You are on page 1of 2

HIRARC FORM

Company

3D Construction Eng. Entp.

Conducted by:
(name, designation, date)

Location
Process

Plastering Work/Exterior Wall.


Mr. Ng
(Site Manager)
25 Julai 2016

Review date
Next review date

Approved by:
(name, designation, date)

HAZARD IDENTIFICATION
No

Work
activity

Hazard

Erect
working
platform

Unguarde
d floor

Loading
concrete
onto
platform
Plasterin
g

Mr. Rahman (Supervisor), Mr. Raju


& Mr. Liew (Plasterer)
24 Jun 2016 to 30 July 2016
2 AUGUST 2016
31 AUGUST 2016

RISK ASSESSMENT

RISK CONTROL

Cause and
effect from
the hazard
Head
injury / fatal

Existing risk
control (if
any)
Safety helmet,
housekeeping

Likelihoo
d

Severity

Risk

20 (High)

Uneven
floor

Fall of
person /
broken leg

Housekeeping,
safety shoes

12
(medium)

Defective
platform

Fall from
height / fatal

Safety belt

20 (High)

Recommended
control
measures
1) Fence
upper floor
exposed
edges
2) Establish
Safe Work
Procedure use
JSA
Put plank on
floor, anti slip
mat

Person in
charge (due
date)
1) Muthu/
20 Ogos 07
completed
2) Ravi/ 2
Sept 07
completed

1) Install
handrail 2) Use
new plank as
platform

Muthu/26
July 07
completed

Muthu/ 26
July 07
completed