You are on page 1of 2

/l>

ilNo.
ofyucstioiis:
Total
No. of Questions
: 5|

5|SFAT-nL-I ^^"^^ I /
ST. AT

382[46701-307yrot-M7isFatx^0^2\v
P2382
1M.B.A. (Operations Management (OPE) Specialization)

305 (OPE): PLANNING AND CONTROL OF OPERATIONS


(2013 Pattern) (Semester - III)

Time : 3 Hours /

/.V/n.v. Marks: SO

Instructions to the candidates:


1)AH questions are compulsory.
2)Each question has an internal option.
3)Each question carries 10 marks.

Ql) a) Why is planning Sc control of operations required in an industry? What


are the main functions of planning & control?

OR
b) What are the different types of documents raised to perform dispatch
function effectively in a manufacturing organization?

Q2) a) Discuss and classify the Forecasting Time Horizon. Also list out the
salient features of this classification.

OR
b) What is Demand Forecasting? Discuss briefly the different methods of
forecasting.

Q3) a) What is Master Production Scheduling (MPS)? How is it related to


Aggregate Production Planning?

OR
h) Discuss in detail the methods used for Aggregate production planning?

P.T.O.

Dee 1oiH>
Q4) a) Discuss the aspect of planning framework for dependent demand items.

OR
b) What is the relationship between MRP and modern ERP system?

Q5) a) What is Gantt chart? What is its use in scheduling?

OR
b) How is the scheduling of a flow-shop done in an organization?

o o o

[4670J-307

You might also like