TUGAS PERANCANGAN BETON BERTULANG

8.2.1 Perhitungan Kolom 40/60


Perhitungan Kolom Dengan Diagram Interaksi 10 d 19
Lebar Kolom ( b ) =
Tinggi Kolom ( h ) =
Diameter Tulangan tarik = tulangan tekan =
Dipakai Diameter Sengkang =
Jumlah Tulangan tarik = jumlah tulangan tekan =
Selimut Beton =
Tebal d' = selimut + sengkang + 1/2 tul =
Tinggi manfaat balok d = h - d ' =
Teg tekan Beton yang diisyaratkan fc' =
tegangan Tulangan leleh fy =
Modulus Elastisitas Es =
Regangan Leleh Tulangan = y = fy /Es =
1 = 0.85 - ( 32-30) x 0.05/7 =
Luas Tulangan tarik(As) = Luas Tulangan Tekan(As')=
Luas Total Tulangan Memanjang Ast =
Luas Total Kolom = Ag = b x h =
Beban Sentris :
Po = ( 0.85.fc'.(Ag - Ast) + Ast.fy ) / 1000
Pn = 0.8 Po =
Kondisi Seimbang
Xb = 600.d / ( 600 + fy ) =
ab = 1 . Xb =
Cc = 0.85 fc' .b .ab =

fs' = ( Xb - d' ).600/xb =


fs' =
500.2762430939 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l

Ts = As . Fy =

Pnb = Cc + Cs - Ts =

Hadi Wira Nasarani (0821049)

86

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG


y = h/2 =
Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))/1000 =
eb = Mnb / Pnb =

326.89066734 mm

Patah Desak
Terjadi bila X lebih Besar dari Xb
Diambil X =

370 > Xb =

285.78947

a = 1 . X =
Cc = 0.85 fc' .b .ab =

fs' = ( Xb - d' ).600/xb =


fs' =
522.972972973 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l

Ts = As . Fy =

Pnb = Cc + Cs - Ts =

y = h/2 =
Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=
eb = Mnb / Pnb =

244.09034257 mm

Patah Desak
Terjadi bila X lebih Besar dari Xb
Diambil X =

350 > Xb =

285.78947

a = 1 . X =
Cc = 0.85 fc' .b .ab =

fs' = ( Xb - d' ).600/xb =


Hadi Wira Nasarani (0821049)

87

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG


fs' =
518.5714285714 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l

Ts = As . Fy =

Pnb = Cc + Cs - Ts =

y = h/2 =
Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=
eb = Mnb / Pnb =

261.65707458 mm

Patah Tarik
Terjadi bila X lebih Kecil dari Xb
Diambil X =

250 < Xb =

285.78947

a = 1 . X =
Cc = 0.85 fc' .b .ab =

fs' = ( Xb - d' ).600/xb =


fs' =
486 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l

Ts = As . Fy =

Pnb = Cc + Cs - Ts =

y = h/2 =
Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=
eb = Mnb / Pnb =

372.00208975 mm

Patah Tarik
Hadi Wira Nasarani (0821049)

88

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG


Terjadi bila X lebih Kecil dari Xb
Diambil X =

200 < Xb =

285.78947

a = 1 . X =
Cc = 0.85 fc' .b .ab =

fs' = ( Xb - d' ).600/xb =


fs' =
757.5 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l

Ts = As . Fy =

Pnb = Cc + Cs - Ts =

y = h/2 =
Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=
eb = Mnb / Pnb =

453.72390777 mm

Lentur Murni
x = tinggi garis netral
a = 1 . X
fs' = ( X - d' ) x 600/X
Cc = 0.85 fc' x b x a = 0.85 x fc' x b x 1 x X =
Cs = As' x ( fs' - 0.85 fc )
Ts = As x fy
H=0
0.85 x fc' x b x 1 x X
0.85 x fc' x b x 1 x X

Cc + Cs - Ts = 0
+ As' x ( fs' - 0.85 fc' ) - As x fy = 0
+ As' x fs' - As' x 0.85 fc - As x fy = 0

Dimana dengan diagram regangan didapat :


s' / c' = X - d' / X
fs' = s' x Es

s' = ( X - d' ) x c' / X

fs' = (X - d') x c' x Es /X = ( X - d' ) x 0.003 x 200000 /X = 600 x ( X - d' )/X

0.85 x fc' x b x 1 x X + As' x ( 600 x ( X-d' ) / X )- As' x 0.85 fc' - As x fy = 0


0.85 x fc' x b x 1 x X + 600 As' x ( 600 As x d' ) / X )- As' x 0.85 fc' - As x fy = 0
Hadi Wira Nasarani (0821049)

89

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG


0.85 x fc' x b x 1 x X2 + 600 As' x X - 600As' x d' - As' x 0.85 fc' x X - As x fy = 0
0.85 x fc' x b x 1 + ( 600As' - As' x 0.85 fc' - As x fy) X -600As' x X = 0
A = 0.85 x fc' x b x 1
A = 0.85 x 25 x 400 x 0.85
A=
7225
B = 600 As' - 0.85 As' x fc' - As x fy
B = 600 . 3928.571 - 0.85 . 3928.571 x 25 - 3928.571x 320
B=
648833.03571429 -648833.0357
C = 600 x As' x d'
C = 600 x 3928.571 x 50
C=
80838214.285714 -80838214.29
Dengan rumus ABC didapat
X1 =
X2 =

70.0104804228 mm
-159.8143607984 mm

X dipakai =

70.010480423 mm

a = 1 x X =

59.508908359 mm

z1 = d - a/2 =

422.74554582 mm

z2 = d - d' =

405 mm

fs' = ( X - d' ) x 600 / X


= ( 75.565 - 50 ) x 600 / 75.565
=
192.9180912928
Cs = As' x ( fs' - 0.85 fc' ) =

486924.2789 kN

Cc = 0.85 x fc' x b x 1 x X =

505825.7211 kN

Mn = Cc x z1 + Cs z2 =

411039903.5 Nmm
411.0399035 kNm

x
0
350
370
285.789
250

Mn
0
419.8312175223
414.5714175223
425.9256751401
422.1793425223

Pn
3179.7749286
1604.5093304
1698.4343304
1302.9606461
1134.8843304

Hadi Wira Nasarani (0821049)

90

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG


200
0

408.3841081473 900.07183036
267.1759372815
0

Hadi Wira Nasarani (0821049)

91

TEKNIK SIPIL S-1 ITN Malang

Mpa

TUGAS PERANCANGAN BETON BERTULANG

400 mm
500 mm
19 mm
8 mm
10 buah
30 mm
47.5 mm
452.5 mm
25 Mpa
350 Mpa
200000 Mpa
0.00175
0.85

0.85

2836.4285714 mm2
5672.8571429 mm2
200000 mm2

6114.9517857 kN
4891.9614286 kN

285.78947368 mm
242.92105263 mm
2064.8289474 kN
2064828.9474 N
500.27624309 Mpa
maka kondisi tul tekan leleh
932.47589286 kN
932475.89286 N
992.75 kN
992750 N
2004.5548402 kN
2004554.8402 N
Hadi Wira Nasarani (0821049)

92

TEKNIK SIPIL S-1 ITN Malang

Mpa

TUGAS PERANCANGAN BETON BERTULANG


250 mm
655270.26945 kNmm

mm
314.5
2673.25 kN
2673250 N
522.97297297 Mpa
maka kondisi tul tekan leleh
932.47589286 kN
932475.89286 N
992.75 kN
992750 N
2612.9758929 kN
2612975.8929 N
250 mm
637802.1808 kNmm

mm
297.5
2528.75 kN
2528750 N
518.57142857 Mpa
Hadi Wira Nasarani (0821049)

93

TEKNIK SIPIL S-1 ITN Malang

Mpa

Mpa

TUGAS PERANCANGAN BETON BERTULANG


maka kondisi tul tekan leleh
932.47589286 kN
932475.89286 N
992.75 kN
992750 N
2468.4758929 kN
2468475.8929 N
250 mm
645894.1808 kNmm

mm
212.5
1806.25 kN
1806250 N
486 Mpa
maka kondisi tul tekan leleh
932.47589286 kN
932475.89286 N
992.75 kN
992750 N
1745.9758929 kN
1745975.8929 N
250 mm
649506.6808 kNmm

Hadi Wira Nasarani (0821049)

94

TEKNIK SIPIL S-1 ITN Malang

Mpa

TUGAS PERANCANGAN BETON BERTULANG


mm
170
1445 kN
1445000 N
757.5 Mpa
maka kondisi tul tekan leleh
932.47589286 kN
932475.89286 N
992.75 kN
992750 N
1384.7258929 kN
1384725.8929 N
250 mm
628283.2433 kNmm

0000 /X = 600 x ( X - d' )/X

Hadi Wira Nasarani (0821049)

95

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG

Hadi Wira Nasarani (0821049)

96

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG

Hadi Wira Nasarani (0821049)

97

TEKNIK SIPIL S-1 ITN Malang

TUGAS BETON BERTULANG


5.3.2 Perhitungan Kolom 40/60
Perhitungan Kolom Dengan Diagram Interaksi 12 d 19
Lebar Kolom ( b ) =
Tinggi Kolom ( h ) =
Diameter Tulangan tarik = tulangan tekan =
Dipakai Diameter Sengkang =
Jumlah Tulangan tarik = jumlah tulangan tekan =
Selimut Beton =
Tebal d' = selimut + sengkang + 1/2 tul =
Tinggi manfaat balok d = h - d ' =
Teg tekan Beton yang diisyaratkan fc' =
tegangan Tulangan leleh fy =
Modulus Elastisitas Es =

400
500
19
8
12
30
47.5
452.5
25
350
200000

Regangan Leleh Tulangan = y = fy /Es =


1 = 0.85 - ( 32-30) x 0.05/7 =

0.00175
0.85

Luas Tulangan tarik(As) = Luas Tulangan Tekan(As')=

3403.714

Luas Total Tulangan Memanjang Ast =

6807.429

Luas Total Kolom = Ag = b x h =

200000

Beban Sentris :
Po = ( 0.85.fc'.(Ag - Ast) + Ast.fy ) / 1000
Pn = 0.8 Po =

6487.942
5190.354

Kondisi Seimbang
Xb = 600.d / ( 600 + fy ) =

285.7895

ab = 1 . Xb =

242.9211

Cc = 0.85 fc' .b .ab =

2064.829
2064829

fs' = ( Xb - d' ).600/xb =

500.2762

fs' =
500.2762430939 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1118.971
1118971

Ts = As . Fy =

1191.3
1191300

Pnb = Cc + Cs - Ts =

1992.5
1992500

Hadi Wira Nasarani (0821049)

91

TEKNIK SIPIL S-1 ITN Malang

TUGAS BETON BERTULANG


y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))/1000 =


eb = Mnb / Pnb =

733241.9

368.00095919 mm

Patah Desak
Terjadi bila X lebih Besar dari Xb
Diambil X =

350 > Xb =

285.78947 mm

a = 1 . X =

297.5

Cc = 0.85 fc' .b .ab =

2528.75
2528750

fs' = ( Xb - d' ).600/xb =

518.5714

fs' =
518.5714285714 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1118.971
1118971

Ts = As . Fy =

1191.3
1191300

Pnb = Cc + Cs - Ts =

2456.421
2456421

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=


eb = Mnb / Pnb =

723865.8

294.68312167 mm

Patah Desak
Terjadi bila X lebih Besar dari Xb
Diambil X =

370 > Xb =

a = 1 . X =

285.78947 mm
314.5

Cc = 0.85 fc' .b .ab =

2673.25
2673250

fs' = ( Xb - d' ).600/xb =

522.973

Hadi Wira Nasarani (0821049)

92

TEKNIK SIPIL S-1 ITN Malang

TUGAS BETON BERTULANG


fs' =
522.972972973 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1118.971
1118971

Ts = As . Fy =

1191.3
1191300

Pnb = Cc + Cs - Ts =

2600.921
2600921

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=


eb = Mnb / Pnb =

715773.8

275.2001348 mm

Patah Tarik
Terjadi bila X lebih Kecil dari Xb
Diambil X =

250 < Xb =

285.78947 mm

a = 1 . X =

212.5

Cc = 0.85 fc' .b .ab =

1806.25
1806250

fs' = ( Xb - d' ).600/xb =

486

fs' =
486 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1118.971
1118971

Ts = As . Fy =

1191.3
1191300

Pnb = Cc + Cs - Ts =

1733.921
1733921

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=


eb = Mnb / Pnb =

727478.3

419.55677306 mm

Patah Tarik
Hadi Wira Nasarani (0821049)

93

TEKNIK SIPIL S-1 ITN Malang

TUGAS BETON BERTULANG


Terjadi bila X lebih Kecil dari Xb
Diambil X =

200 < Xb =

285.78947 mm

a = 1 . X =

170

Cc = 0.85 fc' .b .ab =

1445
1445000

fs' = ( Xb - d' ).600/xb =

757.5

fs' =
757.5 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1118.971
1118971

Ts = As . Fy =

1191.3
1191300

Pnb = Cc + Cs - Ts =

1372.671
1372671

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=


eb = Mnb / Pnb =

706254.9

514.51138344 mm

Lentur Murni
x = tinggi garis netral
a = 1 . X
fs' = ( X - d' ) x 600/X
Cc = 0.85 fc' x b x a = 0.85 x fc' x b x 1 x X =
Cs = As' x ( fs' - 0.85 fc )
Ts = As x fy
H=0
0.85 x fc' x b x 1 x X
0.85 x fc' x b x 1 x X

Cc + Cs - Ts = 0
+ As' x ( fs' - 0.85 fc' ) - As x fy = 0
+ As' x fs' - As' x 0.85 fc - As x fy = 0

Dimana dengan diagram regangan didapat :


s' / c' = X - d' / X
fs' = s' x Es

s' = ( X - d' ) x c' / X

fs' = (X - d') x c' x Es /X = ( X - d' ) x 0.003 x 200000 /X = 600 x ( X - d' )/X

0.85 x fc' x b x 1 x X + As' x ( 600 x ( X-d' ) / X )- As' x 0.85 fc' - As x fy = 0


0.85 x fc' x b x 1 x X + 600 As' x ( 600 As x d' ) / X )- As' x 0.85 fc' - As x fy = 0
Hadi Wira Nasarani (0821049)

94

TEKNIK SIPIL S-1 ITN Malang

TUGAS BETON BERTULANG


0.85 x fc' x b x 1 x X2 + 600 As' x X - 600As' x d' - As' x 0.85 fc' x X - As x fy = 0
0.85 x fc' x b x 1 + ( 600As' - As' x 0.85 fc' - As x fy) X -600As' x X = 0
A = 0.85 x fc' x b x 1
A = 0.85 x 25 x 400 x 0.85
A=
7225
B = 600 As' - 0.85 As' x fc' - As x fy
B = 600 . 3928.571 - 0.85 . 3928.571 x 25 - 3928.571x 320
B=
778599.64285714 -778599.6429
C = 600 x As' x d'
C = 600 x 3928.571 x 50
C=
97005857.142857 -97005857.14
Dengan rumus ABC didapat
X1 =
X2 =

73.9054705213 mm
-181.6701269721 mm

X dipakai =

73.905470521 mm

a = 1 x X =

62.819649943 mm

z1 = d - a/2 =

421.09017503 mm

z2 = d - d' =

405 mm

fs' = ( X - d' ) x 600 / X


= ( 75.565 - 50 ) x 600 / 75.565
=
214.3722541922
Cs = As' x ( fs' - 0.85 fc' ) =

657332.9755 kN

Cc = 0.85 x fc' x b x 1 x X =

533967.0245 kN

Mn = Cc x z1 + Cs z2 =

491068122.9 Nmm
491.0681229 kNm

x
0
370
350
285.789
250

Mn
0
465.2529891518
470.5127891518
476.6072467695
472.8609141518

Pn
3373.7299143
1690.5986964
1596.6736964
1295.1250122
1127.0486964

Hadi Wira Nasarani (0821049)

95

TEKNIK SIPIL S-1 ITN Malang

TUGAS BETON BERTULANG


200
0

459.0656797768 892.23619643
319.1942798745
0

Hadi Wira Nasarani (0821049)

96

TEKNIK SIPIL S-1 ITN Malang

TUGAS BETON BERTULANG

mm
mm
mm
mm
buah
mm
mm
mm
Mpa
Mpa
Mpa

0.85
mm2
mm2
mm2

kN
kN

mm
mm
kN
N
Mpa

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N
Hadi Wira Nasarani (0821049)

97

TEKNIK SIPIL S-1 ITN Malang

TUGAS BETON BERTULANG


mm
kNmm

kN
N
Mpa

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N
mm
kNmm

kN
N
Mpa
Hadi Wira Nasarani (0821049)

98

TEKNIK SIPIL S-1 ITN Malang

TUGAS BETON BERTULANG

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N
mm
kNmm

kN
N
Mpa

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N
mm
kNmm

Hadi Wira Nasarani (0821049)

99

TEKNIK SIPIL S-1 ITN Malang

TUGAS BETON BERTULANG

kN
N
Mpa

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N
mm
kNmm

600 x ( X - d' )/X

Hadi Wira Nasarani (0821049)

100

TEKNIK SIPIL S-1 ITN Malang

TUGAS BETON BERTULANG

Hadi Wira Nasarani (0821049)

101

TEKNIK SIPIL S-1 ITN Malang

TUGAS BETON BERTULANG

Hadi Wira Nasarani (0821049)

102

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG

5.3.2 Perhitungan Kolom 40/60


Perhitungan Kolom Dengan Diagram Interaksi 14 d 19
Lebar Kolom ( b ) =
Tinggi Kolom ( h ) =
Diameter Tulangan tarik = tulangan tekan =
Dipakai Diameter Sengkang =
Jumlah Tulangan tarik = jumlah tulangan tekan =
Selimut Beton =
Tebal d' = selimut + sengkang + 1/2 tul =
Tinggi manfaat balok d = h - d ' =
Teg tekan Beton yang diisyaratkan fc' =
tegangan Tulangan leleh fy =
Modulus Elastisitas Es =

400
500
19
8
14
30
47.5
452.5
25
350
200000

Regangan Leleh Tulangan = y = fy /Es =


1 = 0.85 - ( 32-30) x 0.05/7 =

0.00175
0.85

Luas Tulangan tarik(As) = Luas Tulangan Tekan(As')=

3971

Luas Total Tulangan Memanjang Ast =

7942

Luas Total Kolom = Ag = b x h =

200000

Beban Sentris :
Po = ( 0.85.fc'.(Ag - Ast) + Ast.fy ) / 1000
Pn = 0.8 Po =

6860.933
5488.746

Kondisi Seimbang
Xb = 600.d / ( 600 + fy ) =

285.7895

ab = 1 . Xb =

242.9211

Cc = 0.85 fc' .b .ab =

2064.829
2064829

fs' = ( Xb - d' ).600/xb =

500.2762

fs' =
500.2762430939 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1305.466
1305466

Ts = As . Fy =

1389.85
1389850

Pnb = Cc + Cs - Ts =

1980.445
1980445

Hadi Wira Nasarani (0821049)

96

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))/1000 =


eb = Mnb / Pnb =

811213.6

409.61172157 mm

Patah Desak
Terjadi bila X lebih Besar dari Xb
Diambil X =

350 > Xb =

285.78947 mm

a = 1 . X =

297.5

Cc = 0.85 fc' .b .ab =

2528.75
2528750

fs' = ( Xb - d' ).600/xb =

518.5714

fs' =
518.5714285714 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1305.466
1305466

Ts = As . Fy =

1389.85
1389850

Pnb = Cc + Cs - Ts =

2444.366
2444366

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=


eb = Mnb / Pnb =

801837.5

328.03491626 mm

Patah Desak
Terjadi bila X lebih Besar dari Xb
Diambil X =

370 > Xb =

a = 1 . X =

285.78947 mm
314.5

Cc = 0.85 fc' .b .ab =

2673.25
2673250

fs' = ( Xb - d' ).600/xb =

522.973

Hadi Wira Nasarani (0821049)

97

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG

fs' =
522.972972973 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1305.466
1305466

Ts = As . Fy =

1389.85
1389850

Pnb = Cc + Cs - Ts =

2588.866
2588866

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=


eb = Mnb / Pnb =

793745.5

306.5996469 mm

Patah Tarik
Terjadi bila X lebih Kecil dari Xb
Diambil X =

250 < Xb =

285.78947 mm

a = 1 . X =

212.5

Cc = 0.85 fc' .b .ab =

1806.25
1806250

fs' = ( Xb - d' ).600/xb =

486

fs' =
486 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1305.466
1305466

Ts = As . Fy =

1389.85
1389850

Pnb = Cc + Cs - Ts =

1721.866
1721866

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=


eb = Mnb / Pnb =

805450

467.77731901 mm

Patah Tarik
Hadi Wira Nasarani (0821049)

98

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG

Terjadi bila X lebih Kecil dari Xb


Diambil X =

200 < Xb =

285.78947 mm

a = 1 . X =

170

Cc = 0.85 fc' .b .ab =

1445
1445000

fs' = ( Xb - d' ).600/xb =

757.5

fs' =
757.5 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1305.466
1305466

Ts = As . Fy =

1389.85
1389850

Pnb = Cc + Cs - Ts =

1360.616
1360616

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=


eb = Mnb / Pnb =

784226.5

576.37599185 mm

Lentur Murni
x = tinggi garis netral
a = 1 . X
fs' = ( X - d' ) x 600/X
Cc = 0.85 fc' x b x a = 0.85 x fc' x b x 1 x X =
Cs = As' x ( fs' - 0.85 fc )
Ts = As x fy
H=0
0.85 x fc' x b x 1 x X
0.85 x fc' x b x 1 x X

Cc + Cs - Ts = 0
+ As' x ( fs' - 0.85 fc' ) - As x fy = 0
+ As' x fs' - As' x 0.85 fc - As x fy = 0

Dimana dengan diagram regangan didapat :


s' / c' = X - d' / X
fs' = s' x Es

s' = ( X - d' ) x c' / X

fs' = (X - d') x c' x Es /X = ( X - d' ) x 0.003 x 200000 /X = 600 x ( X - d' )/X

0.85 x fc' x b x 1 x X + As' x ( 600 x ( X-d' ) / X )- As' x 0.85 fc' - As x fy = 0


0.85 x fc' x b x 1 x X + 600 As' x ( 600 As x d' ) / X )- As' x 0.85 fc' - As x fy = 0
Hadi Wira Nasarani (0821049)

99

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG

0.85 x fc' x b x 1 x X2 + 600 As' x X - 600As' x d' - As' x 0.85 fc' x X - As x fy = 0


0.85 x fc' x b x 1 + ( 600As' - As' x 0.85 fc' - As x fy) X -600As' x X = 0
A = 0.85 x fc' x b x 1
A = 0.85 x 25 x 400 x 0.85
A=
7225
B = 600 As' - 0.85 As' x fc' - As x fy
B = 600 . 3928.571 - 0.85 . 3928.571 x 25 - 3928.571x 320
B=
908366.25
-908366.25
C = 600 x As' x d'
C = 600 x 3928.571 x 50
C=
113173500

-113173500

Dengan rumus ABC didapat


X1 =
X2 =

77.193962782 mm
-202.9193953079 mm

X dipakai =

77.193962782 mm

a = 1 x X =

65.614868365 mm

z1 = d - a/2 =

419.69256582 mm

z2 = d - d' =

405 mm

fs' = ( X - d' ) x 600 / X


= ( 75.565 - 50 ) x 600 / 75.565
=
230.8001432638
Cs = As' x ( fs' - 0.85 fc' ) =

832123.6189 kN

Cc = 0.85 x fc' x b x 1 x X =

557726.3811 kN

Mn = Cc x z1 + Cs z2 =

571083681.6 Nmm
571.0836816 kNm

x
0
370
350
285.789
250

Mn
0
515.9345607813
521.1943607813
527.288818399
523.5424857813

Pn
3567.6849
1682.7630625
1588.8380625
1287.2893783
1119.2130625

Hadi Wira Nasarani (0821049)

100

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG

200
0

509.7472514063 884.4005625
371.2043930157
0

Hadi Wira Nasarani (0821049)

101

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG

mm
mm
mm
mm
buah
mm
mm
mm
Mpa
Mpa
Mpa

0.85
mm2
mm2
mm2

kN
kN

mm
mm
kN
N
Mpa

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N
Hadi Wira Nasarani (0821049)

102

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG

mm
kNmm

kN
N
Mpa

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N
mm
kNmm

kN
N
Mpa
Hadi Wira Nasarani (0821049)

103

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N
mm
kNmm

kN
N
Mpa

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N
mm
kNmm

Hadi Wira Nasarani (0821049)

104

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG

kN
N
Mpa

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N
mm
kNmm

600 x ( X - d' )/X

Hadi Wira Nasarani (0821049)

105

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG

Hadi Wira Nasarani (0821049)

106

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG

Hadi Wira Nasarani (0821049)

107

TEKNIK SIPIL S-1 ITN Malang

5.3.2 Perhitungan Kolom 40/60


Perhitungan Kolom Dengan Diagram Interaksi 16 d 19
Lebar Kolom ( b ) =
Tinggi Kolom ( h ) =
Diameter Tulangan tarik = tulangan tekan =
Dipakai Diameter Sengkang =
Jumlah Tulangan tarik = jumlah tulangan tekan =
Selimut Beton =
Tebal d' = selimut + sengkang + 1/2 tul =
Tinggi manfaat balok d = h - d ' =
Teg tekan Beton yang diisyaratkan fc' =
tegangan Tulangan leleh fy =
Modulus Elastisitas Es =

400
500
19
8
16
30
47.5
452.5
25
350
200000

Regangan Leleh Tulangan = y = fy /Es =


1 = 0.85 - ( 32-30) x 0.05/7 =

0.00175
0.85

Luas Tulangan tarik(As) = Luas Tulangan Tekan(As')=

4538.286

Luas Total Tulangan Memanjang Ast =

9076.571

Luas Total Kolom = Ag = b x h =

200000

Beban Sentris :
Po = ( 0.85.fc'.(Ag - Ast) + Ast.fy ) / 1000
Pn = 0.8 Po =

7233.923
5787.138

Kondisi Seimbang
Xb = 600.d / ( 600 + fy ) =

285.7895

ab = 1 . Xb =

242.9211

Cc = 0.85 fc' .b .ab =

2064.829
2064829

fs' = ( Xb - d' ).600/xb =

500.2762

fs' =
500.2762430939 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1491.961
1491961

Ts = As . Fy =

1588.4
1588400

Pnb = Cc + Cs - Ts =

1968.39
1968390

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))/1000 =


eb = Mnb / Pnb =

889185.2

451.73214942 mm

Patah Desak
Terjadi bila X lebih Besar dari Xb
Diambil X =

350 > Xb =

285.78947 mm

a = 1 . X =

297.5

Cc = 0.85 fc' .b .ab =

2528.75
2528750

fs' = ( Xb - d' ).600/xb =

518.5714

fs' =
518.5714285714 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1491.961
1491961

Ts = As . Fy =

1588.4
1588400

Pnb = Cc + Cs - Ts =

2432.311
2432311

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=


eb = Mnb / Pnb =

361.71730168 mm

Patah Desak
Terjadi bila X lebih Besar dari Xb
Diambil X =
a = 1 . X =

879809.1

370 > Xb =

285.78947 mm
314.5

Cc = 0.85 fc' .b .ab =

2673.25
2673250

fs' = ( Xb - d' ).600/xb =

522.973

fs' =
522.972972973 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1491.961
1491961

Ts = As . Fy =

1588.4
1588400

Pnb = Cc + Cs - Ts =

2576.811
2576811

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=


eb = Mnb / Pnb =

871717.1

338.29294496 mm

Patah Tarik
Terjadi bila X lebih Kecil dari Xb
Diambil X =

250 < Xb =

285.78947 mm

a = 1 . X =

212.5

Cc = 0.85 fc' .b .ab =

1806.25
1806250

fs' = ( Xb - d' ).600/xb =

486

fs' =
486 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1491.961
1491961

Ts = As . Fy =

1588.4
1588400

Pnb = Cc + Cs - Ts =

1709.811
1709811

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=


eb = Mnb / Pnb =
Patah Tarik

516.67781138 mm

883421.6

Terjadi bila X lebih Kecil dari Xb


Diambil X =

200 < Xb =

285.78947 mm

a = 1 . X =

170

Cc = 0.85 fc' .b .ab =

1445
1445000

fs' = ( Xb - d' ).600/xb =

757.5

fs' =
757.5 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1491.961
1491961

Ts = As . Fy =

1588.4
1588400

Pnb = Cc + Cs - Ts =

1348.561
1348561

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=


eb = Mnb / Pnb =

862198.2

639.34661857 mm

Lentur Murni
x = tinggi garis netral
a = 1 . X
fs' = ( X - d' ) x 600/X
Cc = 0.85 fc' x b x a = 0.85 x fc' x b x 1 x X =
Cs = As' x ( fs' - 0.85 fc )
Ts = As x fy
H=0
0.85 x fc' x b x 1 x X
0.85 x fc' x b x 1 x X

Cc + Cs - Ts = 0
+ As' x ( fs' - 0.85 fc' ) - As x fy = 0
+ As' x fs' - As' x 0.85 fc - As x fy = 0

Dimana dengan diagram regangan didapat :


s' / c' = X - d' / X
fs' = s' x Es

s' = ( X - d' ) x c' / X

fs' = (X - d') x c' x Es /X = ( X - d' ) x 0.003 x 200000 /X = 600 x ( X - d' )/X

0.85 x fc' x b x 1 x X + As' x ( 600 x ( X-d' ) / X )- As' x 0.85 fc' - As x fy = 0


0.85 x fc' x b x 1 x X + 600 As' x ( 600 As x d' ) / X )- As' x 0.85 fc' - As x fy = 0

0.85 x fc' x b x 1 x X2 + 600 As' x X - 600As' x d' - As' x 0.85 fc' x X - As x fy = 0


0.85 x fc' x b x 1 + ( 600As' - As' x 0.85 fc' - As x fy) X -600As' x X = 0
A = 0.85 x fc' x b x 1
A = 0.85 x 25 x 400 x 0.85
A=
7225
B = 600 As' - 0.85 As' x fc' - As x fy
B = 600 . 3928.571 - 0.85 . 3928.571 x 25 - 3928.571x 320
B=
1038132.8571429 -1038132.857
C = 600 x As' x d'
C = 600 x 3928.571 x 50
C=
129341142.85714 -129341142.9
Dengan rumus ABC didapat
X1 =
X2 =

80.023020692 mm
-223.7092292931 mm

X dipakai =

80.023020692 mm

a = 1 x X =

68.019567588 mm

z1 = d - a/2 =

418.49021621 mm

z2 = d - d' =

405 mm

fs' = ( X - d' ) x 600 / X


= ( 75.565 - 50 ) x 600 / 75.565
=
243.8524845285
Cs = As' x ( fs' - 0.85 fc' ) =

1010233.675 kN

Cc = 0.85 x fc' x b x 1 x X =

578166.3245 kN

Mn = Cc x z1 + Cs z2 =

651101588.7 Nmm
651.1015887 kNm

x
0
370
350
285.789
250

Mn
0
566.6161324107
571.8759324107
577.9703900284
574.2240574107

Pn
3761.6398857
1674.9274286
1581.0024286
1279.4537444
1111.3774286

200
0

560.4288230357 876.56492857
423.2160326683
0

mm
mm
mm
mm
buah
mm
mm
mm
Mpa
Mpa
Mpa

0.85
mm

mm2
mm2

kN
kN

mm
mm
kN
N
Mpa

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N

mm
kNmm

kN
N
Mpa

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N
mm
kNmm

kN
N
Mpa

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N
mm
kNmm

kN
N
Mpa

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N
mm
kNmm

kN
N
Mpa

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N
mm
kNmm

600 x ( X - d' )/X

5.3.2 Perhitungan Kolom 40/60


Perhitungan Kolom Dengan Diagram Interaksi 18 d 19
Lebar Kolom ( b ) =
Tinggi Kolom ( h ) =
Diameter Tulangan tarik = tulangan tekan =
Dipakai Diameter Sengkang =
Jumlah Tulangan tarik = jumlah tulangan tekan =
Selimut Beton =
Tebal d' = selimut + sengkang + 1/2 tul =
Tinggi manfaat balok d = h - d ' =
Teg tekan Beton yang diisyaratkan fc' =
tegangan Tulangan leleh fy =
Modulus Elastisitas Es =

400
500
19
8
18
30
47.5
452.5
25
350
200000

Regangan Leleh Tulangan = y = fy /Es =


1 = 0.85 - ( 32-30) x 0.05/7 =

0.00175
0.85

Luas Tulangan tarik(As) = Luas Tulangan Tekan(As')=

5105.571

Luas Total Tulangan Memanjang Ast =

10211.14

Luas Total Kolom = Ag = b x h =

200000

Beban Sentris :
Po = ( 0.85.fc'.(Ag - Ast) + Ast.fy ) / 1000
Pn = 0.8 Po =

7606.913
6085.531

Kondisi Seimbang
Xb = 600.d / ( 600 + fy ) =

285.7895

ab = 1 . Xb =

242.9211

Cc = 0.85 fc' .b .ab =

2064.829
2064829

fs' = ( Xb - d' ).600/xb =

500.2762

fs' =
500.2762430939 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1678.457
1678457

Ts = As . Fy =

1786.95
1786950

Pnb = Cc + Cs - Ts =

1956.336
1956336

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))/1000 =


eb = Mnb / Pnb =

967156.9

494.37166434 mm

Patah Desak
Terjadi bila X lebih Besar dari Xb
Diambil X =

350 > Xb =

285.78947 mm

a = 1 . X =

297.5

Cc = 0.85 fc' .b .ab =

2528.75
2528750

fs' = ( Xb - d' ).600/xb =

518.5714

fs' =
518.5714285714 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1678.457
1678457

Ts = As . Fy =

1786.95
1786950

Pnb = Cc + Cs - Ts =

2420.257
2420257

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=


eb = Mnb / Pnb =

395.73521775 mm

Patah Desak
Terjadi bila X lebih Besar dari Xb
Diambil X =
a = 1 . X =

957780.8

370 > Xb =

285.78947 mm
314.5

Cc = 0.85 fc' .b .ab =

2673.25
2673250

fs' = ( Xb - d' ).600/xb =

522.973

fs' =
522.972972973 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1678.457
1678457

Ts = As . Fy =

1786.95
1786950

Pnb = Cc + Cs - Ts =

2564.757
2564757

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=


eb = Mnb / Pnb =

949688.8

370.28417153 mm

Patah Tarik
Terjadi bila X lebih Kecil dari Xb
Diambil X =

250 < Xb =

285.78947 mm

a = 1 . X =

212.5

Cc = 0.85 fc' .b .ab =

1806.25
1806250

fs' = ( Xb - d' ).600/xb =

486

fs' =
486 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1678.457
1678457

Ts = As . Fy =

1786.95
1786950

Pnb = Cc + Cs - Ts =

1697.757
1697757

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=


eb = Mnb / Pnb =
Patah Tarik

566.27273391 mm

961393.3

Terjadi bila X lebih Kecil dari Xb


Diambil X =

200 < Xb =

285.78947 mm

a = 1 . X =

170

Cc = 0.85 fc' .b .ab =

1445
1445000

fs' = ( Xb - d' ).600/xb =

757.5

fs' =
757.5 Mpa
fs' =
350 Mpa
Cs = As' ( fs'-0.85fc' ) =

>

fy =

350 Mpa

maka kondisi tul tekan l


1678.457
1678457

Ts = As . Fy =

1786.95
1786950

Pnb = Cc + Cs - Ts =

1336.507
1336507

y = h/2 =

250

Mnb = (Cc ( y - ab/2 ) + Cs( y - d' ) + Ts ( d - y ))=


eb = Mnb / Pnb =

940169.8

703.45319127 mm

Lentur Murni
x = tinggi garis netral
a = 1 . X
fs' = ( X - d' ) x 600/X
Cc = 0.85 fc' x b x a = 0.85 x fc' x b x 1 x X =
Cs = As' x ( fs' - 0.85 fc )
Ts = As x fy
H=0
0.85 x fc' x b x 1 x X
0.85 x fc' x b x 1 x X

Cc + Cs - Ts = 0
+ As' x ( fs' - 0.85 fc' ) - As x fy = 0
+ As' x fs' - As' x 0.85 fc - As x fy = 0

Dimana dengan diagram regangan didapat :


s' / c' = X - d' / X
fs' = s' x Es

s' = ( X - d' ) x c' / X

fs' = (X - d') x c' x Es /X = ( X - d' ) x 0.003 x 200000 /X = 600 x ( X - d' )/X

0.85 x fc' x b x 1 x X + As' x ( 600 x ( X-d' ) / X )- As' x 0.85 fc' - As x fy = 0


0.85 x fc' x b x 1 x X + 600 As' x ( 600 As x d' ) / X )- As' x 0.85 fc' - As x fy = 0

0.85 x fc' x b x 1 x X2 + 600 As' x X - 600As' x d' - As' x 0.85 fc' x X - As x fy = 0


0.85 x fc' x b x 1 + ( 600As' - As' x 0.85 fc' - As x fy) X -600As' x X = 0
A = 0.85 x fc' x b x 1
A = 0.85 x 25 x 400 x 0.85
A=
7225
B = 600 As' - 0.85 As' x fc' - As x fy
B = 600 . 3928.571 - 0.85 . 3928.571 x 25 - 3928.571x 320
B=
1167899.4642857 -1167899.464
C = 600 x As' x d'
C = 600 x 3928.571 x 50
C=
145508785.71429 -145508785.7
Dengan rumus ABC didapat
X1 =
X2 =

82.492340434 mm
-244.1393251102 mm

X dipakai =

82.492340434 mm

a = 1 x X =

70.118489369 mm

z1 = d - a/2 =

417.44075532 mm

z2 = d - d' =

405 mm

fs' = ( X - d' ) x 600 / X


= ( 75.565 - 50 ) x 600 / 75.565
=
254.5133784535
Cs = As' x ( fs' - 0.85 fc' ) =

1190942.84 kN

Cc = 0.85 x fc' x b x 1 x X =

596007.1596 kN

Mn = Cc x z1 + Cs z2 =

731129529.2 Nmm
731.1295292 kNm

x
0
370
350
285.789
250

Mn
0
617.2977040402
622.5575040402
628.6519616579
624.9056290402

Pn
3955.5948714
1667.0917946
1573.1667946
1271.6181104
1103.5417946

200
0

611.1103946652 868.72929464
475.2341940056
0

mm
mm
mm
mm
buah
mm
mm
mm
Mpa
Mpa
Mpa

2400
2833.85

0.85
mm

mm2
mm2

kN
kN

mm
mm
kN
N
Mpa

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N

mm
kNmm

kN
N
Mpa

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N
mm
kNmm

kN
N
Mpa

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N
mm
kNmm

kN
N
Mpa

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N
mm
kNmm

kN
N
Mpa

maka kondisi tul tekan leleh


kN
N
kN
N
kN
N
mm
kNmm

600 x ( X - d' )/X

Pembacaan Staad
Batang
10
11
12
13
14
15
16
17
18

Joint
1
5
2
6
3
7
5
9
6
10
7
11
9
13
10
14
11
15

Mu (kN m)
153.142
26.343
209.025
93.432
189.553
90.748
48.881
33.415
199.432
166.676
172.777
150.52
40.837
12.687
167.59
246.024
141.219
217.652

Pu (kN)

Mn = Mu/

510.995

235.603

923.498

321.577

795.853

291.620

340.892

75.202

621.492

306.818

533.345

265.811

169.328

62.826

306.189

378.498

253.208

334.849

Pn = Pu/

Tulangan yang dipakai

332.147

10 D 19

600.274

10 D 19

517.304

10 D 19

221.580

10 D 19

403.970

10 D 19

346.674

10 D 19

110.063

10 D 19

199.023

14 D 19

164.585

12 D 19

TUGAS PERANCANGAN BETON BERTULANG


TABEL PENULANGAN GESER KOLOM
Kolom
10
11
12
13
14
15
16
17
18

Gaya max
(Pu/Fx)
(Vu/Fy)
510.995
923.498
795.853
340.892
621.492
533.345
169.328
306.189
253.208

40.171
86.416
80.086
25.513
104.602
92.371
10.705
82.723
71.774

Hadi Wira Nasarani (0821049)

Momen Max
(Mz/Mu)

Ag

fy

fc'

bw

d'

Mn

Vc

1/2..Vc

Av

153.142
209.025
189.553
48.881
199.432
172.777
40.837
246.024
217.652

240000
240000
240000
240000
240000
240000
240000
240000
240000

350
350
350
350
350
350
350
350
350

25
25
25
25
25
25
25
25
25

400
400
400
400
400
400
400
400
400

600
600
600
600
600
600
600
600
600

346
346
346
346
346
346
346
346
346

254
254
254
254
254
254
254
254
254

8
8
8
8
8
8
8
8
8

255.237
348.375
315.922
81.468
332.387
287.962
68.062
410.040
362.753

17.54011
31.69944
27.31797
11.70125
21.33296
18.30728
5.812251
10.51006
8.691465

5.262032
9.509831
8.195391
3.510376
6.399888
5.492184
1.743675
3.153018
2.60744

150.72
150.72
150.72
150.72
150.72
150.72
150.72
150.72
150.72

TEKNIK SIPIL S-1 ITN Malang

TUGAS PERANCANGAN BETON BERTULANG

LANGAN GESER KOLOM

Hadi Wira Nasarani (0821049)

Vs Perlu

Vs

Ket.

49.41156
112.3272
106.1587
30.82041
153.0037
135.6444
12.02942
127.3616
110.9319

395.64
395.64
395.64
395.64
395.64
395.64
395.64
395.64
395.64

46133.333
46133.333
46133.333
46133.333
46133.333
46133.333
46133.333
46133.333
46133.333

OK
OK
OK
OK
OK
OK
OK
OK
OK

TEKNIK SIPIL S-1 ITN Malang

PENULANGAN GESER KOLOM


10
11
12
13
14
Batang
40.171
86.416
80.086
25.513
104.602
Vu
510.995 923.498 795.853 340.892 621.492
Pu
500
500
500
500
500
b
500
500
500
500
500
h
452.5
452.5
452.5
452.5
452.5
d
25
25
25
25
25
fc'
0.6
0.6
0.6
0.6
0.6

fy
240
240
240
240
240
Selimut beton
30
30
30
30
30
Tulangan pokok
19
19
19
19
19
sengkang
8
8
8
8
8
Vc
377633.9 378078.3 377940.8 377450.6 377752.9
1/2 Vc
113290.2 113423.5 113382.2 113235.2 113325.9
Di daerah plastis
lo>h
500
500
500
500
500
lo > 1/6 ln
583.3333 583.3333 583.3333 583.3333 583.3333
lo
450
450
450
450
450
s = 1/4.h
125
125
125
125
125
S=6.sengkang
48
48
48
48
48
s
dipakai
di luar daerah plastis
s < 6 . sengkang
48
48
48
48
48
s < 150
150
150
150
150
150
s
150
150
150
150
150
dipakai
8-150
8-150
8-150
8-150
8-150

R KOLOM

Data Perencanaan:
15
16
17
18
92.371
10.705
82.723
71.774
533.345 169.328 306.189 253.208
500
500
500
500
500
500
500
500
452.5
452.5
452.5
452.5
25
25
25
25
0.6
0.6
0.6
0.6
240
240
240
240
30
30
30
30
19
19
19
19
8
8
8
8
377657.9 377265.8 377413.2 377356.1
113297.4 113179.7
113224 113206.8
500
500
500
500
583.3333 833.3333 833.3333 833.3333
450
450
450
450
125
125
125
125
48
48
48
48

Pu
=
Vu
=
Mu
=
bw
=
h
=
D
=
Selimut Beton
sengkang
Momen Nominal

Menurut SNI 03.2848.2002


Struktur yang dibebani beb
Vc

=
=

48
48
48
48
150
150
150
150
150
150
150
150
8-150
8-150
8-150
8-150

=
Kontrol Penulangan
=
=
=
Jadi, Vu > 1/2 x x Vc

Direncanakan luas Tul. Pen


Av

=
=
=

Vs perlu

=
=
=
=

=
=
=

Vs

=
=

Kontrol

=
=

Daerah yang harus dipasan


L tlng

=
=

=
=
NB: untuk perhitungan Ges

PENULANGAN GESER KOLOM 13


Perencanaan:
169.328 KN
10.705 KN
40.837 KN
400 mm
600 mm
32 mm
=
40 mm
=
10 mm

en Nominal

Mu ./

L
Ag
fc'
fy

d
d'

=
=
=
=
Geser

40.837 ./

500
240000
25
350
= 0.6
= 534
= 66

0.6

mm
mm
Mpa
Mpa
mm
mm
mm

68.062

KN

urut SNI 03.2848.2002 Pasal 13.3 (1(1). 47


tur yang dibebani beban Axial
1

Pu
14 x Ag

169.328
14 x 240000

5.040E-005

x bw

25
6

400

534

0.833333

400

534

x
x

8.9703524 KN

ol Penulangan
1/2. . Vc
0.5 x
0.6
2.6911057 KN
Vu > 1/2 x x Vc

8.970352

Maka perlu Tulg. Geser tetapi tulangan geser praktis

ncanakan luas Tul. Penampang sengkang


3

1
4

0.785

235.5 mm
Vu
Vc

10.705
8.970352
0.6
17.841667 8.970352
8.8713143
KN

x
x

3
D
10

kaki

10 mm

3 x

Av
x
bw
3x
235.5 x
400
618.1875 mm
Av

fy
350

fy x
d
S
235.5
x
350 x
618.1875
71200
KN
Vs > Vs perlu

534

Ok!

ah yang harus dipasang tulangan geser yaitu daerah dimana nilai Vu > 1/2 x x Vc
Vu/

1/2 x x Vc
x L/2
Vu/
17.8417
2.69110571
x
250
17.842
212.29184 mm ~ 1800 mm dari tumpuan mulai dipasang tulg. Geser

untuk perhitungan Geser Kolom selanjutnya ditabelkan