Case Sludy 210
ised bed reactor for mineral
Toroidal flui
processing
Case Study Objective
To demonstrate the benefits of using @
toroidal bed reactor to dry, heat or expand
materials,
Potential Users
Applications for this technology can be
founcin most process industies
Investment Cost (1990 prices)
£196,000
Savings Achieved
102,400/year
Payback Period
16 months
Case Study Summary
‘The expansion and exsoliation of crude ver
‘micutte ore producas tha basic material
Used In the manulacture of fre protection
and industrial insulation products.
Excessive operating and maintenance
‘costs, and serious environmental problems,
prompted Capo Industial Products Lid to
replace their five rotary furnaces used for
the exfoiation process, with a toroidal ths
Idised bed reactor,
‘The new reactor maintained the same level
Cf production as the five rotary furnaces
and reduced overall energy consumption
‘and vermiculite wastage. Other benotits
Included lower maintenance costs and
‘much improved envronmental conditions
The savings achieved by this project result.
ed in a payback period of 16 months on an
Investment of £136,000,
Torolda! fluidised bed reactor