Voucher No.Allocation
PCDA/CDA VR No.Dated
I / We hereby certify that I / We have performed works and / or supplied materials on the site for incorporat
by the Conditions of contract and in respect of which I / We demand payment to the extent claimed below,
Government of Reserve, charges for rent, water etc. and previous running Account payment as shown
Date:
May 2013
Signature of Contractor
Amount of Contract Rs. 131,78,36,379,88 Estimated value of work order Rs. 131,78,36,379.88
i)
iv) Deduct
a) Reserve 5% on work done
b) Compensation
c) Reserve 25% on material lying at site (iia)
d) Reserve 25% on material lying at site (iib)
Materail Laying at Site Against BGB
e) Reserve 25% on material lying at site (iic)
f) Amount to be deducted as per schedule of credit
Total Deduction Amount
Release reserve (iv-a) Vide BG No. (Statement "B")
h) 37/2012-2013 to 54/2012-2013 Rs. 19,80,00,000.00
against Mobilisation Advance
"A"
Certified that
a)
I / We have checked the measurement and accordingly have assessed that the wo
lying at site taken into account in the above claim tallies with the physical progres
b)
Adjustments have been made for recoveries, which are to be effected from the co
provisions or contract agreement between DG MAP and the contractor.
c)
No work is being paid for which DO has been ordered on the contractor without ob
in principle.
d)
The work, which has not been approved is not being paid.
e)
This payment in respect of works executed by the contractor under the terms or t
the contractor.
f)
Dated.
Dated...
"B"
AAO
----------------------------------------------------------------------------------------------------------------------"C"
Issued RBI / SBI/
Cheque No.
"D"
Witness.
Address
..
"E"
Entered in construction Account (Folio No)
----------------------------------------------------------------------------------------------------------------------"F"
Entered in construction Account (Folio No...)
T RECEIPT )
ocation
ted
ns Pvt. Ltd.
012-2013
ure of Contractor
Rs. 131,78,36,379.88
Rupees
Rupees
32655367.38
9953217.69
166778258.76
11373870.54
220760714.37
7th RAR
1632768.369
Nill
2488304.42
41694564.69
45815637.48
2843467.63
10019019.18
12862486.81
15000000.00
20000000.00
15000000.00
50000000.00
45815637.48
266576351.85
58678124.30
186868858.68
14630345.00
6399023.87
-------------------------------------------------
DEPMC
7th RAR
Project Manager
Station Command
7th RAR
------------------------------------------------
heque No...Dated
Stamp
Signature of Contractor
Dated
-------------------------------------------------
Project Manager
SCHEDULE OF CREDIT
7th RAR
Description of Material
Steel
GI Pipe 15mm dia
GI Pipe 20mm dia
GI Pipe 25mm dia
Fan Boxes
Ordinary switch 6 amps
-do- but 2 way switch 6 amps
-do- but socket 2 in 1
-do- but switch 20 amps
-do- but socket 20 amps
-do- but bell switch 6 amps
Ordinary ceiling rose
Ordinary angle holder
Ordinary batten holder
Ordinary 2 module box
-do- but 3 module box
-do- but 4 module box
-do- but 6 module box
-do- but 8 module box
Ordinary 2 module plate
-do- bu 3 module plate
-do- bu 4 module plate
-do- bu 6 module plate
-do- bu 8 module plate
Module swtich 15 amps
2 way module switch amps
Modular socket 3 pin 5 amps
Module switch 15 amps
Modular bell push
Modular Fan regulator
Modular ceiling rose
Modular blank plate
MS switch box 4' x 4'
MS switch box 6' x 4'
MS switch box 8' x 4'
MS switch box 10' x 4'
Cupboard frames 526mm x 1976mm
-do- but 961mm x 1976mm
-do- but 1141mm x 1976mm
-do- but 476mm x 1976mm
-do- but 1268mm x 1976mm
-do- but 539mm x 1976mm
-do- but 506mm x 1141mm
-do- but 506mm x 1176mm
-do- but 961mm x 1976mm
-do- but 506mm x 961mm
-do- but 506mm x 476mm
-do- but 506mm x 976mm
-do- but 806mm x 539mm
-do- but 961mm x 1976mm
Unit
MT
Rm
Rm
Rm
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Qty
165.524
84.00
162.00
90.00
368.00
90.00
24.00
36.00
12.00
12.00
2.00
45.00
10.00
10.00
17.00
12.00
12.00
7.00
6.00
25.00
22.00
12.00
16.00
6.00
70.00
24.00
25.00
15.00
2.00
8.00
25.00
25.00
366.00
1225.00
254.00
258.00
48.00
48.00
48.00
24.00
1.00
1.00
48.00
24.00
49.00
48.00
24.00
125.00
24.00
1.00
Credit Rate
44090.15
64.75
69.10
82.10
122.00
24.75
25.40
31.60
41.10
77.45
24.10
26.00
28.00
20.80
35.00
45.00
60.00
90.00
120.00
40.00
60.00
85.00
105.00
128.00
48.00
53.00
85.00
72.00
47.00
190.00
13.00
14.00
85.00
97.00
108.00
154.00
1350.00
1650.00
1950.00
1050.00
1950.00
1350.00
1050.00
1050.00
900.00
750.00
600.00
900.00
1050.00
900.00
Sl. No.
51
52
53
54
55
56
57
58
Description of Material
Door frame double revetted 876mm x 2133mm
-do- but976mm x 2133mm
Door frame single revetted 976mm x 2133mm
-do- but 876mm x 2133mm
-do- but 776mm x 2133mm
MS jali door 976mm x 2133mm
-do- but 876mm x 2133mm
Door frame 876mm x 2133mm
Unit
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Qty
121.00
23.00
2.00
2.00
3.00
23.00
55.00
66.00
Credit Rate
6000.00
6000.00
6000.00
6000.00
5400.00
6000.00
6000.00
6000.00
Total amount of Schedule of Credit carried over to General Summary on serial page No. 139
Signature of Contractor
DEPMC
Project
TE)
Amount
7297977.99
5439.00
11194.20
7389.00
44896.00
2227.50
609.60
1137.60
493.20
929.40
48.20
1170.00
280.00
208.00
595.00
540.00
720.00
630.00
720.00
1000.00
1320.00
1020.00
1680.00
768.00
3360.00
1272.00
2125.00
1080.00
94.00
1520.00
325.00
350.00
31110.00
118825.00
27432.00
39732.00
64800.00
79200.00
93600.00
25200.00
1950.00
1350.00
50400.00
25200.00
44100.00
36000.00
14400.00
112500.00
25200.00
900.00
Amount
726000.00
138000.00
12000.00
12000.00
16200.00
138000.00
330000.00
396000.00
9953217.69
Project Manager
Page 13
Annexute - "B"
Sl. No.
Description of Item
Unit
Qty
S.S.R. Rate
C.P. 60%
27790.00
27790.00
27790.00
27790.00
27790.00
8.56
11.75
56.28
67.31
87.29
24460.00
34.96
53.93
111.86
53.63
53.63
164.67
16674.00
16674.00
16674.00
16674.00
16674.00
5.13
7.05
33.77
40.39
52.37
14676.00
###
###
###
###
20.98
32.36
67.12
32.18
32.18
98.80
S.S.R. Rate
Including CP
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
MT
MT
MT
MT
MT
Rm
Rm
Rm
Rm
Rm
MT
RM
RM
RM
Rm
Pcs
Pcs
Pcs
Pcs
Pcs
Pcs
877.079
40.600
409.466
587.142
269.840
19052.000
6375.000
23998.760
19998.430
32030.290
20.125
699200
48060
55980
25000
240
315
3102
3200
1500
760
22
Pcs
2650
23
Pcs
2800
124.87
74.92
199.79
24
25
Pcs
Pcs
1400
120
9.99
223.25
5.99
133.95
15.98
357.20
44464.00
44464.00
44464.00
44464.00
44464.00
13.69
18.80
90.05
107.70
139.66
39,136.00
55.94
86.29
178.98
85.81
85.81
263.47
Market Rate
VAT/Tax
Cartage
41900.00
41100.00
40500.00
41500.00
40800.00
8.04
11.98
2095
2055
2025
2075
2040
0.1608
0.2396
800
800
800
800
800
###
###
###
###
Page 14
Sl. No.
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
Description of Item
Binding Wire
Plasticizer (Kg)
Berger Paint (Prolink Bison Acrylic) (SI 2211)
Berger Paint (Redoxide Primer) (SI 2467)
Berger Paint Snow White (SI 2415)
Wall Putty
Glazed Ceramic Tiles (New Land Nut)
605mm x 605mm
Glazed Ceramic Tiles (Castelli Beige)
396mm x 396mm
Vitrified Tiles (Fabia)
605mm x 605mm
Unit
Qty
S.S.R. Rate
C.P. 60%
S.S.R. Rate
Including CP
Rm
Rm
MT
MT
MT
MT
MT
MT
MT
Nos
Nos
Nos
Nos
Nos
Nos
M2
20001
2505
4.060
65.560
22.820
22.050
46.850
100.950
125.140
122
785
360
465
720
152
2460.215
135.83
70.91
28330.00
28330.00
30810.00
30810.00
30810.00
28330.00
28330.00
607.59
504.22
81.50
42.55
16998.00
16998.00
18486.00
18486.00
18486.00
16998.00
16998.00
364.55
302.53
217.33
113.46
45328.00
45328.00
49296.00
49296.00
49296.00
45328.00
45328.00
972.14
806.75
1068.16
5181.75
640.90
3109.05
1709.06
8290.80
MT
Kg
Ltr
Ltr
Ltr
Ltr
18.000
8800
30000
3950
10000
16000
31210.00
18726.00
49936.00
56.56
85.60
169.20
33.94
51.36
101.52
90.50
136.96
270.72
Sqm
8078.352
Sqm
34642.900
Sqm
4165.080
PCS
PCS
PCS
PCS
2307
494
250
950
###
###
###
Market Rate
VAT/Tax
Cartage
Page 15
Sl. No.
56
57
Description of Item
Chlorpyrifos (ATT)
Kota Stone
Unit
Qty
Ltr
Sqft
1750
20091
S.S.R. Rate
C.P. 60%
S.S.R. Rate
Including CP
Market Rate
VAT/Tax
Cartage
Page 16
Sl. No.
58
59
60
Description of Item
Signature of Contractor
Unit
Qty
S.S.R. Rate
C.P. 60%
S.S.R. Rate
Including CP
Sqmtr
Sqmtr
Sqmtr
1030.017
1234.648
1396.992
955.71
955.71
955.71
573.42
573.42
573.42
1529.13
1529.13
1529.13
Sqmtr
Sqmtr
238.560
233.100
1721.00
1721.00
1032.60
1032.60
2753.60
2753.60
Pcs
Pcs
100.000
260.000
Pcs
Pcs
Pcs
464.000
30.000
398.000
DEPMC
Market Rate
VAT/Tax
Cartage
Proj
7th RAR
Market Rate
Including VAT
& Cartage
Amount
44795.00
43955.00
43325.00
44375.00
43640.00
8.20
12.22
65.04
82.23
125.20
43500.00
8.36
31.43
54.60
21.39
25.41
42.50
94.03
50.91
60.31
112.33
38998440.66
1784573.00
17740114.45
26054426.25
11775817.60
156226.40
77902.50
1560879.35
1644470.90
4010192.31
787612.00
5845312.00
1510525.80
3056508.00
534750.00
6098.40
13387.50
291681.06
162912.00
90465.00
85370.80
55.84
147976.00
42.25
118300.00
16.25
136.00
22377.60
16320.00
Page 17
Page 18
Market Rate
Including VAT
& Cartage
Amount
147.28
105.63
41300.00
42550.00
40900.00
42967.80
42550.00
40200.00
41400.00
645.66
609.96
610.00
424.00
1292.34
8882.00
408.50
24.50
31.16
39.55
58.73
55056.40
26.52
33.65
77.12
178.50
16.00
2945747.28
264603.15
167678.00
2789578.00
933338.00
947439.99
1993467.50
4058190.00
5180796.00
78770.52
478818.60
219600.00
197160.00
930484.80
1260201.60
1004997.83
56521.50
15393.04
9887.50
55795.02
898848.00
233376.00
1009500.00
304624.00
2707200.00
256000.00
365.00
2948598.48
267.00
9249654.30
390.00
1624381.20
Page 19
Market Rate
Including VAT
& Cartage
165.00
9.50
Amount
288750.00
190864.50
Page 20
Market Rate
Including VAT
& Cartage
Amount
1224.00
1224.00
1224.00
1260740.81
1511209.15
1709918.21
2283.62
2283.62
544780.39
532311.82
1377.00
1326.00
137700.00
344760.00
1091.50
1050.60
1020.00
Total
506456.00
31518.00
405960.00
166778258.76
Project Manager
Annexure - "C"
Sl. No.
1
2
3
4
5
6
Description of Item
40mm Stone aggregate
20mm Stone aggregate
12mm Stone aggregate
Cement (PPC)
Cement (OPC)
Brick (Fly Ash) (SI 366A)
Signature of Contractor
Unit
Cum
Cum
Cum
Bags
Bags
Noc
7th RAR
Qty
S.S.R. Rate
C.P. 60%
S.S.R. Rate
Including CP
215.901
1500.000
2300.000
15000
634
1325000
463.97
494.89
539.75
170.38
170.38
2.06
278.38
296.93
323.85
102.23
102.23
1.23
742.35
791.82
863.60
272.61
272.61
3.29
DEPMC
Market Rate
1164.24
1164.24
1164.24
7th RAR
Market Rate Including
VAT & Cartage
235.00
245.00
Total
Project Manager
Amount
160274.54
1187736.00
1986280.00
3525000.00
155330.00
4359250.00
11373870.54
Annexure - "D"
7th RAR
Deduct advance already payed on 2nd RAR receip vide: Vr. No 0018/Gopalpur/06/
(R&C)/RAR/(PKG-14) Dt. 12.02.2013
Deduct advance already payed on 3rd RAR receip vide: Vr. No 0018/Gopalpur/09/
(R&C)/RAR/(PKG-14) Dt. 23.02.2013
Deduct advance already payed on 4th RAR receip vide: Vr. No 0018/Gopalpur/11/
(R&C)/RAR/(PKG-14) Dt. 09.03.2013
Deduct advance already payed on 5th RAR receip vide: Vr. No 0018/Gopalpur/16/
(R&C)/RAR/(PKG-14) Dt. 05.04.2013
Deduct advance already payed on 5th RAR receip vide: Vr. No 0018/Gopalpur/16/
(R&C)/RAR/(PKG-14) Dt. 05.04.2013
Total (Rs)
7th RAR
Amount
1609858.68
37675000.00
32500000.00
37800000.00
58937000.00
18347000.00
186868858.68
Stamp
Signature of Contractor
Dated
.From...
"A" FY 2012-13
DATE
CH. NO
12.02.2013 RTGS
23.02.2013 RTGS
09.03.2013 RTGS
Total
RAR Amount
INCOME TAX
SALES TAX /
VAT
LWC
37675000.00
32500000.00
37800000.00
803603.00
526879.00
579315.00
0.00
0.00
0.00
0.00
0.00
0.00
107975000.00
1909797.00
0.00
0.00
"B" FY 2013-14
05.04.2013 RTGS
20.04.2013 RTGS
Total
Total (A+B)
1795396.00
844419.00
211105.00
185259000.00
3705193.00
844419.00
211105.00
CHQ. AMT.
36871397.00
31973121.00
37220685.00
106065203.00
56934830.00
17498250.00
74433080.00
180498283.00
Interest calculation
Total amt
Rs. 180,000,000.00
EMI No
Date
Mob Adv
18-Jan-13
EMI No
Date
No of days
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
5/7/2013
6/7/2013
7/7/2013
8/7/2013
9/7/2013
10/7/2013
11/7/2013
12/7/2013
1/7/2014
2/7/2014
3/7/2014
4/7/2014
5/7/2014
6/7/2014
7/7/2014
8/7/2014
9/6/2014
110
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
Date
Rate of Int
8.00%
Total Amt
EMI Principal
Rs. 128,668,881 Rs. 131,783,638
Rs. 7,321,313
Int due
Rs. 3,177,249
Rs. 845,662
Rs. 770,242
Rs. 746,172
Rs. 696,427
Rs. 625,822
Rs. 596,938
Rs. 529,542
Rs. 497,448
Rs. 447,703
Rs. 359,446
Rs. 348,214
Rs. 288,841
Rs. 248,724
Rs. 192,561
Rs. 149,234
Rs. 99,490
Principal due
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
10.00%
Total Amt
EMI Principal
### Rs. 2,678,687
Int due
Principal due
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
2,678,687
2,678,687
2,678,687
2,678,687
2,678,687
2,678,687
2,678,687
2,678,687
2,678,687
2,678,687
2,678,687
2,678,687
2,678,687
2,678,687
2,678,687
2,678,687
2,678,687
Total EMI
Principal
Rs. 10,000,000
Total Int
Rs. 4,630,345
Rs. 1,232,420
Rs. 1,122,508
Rs. 1,087,430
Rs. 1,014,934
Rs. 912,038
Rs. 869,944
Rs. 771,724
Rs. 724,953
Rs. 652,458
Rs. 523,837
Rs. 507,467
Rs. 420,940
Rs. 362,477
Rs. 280,627
Rs. 217,486
Rs. 144,991
18
10/6/2014
30
Rs. 48,140
Rs. 0
Rs. 7,321,313
Rs. 131,783,634
Rs. 22,017
Rs. 2,678,687
Rs. 70,157
Rs. 48,216,366
Rs. 15,546,735
st calculation
EMI to be
Recovered
Rs. 10,588,235
Rs. 0
Rs. 0
Total Principal
Total Int
Cummulative
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs. 4,630,345
Rs. 5,862,765
Rs. 6,985,273
Rs. 8,072,703
Rs. 9,087,637
Rs. 9,999,675
Rs. 10,869,618
Rs. 11,641,343
Rs. 12,366,296
Rs. 13,018,753
Rs. 13,542,590
Rs. 14,050,058
Rs. 14,470,998
Rs. 14,833,474
Rs. 15,114,101
Rs. 15,331,587
Rs. 15,476,578
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
Int
Recovered
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
14,630,345
11,232,420
11,122,508
11,087,430
11,014,934
10,912,038
10,869,944
10,771,724
10,724,953
10,652,458
10,523,837
10,507,467
10,420,940
10,362,477
10,280,627
10,217,486
10,144,991
Remarks
Rs. 67,149,360