

Method for PS throughput


 Needed counters for PDCH DL throughput:
 P38e or GARPDCUDBUT (GPRS_PDCH_DL_traffic_time)
 P20a or GQRPDDR1N (GPRS_DL_RLC_block_PDTCH_CS1_retransmissing_ack)
 P20b or GQRPDDR2N (GPRS_DL_RLC_block_PDTCH_CS2_retransmissing_ack)
 P20c or GQRPDDR3N (GPRS_DL_RLC_block_PDTCH_CS3_retransmissing_ack)
 P20d or GQRPDDR4N (GPRS_DL_RLC_block_PDTCH_CS4_retransmissing_ack)
 P20f+P20g+P20h+P20i+P20j+P20k+P20l+P20m+P20n or GQRPDDRMN
(GPRS_DL_RLC_bytes_PDTCH_MCSx_retransmissing_ack from MCS1 to MSC9)(old P20e)
 P55x (x=a-d) or GTRPDDC1N to GTRPDDC4N (GPRS_DL_useful_RLC_blocks_CS1_ack to
GPRS_DL_useful_RLC_blocks_CS4_ack)

 P55x (x=e-m) or GTRPDDM1N to GTRPDDM9N (GPRS_DL_useful_RLC_blocks_MCS1_ack to


GPRS_DL_useful_RLC_blocks_MCS9_ack)

17 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Air Interface (Cell) Dimensioning

Method for PS throughput


 Needed counters for PDCH UL throughput:
 P38f or GARPDCUUBUT (GPRS_PDCH_UL_traffic_time)
 P21a or GQRPDUR1N (GPRS_UL_RLC_block_PDTCH_CS1_retransmissing_ack)
 P21b or GQRPDUR2N (GPRS_UL_RLC_block_PDTCH_CS2_retransmissing_ack)
 P21c or GQRPDUR3N (GPRS_UL_RLC_block_PDTCH_CS3_retransmissing_ack)
 P21d or GQRPDUR4N (GPRS_UL_RLC_block_PDTCH_CS4_retransmissing_ack)
 P21f+P21g+P21h+P21i+P21j+P21k+P21l+P21m+P21n or GQRPDURMN
(GPRS_UL_RLC_bytes_PDTCH_MCSx_retransmissing_ack from MCS1 to MSC9)(old P21e)
 P57x (x=a-d) or GTRPDUC1N to GTRPDUC4N (GPRS_UL_useful_RLC_blocks_CS1_ack to
GPRS_DL_useful_RLC_blocks_CS4_ack)

 P57x (x=e-m) or GTRPDUM1N to GTRPDUM9N (GPRS_UL_useful_RLC_blocks_MCS1_ack to


GPRS_DL_useful_RLC_blocks_MCS9_ack)

18 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Air Interface (Cell) Dimensioning

Method for PS throughput


 DL and UL throughput:

d PS _ DL [ kbps ] =

Data_DL
=
Transmision_Time_DL

m
n
d

8 P 20 x RLC _ Block _ Size x + P 55 x RLC _ Block _ Size x + P 20 x


x =a
x =f
x =a

=
1000 P 38e

d PS _ UL [ kbps ] =

Data _ UL
=
Transmisio n _ Time _ UL

m
n
d

8 P 21x RLC _ Block _ Size x + P 57 x RLC _ Block _ Size x + P 21x


x =a
x =f
x =a

=
1000 P 38f

19 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

Abis Interface
Dimensioning

20 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Abis Interface Dimensioning

Target
 Find the required number of ExtraAbis TS
 Check RSL congestion
 Methods are applied at BTS level
 Based on Abis allocation priorities

MAX_PDCH_High_Load Zone

From MAX_PDCH_High_Load to MAX_PDCH

Basic nibbles
of cell
Priority N1

Priority N3
Priority N2

Extra + Bonus
nibbles of BTS

21 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Abis Interface Dimensioning

Method for ExtraAbis TS


 ErlangC
 Input (counters values):

PS Traffic
Extra-Bonus Traffic
Available Extra-Bonus nibbles
PS Congestion (Abis)
Customer requirements for QoS (delay and quantile)
Customer requirements for number of basic and bonus nibbles

 Output:
Nb of extra Abis nibbles
Nb of ExtraAbisTS

22 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Abis Interface Dimensioning

Extra and Bonus Nibbles Method


 (Method 1)

INPUT

Nb of required
extra & bonus
Abis Nibbles

Required extra
& bonus Abis
nibble Traffic

Erlang C
GoS:
% Quantile of x
delay sec

23 | Presentation Title | Month 2008

OUTPUT

METHOD

Nb of bonus Abis
Nibbles

All Rights Reserved Alcatel-Lucent 2008, XXXXX

Nb of required
extra Abis Nibbles

BSS Dimensioning Methods in B10


Abis Interface Dimensioning

Extra and Bonus Nibbles Method


 Needed counters:
 P466 or GABGCHUSEBT (GPRS_transmission_GCH_use_bonus_and_extra_time),
 P105i or GQRDTECBN (GPRS_DL_TBF_estab_fail_abis_cong),
 P91a + P91b + P91c + P91d + P91e + P91f + P505 or GTRDTERQN
(GPRS_DL_TBF_request)
 P105j or GQRUTECBN (GPRS_UL_TBF_estab_fail_abis_cong),
 P62a+P62b+P62c- P438c+ P507 or GTRUTERQN (GPRS_UL_TBF_request)

 Note:
 The counters retrieved at cell level must be aggregated per BTS.

24 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Abis Interface Dimensioning

Extra and Bonus Nibbles Method

Measured _ extra & bonus _ Abis _ traffic =

P 466
3600

%DL _ TBF _ Abis _ cong =

P105 i
100 %
P 91a + P 91b + P 91c + P 91d + P 91e + P 91f + P 505

%UL _ TBF _ Abis _ cong =

P105 j
100 %
P 62a + P 62b + P 62c P 438 c + P 507

%TBF _ Abis _ cong = Max (%DL _ TBF _ Abis _ cong , %UL _ TBF _ Abis _ cong )

Re quired _ extra & bonus _ Abis _ traffic =

25 | Presentation Title | Month 2008

Measured _ extra & bonus _ Abis _ traffic


1 Min(%TBF _ Abis _ cong , 30%)

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Abis Interface Dimensioning

Extra and Bonus Nibbles Method

Nb of Re quired extra & bonus nibbles =


= InverseErl angC (Required_e xtra & bonus_traf fic; quantile; delay )
where quantile = 99% and delay = 0.01s

26 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Abis Interface Dimensioning

Extra and Bonus Nibbles Method

Number of required Extra Abis nibbles =


= Number of required extra & bonus Abis nibbles Nb of bonus Abis nibbles,

Note: Nb of bonus nibbles corresponds to Nb of BCCH and static SDCCH timeslots.


and
Number of required Extra Abis TS =
= Roundup[(Number of required extra Abis nibbles)/4].

Note: 1 Abis TS contains 4 Abis nibble

This method is recommended in case of BTSs with 2 or more cells.

27 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Abis Interface Dimensioning

GCH Method
 (Method 2)

INPUT

Nb of required
Abis Nibbles

Required Data
Traffic on Abis

Erlang C
GoS:
% Quantile of x
delay sec

28 | Presentation Title | Month 2008

OUTPUT

METHOD

Nb of basic &
bonus Abis Nibbles

All Rights Reserved Alcatel-Lucent 2008, XXXXX

Nb of required
extra Abis Nibbles

BSS Dimensioning Methods in B10


Abis Interface Dimensioning

GCH Method
Needed counters for Data traffic:
 P100c or GAAGCHUST (GPRS_transmission_GCH_busy_time)

 Needed counters for Abis congestion:


 P105i or GQRDTECBN (GPRS_DL_TBF_estab_fail_abis_cong),
 P91a + P91b + P91c + P91d + P91e + P91f + P505 or GTRDTERQN
(GPRS_DL_TBF_request)
 P105j or GQRUTECBN (GPRS_UL_TBF_estab_fail_abis_cong),
 P62a+P62b+P62c- P438c+ P507 or GTRUTERQN (GPRS_UL_TBF_request)

 Note:
 The counters retrieved at cell level must be aggregated per BTS.

29 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Abis Interface Dimensioning

GCH Method
 Abis congestion:

%DL _ TBF _ Abis _ cong =

P105 i
100 %
P 91a + P 91b + P 91c + P 91d + P 91e + P 91f + P 505

%UL _ TBF _ Abis _ cong =

P105 j
100 %
P 62a + P 62b + P 62c P 438 c + P 507

%TBF _ Abis _ cong = Max (%DL _ TBF _ Abis _ cong , %UL _ TBF _ Abis _ cong )

30 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Abis Interface Dimensioning

GCH Method
 Measured traffic:

 Required traffic:

Measured _ GCH _ traffic =

Re quired _ GCH _ traffic =

P100c
3600

Measured _ GCH _ traffic


1 Min(%TBF _ Abis _ cong , 30%)

 Required Abis nibbles for PS:


Nb of Re quired Abis nibbles =

= InverseErl angC (Required_G CH_traffic ; quantile; delay )


where quantile = 99% and delay = 0.01s

31 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Abis Interface Dimensioning

GCH Method

Number of required Extra Abis nibbles =


= Number of required Abis nibbles Nb of basic and bonus Abis nibbles,
Note: Nb of basic nibbles per cell = MAX_PDCH.
Nb of bonus nibbles corresponds to Nb of BCCH and static SDCCH timeslots.
and
Number of required Extra Abis TS =
= Roundup[(Number of required Extra Abis nibbles)/4].

Note: 1 Abis TS contains 4 Abis nibble


This method is recommended in case of BTSs with only 1 cell.

32 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Abis Interface Dimensioning

Abis Dimensioning
 Finally, at BTS level for Abis dimensioning
Total Number of Abis TS =
= 2*Total nb of TRX +
+ Nb of TS for RSL and OML (depending on MCB type)
+ Nb of required Extra Abis TS,

and
Number of required Abis Links =
= Roundup[(Total Number of Abis Ts)/31].

33 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Abis Interface Dimensioning

Method for RSL


 LAPD efficiency (in DL):
 Needed counters
Conter Type: 7
Measured Object: LAPD

 Conter L1.1 (NB_LAPD_INFO_FRAME_SENT)


Number of Information frames transmitted on the LapD link, excluding the
re-transmissions.

 Conter L1.15 (NB_LAPD_INFO_FRAME_RESENT)


Number of Information frames re-transmitted on the LapD link.

 Formula:
LAPD efficiency [%] = L1.1/( L1.1+L1.15)*100

34 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Abis Interface Dimensioning

Method for RSL congestion


 LAPD congestion detection:
 Conter L1.18 (TIME_LAPD_CONG)
Conter Type: 7
Measured Object: LAPD
Time in seconds during which the LapD link is congested in transmission in
the BSC.

 In case LAPD congestion is present, the MCB load must be reduced:


 If the multiplexing rule is applied per BTS by changing at BTS level the signaling
load from normal to high;
 If the load is already high by changing the multiplexing rule from per BTS to per
Sector with the same load options normal or high.

 Note: These changes may impact the Abis TS usage.

35 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSC
Dimensioning

36 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


BSC Dimensioning

Target
 Find the total CS traffic
 Find the related CS signaling traffic
 Decide what solution is required for signaling traffic: LSL or HSL
 Check the HDLC occupancy to decide what type of TP GSM board is required:
TP GSM V1 or TP GSM STM1 (V3)
 Find the required number of AterMux CS links
 Find the total PS traffic
 Find the required number of AterMux PS links
 Find the required number of GPU/GP boards

37 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


BSC Dimensioning

Method for BSC Dimensioning


 ErlangB and ErlangC
 Input (counters values):

CS Traffic
SS7 Traffic
PS Traffic
AterMux PS congestion
Customer requirements for CS and SS7 blocking and QoS for PS

Nb
Nb
Nb
Nb
Nb

 Output:

38 | Presentation Title | Month 2008

of
of
of
of
of

TCH, CS dedicated links and real blocking


SS7 connections, links and real blocking
GCH
GPU boards per BSC
PS links per BSC and PS real quantile

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


BSC Dimensioning

Method for CS Traffic


 Needed counters for TCH:
 MC380a or GTCTRFT (RTCH_full_occy_total)
 MC380b or GTCTRHT (RTCH_half_occy_total)

 Needed counters for SCCP:


 MC01+MC02 or GSDNASUN (SDCCH_assign_success),
 MC10 or GSDHOSUN (SDCCH_HO_success)
 MC390 or GSDAHCAN (SDCCH_allocated),
 MC400 or GSDTRT (SDCCH_occy_total),
 MC380a+MC380b or GTCTRT (RTCH_occy_total)
 or GQSTRSCE (SCCP_Erlang_BH)

39 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


BSC Dimensioning

Method for CS Traffic


 Max CS Traffic (during BH)
Measured _TCH _ traffic =

MC380a + MC380b
3600

Re quired _TCH _ traffic = measured _TCH _ traffic + 15%m arg in

 The required value of TCH traffic must be below the BSC Erlang capacity
(depending on BSC configuration), else the BSC capacity must be extended if
possible by adding one CCP board.

40 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


BSC Dimensioning

Method for CS Traffic


 Max SCCP Traffic (during BH)
 Measured SCCP Traffic = SCCP traffic in Erlang during Busy Hour =
= ((MC400/MC390)*(MC01+MC02+MC10) + (MC380a+MC380b))/3600
Re quired _ SCCP _ traffic = measured _ SCCP _ traffic + 15%m arg in
Nb of Re quired SCCP connections = InverseErlangB (Required_SCCP_traffic;0.1% )

No _ required _ SCCP _ channels


No _ required _ SS 7 _ TSs =

103

 If the required number of SS7 TSs is below or equal to 16, the LSL solution
may be used.
 If the required number of SS7 TSs is above 16, the HSL solution is mandatory.
41 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


BSC Dimensioning

Method for HDLC occupancy


 Due to limited number of HDLC channels inside TP GSM board, it is important
to check the number of HDLC channels in use.
Apply MCB rule
AlcatelBtsSiteManager
InstanceIdentifier

UserLabel

MuxRate

MuxRule

{ amecID 1, moiRdn 1}

G62B011

{signallingLoadBts high}

statisticMux64

{ amecID 1, moiRdn 10}

G62B083

{signallingLoadBts high}

{ amecID 1, moiRdn 100}

G62B271

{ amecID 1, moiRdn 134}

Total #
TRE

Total #
TRX DR

Total #
TRX FR

Total #
HDLC

statisticMux64

{signallingLoadBts dummy}

statisticMux64

G62B122

{signallingLoadBts normal}

statisticMux64

12

11

11

{ amecID 1, moiRdn 11}

G62B091

{signallingLoadBts dummy}

noMux

{ amecID 1, moiRdn 17}

G62A12_3

{signallingLoadBts dummy}

staticMux

10

10

from AlcatelBtsSiteManager.csv
42 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

Total #
LAPD

from AlcatelBts_Sector.csv

BSS Dimensioning Methods in B10


BSC Dimensioning

Method for HDLC occupancy


 This check is important especially when the BSC must be extended by adding
new cells.
 If the total required number of HDLC channels is below 441, the TP GSM V1
board has enough capacity to be used.
 If the required number of HDLC channels is above 441, the multiplexing rule
must be changed from noMux to statisticMux64.
 If the resulted number of HDLC channels is still above 441, the TP GSM V1
board must be replaced by TP GSM STM1 (V3) board.

43 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


BSC Dimensioning

Method for PS Traffic


 Needed counters for GCH Traffic:
 P100c or GAAGCHUST (GPRS_transmission_GCH_busy_time),
 P383a or GQAGALCTT (GPRS_GPU_Ater_cong_time),
 P384 or GQRGPUCDT (GPRS_GPU_DSP_cong_time),

 Needed counters for GSL:


 P41 or GTALAPDLN (GPRS_LAPD_DL_traffic_sent_to_BSC),
 P42 or GTALAPULN (GPRS_LAPD_UL_traffic_received_from_BSC).

44 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


BSC Dimensioning

Method for PS Traffic


 Max GCH Traffic
Measured _ GCH _ traffic =
%GCH _ Ater _ cong =

P100c
3600

P 383a
100 %
3600

%GCH _ GPU _ cong =

P 384
100 %
3600

%GCH _ cong = Max (%GCH _ Ater _ cong ,%GCH _ GPU _ cong )


Re quired _ GCH _ traffic =

Measured _ GCH _ traffic


1 Min (%GCH _ cong ; 30%)

 Number of required GCH per BSC


Nb of Re quired GCH = InverseErl angC (Required_G CH_traffic; quantile; delay )

where quantile = 99% and delay = 0.01s


45 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


BSC Dimensioning

Method for PS Traffic


 Number of GPU/GP boards per BSC

Nb of Required GCH
Nb of Re quired GPU/GP board =

GPU/GP board GCH Capacity

 GPU Capacity is of max 480 GCH.


 GP Capacity is of max 1560 GCH.
 N_ATER_TS_MARGIN_GPU resources must not be taken into account. So, the max
number of GCH per GPU/GP is:
 480 N_ATER_TS_MARGIN_GPU*4 (for legacy MFS)
 1560 N_ATER_TS_MARGIN_GPU*4 (for Mx MFS)

46 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


BSC Dimensioning

Method for PS Traffic


 Number of GSL links per BSC
Measured _ GSL _ traffic =

Max ( P 41, P 42 )
28800

Re quired _ GSL _ traffic = Measured _ GSL _ traffic + 30%m arg in

Nb of Re quired GSL = InverseErlangC (Required_GSL_traffic; quantile; delay )

where quantile = 99% and delay = 0.01s

47 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


BSC Dimensioning

Method for PS Traffic


 Number of GPU boards per BSC
Nb of Required GSL
Nb of Re quired GPU/GP board =

 At least 2 GSLs are recommended to be defined per GPU due to security reason.
 Up to 4 GSLs can be defined per GPU.

 Number of GP boards per BSC


Nb of Required GSL
Nb of Re quired GPU/GP board =

 At least 2 GSLs are recommended to be defined per GP due to security reason.


 Up to 8 GSLs can be defined per GP.

48 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


BSC Dimensioning

Method for PS Traffic


 Number of GPU boards per BSC
 The final number of required GPU/GP boards per BSC is the maximum value
between the number of boards needed for signaling traffic (GSL) and for user
traffic (GCH).

49 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

Ater CS
Dimensioning

50 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Ater CS Dimensioning

Target
 Find the required number of AterMux CS links
 Method: ErlangB
 Input (counters values):
CS Traffic
SS7 Traffic
Customer requirements for CS and SS7 blocking and QoS for PS

 Output:
Nb of SS7 connections, links and real blocking
Nb of TCH, CS dedicated links and real blocking

51 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Ater CS Dimensioning

Method
 Find the max number of Ater CS links between TCH requirements and
signaling requirements (SCCP)
INPUT

METHOD

OUTPUT

Signalling Traffic
Required
SDCCH
Traffic

Erlang B

Nb of
required SS7
per BSC

GoS:
% SS7
blocking

Choose
Max
value

User Traffic
Required
TCH
Traffic
GoS:
% TCH
blocking

52 | Presentation Title | Month 2008

Nb of
required
AterMUX-CS
links per
BSC

Erlang B

Nb of
required
TCH per BSC

Nb of
required
AterMUX-CS
links per
BSC

All Rights Reserved Alcatel-Lucent 2008, XXXXX

Final nb of
required
AterMUX-CS
links per
BSC

BSS Dimensioning Methods in B10


Ater CS Dimensioning

CS Traffic
 Method for TCH
Measured _TCH _ traffic =

MC380a + MC380b
3600

Re quired _TCH _ traffic = measured _TCH _ traffic + 15%m arg in

Nb of Re quired TCH channels = InverseErl angB (Required_T CH_traffic ;0.1% )

 The number of required AterMux CS links can be obtained by dividing the number of
AterMux CS channels obtained from the dimensioning process by the AterMux CS link
capacity.
 The total capacity of n AterMUX CS links is:
111TCH(link#1) + 111TCH(link#2) + 116TCH(link#3) + 116TCH(link#4) +
116TCH(link#5) + 116TCH(link#6) + 115TCH(link#7) + 115TCH (link#8) + 116TCH(link
#9) + 116TCH(link #10) + 116TCH(link #11)+ + 116TCH(link #N),
where N =< MaxNbAterMuxCS.
53 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Ater CS Dimensioning

CS Signaling Traffic
 Method for SCCP
 Measured SCCP Traffic = SCCP traffic in Erlang during Busy Hour =
= ((MC400/MC390)*(MC01+MC02+MC10) + (MC380a+MC380b))/3600

Re quired _ SCCP _ traffic = measured _ SCCP _ traffic + 15 %m arg in


Nb of Re quired SCCP connection s = InverseErlangB (Required_S CCP_traffic;0.1% )

No _ required _ SCCP _ channels


No _ required _ SS 7 _ links =

103

 The result is obtained for 40% load at SS7 link level.


 The final number of required AterMux CS links is the maximum value between the
number of links needed for signaling traffic (SS7) and for user traffic (TCH).

54 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Ater CS Dimensioning

CS Signaling Traffic
 Method for SS7 based on volume of data transferred
 Counters for N7 at link level (Type 9):
 N3.1 (NB_N7_SIF_SIO_SENT)
Number of octets of Signalling Information (SIF) and Service Information Octets
(SIO) transmitted on the N7 SL.

 N3.3 (NB_N7_MSU_SENT)
Number of Message Signalling Units (MSU) transmitted on the N7 SL.

 N3.4 (NB_N7_SIF_SIO_REC)
Number of octets of Signalling Information Field (SIF) and Service Information
Octets (SIO) received on the N7 SL.

 N3.5 (NB_N7_MSU_REC)
Number of Message Signalling Units (MSU) received on the N7 SL.

 N3.10 (NB_N7_MSU_DISC_DUE_CONG)
Number Message Signalling Units (MSU) discarded due to a message buffer overflow
caused by an extended period of Signalling Link congestion.

55 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Ater CS Dimensioning

CS Signaling Traffic
 Method for SS7 based on volume of data transferred
 Traffic evaluation in UL
Counter values must be aggregated for the link set

Measured _ SS 7 _ traffic =

%SS 7 _ cong =

N 3. 1 + 6 * N 3 . 3
28800000

N 3.10
100 %
N 3.3 + N 3.10

Re quired _ SS 7 _ traffic =

Measured _ SS 7 _ traffic
1 Min (%SS 7 _ cong ; 30%)

Nb of Re quired SS7 TS = InverseErlangB (Required_SS7_traffic;0.1% )

56 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Ater CS Dimensioning

CS Signaling Traffic
 Method for SS7 based on volume of data transferred
 Traffic evaluation in DL
Counter values must be aggregated for the link set

Measured _ SS 7 _ traffic =

N 3 . 4 + 6 * N 3 .5
28800000

Re quired _ SS 7 _ traffic = Measured _ SS 7 _ traffic + 15%m arg in

Nb of Re quired SS7 TS = InverseErlangB (Required_SS7_traffic;0.1% )

 The final number of SS7 TSs (links) is the max value between the results for
UL and DL.
 If this number is greater than 16, HSL usage is mandatory.

57 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Ater CS Dimensioning

CS Signaling Traffic
 Method for SS7 based on volume of data transferred
 N7 link efficiency based on couters (in UL):
 N3.3 (NB_N7_MSU_SENT)
 N3.10 (NB_N7_MSU_DISC_DUE_CONG)

 Formula:
N7 efficiency [%] = N3.3/( N3.3+N3.10)*100

 N7 link congestion detection:


 N1.6 (NB_N7_LINK_FAIL_CONG)
Number of N7 SL failures due to congestion during an extended period of
time.

58 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Ater CS Dimensioning

CS Signaling Traffic
 Method for SS7 link load based on volume of data transferred
 LSL case
 %N7 Utilization in UL = (N3.1 + (6 * N3.3)) / (3600*8,000)
 %N7 Utilization in DL = (N3.4 + (6 * N3.5)) / (3600*8,000)
 Explanation:
MSU contains 6 bytes (fix part) + SIF&SIO (variable part).
SIF is between 2 and 34 bytes.
SIO is 1 byte.

 Note:
1 hour of usage of 1 E1 Time Slot (for N7) = 1hour * 64Kbps =
= 3600s * 8000 bytes/s = 28,800 Kbytes/h

 Warning:
The load on one N7 link shall not exceed 40% (recommended).

59 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Ater CS Dimensioning

CS Signaling Traffic
 Method for SS7 link load based on volume of data transferred
 HSL case
 In B10, if HSL is actived, N7 can have 2 different frame formats:
Normal frame format
Extended frame format

 Parameter: MTP_Sequence_Number_Format
(MtpSequenceNumberFormat in ACIE AlcatelManagedElementComplex.csv)
Range / default value: (0=Normal, 1=Extended) / 0
Note:
 In case of Normal frame format
MSU contains 6 bytes (fix part) + SIF&SIO (variable part).

 In case of Extended frame format


MSU contains 9 bytes (fix part) + SIF&SIO (variable part).

60 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Ater CS Dimensioning

CS Signaling Traffic
 Method for SS7 link load based on volume of data transferred
 HSL case with Normal frame format
 %N7 Utilization in UL = (N3.1 + (6 * N3.3)) / (3600*8,000*31)
 %N7 Utilization in DL = (N3.4 + (6 * N3.5)) / (3600*8,000*31)
 Explanation:
32 TSs of 64Kbps are available for one HSL link.

 Note:
1 hour of usage of 1 E1 Time Slot (for N7) = 1hour * 64Kbps =
= 3600s * 8000 bytes/s = 28,800 Kbytes/h
For 32 TS per HSL link we get
3600s * 8000 bytes/s * 31TS = 892,800 Kbytes/h

 Warning:
The load on one N7 link shall not exceed 40% (recommended).

61 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Ater CS Dimensioning

CS Signaling Traffic
 Method for SS7 link load based on volume of data transferred
 HSL case with Extended frame format
 %N7 Utilization in UL = (N3.1 + (9 * N3.3)) / (3600*8,000*31)
 %N7 Utilization in DL = (N3.4 + (9 * N3.5)) / (3600*8,000*31)
 Explanation:
32 TSs of 64Kbps are available for one HSL link.

 Note:
1 hour of usage of 1 E1 Time Slot (for N7) = 1hour * 64Kbps =
= 3600s * 8000 bytes/s = 28,800 Kbytes/h
For 32 TS per HSL link we get
3600s * 8000 bytes/s * 31TS = 892,800 Kbytes/h

 Warning:
The load on one N7 link shall not exceed 40% (recommended).

62 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

Ater PS
Dimensioning

63 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Ater PS Dimensioning

Target
 Find the required number of AterMux PS links
 Method: ErlangC
 Input (counters values):

PS Traffic
Number of Available GCH
Number of Max Busy GCH
AterMux PS congestion
Customer requirements for PS QoS

 Output:
Nb of GCH
Nb of GSL links per BSC and PS real quantile
Nb of PS links per BSC and PS real quantile

64 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Ater PS Dimensioning

Method
 Find the max number of Ater PS links between GCH requirements and
signaling requirements (GSL)

INPUT

OUTPUT

METHOD

Signaling Traffic
Required
GSL
Traffic

Erlang C

Nb of
required
GSL per BSC

QoS:
quantile
delay

Choose
Max
value

User Traffic
Required
GCH
Traffic

Erlang C

Nb of
required
GCH per BSC

QoS:
quantile
delay

65 | Presentation Title | Month 2008

Nb of
required PS
links per
BSC

All Rights Reserved Alcatel-Lucent 2008, XXXXX

Nb of
required PS
links per
BSC

Final nb of
required
AterMUX-PS
links per
BSC

BSS Dimensioning Methods in B10


Ater PS Dimensioning

Method for Ater PS


 Needed counters for GCH:
 P100c or GAAGCHUST (GPRS_transmission_GCH_busy_time),
 P383a or GQAGALCTT (GPRS_GPU_Ater_cong_time),
 P384 or GQRGPUCDT (GPRS_GPU_DSP_cong_time),

 Needed counters for GSL:


 P41 or GTALAPDLN (GPRS_LAPD_DL_traffic_sent_to_BSC),
 P42 or GTALAPULN (GPRS_LAPD_UL_traffic_received_from_BSC).

66 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Ater PS Dimensioning

Method for GCH


 The number of required GCH
Measured _ GCH _ traffic =
%GCH _ Ater _ cong =

P100c
3600

P 383a
100 %
3600

%GCH _ GPU _ cong =

P 384
100 %
3600

%GCH _ cong = Max (%GCH _ Ater _ cong ,%GCH _ GPU _ cong )

Re quired _ GCH _ traffic =

Measured _ GCH _ traffic


1 Min (%GCH _ cong ; 30%)

Nb of Re quired GCH = InverseErlangC (Required_GCH_traffic; quantile; delay )

where quantile = 99% and delay = 0.01s


67 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Ater PS Dimensioning

Method for GCH


 The number of required AterMux PS TSs for user traffic
Nb _ required _ GCH
Nb _ required _ AterPS _ TSs =

 The number of required AterMux PS links for user traffic


No _ required _ AterPS _ TSs
Nb _ required _ AterPS _ links =

28

68 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Ater PS Dimensioning

Method for GSL


Measured _ GSL _ traffic =

Max ( P 41, P 42 )
28800

Re quired _ GSL _ traffic = Measured _ GSL _ traffic + 30%m arg in

Nb of Re quired GSL = InverseErlangC (Required_GSL_traffic; quantile; delay )

 GSL load checking


Measured _ traffic _ 1GSL =

GSL _ load =

Measured _ GSL _ traffic


Nb of required GSL

Measured _ traffic _ 1GSL


100 %
GSL _ Capacity ( = 0.78Erlangs )

 It is recommended to increase the number of GSL per GPU if GSL load is greater than
80%.

 The final number of required AterMux PS links is the maximum value between
the number of links needed for signaling traffic (GSL) and for user traffic (GCH).

69 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

GPU/GP
Dimensioning

70 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

Target
 Find the load and the required number of AterMux PS links per GPU/GP board
 Method: ErlangC
 Input (counters values):

PS Traffic
MS context average
MS context max
DSP congestion
GSL traffic
Average & Max CPU load
BSS failures rate

Max DL GCH Capacity


Max UL GCH Capacity
Max DL PDCH Capacity
Max UL PDCH Capacity
GSL load
MCS usage

 Output:

71 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

GPU/GP load
 Check if GPU/GP board is not overloaded

INPUT

METHOD
MS_context_handling (= 0/1)

User Traffic
Required
GCH
Traffic
QoS:
quantile
delay

72 | Presentation Title | Month 2008

Erlang C

Needed
GCH

GCH
capacity
of GPU

Power_Limitation (= 0/1)

All Rights Reserved Alcatel-Lucent 2008, XXXXX

OUTPUT

Number
of GPU
boards

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

GPU/GP load
 GPU/GP board limitation control
GPU limitation

PMU

PTU

PPC/CPU
DSP
Power Limitation Memory Limitation Power Limitation Memory Limitation
P76a
P392a
P201 (thr_1 )
Dimensioning
P77a
P384
P392b
P202 (thr_2 )
indicators
=> P402 (thr )
QoS
P105e
UL TBF estab
P203
P105c
indicators
P105f
BSS Failure
P204
P105d
(TBF establ)
CPU Cong

BSS Fail

DSP Load

MFS parameters:
Thr = PMU_CPU_Overload (Default=95%)
Thr_1 = DSP_Load_Thr_1 (Default=85%)
Thr_2 = DSP_Load_Thr_2 (Default=95%)

73 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

DSP Cong

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

GPU/GP load
 User traffic load (GCH)
 Needed counters:
 P100c or GAAGCHUST (GPRS_transmission_GCH_busy_time),
 P383a or GQAGALCTT (GPRS_GPU_Ater_cong_time),
 P384 or GQRGPUCDT (GPRS_GPU_DSP_cong_time),
 P201 or GTRGPULDLT (GPRS_DSP_CPU_load_time),
 P202 or GTRGPULDOLT (GPRS_DSP_CPU_overload_time),
 GQRDTELDR (GPRS_DL_TBF_estab_fail_dsp_load_rate)
or P203 / (P91a + P91b + P91c + P91d + P91e + P91f + P505)

 GQRUTELDR (GPRS_UL_TBF_estab_fail_dsp_load_rate)
or P204 / (P62a + P62b + P62c - P438c + P507)

74 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

GPU/GP load
 Signaling load
 Needed counters:
 P392a or GTRGPUMCA (GPRS_MS_idle_context_avg),
 P392b or GTRGPUM (GPRS_MS_idle_context_max),
 P76a or GTRGPUPBA (GPRS_PMU_CPU_power_budget_avg),
 P77a or GTRGPUPBM (GPRS_PMU_CPU_power_budget_max),
 P402 or GTRGPUOT (GPRS_PMU_overload_time),
 GQRDTECCR (GPRS_DL_TBF_estab_fail_cpu_cong_rate)
or P105e / (P91a + P91b + P91c + P91d + P91e + P91f + P505)

 GQRUTECCR (GPRS_UL_TBF_estab_fail_cpu_cong_rate),
or P105f / (P62a + P62b + P62c - P438c + P507)

75 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

GPU/GP load
 Required number of GPU/GP boards based on user traffic
Measured _ GCH _ traffic =
%GCH _ Ater _ cong =
%DSP _ load =

P100c
3600

P 383a
100 %
3600

Max ( P 201, P 202 )


x100 %
3600

%GCH _ DSP _ cong =


%CPU _ overload =

P 384
100 %
3600

P 402
x100 %
3600

%GCH _ cong = Max(% Ater _ cong ,%DSP _ cong ,%DSP _ load ,%CPU _ overload )
Re quired _ GCH _ traffic =

Measured _ GCH _ traffic


1 Min (%GCH _ cong ; 30%)

Nb of Re quired GCH = InverseErlangC (Required_GCH_traffic; quantile; delay )

where quantile = 99% and delay = 0.01s

76 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

GPU/GP load
 Required number of GPU/GP boards based on user traffic

Nb of Required GCH
Nb of Re quired GPU/GP board =

GPU/GP board GCH Capacity

where the GPU board capacity is 480 GCH and the GP board capacity is 1560 GCH.
 The result must be compared with the existing number of GPU/GP boards per BSC.
 If the required number of GPU/GP boards is less than the existing one, there is no
need for change.
 If the required number of GPU/GP boards is greater than the existing one, then the
number of GPU/GP boards per BSC must be increased by one unit.
 For a BSC in multi GPU configuration, the method (GCH traffic) may be applied per
each GPU/GP board separately to check the load on each board.

77 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

GPU/GP load
 Required number of GPU/GP boards
 GPU power limitation from PTU (DSP/CPU)
If
MAX(P201;P202)/3600 > 0.1%

for at least 12% of the observation period

and
dsp_load_fail_rate = MAX(GQRDTELDR; GQRUTELDR) > 1%

then

PTU_Power_Limitation = 1

else

PTU_Power_Limitation = 0

78 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

GPU/GP load
 Required number of GPU/GP boards
 GPU power limitation from PMU (CPU)
If
P402/3600 > 0.1% or P76a > 70%

for at least 12% of the observation period

and
cpu_cong_fail_rate = MAX (GQRUTECCR; GQRDTECCR) > 1%

then

PMU_Power_Limitation = 1

else

PMU_Power_Limitation = 0

79 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

GPU/GP load
 Required number of GPU/GP boards
 GPU memory limitation from PMU (CPU)
If P392b = 1000 and P392a > 900

for at least 12% of the observation period

for Legacy MFS


or
if P392b = 4000 and P392a > 3600

for at least 12% of the observation period

for MxMFS
then

MS_context_handling = 1

else

MS_context_handling = 0

80 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

GPU/GP load
 Final result

The number of required GPU/GP boards =


= Number of required GPU/GP board (from user traffic) +
+ MAX(PTU_Power_Limitation; PMU_Power_Limitation; MS_context_handling)
Note:
If the required number of GPU/GP boards is greater than the existing one, it
is recommanded to add a single board at one time and redo the load
assessment after it.

81 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

Number of AterMux PS links per GPU/GP board


 Check the number of links from GCH and GSL requirements

INPUT

OUTPUT

METHOD

Signaling Traffic
Required
GSL
Traffic

Erlang C

Nb of
required
GSL per BSC

QoS:
quantile
delay

Choose
Max
value

User Traffic
Required
GCH
Traffic

Erlang C

Nb of
required
GCH per BSC

Nb of
required
GPU boards
per BSC

QoS:
quantile
delay

82 | Presentation Title | Month 2008

Nb of
required PS
links per
GPU board

All Rights Reserved Alcatel-Lucent 2008, XXXXX

Nb of
required PS
links per
GPU board

Final nb of
required
AterMUX-PS
links per
GPU

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

Number of AterMux PS links per GPU/GP board


 Based on total GCH load and final number of required GPU/GP bords, the
number of Ater PS links per board is:
( Nb _ required _ GCH ) / 112
Nb _ required _ AterPS _ links _ per _ GPU / GP =

Nb _ required _ GPU / GP board

83 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

Number of AterMux PS links per GPU/GP board


 Method based on total number of GSL links and final number of required
GPU/GP bords

INPUT

OUTPUT

METHOD

Signaling Traffic
Required
GSL
Traffic
QoS:
quantile
delay

84 | Presentation Title | Month 2008

Erlang C

Nb of
required
GSL per BSC

Nb of
required
GPU boards
per BSC

All Rights Reserved Alcatel-Lucent 2008, XXXXX

Nb of
required
GSL links
per GPU

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

Number of AterMux PS links per GPU/GP board


 Assessment based on GSL bandwidth
 Needed counters:
 P41 or GTALAPDLN (GPRS_LAPD_DL_traffic_sent_to_BSC),
 P42 or GTALAPULN (GPRS_LAPD_UL_traffic_received_from_BSC).

 Required number of GSL links per BSC:


Measured _ GSL _ traffic =

Max ( P 41, P 42 )
28800

Re quired _ GSL _ traffic = Measured _ GSL _ traffic + 30%m arg in

Nb of Re quired GSL = InverseErlangC (Required_GSL_traffic; quantile; delay )

where quantile = 99% and delay = 0.01s

85 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

Number of AterMux PS links per GPU/GP board


 Assessment based on GSL bandwidth
 Checking the GSL load:
 GSL link load is:

GSL _ load =

Measured _ GSL _ traffic


Nb of required GSL links

 Compare GSL_load with GSL_link_band_capacity


where GSL_link_band_Capacity = 0.78 Erlang
(corresponding to max rate of 50 Kbps in a 64 Kbps Time slot).
 GSL load on a given GPU/GP should not exceed 0.78 Erlang.
It is recommended to increase the number of GSL per GPU/GP if GSL load is greater
than 0.78 Erlang.

86 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

Number of AterMux PS links per GPU/GP board


 Assessment based on the number of GSL messages per second
 Number of GSL messages/s per GPU is calculated as a function of PS traffic (UL and
DL TBF establish requests) and of the number of cells mapped to the GPU/GP.
 GSL_link_Max_capacity per GPU is defined as:
K_GSL * (1000ms/GSL_round_trip_delay) * Nb of GSL links per GPU/GP, where
K_GSL is the maximum number of outstanding I frames on a GSL link
(Min = 1, Max = 32, Default = 7)

For terrestrial links: GSL_round_trip_delay < 500ms


(default value = 60ms)

For satellite links: GSL_round_trip_delay > 500ms


(default value = 500ms)
GSL_round_trip_delay

GPU
K_GSL

BSC

A message is kept in the buffer


during GSL_round_trip_delay

GSL messages
buffer
87 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

Number of AterMux PS links per GPU/GP board


 Assessment based on the number of GSL messages per second
 How to estimate the number of GSL messages per second:
0.3 Msg/s x Nb_cell

 Msg on GSL due to RAE4 mechanism


 Msg on GSL due to PS traffic
Msg on GSL due to PS/CS paging:

Nb_PS_paging/s+ Nb_CS_paging/s

Msg on GSL due to PS data traffic (TBF requests):


1.7 x Nb_TBF_Sig_req/s

TBF (UL & DL) corresponding to RA update


TBF (UL & DL) corresponding to PS data (3 cases)
Low GSL usage (eg. Ping 5 s)

2.5

Medium GSL usage

3.5

High GSL usage (worst case)

The Sum of all rates above gives the Total Nb of Msg/s.


88 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

x Nb_TBF_Data_req/s

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

Number of AterMux PS links per GPU/GP board


 Assessment based on the number of GSL messages per second
 The GSL usage condition can be defined through the following table:
PS traffic
Nb of Msg on GSL

(TBF req)

If #TBF req /s < 20 TBF/s

per TBF_data_req

Available

High

Low

High

3.5

Low

2.5

3.5

GCH
If Ater congestion observed

The values provided in the table above are relibale if T_GCH_INACTIVITY = 3s and
T_GCH_INACTIVITY_LAST = 20s (default setting).
Otherwise (I.e. T_GCH_INACTIVITY = 2s and T_GCH_INACTIVITY_LAST = 6s) GSL load will be
greater due to the consequent increase of deallocation/allocation messages.
89 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

Number of AterMux PS links per GPU/GP board


 Assessment based on the number of GSL messages per second
 Nb_cell: number of cell (at BSC level or managed by the GPU, depending if the
method is applied at BSC or GPU level)
 Nb_PS_paging: number of processed PS paging requests/s is measured by
P391a/3600
 Nb_CS_paging: number of processed CS paging requests/s is measured by P391b/3600
 Nb_UL_TBF_req: the total number of UL TBF requests/s
(P62a+P62b+P62c-P438c+P507)/3600
 Nb_DL_TBF_req: the total number of DL TBF requests/s
(P91a+P91b+P91c+P91d+P91e+P91f+P505)/3600
 Nb_UL_TBF_req_noGSL: number of UL TBF requests/s which will not generate any
message on the GSL is counted by P62b.

90 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

Number of AterMux PS links per GPU/GP board


 Assessment based on the number of GSL messages per second
 Nb_TBF_Sig_req: the number of TBF (UL and DL)/s which correspond to signalling
traffic. The part of DL TBF signalling requests is estimated with %_DL_TBF_Sig_req =
P160 / Nb_DL_TBF_succ.
where P160 = NB_DL_TBF_1_succ (Number of DL TBF establishment requests
requesting 1 slot which are satisfied) and
Nb_DL_TBF_succ = P90a+P90b+P90c+P90d+P90e+P90f+P506. So,
Nb_TBF_Sig_req = %_DL_TBF_Sig_req x (Nb_UL_TBF_req - Nb_UL_TBF_req_noGSL +
Nb_DL_TBF_req)
 Nb_TBF_Data_req: the number of TBF (UL and DL)/s which correspond to data
traffic.
Nb_TBF_Data_req = Nb_UL_TBF_req + Nb_DL_TBF_req - Nb_UL_TBF_req_noGSL Nb_TBF_Sig_req

91 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

Number of AterMux PS links per GPU/GP board


 Assessment based on the number of GSL messages per second
 GSL load (in terms of treated messages)

GSL _ load =

Nb _ GSL _ messages _ per _ sec


100%
GSL _ Link _ Max _ Capacity

 GSL load in terms of treated messages per second on a given GPU/GP should not
exceed 75%
 It is recommended to increase the number of GSL per GPU/GP if GSL load is greater
than 75%.

92 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


GPU/GP Dimensioning

Number of AterMux PS links per GPU/GP board


 Based on total GSL load and final number of required GPU/GP bords, the
number of GSL links per board is:
Nb of Required GSL per BSC
Nb of Re quired GSL per GPU/GP =

Nb of Re quired GPU/GP board

 If the result is greater than 4 (8), we must increase the number of GPU (GP)
boards with 1, and redo the calculations.

 The final number of required AterMux PS links per GPU/GP boards is the
maximum value between the number of links needed for signaling traffic
(GSL) and for user traffic (GCH).

93 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

Gb Interface
Dimensioning

94 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Gb Interface Dimensioning

Gb over Frame Relay


Target
 Find the required number of Gb TS
 Input (counters values):
 PVC downlink Traffic
 PVC uplink Traffic
 PVC downlink average throughput
 PVC uplink average throughput
 Customer requirements for QoS (delay and quantile)

 Output:
 Nb of Gb TS

95 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Gb Interface Dimensioning

Gb over Frame Relay


 Method: ErlangC
 Needed counters:
 P45 or GTGPVCDLN (GPRS_PVC_DL_traffic_from_SGSN),
 P46 or GTGPVCULN (GPRS_PVC_UL_traffic_to_SGSN).

INPUT

Required Gb
Traffic
QoS:
% Quantile of x
delay sec

96 | Presentation Title | Month 2008

METHOD

Erlang C

OUTPUT

Nb of required
Gb Timeslot per
link

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Gb Interface Dimensioning

Gb over Frame Relay


 The required Gb traffic is:
Measured _ Gb _ traffic =

max( P 45,P 46 )
28800

Re quired _ Gb _ traffic = Measured _ Gb _ traffic + 15%m arg in

 The required number of Gb TS is:


No _ Gb _ TS _ per _ link = ErlangC (Re quired _ Gb _ traffic ; quantile; delay )
where quantile = 99% and delay = 0.01s

 The maximum number of Gb links from one GPU/GP board to the SGSN is 8.
 Maximum 31 Gb TS (TS no. 1 to 31) can be configured per one Gb link.

97 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Gb Interface Dimensioning

Gb over Frame Relay


 The Gb over FR configuration
 Parameters:
Bit rate

 Tc (Measurement interval) = 1s

ACCESS_RATE_BC
EIR

 CBS (Committed Burst Size)


 CIR (Committed Information Rate)

EBS
NIR
CIR

CIR = (CBS*8)/Tc
 NIR (Normal Information Rate)

CBS

NIR CIR
 EBS (Excess Burst Size)

Tc

 EIR (Excess Information Rate)


EIR = CIR+EBS*8/Tc
 AC (Access Rate Bearer Channel)
AC CIR(1+EBS/CBS)
 NbGbTS = AC/64kbps
98 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

time

BSS Dimensioning Methods in B10


Gb Interface Dimensioning

Gb over Frame Relay


 The Gb over FR configuration
 Rules if no direct access is used between MFS and SGSN:
CIR NIR CIR x (1 + EBS/CBS) ACCESS_RATE_BC

 Example:
Parameter

99 | Presentation Title | Month 2008

value

unit

Tc

CBS

124

kbyte

CIR

992

kbps

NIR

992

kbps

EBS

kbyte

EIR

1008

kbps

AC

1008

kbps

NbGbTS

16

number

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Gb Interface Dimensioning

Gb over Frame Relay


 The Gb over FR configuration
 Rules if direct access is used between MFS and SGSN:
CIR = 0 <=> CBS = 0 => EBS > 0 (mandatory)
NIR = 0 (recommanded)
EBS = ACCESS_RATE_BC (expressed in kbit/s)/8, if CIR = 0 (recommanded)

 Example:
For CBS = 0; CIR = 0 and NIR = 0:

100 | Presentation Title | Month 2008

Parameter

value

unit

Tc

EBS

160

kbyte

AC

1280

kbps

EIR

1280

kbps

NbGbTS

20

number

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Gb Interface Dimensioning

Gb over IP
 Using Gigabit Ethernet link to the aggregation Router, the max load is:
 For MxMFS: 1560 GCHperGP * 16 Kbps = 24.96 Mbps
Assuming all this traffic coming from SGSN for one MxMFS with 21 GP boards we get:
21 boards*24.96 Mbps = 524.16 Mbps  Half of the GigaEthernet link capacity

 For Legacy MFS: 480 GCHperGPU * 16 Kbps = 7.68 Mbps


Assuming all this traffic coming from SGSN for one MFS DS10 with 30 GPU boards we
get:
30 boards*7.68 Mbps = 230.4 Mbps  Quarter of the GigaEthernet link capacity

Congestion is not expected at the level of the link to the aggregation router.
Any Congestion seen afterwards is dependent on bandwidth management of the
core IP network.

101 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Gb Interface Dimensioning

Gb over IP
Target
 Find the DL and UL traffic during BH
 Input (counters values):
Ip Endpoint downlink data volume
Ip Endpoint uplink data volume

 Output:
DL and UL data rate

 Counters in the MFS


 New counters per IP Endpoint are defined in case of GboIP:
P34a (TIME_SGSN_IP_ENDPOINT_NOT_AVAIL_GBIP),
P45a (NB_KBYTES_RECEIVED_FROM_SGSN_GBIP),
P46a (NB_KBYTES_SENT_TO_SGSN_GBIP).

102 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Gb Interface Dimensioning

Gb over IP
 Data rate calculation in DL (SGSN to MFS) and in UL (MFS to SGSN)
 Data rate DL/UL, at IP Endpoint level or aggregated at GP or MFS level:
 DL Data rate [Kbps] = 1.233*(P45a*8 )/(3600-P34a)
 UL Data rate [Kbps] = 1.233*(P46a*8)/(3600-P34a)

 Explanation:
 Assuming LLC PDU and BSSGP payload are 300 bytes, NS, UDP, IP and Fast Ethernet
overhead are 70 bytes (i.e. 4+28+38),
 SNS layer (where Kbytes counts is done) overhead ratio at this layer is 0.23% (i.e.
70/300).

103 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Gb Interface Dimensioning

Gb over IP
 GboIP traffic estimation based on actual GboFR traffic
 Estimated Traffic:
 Estimated DL IP Data rate [Kbps] = (370/306)*(P45*8)/(3600-P34)
 Estimated UL IP Data rate [Kbps] = (370/306)*(P46*8)/(3600-P34)

 Explanation:
 Assuming LLC PDU and BSSGP payload are 300 bytes, NS, UDP, IP and Fast Ethernet
overhead are 70 bytes (i.e. 4+28+38), NS and FR overhead are 6 bytes (i.e. 4+2).
 Packet size increase ratio = Total IP packet (i.e. 370) / Total FR packet (i.e. 306)

104 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

Location Area
Dimensioning

105 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

Location Area definition


 Set of cells which are paged each time one Terminating Call is initiated
 Specified with a unique Location Area Code (LAC)
 Position of each MS in a specific Location Area stored in HLR / VLR
 MS tells mobile network (using SDCCH resources)
 when it moves from one LAC to another (Location Update)
 periodically its current LAC position (Periodical LU)

Location Area size


 Trade off between
 Signalling load in cells located at LAC border
SDCCH resources in each cell has to be sized accordingly

 Number of simultaneous pagings in each cell of the LAC


All MS in LAC and in MT call are paged simultaneously
106 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

CCCH Sharing
 Air interface
 Pagings sent in DL on CCCH
 Sharing between PCH & AGCH within one CCCH M-51 frame (235 mS
duration)
CCCH_CONF
Combined mode
3 blocks
Non combined mode
9 blocks
Nb of AGCH blocks = BS_AG_BLKS_RES

 Nb of PCH blocks = Nb of total CCCH blocks - BS_AG_BLKS_RES


CCCH 0

CCCH 1

CCCH 2

Reserved for AGCH

CCCH 3

CCCH 4

CCCH 5

CCCH 6

CCCH 7

6 CCCH blocks are available for the PCH

Example of AGCH and PCH organisation when BS_AG_BLKS_RES = 3 (Non combined mode)

107 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

CCCH 8

BSS Dimensioning Methods in B10


Location Area Dimensioning

PCH content
 Air interface
 Nb of pagings per CCCH block, depends on
Paging request type
TYPE 1
TYPE 2
- IMSI
- (P)TMSI, (P)TMSI, (P)TMSI
- (P)TMSI
- (P)TMSI, (P)TMSI,IMSI
- IMSI,IMSI
- IMSI, (P)TMSI
- (P)TMSI, (P)TMSI

TYPE 3
- (P)TMSI, (P)TMSI, (P)TMSI, (P)TMSI

Subscribers behavior (mobile often on/off)

 Paging efficiency
between 1.5 3
2.5 pagings / PCH block considered usually in dimensioning

108 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

PCH content

Paging request
message
(type 1, 2 or 3)

MS

PCH blocks
on CCCH

Paging command
Message
(RSL)

Cell

TC

MSC

AterMUX-CS

BTS

Paging request
or
Packet downlink
assignment
message

109 | Presentation Title | Month 2008

CS Paging
(SS7)

Gs

Abis
BSC
Paging command
or
Immediate assign
command message
(RSL)

AterMUX-PS

(GSL)
PS/CS Paging
or
Channel assignment
downlink message

All Rights Reserved Alcatel-Lucent 2008, XXXXX

Gb
SGSN
MFS
GPU

BSS Dimensioning Methods in B10


Location Area Dimensioning

PCH capacity
 Non-Combined cell
 BS_AG_BLKS_RES = 4 (AGCH blocks)

9 - 4 = 5 PCH blocks (default configuration)

 5 PCH blocks/Multiframe * (3600s / 235 ms) =


76 594 PCH blocks/ hour
 2.5 paging / Block x 76 594 Blocks =
191 485 paging/hour at 100% load
 If 60 % engineering limit applied:

114 891 paging/hour


31.91 paging/s

110 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

PCH capacity
 Combined cell
 BS_AG_BLKS_RES = 1

3 - 1 = 2 PCH blocks

 2 PCH blocks/Multiframe x (3600s / 235 ms) =


30 638 PCH blocks/ hour
 2.5 paging / Block x 30 638 Blocks =
76 595 paging/hour at 100% load
 If 60 % engineering limit applied:

45 957 paging/hour
12.76 paging/s

111 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

AGCH content

Access grant
message
(IA, IAE or IAR)
AGCH blocks
MS on CCCH

Immediate assign
command message
(RSL)

Immediate assignment
or
Immediate assignment
reject message

BTS
Cell

Access grant
message
(PUA, PDA or IAR)

Abis
BSC
Immediate assign
command message
(RSL)

AterMUX-PS

(GSL)
Channel assignment uplink
(EGPRS Uplink assign.),
Channel assignment downlink
(Downlink assign.)
or
Channel assignment uplink
message (Assign. reject)

MFS
GPU

Note: IA= Immediate Assign; IAE=Immediate Assign Extended; IAR= Immediate Assign Reject;
PUA= Packet Uplink Assignment; PDA= Packet Downlink Assignment.
112 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

AGCH capacity
 Non-Combined cell
 BS_AG_BLKS_RES = 4
 4 AGCH blocks/Multiframe x (3600s / 235 ms) =
61 272 AGCH blocks/ hour
 1 Immediate Assign message / Block x 61 272 Blocks =
61 272 paging/hour at 100% load
 If 60 % engineering limit applied:

36 763 IA message/hour
10.21 IA message/s

 AGCH efficiency: between 1 2 (2 if Immediate Assign Extended)


1 Immediate Assign message / AGCH block used usually in dimensioning

113 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

AGCH capacity
 Combined cell
 BS_AG_BLKS_RES = 1
 1 AGCH block/Multiframe x (3600s / 235 ms) =
15 318 AGCH blocks/ hour
 1 Immediate Assign message / Block x 15 318 Blocks =
15 318 paging/hour at 100% load
 If 60 % engineering limit applied:

9 180 IA message/hour
2.55 IA message/s

114 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

AGCH and PCH capacity


 Non-Combined cell

PCH
blocks
6
5*
4**

AGCH
blocks
3
4
5

Paging
Request/s
(PCH
blocks/s)
25.53
21.27
17.02

Access
Grant
msgs/s
(AGCH
blocks/s)
12.75
17.02
21.27

Paging
msgs/s at
60% limit
38.29
31.91
25.53

ImmAs
msgs/s at
60% limit
7.65
10.21
12.76

PCH
msgs/h at
60% limit
137851
114893
91908

Notes: * Alcatel recommended default configuration.


** Recommended for 16 TRX cells with CS only.

115 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

ImmAs
msgs/h at
60% limit
27540
36763
45936

Total #
msgs
sent/h at
60% limit
165391
151656
137844

BSS Dimensioning Methods in B10


Location Area Dimensioning

B9 limitations
 Abis interface limitation
 max paging load of 33 paging commands per second = 118 800 paging/hour

 G2 BSC limitation
 max paging load of 70 paging commands per second = 252 000 paging/hour

 MxBSC limitation
 max paging load of 95 paging commands per second = 342 000 paging/hour

116 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

Location Area dimensioning in B9


 G2 BSC:

2 Location Areas
with an average of
132 cells per LA

LA
LA

Abis
33 paging/s

G2 BSC
(max 264 cells)

A
70 paging/s

 MxBSC:

3 Location Areas
with an average of
88 cells per LA

LA
LA

Abis
33 paging/s

Mx BSC
(max 264 cells)

LA

117 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

A
95 paging/s

BSS Dimensioning Methods in B10


Location Area Dimensioning

B10 limitations
 Abis interface limitation
 max paging load of 33 paging commands/second 118 800 paging/hour
 max paging load of 66 paging commands/second 237 600 paging/hour with mCCCH

 G2 BSC limitation
 max paging load of 70 paging commands/second = 252 000 paging/hour

 MxBSC limitation
 max paging load of 120 paging commands/second= 432 000 paging/h
(expected in B10)

118 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

B10 limitations
 CCCH capacity in B10 with mCCCH
 (rounded figures)
Nb CCCH TS BS_AG_BLKS_RES PCH blocks
1
1
1
2
2
2
2

119 | Presentation Title | Month 2008

3
4
5
3
4
5
6

6
5
4
12
10
8
6

AGCH blocks Max paging/s Max assign/s


at 60% load
at 60% load
3
38
7
4
32
10
5
25
12
6
76
15
8
63
20
10
51
25
12
38
31

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

Location Area dimensioning in B10


 G2 BSC without mCCCH:

2 Location Areas
with an average of
132 cells per LA

LA
LA

Abis
33 paging/s

G2 BSC
(max 264 cells)

A
70 paging/s

 G2 BSC with mCCCH:


1 Location Area with
up to 264 cells per
LA

120 | Presentation Title | Month 2008

LA

Abis
66 paging/s

G2 BSC
(max 264 cells)

All Rights Reserved Alcatel-Lucent 2008, XXXXX

A
70 paging/s

BSS Dimensioning Methods in B10


Location Area Dimensioning

Location Area dimensioning in B10


 MxBSC without mCCCH:

4 Location Areas
with an average of
125 cells per LA

LA
LA

LA
LA

Abis
1 CCCH
33 paging/s

Mx BSC
(max 500 cells)

A
120 paging/s

 MxBSC with mCCCH:


2 Location Areas
with an average of
250 cells per LA

LA
LA

121 | Presentation Title | Month 2008

Abis
2 CCCH
66 paging/s

Mx BSC
(max 500 cells)

All Rights Reserved Alcatel-Lucent 2008, XXXXX

A
120 paging/s

BSS Dimensioning Methods in B10


Location Area Dimensioning

Location Area dimensioning in B10


 There is no relationship between the BSC paging mechanism and CCCH
configuration.
 The BSC has just the task of broadcasting paging messages per LAC.
 If paging coming from MSC has a high rate, the BSC will send on Abis paging
commands at high speed, ignoring the fact that some cells are not able to
send it.
 As a consequence, some paging commands shall be discarded by cells with
less radio capacity compared with BSC capacity for sending paging on Abis.

122 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

Location Area dimensioning in B10


 The Paging load must be assessed during busy hour.
 If the paging rate on Abis doesnt exceed 33 paging/s, cells with 1 CCCH TS
may be used without loses.
 If the paging rate is higher (up to 66 paging/s), all the cells in LAC should be
configured with 2 CCCH TS, to avoid paging messages to be discarded.
 If the paging rate per LAC is higher than 66 paging/s, the LAC should be split.

123 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

Dimensioning Target
 Verify if the Location Area size is OK
 Method:
 Check the BSC and Abis limits
 Check the related parameters
 Check the load on CCCH (PCH, AGCH, RACH)

 Input (counter values):


 Paging rate, Nb of paging messages discarded, PS Paging rate, AGCH load, Nb of IA
messages discarded

 Output
 Location area load

124 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

Method for Location area:


 Needed telecom parameters:
 BS_AG_BLKS_RES
 CCCH_CONF

 Needed counters for PCH and AGCH:


 MC8a = NB_CELL_PAGING_CMD
 MC8b = NB_CELL_IMM_ASS_CMD
 MC8d = NB_CELL_IMM_ASS_REJ
 P49 = NB_IMM_ASS_AGCH
 MC27 = CCCH_TS_Cell_available

125 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

Method for Location area:


 New counters for CCCH in B10:
 MC925a = NB_AGCH_USEFUL_BLOCKS_SENT
 MC925b = NB_PCH_USEFUL_BLOCKS_SENT
 MC925c = NB_BUSY_RACH_SLOTS
 MC925d = NB_CHANNEL_RQ_RADIO
 MC925e = NB_ASSIGN_CMD_RECEIVED_ABIS
 MC925f = NB_ASSIGN_CMD_DISCARDED
 MC925g = NB_PAGING_CMD_RECEIVED_ABIS
 MC925h = NB_PAGING_CMD_DISCARDED
 MC930 = NB_ABIS_PAGING_MESSAGE_RECEIVED

126 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

Method for Location area:


 B9 Method

This value represents G2 BSC limit.


For MX BSC the limit is 342 000.

Check BSC Limitation

Yes

No

Re-Design LA, and/or


Reduce nb of LA per BSC

Total MC8a > 252000


(Total for all LA in the BSC)

Check Um Limitation
No

All Cells in a LA are non-combined

No

Yes

No

127 | Presentation Title | Month 2008

This value represents 60%


of PCH channel capacity.
Yes

MC8a >114,891

MC8a > 57,446

OK

Yes

Change to non-combined
Re-Design LA

OK

All Rights Reserved Alcatel-Lucent 2008, XXXXX

Re-Design LA

BSS Dimensioning Methods in B10


Location Area Dimensioning

Method for Location area:


 B10 Method

This value represents G2 BSC limit.


For MX BSC the limit is 432 000.

Check BSC Limitation

Yes

No

Re-Design LA, and/or


Reduce nb of LA per BSC

Total MC8a > 252000


(Total for all LA in the BSC)

Check Um Limitation
No

All Cells in a LA are non-combined

No

Yes

No

128 | Presentation Title | Month 2008

Yes
MC8a >114,891

MC8a > 57,446

OK

This value represents 60%


of PCH channel capacity.

Yes

Change to non-combined
Re-Design LA

OK

All Rights Reserved Alcatel-Lucent 2008, XXXXX

Re-Design LA

This value must be double


in case of 2 CCCH TS.

BSS Dimensioning Methods in B10


Location Area Dimensioning

Method for Location area (and Routing Area):


 Abis approach
 If (CS+PS) Paging load is less than 60% of PCH channel capacity:
 The LA size is OK (no overload)
 It is possible to keep RA size = LA size

LA

RA

Note:
Total PCH channel capacity is 191 485 paging/hour for 1 CCCH TS and
382 970 paging/hour for 2 CCCH TSs (for BS_AG_BLKS_RES = 4).
(CS+PS) Paging load = MC8a
60% represents engineering limit
129 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

Method for Location area (and Routing Area):


 Abis approach
 If (CS+PS) Paging load is greater than 60% of PCH channel capacity and if
PS Paging load/(CS+PS) Paging load is greater than 20% then:
 Is necessary to have RA size < LA size, so LA must be splitted in two or more RAs.

RA

RA1
RA2

LA

Note: (CS+PS) Paging load = MC8a


PS Paging load = P53a
130 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

Method for Location area (and Routing Area):


 Abis approach
 If (CS+PS) Paging load is still greater than 60% of PCH channel capacity after
PS Paging load/(CS+PS) Paging load has been changed to be under 20%, then:
 Is necessary to splitt the initial LA in two or more LAs.

LA

LA1
LA2

131 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

BSS Dimensioning Methods in B10


Location Area Dimensioning

Method for Location area (and Routing Area):


CCCH frame tuning at cell level
 Checking during busy hour
 Check BS_AG_BLKS_RES value
 Check AGCH load (MC925e/AGCH capacity) and congestion (MC925f/ MC925e)
 Check PCH load (MC925g/PCH capacity) and congestion (MC925h/ MC925g)

 Tuning
 If PCH load is below 60% and no congestion but AGCH load is above 60% and with
congestion => BS_AG_BLKS_RES may be increased by 1.
 If PCH load is above 60% and with congestion but AGCH load is below 60% and without
congestion => BS_AG_BLKS_RES may be decreased by 1.

132 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

www.alcatel-lucent.com
www.alcatel-lucent.com

133 | Presentation Title | Month 2008

All Rights Reserved Alcatel-Lucent 2008, XXXXX

You might also like