You are on page 1of 7

324

Dgl Price

C.

1.

DAFTAR HARGA SATUAN BAHAN BANGUNAN / KONSTRUKSI


BAHAN PERPIPAAN
PERIODE : OKTOBER 2016
Kecamatan

NO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

Banawa

BAHAN / MATERIAL

Besi Plat 3 mm
Besi Siku L = 50.50.4
Cat Tembok
Cat Besi
Menie
Dempul
Plamir Tembok
Pipa PVC 20 mm ( " )
Pipa PVC 25 mm ( " )
Pipa PVC 32 mm ( 1 " )
Pipa PVC 50 mm ( 1 " )
Pipa PVC 63 mm ( 2 " )
Pipa PVC 75 mm ( 2 " )
Pipa PVC 90 mm ( 3 " )
Pipa PVC 110 mm ( 4 " )
Pipa PVC 160 mm ( 6 " )
Pipa PVC 160 mm ( 8 " )
Pipa GIP "
Pipa GIP "
Pipa GIP 1 "
Pipa GIP 1 "
Pipa GIP 1 "
Pipa GIP 2 "
Pipa GIP 2 "
Pipa GIP 3 "
Pipa GIP 4 "
Pipa GIP 6 "
Pipa GIP 8 "
Pipa HDPE 8 "
Pipa HDPE 6 "
Pipa HDPE 4 "
Pipa HDPE 2 "
Double Flanged Gate Valve CI 8"
Double Flanged Gate Valve CI 6"
Double Flanged Gate Valve CI 4"
Double Flanged Gate Valve CI 3"
Double Flanged Gate Valve CI 2"
Stub Flanged HDPE 6"

SATUAN

M2
M
Kg
Kg
Kg
Kg
Kg
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
Bh
Bh
Bh
Bh
Bh
Bh

HARGA BAHAN
(Tidak termasuk PPN)
TERENDAH
TERTINGGI
(Rp)
(Rp)
774.760,00
23.580,00
23.410,00
44.310,00
27.810,00
24.210,00
34.210,00
5.810,00
7.820,00
12.330,00
21.410,00
32.240,00
47.790,00
68.710,00
101.200,00
218.500,00
344.670,00
18.220,00
23.330,00
32.700,00
53.390,00
54.920,00
82.000,00
117.000,00
140.110,00
210.190,00
490.270,00
746.820,00
556.420,00
356.850,00
176.280,00
56.710,00
3.780.340,00
2.475.340,00
1.782.340,00
1.248.340,00
650.340,00
431.980,00

778.750,00
24.300,00
27.720,00
48.620,00
32.120,00
28.520,00
38.520,00
6.290,00
8.340,00
12.900,00
22.130,00
32.960,00
48.590,00
69.510,00
102.150,00
219.700,00
346.110,00
18.700,00
23.860,00
33.280,00
54.030,00
55.640,00
83.000,00
118.000,00
140.910,00
211.150,00
491.470,00
748.260,00
565.050,00
364.040,00
182.030,00
61.020,00
3.781.200,00
2.476.200,00
1.783.200,00
1.249.200,00
651.200,00
432.840,00

325
Dgl Price

Banawa

NO

39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79

BAHAN / MATERIAL

Stub Flanged HDPE 4"


Stub Flanged HDPE 3"
Stub Flanged HDPE 2"
Reducer HDPE 6" x 4"
Reducer HDPE 4" x 3"
Reducer HDPE 3" x 2"
Long Elbow 6" x 90 (HDPE)
Long Elbow 4" x 90 (HDPE)
Long Elbow 3" x 90 (HDPE)
Long Elbow 2" x 90 (HDPE)
Long Elbow 6" x 45 (HDPE)
Long Elbow 4" x 45 (HDPE)
Long Elbow 3" x 45 (HDPE)
Long Elbow 2" x 45 (HDPE)
Bend CI 90 6"
Bend CI 90 4"
Bend CI 90 3"
Bend CI 90 2"
Blind Flanged PN 10 6"
Flanged Strainer Cl 8"
Flanged Strainer Cl 6"
Flanged Strainer Cl 4"
Flanged Strainer Cl 3"
Flanged Strainer Cl 2,5 "
Sock Strainer 8 "
Sock Strainer 6 "
Sock Strainer 4 "
Sock Strainer 3 "
Sock Strainer 2 "
Flanged Steel Cl 8"
Flanged Steel Cl 6"
Flanged Steel Cl 4"
Flanged Steel Cl 3"
Flanged Steel Cl 2,5"
Flanged Steel Cl 2"
Double Flanged Gate Valve Cl 8"
Double Flanged Gate Valve Cl 6"
Double Flanged Gate Valve Cl 4"
Double Flanged Gate Valve Cl 3"
Double Flanged Gate Valve Cl 2,5"
Knei GIP 8"

SATUAN

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

HARGA BAHAN
(Tidak termasuk PPN)
TERENDAH
TERTINGGI
(Rp)
(Rp)
345.340,00
276.340,00
221.340,00
322.340,00
258.340,00
206.340,00
681.340,00
545.340,00
436.340,00
349.340,00
521.340,00
417.340,00
334.340,00
267.340,00
901.340,00
721.340,00
649.340,00
584.340,00
262.340,00
450.340,00
400.340,00
350.340,00
325.340,00
300.340,00
315.340,00
260.340,00
205.340,00
177.840,00
150.340,00
130.340,00
110.340,00
90.340,00
80.340,00
60.340,00
50.340,00
1.050.340,00
850.340,00
650.340,00
550.340,00
400.340,00
115.340,00

346.200,00
277.200,00
222.200,00
323.200,00
259.200,00
207.200,00
682.200,00
546.200,00
437.200,00
350.200,00
522.200,00
418.200,00
335.200,00
268.200,00
902.200,00
722.200,00
650.200,00
585.200,00
263.200,00
451.200,00
401.200,00
351.200,00
326.200,00
301.200,00
316.200,00
261.200,00
206.200,00
178.700,00
151.200,00
131.200,00
111.200,00
91.200,00
81.200,00
61.200,00
51.200,00
1.051.200,00
851.200,00
651.200,00
551.200,00
401.200,00
116.200,00

326
Dgl Price

Banawa

NO

80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120

BAHAN / MATERIAL

Knei GIP 6"


Knei GIP 4"
Knei GIP 3"
Knei GIP 2,5"
Knei GIP 2"
Knei GIP 1,5"
Knei GIP 1"
Knei GIP 3/4"
Knei GIP 1/2"
Dop Gip 4"
Dop Gip 3"
Dop Gip 2,5"
Dop Gip 2"
Dop Gip 1,5"
Dop Gip 1/2"
Dop PVC 4"
Dop PVC 3"
Dop PVC 2,5"
Dop PVC 2"
Dop PVC 1,5"
Dop PVC 1/2"
Paking Karet 8"
Paking Karet 6"
Paking Karet 4"
Paking Karet 3"
Paking Karet 2,5"
Paking Karet 2"
Baut Moor 6 " / 24 mm
Baut Moor 4 " / 24 mm
Baut Moor 3 " / 24 mm
Baut Moor 2 " / 24 mm
Baut Moor 12 mm
Sock GIP 8 "
Sock GIP 6 "
Sock GIP 4 "
Sock GIP 3 "
Sock GIP 2,5 "
Sock GIP 2 "
Sock GIP 1 "
Sock GIP 3/4 "
Sock GIP 1/2 "

SATUAN

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

HARGA BAHAN
(Tidak termasuk PPN)
TERENDAH
TERTINGGI
(Rp)
(Rp)
95.340,00
75.340,00
60.340,00
45.340,00
30.340,00
25.340,00
22.340,00
17.340,00
15.340,00
95.340,00
87.840,00
80.340,00
70.340,00
50.340,00
22.340,00
70.340,00
60.340,00
50.340,00
30.340,00
25.340,00
15.340,00
70.340,00
50.340,00
30.340,00
20.340,00
20.340,00
15.340,00
10.840,00
7.840,00
6.340,00
5.090,00
3.340,00
116.340,00
98.340,00
80.340,00
50.340,00
45.340,00
40.340,00
20.340,00
20.340,00
15.340,00

96.200,00
76.200,00
61.200,00
46.200,00
31.200,00
26.200,00
23.200,00
18.200,00
16.200,00
96.200,00
88.700,00
81.200,00
71.200,00
51.200,00
23.200,00
71.200,00
61.200,00
51.200,00
31.200,00
26.200,00
16.200,00
71.200,00
51.200,00
31.200,00
21.200,00
21.200,00
16.200,00
11.700,00
8.700,00
7.200,00
5.950,00
4.200,00
117.200,00
99.200,00
81.200,00
51.200,00
46.200,00
41.200,00
21.200,00
21.200,00
16.200,00

327
Dgl Price

Banawa

NO

BAHAN / MATERIAL

121 Double Niple GIP 8 "


122 Double Niple GIP 6 "
123 Double Niple GIP 3 "
124 Double Niple GIP 2,5 "
125 Double Niple GIP 2 "
126 Double Niple GIP 1,5 "
127 Double Niple GIP 1 "
128 Double Niple GIP 3/4 "
129 Double Niple GIP 1/2 "
130 Water Mur GIP 8 "
131 Water Mur GIP 6 "
132 Water Mur GIP 4 "
133 Water Mur GIP 3 "
134 Water Mur GIP 2,5 "
135 Water Mur GIP 2 "
136 Water Mur GIP 3/4 "
137 Water Mur GIP 1/2 "
138 Stopkran Bronce 8 "
139 Stopkran Bronce 6 "
140 Stopkran Bronce 4 "
141 Stopkran Bronce 3 "
142 Stopkran Bronce 2,5 "
143 Stopkran Bronce 2"
144 Stopkran Bronce 1,5"
145 Stopkran 1"
146 Stopkran 3/4 "
147 Stopkran 1/2 "
148 Double Flanged Bend Cl 8" x 90
149 Double Flanged Bend Cl 6" x 90
150 Double Flanged Bend Cl 4" x 90
151 Double Flanged Bend Cl 3" x 90
152 Double Flanged Bend Cl 2,5" x 90
153 Double Flanged Bend Cl 4" x 45
154 Double Flanged Bend Cl 3" x 45
155 Double Flanged Bend Cl 2,5" x 45
156 Double Flanged Bend Cl 8" x 22,5
157 Double Flanged Bend Cl 6" x 22,5
158 Double Flanged Bend Cl 4" x 22,5
159 Double Flanged Bend Cl 3" x 22,5
160 Double Flanged Bend Cl 2,5" x 22,5
161 Socket Spigot Bend PVC 110 " x 90

SATUAN

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

HARGA BAHAN
(Tidak termasuk PPN)
TERENDAH
TERTINGGI
(Rp)
(Rp)
185.340,00
150.340,00
97.840,00
80.340,00
52.840,00
30.340,00
17.840,00
15.340,00
12.340,00
108.340,00
88.340,00
68.340,00
58.340,00
50.340,00
45.340,00
20.340,00
15.340,00
505.340,00
435.340,00
365.340,00
330.340,00
300.340,00
245.340,00
130.340,00
80.340,00
25.340,00
20.340,00
992.140,00
870.340,00
630.340,00
537.340,00
452.340,00
644.740,00
570.340,00
500.840,00
912.340,00
800.340,00
734.740,00
612.340,00
492.340,00
110.340,00

186.200,00
151.200,00
98.700,00
81.200,00
53.700,00
31.200,00
18.700,00
16.200,00
13.200,00
109.200,00
89.200,00
69.200,00
59.200,00
51.200,00
46.200,00
21.200,00
16.200,00
506.200,00
436.200,00
366.200,00
331.200,00
301.200,00
246.200,00
131.200,00
81.200,00
26.200,00
21.200,00
993.000,00
871.200,00
631.200,00
538.200,00
453.200,00
645.600,00
571.200,00
501.700,00
913.200,00
801.200,00
735.600,00
613.200,00
493.200,00
111.200,00

328
Dgl Price

Banawa

NO

162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202

BAHAN / MATERIAL

Socket Spigot Bend PVC 110 " x 45


Socket Spigot Bend PVC 90 " x 90
Socket Spigot Bend PVC 90 " x 45
Socket Spigot Bend PVC 63 " x 90
Socket Spigot Bend PVC 63 " x 45
Valve Socket Drat Dalam 8"
Valve Socket Drat Dalam 6"
Valve Socket Drat Dalam 4"
Valve Socket Drat Dalam 3"
Valve Socket Drat Dalam 2,5"
Valve Socket Drat Dalam 2"
Valve Socket Drat Dalam 1"
Valve Socket Drat Dalam 3/4"
Valve Socket Drat Dalam 1/2"
Valve Socket Drat Luar 8"
Valve Socket Drat Luar 6"
Valve Socket Drat Luar 4"
Valve Socket Drat Luar 3"
Valve Socket Drat Luar 2,5"
Valve Socket Drat Luar 2"
Valve Socket Drat Luar 1"
Valve Socket Drat Luar 3/4"
Valve Socket Drat Luar 1/2"
All Flanged Tee Cl 6" x 6"
All Flanged Tee Cl 6" x 4"
All Flanged Tee Cl 4" x 4"
All Flanged Tee Cl 4" x 3"
All Flanged Tee Cl 3" x 3"
All Flanged Tee Cl 3" x 2,5"
All Flanged Tee Cl 2,5" x 2,5"
Sock Tee GIP 8" x 8 "
Sock Tee GIP 6" x 6 "
Sock Tee GIP 4" x 4 "
Sock Tee GIP 3" x 3 "
Sock Tee GIP 2,5" x 2,5 "
Sock Tee GIP 1/2" x 1/2 "
Flanged Spigot PVC 110 mm
Flanged Spigot PVC 90 mm
Flanged Spigot PVC 75 mm
Flanged Spigot PVC 63 mm
Flanged Socket PVC 110 mm

SATUAN

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

HARGA BAHAN
(Tidak termasuk PPN)
TERENDAH
TERTINGGI
(Rp)
(Rp)
115.340,00
97.340,00
96.340,00
75.340,00
75.340,00
210.340,00
150.340,00
90.340,00
70.340,00
40.340,00
37.340,00
25.340,00
18.340,00
9.340,00
210.340,00
150.340,00
90.340,00
70.340,00
40.340,00
37.340,00
25.340,00
18.340,00
9.340,00
330.340,00
280.340,00
230.340,00
220.340,00
180.340,00
175.340,00
130.340,00
200.340,00
150.340,00
100.340,00
80.340,00
65.340,00
30.340,00
150.340,00
145.340,00
145.340,00
120.340,00
150.340,00

116.200,00
98.200,00
97.200,00
76.200,00
76.200,00
211.200,00
151.200,00
91.200,00
71.200,00
41.200,00
38.200,00
26.200,00
19.200,00
10.200,00
211.200,00
151.200,00
91.200,00
71.200,00
41.200,00
38.200,00
26.200,00
19.200,00
10.200,00
331.200,00
281.200,00
231.200,00
221.200,00
181.200,00
176.200,00
131.200,00
201.200,00
151.200,00
101.200,00
81.200,00
66.200,00
31.200,00
151.200,00
146.200,00
146.200,00
121.200,00
151.200,00

329
Dgl Price

Banawa

NO

203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243

BAHAN / MATERIAL

Flanged Socket PVC 90 mm


Flanged Socket PVC 75 mm
Flanged Socket PVC 63 mm
Stub Flanged HDPE 6 "
Stub Flanged HDPE 4 "
Stub Flanged HDPE 3 "
Stub Flanged HDPE 2 "
Reducer HDPE 6 " x 4 "
Reducer HDPE 4 " x 3 "
Reducer HDPE 3 " x 2 "
Long Elbow 6 " x 90 (HDPE)
Long Elbow 4 " x 90 (HDPE)
Long Elbow 3 " x 90 (HDPE)
Long Elbow 2 " x 90 (HDPE)
Long Elbow 6 " x 45 (HDPE)
Long Elbow 3 " x 45 (HDPE)
Long Elbow 2 " x 45 (HDPE)
Bend CI 90 6 "
Bend CI 90 4 "
Bend CI 90 3 "
Bend CI 90 2 "
Blind Flanged PN 10 6 "
Pelampung 3/4 "
Pelampung 1/2 "
Sock Reducer GIP 4" x 3 "
Sock Reducer GIP 3 " x 2,5 "
Sock Reducer GIP 2,5 " x 2 "
Sock Reducer GIP 2 " x 1 "
Sock Reducer GIP " x "
All Socket Reducer PVC 4" x 3"
All Socket Reducer PVC 3 " x 2 "
All Socket Reducer PVC 2 " x 1 "
All Socket Tee 4 " x 4 "
All Socket Tee 3" x 3"
All Socket Tee 2" x 2"
All Socket Tee 2" x 1
All Socket Tee 1,5" x 1
Clam Sadle 4" x 3/4 "
Clam Sadle 3" x 3/4 "
Clam Sadle 2,5" x 3/4 "
Clam Sadle 2" x 3/4 "

SATUAN

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

HARGA BAHAN
(Tidak termasuk PPN)
TERENDAH
TERTINGGI
(Rp)
(Rp)
145.340,00
145.340,00
120.340,00
431.980,00
345.340,00
276.340,00
221.340,00
322.340,00
258.340,00
206.340,00
681.340,00
545.340,00
436.340,00
349.340,00
521.340,00
334.340,00
267.340,00
901.340,00
721.340,00
649.340,00
584.340,00
262.340,00
30.340,00
25.340,00
155.340,00
100.340,00
97.840,00
75.340,00
20.340,00
73.340,00
50.340,00
40.340,00
155.340,00
120.340,00
80.340,00
40.340,00
32.340,00
40.340,00
38.340,00
37.340,00
37.340,00

146.200,00
146.200,00
121.200,00
432.840,00
346.200,00
277.200,00
222.200,00
323.200,00
259.200,00
207.200,00
682.200,00
546.200,00
437.200,00
350.200,00
522.200,00
335.200,00
268.200,00
902.200,00
722.200,00
650.200,00
585.200,00
263.200,00
31.200,00
26.200,00
156.200,00
101.200,00
98.700,00
76.200,00
21.200,00
74.200,00
51.200,00
41.200,00
156.200,00
121.200,00
81.200,00
41.200,00
33.200,00
41.200,00
39.200,00
38.200,00
38.200,00

330
Dgl Price

Banawa

NO

244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271

BAHAN / MATERIAL

Clam Sadle 4" x 1/2 "


Clam Sadle 3" x 1/2 "
Clam Sadle 2,5" x 1/2 "
Clam Sadle 2" x 1/2 "
Labrang Baja 12 mm
Labrang Baja 10 mm
Besi Jangkar (19 mm)
Clemp U 10 mm
Clemp U 12 mm
Plat Penggantung
Air Realive valve (Pentil Udara)
Solven Cement
Plat Penggantung
Air Realive valve (Pentil Udara)
Screen Besi Bulat 14 mm
Screen Besi Plat 5 mm
Menhole 40 cm x 40 cm x 3 mm
Menhole 50 cm x 50 cm x 3 mm
Menhole 60 cm x 60 cm x 3 mm
Menhole 80 cm x 80 cm x 3 mm
Menhole 100 cm x 100 cm x 3 mm
Pintu Air Satu Ulir
Kawat Las Listrik
Besi Striip
Paku Seng
Kayu Dolken
Jeruji Besi Beton 12 mm
Residu

SATUAN

Bh
Bh
Bh
Bh
M'
M'
Btg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Kg
Kg
Kg
Btg
Bh
Ltr

HARGA BAHAN
(Tidak termasuk PPN)
TERENDAH
TERTINGGI
(Rp)
(Rp)
40.340,00
38.340,00
37.340,00
37.340,00
55.680,00
45.680,00
131.240,00
15.340,00
17.340,00
20.340,00
300.340,00
80.140,00
20.340,00
155.340,00
250.430,00
300.430,00
85.430,00
100.490,00
150.620,00
190.680,00
250.940,00
7.503.420,00
12.590,00
9.170,00
30.090,00
3.680,00
150.430,00
15.430,00

41.200,00
39.200,00
38.200,00
38.200,00
57.410,00
47.410,00
134.380,00
16.200,00
18.200,00
21.200,00
301.200,00
80.480,00
21.200,00
156.200,00
251.510,00
301.510,00
86.510,00
101.720,00
152.190,00
192.410,00
253.300,00
7.512.050,00
12.800,00
9.600,00
30.300,00
5.410,00
151.510,00
16.510,00

Catatan :
- Harga bahan ini termasuk biaya angkutan darat Kendaraan Roda 4 dan untuk lokasi yang tidak dijangkau kendaraan roda 4 dapat
ditambahkan angkutan lokal yang berlaku di daerah tersebut.
-

Khusus untuk Harga Bahan Accessories Perpipaan diasumsikan sudah termasuk biaya pemasangan.

You might also like