HAZARD IDENTIFICATION
No
Work
activity
Hazard
Erect
working
platform
Unguarde
d floor
Loading
concrete
onto
platform
Plasterin
g
RISK ASSESSMENT
RISK CONTROL
Cause and
effect from
the hazard
Head
injury / fatal
Existing risk
control (if
any)
Safety helmet,
housekeeping
Likelihoo
d
Severity
Risk
20 (High)
Uneven
floor
Fall of
person /
broken leg
Housekeeping,
safety shoes
12
(medium)
Defective
platform
Fall from
height / fatal
Safety belt
20 (High)
Recommended
control
measures
1) Fence
upper floor
exposed
edges
2) Establish
Safe Work
Procedure use
JSA
Put plank on
floor, anti slip
mat
Person in
charge (due
date)
1) Muthu/
20 Ogos 07
completed
2) Ravi/ 2
Sept 07
completed
1) Install
handrail 2) Use
new plank as
platform
Muthu/26
July 07
completed
Muthu/ 26
July 07
completed