You are on page 1of 2

PAGINA:

PROYECTO PSA PANAMA INTERNATIONAL


TERMINAL PHASE 2 EXPANSION

EDICION

01

JV JAN DE NUL PANAMA S.A. SAIPEM


CONTRACTING PREP S.A.

OT (TMI)

015-2016

TN NUMBER: 015-2016-TRN-ING-002
Transmittal Date: - September - 2016
Sender: Tcnicas Metlicas Ingenieros S.A.C.
Media: E-mail

SAIPEM
Atte: Iris Rodriguez

Ref: Planos de Fabricacin para


Aprobacin
Total items on transmittal:
Vendor Document

15
Reference Document
PLANO DE FABRICACIN SUPERIOR SUPPORT
ANCHORAGE
PLANO DE FABRICACIN INFERIOR SUPPORT
ANCHORAGE
PLANO DE FABRICACIN WEDGE JACK SUPPORT BEAM

015-A2-Z100

015-A3-Z100
015-A5-V100

REV

Status

Rev Date

Purpose

IFR

19/09/2016

FA

IFR

19/09/2016

FA

IFR

19/09/2016

FA

015-A6-K100

PLANO DE FABRICACIN TRUSS GIRDER LIFTING DEVICE

IFR

19/09/2016

FA

015-A7-M100

PLANO DE FABRICACIN TIMING

IFR

19/09/2016

FA

015-A8-M100

PLANO DE FABRICACIN WEDGE JACK SUPPORT

IFR

19/09/2016

FA

015-A9-K100

PLANO DE FABRICACIN TRUSS GIRDER CLAMPING

IFR

19/09/2016

FA

IFR

19/09/2016

FA

IFR

19/09/2016

FA

IFR

19/09/2016

FA

PLANO DE FABRICACIN BRACKET CLAMPING


PLANO DE FABRICACIN SUPPORT ANCHORAGE ROD
CLAMPING

015-A10-K100
015-A11-M1

PLANO DE FABRICACIN TEMPORARY GUARD RAIL

015-A12-B100

SENDER
TMI DOCUMENT CONTROL
Name:
Johan Vilchez Esquivel
Signature:

Purpose: FI = For Information / FA = For Action

ACKNOWLEDGMENT OF RECEIPT
SAIPEM DOCUMENT CONTROL
Name:
Signatura:

Status IFA = Issue For Approval / IFR = Issue For Revision

PAGINA:

PROYECTO PSA PANAMA INTERNATIONAL


TERMINAL PHASE 2 EXPANSION

EDICION

01

JV JAN DE NUL PANAMA S.A. SAIPEM


CONTRACTING PREP S.A.

OT (TMI)

015-2016

PLANO DE FABRICACIN WEDGE JACK-CAP


30TONANCHORAGE
PLANO DE FABRICACIN WEDGE JACK-CAP
30TONANCHORAGE
PLANO DE FABRICACIN WEDGE JACK-CAP
30TONANCHORAGE
PLANO DE FABRICACIN WEDGE JACK-CAP
30TONANCHORAGE
PLANO DE FABRICACIN WEDGE JACK-CAP
30TONANCHORAGE

015-A13-J100

015-A13-J101

015-A13-J102

015-A13-J103

015-A13-J104

SENDER
TMI DOCUMENT CONTROL
Name:
Johan Vilchez Esquivel
Signature:

Purpose: FI = For Information / FA = For Action

IFR

19/09/2016

FA

IFR

19/09/2016

FA

IFR

19/09/2016

FA

IFR

19/09/2016

FA

IFR

19/09/2016

FA

ACKNOWLEDGMENT OF RECEIPT
SAIPEM DOCUMENT CONTROL
Name:
Signatura:

Status IFA = Issue For Approval / IFR = Issue For Revision

You might also like