S.NO.
DESCRIPTION
UNIT
QTY
Installation , testing and commissioning of VRV/VRF air conditioning units of different capacities (as per mentioned in schedule) complete
including installation of supports, brackets, branch distributor rubber isolator, flashing, gas charging, flexible duct connector, control wiring &
external / PVC for internal from outdoor unit to indoor unit complete in all respects ready to operate.(EXCLUDING LIFTING/TRANSPORTA
OF A/C SUPPLIER
CU-02 ( 32 HP = 16 HP + 16 HP Outdoor Units )
(Wall Mounted indoor units 1 HP)
(Wall Mounted indoor units 1.25 HP)
(Wall Mounted indoor units 2 HP)
(Wall Mounted indoor units 2.5 HP)
Set
No.
No.
No.
No.
2
1
1
11
4
SU
SECTION - 2 PIPING
Installation, testing and commissioning of refrigerant pipes (liquid + gas) with insulation, PVC tape
wrapping + control wiring from indoor to outdoor for Split type units complete in all respects ready to
operate.
Lot
SU
SECTION - 4 ELECTRICAL
5.1
Supply and installation of electrical wiring from owner supplied electrical panel to all VRF indoor units
and outdoor units
Lot
SU
Lot
SU
AMOUNT
(Rs.)
ditioning units of different capacities (as per mentioned in schedule) complete in all respects, ready to operate
bber isolator, flashing, gas charging, flexible duct connector, control wiring & power wiring (connection) in G.I. for
plete in all respects ready to operate.(EXCLUDING LIFTING/TRANSPORTATION OF OUTDOOR UNITS) PART
OF A/C SUPPLIER
40,000
2,000
2,000
2,500
3,000
SUB TOTAL:
80,000
2,000
2,000
27,500
12,000
123,500.00
500,000
SUB TOTAL:
500,000
SUB TOTAL:
500,000
500,000
SUB TOTAL:
100,000
100,000.00
1,223,500.00