DAFTAR HARGA SATUAN BAHAN DAN UPAH KERJA

PEKERJAAN
LOKASI
PROVINSI
T.A

:
:
:
:

Rumah Tinggal Type 151.5 M


Kota Jayapura
PAPUA
2011

NO

URAIAN JENIS

SATUAN

HARGA SATUAN
( Rp. )
4

1 BAHAN BATU DAN PASIR


Batu Kali
Batu Tela
Pasir Pasang /Halus
Pasir Beton/Cor
Kerikil
Batu Pecah Dia 3-5 Cm
Batu Pecah Dia 5-7 Cm
Roaster

M
Bh
3
M
3
M
3
M
3
M
3
M
Bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

365,000.00
2,300.00
365,000.00
375,000.00
300,000.00
825,000.00
765,000.00
15,000.00

2 BAHAN TANAH TIMBUNAN


Tanah Urug
Pasir Urug
Pasir Beton
Pasir Kapur

M
3
M
3
M
3
M

Rp
Rp
Rp
Rp

205,000.00
330,000.00
225,000.00
-

3 BAHAN SEMEN
Semen Bosowa 50 Kg
Semen Tonasa 50 Kg
Semen Tiga Roda 50 Kg
Semen Warna
Semen Putih

Zak
Zak
Zak
Kg
Kg

Rp
Rp
Rp
Rp
Rp

85,000.00
17,800.00
17,800.00

4 BAHAN LANTAI
Ubin Porselin DN 20 x 20
Ubin Keramik 30 x 30 ( Polos )
Ubin Keramik 10 x 10 ( Polos )
Keramik 30 x 30 ( Romance Italia Tile)
Keramik 10 x 20
Tegel Plint 10/30
Tegel Plint dinding 5/15

Bh
Bh
Bh
M2
Bh
M2
M2

Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,600.00
9,090.91
6,500.00
-

5 BAHAN KAYU
Kayu Besi Papan
Kayu Besi Balok
Kayu Matoa Papan
Kayu Matoa Balok
Kayu Merah Papan
Kayu Merah Balok
Kayu Matoa (Balok, Papan)
Kayu Bekisting ( Putih)
Kayu Buah
Kayu Galam 8 - 10/4m
Tripleks 3 mm
Tripleks 4 mm

M3
M3
M3
M3
M3
M3
M3
M3
Btg
Btg
Lbr
Lbr

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,600,000.00
3,600,000.00
2,200,000.00
2,200,000.00
35,000.00
65,000.00
85,000.00

Tripleks 5 mm
Tripleks 9 mm
Gypsum 2,40 x 1,20
GRC 2,40 x 1,20
Teakwood
List Plafond Kayu Matoa 1,5 x 4 cm
List Plafond Kayu Gypsum 1,5 x 4 cm
List Plafond Kayu GRC 1,5 x 4 cm

Lbr
Lbr
Lbr
Lbr
Lbr
M'
M'
M'

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

128,000.00
152,000.00
-

6 BAHAN ATAP DAN PAKU


Nok Seng Multiroof uk
Nok Seng Multiroof uk. 80 x 70 cm
Atap Zincalume Multiroof ( Sakura ) uk
Atap Zincalume Multiroof uk.
Seng Gelombang BJLS 0,30
Seng Plat BJLS 0,30
Seng Gelombang BJLS 0,20
Seng Plat BJLS 0,20
Paku Halus
Paku 3,5 - 7 " ( Campur )
Paku Seng Gelombang
Paku Beton
Paku Tripleks

M'
M'
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Kg
Kg
Kg
Kg
Kg

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

77,500.00
77,500.00
55,000.00
55,000.00
25,000.00
27,000.00
26,500.00
25,000.00
25,000.00

7 BAHAN BESI BETON


Besi Beton diameter 6mm
Besi Beton diameter 10mm
Besi Beton diameter 12mm
Besi Beton diameter 16mm
Besi Beton diameter 19mm
Besi Beton diameter 22mm
Kawat Ikat Beton
Kawat Duri

Kg
Kg
Kg
Kg
Kg
Kg
Kg
M

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

32,000.00
73,000.00
85,000.00
141,000.00
23,000.00
5,000.00

8 BAHAN KACA DAN GLASS BLOCK


Kaca Bening 5 mm ( 122 x 182 )
Kaca Rayban 5 mm ( 122 x 182 )
Kaca Bening 3 mm ( 122 x 182 )
Glass Block

Lbr
Lbr
Lbr
Bh

Rp
Rp
Rp
Rp

275,000.00
325,000.00
200,000.00
-

9 BAHAN PENGUNCI
Kunci Tanam 2 Slagh Union
Handle Pintu
Kunci Tanam 2 Slagh Merk Ulmer
Kunci Tanam 2 Slagh Merk Royal
Kunci Tanam 2 Slagh Merk Yale
Kunci Tanam 2 Slagh Merk Valentino
Kunci Tanam 1 Slagh
Grendel Sedang
Haak Angin
Spring Knive
Engsel H Pintu
Engsel H Jendela
Kunci Lemari

Pas
Bh
Pas
Pas
Pas
Pas
Pas
Bh
Bh
Bh
Pas
Pas
Bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

230,000.00
12,500.00
18,000.00
25,000.00
22,000.00
-

10 BAHAN INSTALASI LISTRIK


Lampu SL 18 Watt merk Phillips
Lampu SL 20 Watt merk Phillips
Lampu Pijar 40 Watt
Lampu TL 40 Watt + Bak
Vitting Lampu Pijar
Saklar Dobel Tempel ( Broco )
Saklar + Stop Kontak ( Tanam NG )
Saklar Ganda ( Broco )
Saklar Tunggal ( Broco )
Stop Kontak ( Broco )
Box Sekring Otomat 2 Group ( Presto )
Kabel NYM 3 x 1 1/2 ( Merk Eterna )
Kabel NYM 3 x 1 1/2 ( Merk Split )
Kabel NGA 3 x 1 1/2 ( Merk Eterna )
Kabel NGA 3 x 1 1/2 ( Merk Split )
Terminal Listrik
Isolator
MCB 8 Ampere Made Germany
MCB 10 Ampere Made Germany
MCB 10 Ampere Merk Sweden
Box Sekring Otomat 2 Group ( Presto )
Box Sekring Otomat 4 Group ( Presto )
Pipa PVC 5/8"

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M
M
M
M
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M'

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

35,000.00
90,000.00
30,000.00
35,000.00
35,000.00
60,000.00
25,000.00
25,000.00
60,000.00
-

11 BAHAN CAT DAN ALAT BANTU


Cat Plafond
Cat Tembok
Cat Tembok
Cat Tembok
Cat Tembok
Cat Tembok
Cat Tembok
Cat Tembok
Cat Tembok

Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

230,000.00
230,000.00
230,000.00
230,000.00
230,000.00
230,000.00
230,000.00
230,000.00

12 BAHAN CAT DAN ALAT BANTU


Cat Kayu
Cat Minyak Altex
Cat Minyak Mawar
Cat Atap Seng
Cat Atap Genteng Bell Mas Roff
Cat Atap Genteng Neptune Roff
Cat Kilat Kayu
Cat Residu
Cat Tembok
Dempul Matek
Dempul Kayu
Meni Kayu
Minyak Cat
Politur
Amplas
Kuas 2 "
Kuas 3 "
Kuas 4 "
Kuas Rool 8

Klg
Klg
Klg
Klg
Klg
Klg
klg
Klg
Klg
Kg
Kg
Ltr
Ltr
Ltr
Lbr
Bh
Bh
Bh
Bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

49,500.00
230,000.00
24,000.00
21,000.00
23,000.00
39,000.00
5,000.00
4,000.00
6,000.00
12,000.00
20,000.00

Lem Fox
Lem Aibom
Lem Castol
Plamir Dinding
Minyak Bekisting
13 BAHAN SANITAIR
Washbak
Wastafel
Zink 1 Mata
Zink 2 Mata
Bath Tube
Bak Air Plastik
Tandon Air 3300 Plastik ( Orange ) uk. 1100 ltr
Tandon Air 3300 Plastik ( Orange ) uk. 2200 ltr
Tandon Air 3300 Alumunium ( Orange ) uk. 1100 ltr
Shower Set
Towel Bar
Closed Duduk ( Ina)
Closed Duduk
Closed Jongkok ( Ina)
Closed Jongkok ( Biasa )
Floor Drain
Lem Pipa
Selotip
Stop Kran 3/4 Jangkar
Stop Kran 3/4 Jangkar
Socket 1/2"
Socket 2"
Socket 4"
Pipa PVC 2"
Pipa PVC 4"
Pipa GIP 3/4" med. A
Pipa GIP 2" med. A
Pipa Vent 1/2"
Elbow 1/2"
Elbow 2"
Elbow 4"
Tee 1/2"
Tee 2"
Tee 4"
Talang Air Hujan

Kg
Kg
Tube
Kg
Ltr

Rp
Rp
Rp
Rp
Rp

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M'
M'
M'
M'
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M'

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

42,000.00
52,000.00
22,000.00
23,000.00
-

DAFTAR HARGA SATUAN UPAH


NO.

URAIAN

SATUAN

HARGA
SATUAN
(Rp)

Kepala Tukang Kayu

HO

100,000.00

Kepala Tukang Batu

HO

100,000.00

Kepala Tukang Besi/Pipa

HO

100,000.00

Kepala Tukang Cat

HO

100,000.00

Mandor

HO

115,000.00

Pekerja Terlatih

HO

70,000.00

Pekerjaan Tak Terlatih

HO

75,000.00

Tukang Kayu

HO

95,000.00

Tukang Batu

HO

95,000.00

10

Tukang Besi

HO

95,000.00

11

Tukang Cat

HO

95,000.00

12

Operator

HO

115,000.00

13

Pembantu Operator

HO

90,000.00

14

Supir

HO

80,000.00

15

Pembantu Supir

HO

60,000.00

RENCANA ANGGARAN BIAYA (RAB)

NO.

JENIS PEKERJAAN

I.

BOBOT
(%)

4.08
68.00

1
2
3
4
5

PEKERJAAN TANAH, PASIR DAN PONDASI


Galian Tanah Pondasi
Urugan Tanah Kembali
Urugan Pasir Bawah Pondasi dan Lantai
Pas. Anstamping Batu Kali
Pas. Pondasi Batu Kali Camp. 1 : 4

1
2
3
4
5
6

PEKERJAAN BETON, PASANGAN DAN PLESTERAN


Pek. Cor Sloof 15/20
Pek. Cor Ringbalk Beton Bertulang 12/15Camp. 1 : 2 : 3
Pek. Cor Kolom 12/15 Camp. 1 : 2 : 3
Pek. Cor Kolom Praktis 10/10 Campuran 1 : 2 : 3
Pas. Batu Tela Camp. 1 : 4
Pek .Plesteran Dinding Camp. 1 : 4

III.

PEKERJAAN ATAP DAN PLAFOND


1 Pek. Penutup Atap Seng
2 Pasang Plafond Tripleks + Rangka

V.
1
2
3
4
5
6
7
VI.

SAT

PEKERJAAN PENDAHULUAN
1 Pekerjaan Persiapan + Pembersihan Lokasi
2 Pengukuran dan Pemasangan Bouw Plank

II.

IV.

VOL

PEKERJAAN KAYU DAN KACA


Pek. Kusen Pintu, Jendela Dan Ventilasi
Pek. Kuda-kuda Kayu Besi 5/10
Pek. Balok Gording + Ikatan Angin Kayu Besi 5/10
Pek. Balok Bubungan
Pek List Plank Kayu besi 3/30
Pek. Pintu Panil
Pek. Jendela Panil Kaca Bening 5 mm

PEKERJAAN LANTAI DAN DINDING


1 Cor Lantai Camp. 1 : 3 : 5, t = 5cm
2 Pas. Lantai Keramik 30/30 ( Motif ))
3 Pas. Keramik Anti Slip 20/20 (KM/WC )

VII.

Ls

0.43

M'

0.87

91.68
30.56
22.57
21.16
48.92

M3

0.64

M3

0.10

2.01

M3

2.87

M3

10.81

5.56
2.21
1.96
0.78
29.48
594.02

M3

14.94

M3

9.32

M3

8.42

M3

3.35

187.71
202.156

M
2
M

0.53
2.98
1.56
0.13
0.62
19.53
12.74

M
3
M
3
M
3
M
3
M
2
M
2
M

7.76
143.27
26.05

M
2
M
2
M

0.20

0.32

1.25

10.27

1
2
3
4

PEKERJAAN PENGGANTUNG DAN PENGUNCI


Pasang Engsel H - 4" Untuk Pintu
Pasang Engsel H - 3" Untuk Jendela
Kunci Pintu Tanam 2 Slag Antik
Pasang Hak Angin

36.00
14.00
8.00
13.00

Bh
Bh
Bh
Bh

1
2
3
4
5
6

PEKERJAAN PENGECATAN
Cat Dinding Tembok
594.02
Cat Plafond
202.16
Cat Kusen Pintu, Jendela dan Ventilasi dengan Cat Warna Kayu
31.77
Cat List Plank Kayu Besi dengan Cat Warna Kayu
0.62
Meni Kusen Pintu, Jendela dan Ventilasi
31.77
Meni Listplank
0.62

M
2
M
2
M
2
M
2
M
2
M

VIII.

2.80
3.99

0.73
3.52
2.19
0.18
0.01
2.01
1.22

7.47
1.38

0.10
0.58
0.06

4.11
3.14
0.52
0.00
0.16
0.00

HARGA
SATUAN
(Rp)
6

JUMLAH
HARGA
(Rp)
7

500,000.00
60,415.00

2,040,000.00
4,108,220.00
6,148,220.00

32,600.00
15,625.00
418,150.00
637,035.00
1,037,325.00

2,988,637.60
477,468.75
9,436,641.94
13,477,112.46
50,750,088.30
77,129,949.05

12,616,690.20
19,790,218.05
20,200,970.34
20,200,970.34
198,985.00
81,184.50

70,174,030.91
43,794,169.33
39,561,580.31
15,756,756.87
5,865,540.54
48,224,891.95
223,376,969.91

70,180.00
92,812.50

13,173,501.84
18,762,603.75
31,936,105.59

6,514,500.00
5,544,600.00
6,588,750.00
6,588,750.00
72,325.00
482,250.00
451,536.25

3,425,975.55
16,546,472.55
10,299,534.00
823,923.19
44,568.83
9,418,342.50
5,752,571.83
46,311,388.45

123,240.00
244,976.01
248,530.00

956,071.27
35,096,635.06
6,474,604.15
42,527,310.48

41,886.25
33,257.50
342,050.00
22,750.00

1,507,905.00
465,605.00
2,736,400.00
295,750.00
5,005,660.00

32,477.50
72,850.00
77,280.00
26,505.00
23,055.00
23,055.00

19,292,154.64
14,727,064.60
2,455,185.60
16,333.18
732,457.35
14,207.18
37,237,402.55

IX.

X.

1
2
3
4
5
6

PEKERJAAN INSTALASI LISTRIK


Stop Kontak 200 Watt
Saklar Tunggal
Saklar Ganda
Lampu SL 20 Watt lengkap
Box Kontrol Panel
Box Sekring 2 Group

Titik
Titik
Titik
Titik
Unit
Unit

1
2
3
4
5
6
7
8

PEKERJAAN SANITAIR DLL


Septictank + Peresapan
Pasang Kloset Jongkok
Pasang Pipa Air Bersih GIP 1/2"
Pasang Pipa Air Kotor PVC 4"
Pasang Pipa Air Bekas PVC 2"
Pasang Floor Drain
Pasang Kran Air 1/2"
Pasang Saluran Air Hujan

Unit
Bh
M'
M'
M'
Bh
Bh
M'

100.00

469,673,006.02

REKAPITULASI RENCANA ANGGARAN BIAYA

NO.

JENIS PEKERJAAN

JUMLAH HARGA

Rp
3
6,148,220.00

I.

PEKERJAAN PENDAHULUAN

II.

PEKERJAAN TANAH, PASIR DAN PONDASI

III.

PEKERJAAN BETON, PASANGAN DAN PLESTERAN

IV.

PEKERJAAN ATAP DAN PLAFOND

31,936,105.59

V.

PEKERJAAN KAYU DAN KACA

46,311,388.45

VI.

PEKERJAAN LANTAI DAN DINDING

42,527,310.48

VII.

PEKERJAAN PENGGANTUNG DAN PENGUNCI

VIII.

PEKERJAAN PENGECATAN

IX.

PEKERJAAN INSTALASI LISTRIK

PEKERJAAN SANITAIR DLL

77,129,949.05
223,376,969.91

5,005,660.00
37,237,402.55

REAL COST
PPN 10 %
TOTAL COST
DIBULATKAN
TERBILANG

469,673,006.02
46,967,300.60
422,705,705.42
422,705,000.00

Empat Ratus Dua Puluh Dua Juta Tujuh Ratus Lima Ribu Rupiah

ANALISA HARGA SATUAN


NO

URAIAN PEKERJAAN

JUMLAH HARGA
(Rp)
4

PEKERJAAN PENDAHULUHAN

1 Ukur dan Pasang Papan Bouwplank / M'


0.007
0.012
0.020
0.100
0.010
0.100
0.005

II

HARGA SATUAN
(Rp)

M3
M3
Kg
OH
OH
OH
OH

Papan Matoa
Balok Kayu Matoa
Paku Campur
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

2,200,000.00
2,200,000.00
27,000.00
95,000.00
100,000.00
70,000.00
115,000.00

15,400.00
26,400.00
540.00
9,500.00
1,000.00
7,000.00
575.00
60,415.00

191.000
0.240
5.000
5.000
5.000
1.000
2.000
2.000
1.000
1.000
6.000

M3
Set
Jam
Jam
Jam
OH
OH
OH
OH
OH
OH

Urugan Tanah Pilihan Klas C


Alat Bantu (Set @ 3 Set )
Motor Grader
Three Wheel Roller
Water Tank Truck
Mandor
Operator Terlatih
Pembantu Operator
Sopir Terampil
Pembantu Sopir
Pekerja Tak Terlatih

30.56

5,836.58
3,556,100.00
1,388,800.00
167,600.00
115,000.00
230,000.00
180,000.00
80,000.00
60,000.00
450,000.00
6,233,336.58

711,220.00
277,760.00
33,520.00
115,000.00
115,000.00
90,000.00
80,000.00
60,000.00
75,000.00

0.400
0.040

OH
OH

Pekerja
Mandor

70,000.00
115,000.00

28,000.00
4,600.00
32,600.00

0.192
0.019

OH
OH

Pekerja
Mandor

70,000.00
115,000.00

13,440.00
2,185.00
15,625.00

1.200
0.300
0.010

M3
OH
OH

Pasir urug
Pekerja
Mandor

330,000.00
70,000.00
115,000.00

396,000.00
21,000.00
1,150.00
418,150.00

1.200
0.300
0.010

M3
OH
OH

Tanah urug
Pekerja
Mandor

205,000.00
70,000.00
115,000.00

246,000.00
21,000.00
1,150.00
268,150.00

M3
M3
OH
OH
OH
OH

Batu Kali
Pasir Urug
Tukang Batu
Kepala Tukang
Pekerja
Mandor

365,000.00
330,000.00
95,000.00
100,000.00
70,000.00
115,000.00

438,000.00
99,000.00
37,050.00
3,900.00
54,600.00
4,485.00
637,035.00

1.100
163.000
0.520
1.500
0.600
0.060
0.075

M3
Kg
M3
OH
OH
OH
OH

Batu Kali
Semen PC
Pasir
Pekerja Tak Terlatih
Tukang Batu
Kepala Tukang
Mandor

365,000.00
1,700.00
330,000.00
75,000.00
100,000.00
100,000.00
115,000.00

401,500.00
277,100.00
171,600.00
112,500.00
60,000.00
6,000.00
8,625.00
1,037,325.00

3.600
0.043
0.250
4.500
1.500
0.150
0.225

BH
Zak
M3
OH
OH
OH
OH

Batu Tela
Semen PC
Pasir Pasang
Tukang Batu
Kepala Tukang
Pekerja
Mandor

2,300.00
85,000.00
330,000.00
95,000.00
100,000.00
70,000.00
115,000.00

8,280.00
3,660.45
82,500.00
427,500.00
150,000.00
10,500.00
25,875.00
708,315.45

PEKERJAAN TANAH, PASIR DAN PONDASI

1 150 M3 / Urugan Tanah Pilihan Klas C

2 Galian Tanah Biasa / M3

3 Urugan Tanah Kembali / M3

4 Urugan Pasir / M3

5 Urugan Tanah Peninggian Peil Lantai / M3

6 Pasangan Batu Kosong / Anstamping Batu Kali / M3


1.200
0.300
0.390
0.039
0.780
0.039
7 Pasang Batu Kali Camp. 1 : 4 / M3

8 Pasang Pondasi Rollage Camp. 1 : 2 / M'

III

PEKERJAAN BETON, PASANGAN DAN PLESTERAN

1 Besi Beton / Kg

1.100
0.200
0.060
0.006
0.025
0.001

Kg
Kg
OH
OH
OH
OH

Besi Beton
Kawat Ikat
Tukang Besi
Kepala Tukang
Pekerja
Mandor

61,714.28
23,000.00
95,000.00
100,000.00
70,000.00
115,000.00

67,885.71
4,600.00
5,700.00
600.00
1,750.00
143.75
80,679.46

232.000
0.540
0.780
0.020
0.025
1.650
0.080

Kg
M3
M3
OH
OH
OH
OH

Semen PC
Pasir Cor
Batu Pecah 3 - 5
Tukang Batu
Kepala Tukang
Pekerja
Mandor

1,700.00
225,000.00
825,000.00
95,000.00
100,000.00
70,000.00
115,000.00

394,400.00
121,500.00
643,500.00
1,900.00
2,500.00
115,500.00
9,200.00
1,288,500.00

27,000.00
95,000.00
100,000.00
70,000.00
115,000.00

10,800.00
47,500.00
5,000.00
14,000.00
1,150.00
78,450.00

2 Cor Beton Bertulang Camp. 1 : 2 : 3 / M3

3 Pasang Stut Work/ Penyokong Bekisting untuk Beton Plat Dan Balok / M3
0.700
M3
Kayu Perancah
0.400
Kg
Paku Campur
0.500
OH
Tukang Kayu
0.050
OH
Kepala Tukang
0.200
OH
Pekerja
0.010
OH
Mandor
4 Pasang Bekisting Untuk Sloof / M2
0.045
0.300
0.100
0.260
0.026
0.300
0.005

M3
Kg
Ltr
OH
OH
OH
OH

Kayu Papan Matoa


Paku Campur
Minyak Bekisting
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

2,200,000.00
27,000.00
23,000.00
95,000.00
100,000.00
70,000.00
115,000.00

99,000.00
8,100.00
2,300.00
24,700.00
2,600.00
21,000.00
575.00
158,275.00

0.040
0.400
0.200
0.018
0.350
2.000
0.320
0.300
0.033
0.006

M3
Kg
Ltr
M3
Lbr
Btg
OH
OH
OH
OH

Kayu Balok Matoa


Paku Campur
Minyak Bekisting
Balok Kayu Matoa
Tripleks Tebal 5mm
Dolkan Kayu Galam 8 - 10/4m
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

2,200,000.00
27,000.00
23,000.00
2,200,000.00
128,000.00
35,000.00
70,000.00
95,000.00
100,000.00
115,000.00

88,000.00
10,800.00
4,600.00
39,600.00
44,800.00
70,000.00
22,400.00
28,500.00
3,300.00
690.00
312,690.00

0.040
0.400
0.200
0.018
0.350
2.000
0.320
0.300
0.033
0.006

M3
Kg
Ltr
M3
Lbr
Btg
OH
OH
OH
OH

Kayu Balok Matoa


Paku Campur
Minyak Bekisting
Balok Kayu Matoa
Tripleks Tebal 5mm
Dolkan Kayu Galam 8 - 10/4m
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

2,200,000.00
23,000.00
23,000.00
2,200,000.00
128,000.00
35,000.00
115,000.00
80,000.00
75,000.00
95,000.00

88,000.00
9,200.00
4,600.00
39,600.00
44,800.00
70,000.00
36,800.00
24,000.00
2,475.00
570.00
320,045.00

0.500
0.010

OH
OH

Pekerja
Mandor

70,000.00
115,000.00

35,000.00
1,150.00
36,150.00

1.000
138.000
1.000
1.000

M3
Kg
M2
M2

Beton 1:2:3
Besi Beton
Bekisting
Bongkar Bekisting

1,288,500.00
80,679.46
158,275.00
36,150.00

1,288,500.00
11,133,765.20
158,275.00
36,150.00
12,616,690.20

1.000
225.000
1.000
1.000

M3
Kg
M2
M2

Beton 1:2:3
Besi Beton
Bekisting
Bongkar Bekisting

1,288,500.00
80,679.46
312,690.00
36,150.00

1,288,500.00
18,152,878.05
312,690.00
36,150.00
19,790,218.05

1.000
230.000
1.000
1.000

M3
Kg
M2
M2

Beton 1:2:3
Besi Beton
Bekisting
Bongkar Bekisting

1,288,500.00
80,679.46
320,045.00
36,150.00

1,288,500.00
18,556,275.34
320,045.00
36,150.00
20,200,970.34

25.000
26.550
0.080
0.200
0.020
0.650
0.030

BH
Kg
M3
OH
OH
OH
OH

Batu Tela 8 x 14 x 28
Semen PC
Pasir Pasang
Tukang Batu
Kepala Tukang
Pekerja
Mandor

2,300.00
1,700.00
330,000.00
95,000.00
100,000.00
70,000.00
115,000.00

57,500.00
45,135.00
26,400.00
19,000.00
2,000.00
45,500.00
3,450.00
198,985.00

5 Pasang Bekisting Untuk Ring Balk / M2

6 Pasang Bekisting Untuk Kolom / M2

7 Bongkar Bekisting / M2

8 Cor Sloof & Balok 15 / 20 M3

9 Cor Ring Balk 12/15/ M3

10 Cor Kolom 12/15 / M3

12 Pasang Batu Tela 1 : 4 / M3

13 Plesteran Dinding 1 : 4 +Acian /M2

5.200
0.040
0.150
0.015
0.200
0.010

Kg
M3
OH
OH
OH
OH

Semen PC
Pasir Pasang
Tukang Batu
Kepala Tukang
Pekerja
Mandor

1,700.00
330,000.00
95,000.00
100,000.00
70,000.00
115,000.00

8,840.00
13,200.00
14,250.00
1,500.00
14,000.00
1,150.00
52,940.00

IV

PEKERJAAN ATAP DAN PLAFON

1 Pasang Atap Seng Gelombang /M2

0.700
0.020
0.060
0.006
0.120
0.006

Lbr
Kg
OH
OH
OH
OH

Seng Gelombang BJLS 0.30


Paku Campur
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

77,500.000
27,000.00
95,000.00
100,000.000
70,000.00
115,000.000

54,250.00
540.00
5,700.00
600.00
8,400.00
690.00
70,180.00

0.300
0.040
0.070
0.008
0.150
0.008

Bh
Kg
OH
OH
OH
OH

Seng Plat BJLS 0.20


Paku Campur
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

55,000.000
27,000.000
95,000.00
100,000.000
70,000.00
115,000.000

16,500.00
1,080.00
6,650.00
800.00
10,500.00
920.00
36,450.00

3 Pasang Flapond Tripleks 3 mm + Rangka / M2


0.360
0.024
0.030
0.100
0.010
0.070
0.0035

Lbr
M3
Kg
OH
OH
OH
OH

Tripleks 3 mm
Balok Kayu Matoa
Paku Campur
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

65,000.00
2,200,000.00
27,000.00
95,000.00
100,000.00
70,000.00
115,000.00

23,400.00
52,800.00
810.00
9,500.00
1,000.00
4,900.00
402.50
92,812.50

M3
OH
OH
OH
OH

Balok Kayu Besi


Tukang Kayu
Kepala Tukang
Pekerja
Mandor

3,600,000.00
95,000.00
100,000.00
70,000.00
115,000.00

3,960,000.00
1,900,000.00
200,000.00
420,000.00
34,500.00
6,514,500.00

1.100
0.800
12.000
1.200
4.000
0.200

M3
Kg
OH
OH
OH
OH

Balok Kayu Besi


Paku Campur
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

3,600,000.00
27,000.00
95,000.00
100,000.00
70,000.00
115,000.00

3,960,000.00
21,600.00
1,140,000.00
120,000.00
280,000.00
23,000.00
5,544,600.00

1.200
0.500
16.000
1.600
6.000
0.600

M3
Kg
OH
OH
OH
OH

Balok Kayu Besi


Paku Campur
Tukang
Kepala Tukang
Pekerja
Mandor

3,600,000.00
27,000.00
95,000.00
100,000.00
70,000.00
115,000.00

4,320,000.00
13,500.00
1,520,000.00
160,000.00
420,000.00
69,000.00
6,502,500.00

4 Balok Gording + Ikatan Angin Kayu Besi / M3


1.200
18.000
1.800
5.000
0.250

M3
OH
OH
OH
OH

Balok Kayu Besi


Tukang Kayu
Kepala Tukang
Pekerja
Mandor

3,600,000.00
95,000.00
100,000.00
70,000.00
115,000.00

4,320,000.00
1,710,000.00
180,000.00
350,000.00
28,750.00
6,588,750.00

M3
OH
OH
OH
OH

Balok Kayu Besi


Tukang Kayu
Kepala Tukang
Pekerja
Mandor

3,600,000.00
95,000.00
100,000.00
70,000.00
115,000.00

4,320,000.00
1,710,000.00
180,000.00
350,000.00
28,750.00
6,588,750.00

2 Pasang Atap Nok Seng / M2

PEKERJAAN KAYU DAN KACA

1 Pasang Kusen Pintu , Jendela Dan Ventilasi / M3


1.100
20.000
2.000
6.000
0.300
2 Pasang Kuda - Kuda Kayu Besi / M3

3 Konsul Kayu Besi / M3

5 Balok Bubungan Kayu Besi / M3


1.200
18.000
1.800
5.000
0.250

6 Pasang Papan Tritis (Jalusi/Listplank) Kayu Besi Diketam Halus / M2


0.011
M3
0.050
Kg
0.220
OH
0.022
OH
0.110
OH
0.005
OH

Papan Kayu Besi


Paku Campur
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

3,600,000.00
27,000.00
95,000.00
100,000.00
70,000.00
115,000.00

39,600.00
1,350.00
20,900.00
2,200.00
7,700.00
575.00
72,325.00

7 Pasaang Pintu / Jendela / Ventilasi Panil Kaca / M2


0.800
0.035
2.000
0.200
0.800
0.050

M2
M2
OH
OH
OH
OH

Kaca Bening 5 mm
Kayu Besi
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

275,000.00
3,600,000.00
95,000.00
100,000.00
70,000.00
115,000.00

220,000.00
126,000.00
190,000.00
20,000.00
56,000.00
5,750.00
617,750.00

0.040
2.500
0.250
1.000
0.050

M3
OH
OH
OH
OH

Papan Kayu Besi


Tukang Kayu
Kepala Tukang
Pekerja
Mandor

3,600,000.00
95,000.00
100,000.00
70,000.00
115,000.00

144,000.00
237,500.00
25,000.00
70,000.00
5,750.00
482,250.00

1.000
0.044
0.050
0.150
0.015
0.015
0.00075

M2
M2
Kg
OH
OH
OH
OH

Kaca Bening 5 mm
Kayu List Kls I. ( Kayu Besi )
Paku Tripleks
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

275,000.00
3,600,000.00
25,000.00
95,000.00
100,000.00
70,000.00
115,000.00

275,000.00
158,400.00
1,250.00
14,250.00
1,500.00
1,050.00
86.25
451,536.25

1 Pekerjaan Cor Beton Tumbuk Camp 1 : 3 : 5 / M3


10.000
0.026
0.044
0.020
0.002
1.150
0.006

Kg
M3
M3
OH
OH
OH
OH

Semen PC
Pasir Cor
Kerikil
Tukang Batu
Kepala Tukang
Pekerja
Mandor

1,700.00
375,000.00
300,000.00
95,000.00
100,000.00
70,000.00
115,000.00

17,000.00
9,750.00
13,200.00
1,900.00
200.00
80,500.00
690.00
123,240.00

4 Pasangan Ubin Porselen 30 x 30 ( Polos ) / M2


11.000
11.380
0.042
1.500
0.350
0.035
0.620
0.030

Bh
Kg
M3
Kg
OH
OH
OH
OH

Ubin Bermotif
Semen PC
Pasir Pasang
Semen Warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor

9,090.91
1,700.00
365,000.00
17,800.00
95,000.00
100,000.00
70,000.00
115,000.00

100,000.01
19,346.00
15,330.00
26,700.00
33,250.00
3,500.00
43,400.00
3,450.00
244,976.01

5 Pasangan Keramik Anti Slip 20 x 20 ( Lantai KM/WC ) / M3


25.000
9.300
0.018
1.500
0.100
0.045
0.600
0.030

Bh
Kg
M3
Kg
OH
OH
OH
OH

Keramik Anti Slip


Semen PC
Pasir Pasang
Semen Warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor

5,600.00
1,700.00
365,000.00
17,800.00
95,000.00
100,000.00
70,000.00
115,000.00

140,000.00
15,810.00
6,570.00
26,700.00
9,500.00
4,500.00
42,000.00
3,450.00
248,530.00

8 Pasang Daun Pintu Panel Kayu Besi / M2

9 Pasang Jendela Kaca Mati / M2

VI

PEKERJAAN LANTAI DAN DINDING

VII

PEKERJAAN PENGGANTUNG DAN PENGUNCI

1 Pasang Engsel Pintu Ring 4" / Bh

1.000
0.015
0.150
0.015
0.00075

Bh
OH
OH
OH
OH

Engsel Pintu 4"


Pekerja
Tukang Kayu
Kepala Tukang
Mandor

25,000.00
70,000.00
95,000.00
100,000.00
115,000.00

25,000.00
1,050.00
14,250.00
1,500.00
86.25
41,886.25
8.00
22,000.00
700.00
9,500.00
1,000.00
57.50
33,257.50

2 Pasang Engsel Jendela dan Ventilasi Ring 3" / Bh


1.000
0.010
0.100
0.010
0.0005

Bh
OH
OH
OH
OH

Engsel Jendela 3"


Pekerja
Tukang Kayu
Kepala Tukang
Mandor

22,000.00
70,000.00
95,000.00
100,000.00
115,000.00

1.000
0.080
0.080
1.000
0.030

Bh
OH
OH
OH
OH

Kunci Tanam 2 Slag Antik


Pekerja
Kepala Tukang
Tukang Kayu
Mandor

230,000.00
70,000.00
100,000.00
95,000.00
115,000.00

230,000.00
5,600.00
8,000.00
95,000.00
3,450.00
342,050.00

1.000
0.050
0.050
1.000
0.030

Bh
OH
OH
OH
OH

Handle Pintu
Pekerja
Kepala Tukang
Tukang Kayu
Mandor

70,000.00
100,000.00
95,000.00
115,000.00

3,500.00
5,000.00
95,000.00
3,450.00
106,950.00

1.000
0.050

Bh
OH

Hak Angin Antik


Tukang Kayu

18,000.00
95,000.00

18,000.00
4,750.00
22,750.00

2 Cat Dinding Tembok Yang Baru Dengan Cat Tembok 3x Pengecatan/ M2


0.100
Kg
Cat Tembok Warna
0.160
BH
Kuas Roll
0.042
OH
Tukang Cat
0.006
OH
Kepala Tukang
0.020
OH
Pekerja
0.00250
OH
Mandor

230,000.00
20,000.00
95,000.00
100,000.00
70,000.00
115,000.00

23,000.00
3,200.00
3,990.00
600.00
1,400.00
287.50
32,477.50

3 Cat Plafond/Langit - Langit Yang Baru Dengan 3x Pengecatan / M2


0.100
Kg
0.160
Bh
0.300
OH
0.030
OH
0.200
OH
0.01000
OH

Cat Tembok Warna


Kuas Rol
Tukang Cat
Kepala Tukang
Pekerja
Mandor

230,000.00
20,000.00
95,000.00
100,000.00
70,000.00
115,000.00

23,000.00
3,200.00
28,500.00
3,000.00
14,000.00
1,150.00
72,850.00

4 Cat Kusen Pintu / Jendela dan Ventilasi dengan Cat kilap Kayu / M2
0.360
Kg
0.020
Ltr
0.250
Lbr
0.100
Bh
0.400
OH
0.040
OH
0.200
OH
0.010
OH

Cat Kilap Kayu


Minyak Cat
Amplas
Kuas Plat
Tukang Cat
Kepala Tukang
Pekerja
Mandor

49,500.00
23,000.00
5,000.00
6,000.00
95,000.00
100,000.00
70,000.00
115,000.00

17,820.00
460.00
1,250.00
600.00
38,000.00
4,000.00
14,000.00
1,150.00
77,280.00

3 Pasang Kunci Tanam 2 Slag Antik / Bh

6 Pasang Handle Pintu / Bh

9 Pasang Hak Angin Antik / Bh

VIII

PEKERJAAN PENGECATAN

5 Cat Listplank Dan Jalusi / M2


0.360
0.160
0.200
0.020
0.060
0.003

Kg
Bh
OH
OH
OH
OH

Cat Minyak Glotex


Kuas Plat
Tukang Cat
Kepala Tukang
Pekerja
Mandor

6,000.00
95,000.00
100,000.00
70,000.00
115,000.00

960.00
19,000.00
2,000.00
4,200.00
345.00
26,505.00

0.170
0.150
0.017
0.250
0.010
0.100
0.010
0.050
0.005

Kg
Kg
Ltr
Lbr
Bh
OH
OH
OH
OH

Cat Meni Kayu


Dempul Kayu
Minyak Cat
Kertas Gosok
Kuas Plat
Tukang Cat
Kepala Tukang
Pekerja
Mandor

21,000.00
24,000.00
5,000.00
6,000.00
95,000.00
100,000.00
70,000.00
115,000.00

3,570.00
3,600.00
1,250.00
60.00
9,500.00
1,000.00
3,500.00
575.00
23,055.00

0.300
0.020
0.150
0.010
0.400
0.040
0.200
0.010

Ltr
Ltr
Lbr
Bh
OH
OH
OH
OH

Politur
Minyak Cat
Kertas Gosok
Kuas Plat
Tukang Cat
Kepala Tukang
Pekerja
Mandor

39,000.00
5,000.00
6,000.00
95,000.00
100,000.00
70,000.00
115,000.00

11,700.00
750.00
60.00
38,000.00
4,000.00
14,000.00
1,150.00
69,660.00

6 Cat Meni Kayu / M2

7 Politur / Teak Oil / M2

IX

PEKERJAAN INSTALASI LISTRIK

1 Pasang Stop Kontak 200 Watt / Titik


1.000
10.000
10.000
0.150
0.015

Bh
M'
M'
OH
OH

Stop Kontak
Kabel NYM 3 x 1
Pipa PVC 5/8"
Tukang Listrik
Mandor

17,600.00
87,800.00
65,000.00
95,000.00

17,600.00
878,000.00
9,750.00
1,425.00
906,775.00

1.000
10.000
10.000
0.150
0.015

Bh
M'
M'
OH
OH

Saklar Tunggal
Kabel NYM 3 x 1
Pipa PVC 5/8"
Tukang Listrik
Mandor

21,630.00
87,800.00
65,000.00
95,000.00

21,630.00
878,000.00
9,750.00
1,425.00
910,805.00

1.000
10.000
10.000
0.150
0.015

Bh
M'
M'
OH
OH

Saklar Ganda
Kabel NYM 3x1
Pipa PVC 5/8"
Tukang Listrik
Mandor

20,600.00
87,800.00
65,000.00
95,000.00

20,600.00
878,000.00
9,750.00
1,425.00
909,775.00

1.000
0.150
0.015
0.200
0.015

Set
OH
OH
OH
OH

Lampu Down Light (SL 18 Watt)


Tukang Listrik
Kepala Tukang
Pekerja
Mandor

65,000.00
75,000.00
55,000.00
95,000.00

9,750.00
1,125.00
11,000.00
1,425.00
23,300.00

1.000
0.150
0.015
0.200
0.015

Set
OH
OH
OH
OH

Lampu SL 18 Watt
Tukang Listrik
Kepala Tukang
Pekerja
Mandor

65,000.00
75,000.00
55,000.00
95,000.00

9,750.00
1,125.00
11,000.00
1,425.00
23,300.00

1.000
0.150
0.015
0.200
0.015

Set
OH
OH
OH
OH

Lampu TL 40 Watt
Tukang Listrik
Kepala Tukang
Pekerja
Mandor

150,150.00
65,000.00
75,000.00
55,000.00
95,000.00

150,150.00
9,750.00
1,125.00
11,000.00
1,425.00
173,450.00

1.000
10.000
10.000
0.150
0.015

Unit
M'
M'
OH
OH

Box Kontrol Panel


Kabel NYM 3x 1
Pipa PVC 5/8"
Tukang Listrik
Mandor

92,400.00
87,800.00
65,000.00
95,000.00

92,400.00
878,000.00
9,750.00
1,425.00
981,575.00

1.000
10.000
10.000
0.150
0.015

Unit
M'
M'
OH
OH

Box Sekring 2 Group


Kabel NYM 3x 1
Pipa PVC 5/8"
Tukang Listrik
Mandor

88,000.00
87,800.00
65,000.00
95,000.00

88,000.00
878,000.00
9,750.00
1,425.00
977,175.00

5.350
0.193
0.225
0.295
0.920
16.92
0.450
1.000
1.000

M3
M3
M3
M3
M3
M2
M3
Btg
Btg

Galian Tanah
Urugan Pasir Dibawah Lantai
Adukan Beton 1 : 3 : 5
Adukan Beton Bertulang Camp. 1:2:3
Pasangan Batu Tela 1 : 4
Plesteran Dinding 1 : 4
Kerikil Koral
Pipa Peresapan PVC dia 4"
Pipa hawa GIP. dia 2"

52,587.50
369,410.00
1,512,188.00
1,512,188.00
1,328,943.40
99,803.20
342,200.00
272,800.00
504,200.00

281,343.13
71,296.13
340,242.30
446,095.46
1,222,627.93
1,688,670.14
153,990.00
272,800.00
504,200.00
4,981,265.09

1.000
0.500
0.160
0.050

Bh
OH
OH
OH

Kloset Jongkok KIA


Tukang Pipa
Pekerja
Mandor

154,000.00
65,000.00
55,000.00
95,000.00

154,000.00
32,500.00
8,800.00
4,750.00
200,050.00

1.000
0.015
0.150
0.015
0.008

M'
Set
H/O
H/O
H/O

Pipa GIP dia 1/2"


Alat Bantu
Tukang Pipa
Pekerja
Mandor

222,800.00

222,800.00
9,750.00
825.00
712.50
234,087.50

2 Pasang Saklar Tunggal / Titik

3 Pasang Saklar Ganda / Titik

4 Lampu Down Light ( SL 18 Watt )/ Titik

5 Pasang Lampu SL. 18 Watt / Titik

6 Pasang Lampu TL. 40 Watt / Titik

7 Pasang Box Kontrol Panel / Unit

8 Pasang Box Sekring / Unit

PEKERJAAN SANITAIR DLL

1 Pembuatan Septictank + Peresapan / Unit

2 Pasang Kloset Jongkok / Bh

3 Pasang Pipa GIP dia 1/2" / M'

65,000.00
55,000.00
95,000.00

4 Pasang Pipa PVC. Dia 4" / M'


1.000
0.091
0.015
0.100
0.010
0.120
0.006

M'
Kg
Set
H/O
H/O
H/O
H/O

Pipa PVC 4"


Lem Pipa
Alat Bantu
Tukang Pipa
Kepala Tukang
Pekerja
Mandor

272,800.00
44,000.00
65,000.00
75,000.00
55,000.00
95,000.00

272,800.00
4,004.00
6,500.00
750.00
6,600.00
570.00
291,224.00

1.000
0.081
0.015
0.100
0.010
0.100
0.005

M'
Kg
Set
H/O
H/O
H/O
H/O

Pipa PVC 2"


Lem Pipa
Alat Bantu
Tukang Pipa
Kepala Tukang
Pekerja
Mandor

75,900.00
44,000.00
65,000.00
75,000.00
55,000.00
95,000.00

75,900.00
3,564.00
6,500.00
750.00
5,500.00
475.00
92,689.00

1.000
0.150
0.007

Bh
H/O
H/O

Floor Drain
Tukang Pipa
Mandor

65,000.00
95,000.00

9,750.00
665.00
10,415.00

1.000
0.055
0.150
0.015

Bh
Bh
H/O
H/O

Kran air 1/2"


Shelotip
Tukang Pipa
Kepala Tukang

126,500.00
65,000.00
75,000.00

126,500.00

0.063
0.013
0.060
2.250

M3
M3
M3
M2

Galian Tanah
Pasir Urug
Cor Beton 1:3:5
Plesteran 1:3

52,587.50
369,410.00
1,576,268.00
101,620.82

3,286.72
4,617.63
94,576.08
228,646.85
331,127.27

5 Pasang Pipa PVC Dia 2" / M'

6 Pasang Floor Drain / Bh

7 Pasang Buah Kran Air 1/2 "

9,750.00
1,125.00
137,375.00

8 Saluran Air Hujan / M'

PERHITUNGAN BOBOT

NO

BAGIAN / JENIS PEKERJAAN

I
1
2
II

III

IV

VI

1
2
3
4
5
6
7
8
9
10

PEK. PENDAHULUAN
Pembersihan Lokasi
Pengukuran Bouplank
PEK. TANAH, PASANGAN DAN BETON
Pek. Galian pondasi
Urugan kembali
Pas. Batu kosong ( aanstamping )
Pasang pondasi batu kali
Timbunan pasir urugan bawah lantai
Beton Sloof 15x20
kolom 10/10
Ring Balok 12x15
Pas. Batu tela 1 : 4
Plesteran 1 : 4

BOBOT
(%)
terhadap seluruh
pekerjaan
3

Kemajuan Pek.
Terhadap tiap
bag. pekerjaan

% kemajuan
pekerjaan thp
seluruh pekerjaan

0.43
0.87

100%
100%

0.43
0.87

0.64
0.10
2.87
10.81
2.01
14.94
3.35
9.32
1.25
10.27

100%
100%
100%
100%
100%
100%
100%
0%
50%
0%

1
2
3
4
5
6

PEKERJAAN KAYU
Kusen kayu besi 5/10
Gording Kayu besi 5/10
Kuda-kuda kayu besi 5/10
Listplank kayu besi
Pintu Panel
Kaca mati ryben 5 mm

0.73
2.19
3.52
0.01
2.01
1.22

100%
0%
30%
30%
0%
0%

0.64
0.10
2.87
10.81
2.01
14.94
3.35
0.62
0.73
1.06
0.00
-

1
2

PEKERJAAN ATAP DAN PLAFOND


Pemasangan Atap Multiroof
Plafond triplek rangka kayu

2.80
3.99

0%
0%

1
2

PEKERJAAN LANTAI
Pasang Lantai keramik 30/30
Pasang Lantai keramik Kamar Mandi 20/20

7.47
1.38

0%
0%

1
2
3
4

PEKERJAAN ALAT GANTUNG


Kunci pintu 2 putaran
Engsel pintu
Engsel jendela
Kait Angin

0.58
0.32
0.10
0.06

0%
0%
0%
0%

VII

VIII

IX

1
2
3
4

PEKERJAAN PENGECATAN
Cat tembok luar dalam
Cat plafond
Cat kayu kusen
Cat listplank 2/25

1
2
3
4
5
6

1
2
3
4
5
6

4.11
3.14
0.52
0.00

0%
0%
0%
0%

PEK. INSTALASI LISTRIK


Lampu
Saklar tunggal
Saklar Ganda
Saklar 3 Katub
Stop Kontak
limit

0%
0%
0%
0%
0%
0%

PEKERJAAN SANITAIR
Stop kran
Bak KM/WC
Closet Duduk
Pipa PVC 4"
Pipa PVC 2"
Septictank + Resapan

0%
0%
0%
0%
0%
0%

DIAGRAM BATANG
BULAN
NO

URAIAN PEKERJAAN

BOBOT

PEK. PENDAHULUAN

II

PEK. TANAH, PASANGAN DAN BETON

III

PEKERJAAN KAYU

9.68

IV

PEKERJAAN ATAP DAN PLAFOND

6.80

PEKERJAAN LANTAI

8.85

VI

PEKERJAAN ALAT GANTUNG

1.07

VII

PEKERJAAN PENGECATAN

7.77

VIII

PEK. INSTALASI LISTRIK

PEKERJAAN SANITAIR

IX

Rencana Prestasi Pekerjaan


Rencana Komulatif Pekrjaan

1
1/2/2011
s/d
5/2/2011

1.31

1.3090427

55.56

6.94

100%

Februari
2
3
7/2/2011
14/2/2011
s/d
s/d
12/2/2011 192/2/2011

6.94

4
21/2/2011
s/d
26/2/2011

1
28/2/2011
s/d
5/3/2011

2
7/3/2011
s/d
12/3/2011

6.94

6.94

6.94

6.94

1.61

1.61

1.61

1.61

Maret
3
14/3/2011
s/d
19/3/2011

6.94
1.61

4
21/3/2011
s/d
26/3/2011

1
28/3/2011
s/d
2/4/2011

April
2
3
4/4/2011 11/4/2011
s/d
s/d
9/4/2011 16/4/2011

4
18/4/2011
s/d
23/4/2011

6.94
1.61

2.26654894 2.26654894 2.26654894


2.95
0.53

2.95

2.95

0.53
7.76939223

8.25
8.25

6.94
15.20

8.56
23.76

8.56
32.32

8.56
40.88

10.83
51.70

11.36
63.06

11.36
74.42

2.95
77.37

2.95
80.32

2.95
83.27

7.77
100.00

Kurva S

120.00

Presentase (%)

100.00

100.00

80.00
63.06

60.00

83.27

80.32

77.37

74.42

51.70

40.00
20.00
8.25

0.00
1

32.32

23.76

15.20
3

Februari

Rencana Komulatif
Pekrjaan

40.88

3
Maret

Bulan

3
April

KURVA S

NO

URAIAN PEKERJAAN

BOBOT

BULAN
Februari
Maret
1
2
3
4
5
6
7
8
9
1/2/2011 7/2/2011 14/2/2011 21/2/2011 28/2/2011 7/3/2011 14/3/2011 21/3/2011 28/3/2011
s/d
s/d
s/d
s/d
s/d
s/d
s/d
s/d
s/d
5/2/2011 12/2/2011 192/2/2011 26/2/2011 5/3/2011 12/3/2011 19/3/2011 26/3/2011 2/4/2011

PEK. PENDAHULUAN

0.74

0.74

II

PEK. TANAH, PASANGAN DAN BETON

36.78

4.60

III

PEKERJAAN KAYU

10.66

IV

PEKERJAAN ATAP DAN PLAFOND

11.4

PEKERJAAN LANTAI

17.26

VI

PEKERJAAN ALAT GANTUNG

0.58

VII

PEKERJAAN PENGECATAN

16.59

VIII

PEK. INSTALASI LISTRIK

IX

PEKERJAAN SANITAIR

April
10
11
12
4/4/2011 11/4/2011 18/4/2011
s/d
s/d
s/d
9/4/2011 16/4/2011 23/4/2011
100%

4.60

4.60

4.60

4.60

4.60

4.60

1.78

1.78

1.78

1.78

1.78

1.78

3.8

3.8

3.8

90%

4.60

80%
70%
5.75

0.29

5.75

60%

5.75

50%

0.29
16.59

40%
30%
20%
10%
0%

Rencana Prestasi Pekerjaan


Rencana Komulatif Pekrjaan

100%

4.60
4.60

0.00
4.60

1.78
6.37

1.78
8.15

1.78
9.93

5.58
15.50

5.87
21.37

5.87
27.24

5.75
32.99

5.75
38.74

5.75
44.50

16.59
100.00