Area
Activity
Loads
Nos.
Watt
KW
Remarks
Ground Floor
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Luminaries
Emergency
Exit
Cooling
Coms & Others
Dryer
Cutting Sec , M/C
TT
T
TMS
CCL
CLMS
LED
LEDC
IPCL
Exit Sign
EmL
Ceiling Fan
E/F SP
E/F TP
Split A/C
Camera
Com
Com + Printer
Lift
Estimated Load
Future Increase
3
6
126
8
13
16
40
4
4
3
6
4
2
1
1
10%
1500
1500
24
12
12
20
3
18
36
3
24
24
80
100
1100
2250
20
400
700
20000
4.50
0.14
1.51
0.10
0.26
0.05
0.12
0.10
0.10
0.30
6.60
0.08
0.80
0.70
20.00
35.35
3.54
24
25
Total Load
38.89
Project : Alpha
Electrical Load Calculation
Area
Activity
Loads
Nos.
Watt
45
2
2
3
10
10
400
700
750
1500
400
24
12
12
20
3
18
36
3
24
24
80
KW
Remarks
First Floor
1 1F Finishing Sec. 1
2 1F Finishing Sec. 2
3 5 Inspection Room
4
5
6
7
8
9
10
11
12
13
14
15
16
Finishing
Spot Remove
Niddle Machines
T Socker
Snap M/C
Luminaries
Emergency
Exit
Iron M/C
Spot Remove M/C
Niddle Detector
Thread Socker
Snap M/C
TT
T
TMS
CCL
CLMS
LED
LEDC
IPCL
Exit Sign
EmL
Ceiling Fan
9
22
102
38
44
4
4
6
18.00
1.40
1.50
4.50
4.00
0.24
0.11
0.07
1.84
1.37
0.13
0.10
0.10
0.48
17
18
19
20
21
22
23
24
25
26
27
28
29
E/F SP
E/F TP
Split A/C
Camera
Projecter
Laptop
Com
Com + Printer
Cooling
Coms & Others
Estimated Load
Future Increase
4
7
7
10
1
10
5
2
100
1100
2250
20
350
100
400
700
0.40
7.70
15.75
0.20
0.35
1.00
2.00
1.40
62.62
6.26
10%
Total Load
68.88
Project : Alpha
Electrical Load Calculation
Area
Activity
Loads
Nos.
Watt
400
10
204
8
350
24
12
12
20
KW
Second Floor
1
2
3
4
5
2F Sewing Section
Sewing Machinary
Luminaries
Sewing M/C
TT
T
TMS
CCL
140.00
0.24
2.45
0.10
0.00
Remarks
6
7
8
9
10
11
12
13 IED Meeting Room
14
15
16
17
18 2F 3 Rooms
19
20
21
22
23
CLMS
LED
LEDC
IPCL
Exit Sign
EmL
Ceiling Fan
E/F SP
E/F TP
A/C
Computer
Camera
COM/LAP
Emergency
Exit
Cooling
Computers
Estimated Load
Future Increase
26
6
16
74
4
4
1
4
8
3
4
8
3
3
18
36
3
24
24
80
100
1100
2250
700
20
200
0.08
0.11
0.58
0.22
0.10
0.10
0.08
0.40
8.80
6.75
2.80
0.16
0.60
163.55
16.36
10%
Total Load
179.91
Project : Alpha
Electrical Load Calculation
Area
Activity
Loads
Nos.
Watt
400
10
204
350
24
12
KW
1
2
3
2F Sewing Section
Sewing Machinary
Luminaries
Sewing M/C
TT
T
140.00
0.24
2.45
Remarks
4
5
6
7
8
9
10
11
12
13 IED Meeting Room
14
15
16
17
18 2F 3 Rooms
19
20
21
22
23
Ground Floor
1st. Floor
2nd. Floor
3rd Floor
4th Floor
5th Floor
Compressor (1x15KW)
Gas Boiler
Electric Boiler (2x42KW)
TMS
CCL
CLMS
LED
LEDC
IPCL
Exit Sign
EmL
Ceiling Fan
E/F SP
E/F TP
A/C
Computer
Camera
COM/LAP
Emergency
Exit
Cooling
Computers
Estimated Load
Future Increase
Total Load
38.89
68.88
179.91
180.02
180.02
180.02
15.00
2.00
84.00
KW
KW
KW
KW
KW
KW
KW
KW
KW
8
26
22
74
4
4
1
4
8
3
4
8
3
10%
12
20
3
18
36
3
24
24
80
100
1100
2250
700
20
200
0.10
0.00
0.08
0.00
0.79
0.22
0.10
0.10
0.08
0.40
8.80
6.75
2.80
0.16
0.60
163.66
16.37
180.02
DTW
Centrifugal Pump
Dinning
Child Care
Doctor Rm.
Office Area
Surrounding/Street Light
Focus Light
Total Load
Transformer Rating
15.00
5.00
4.00
0.50
2.50
15.00
2.00
2.00
KW
KW
KW
KW
KW
KW
KW
KW
974.75 KW
1218.43 KVA
1250.00 KVA