Professional Documents
Culture Documents
3
5
3
5
3
5
3
5
Parking slab, 150mm thick, 3000 psi, with 10mm dia. rebar
spaced at 150mm both ways.
B. ARCHITECTURAL WORKS / FIT-OUT WORKS
1 WALL FINISHES
7
1.1
1.2
1.4
1.5
2
2.1
2.2
2.3
3
7-Mar
6-Mar
5-Mar
4-Mar
3-Mar
2-Mar
1-Mar
29-Feb
28-Feb
27-Feb
26-Feb
25-Feb
24-Feb
23-Feb
22-Feb
21-Feb
20-Feb
19-Feb
18-Feb
17-Feb
16-Feb
15-Feb
3
4
4
Painting Works for Dry Wall Partition ; Semi Gloss Latex Paint
Finish. (minimum of 3 coatings)
Repainting of Exterior Walls of Container Van, QDE. (minimum
of 2 coating)
200 x 200 mm Ceramic Tiles.
FLOOR FINISHES
Installation of 19 mm thick Plywood at Flooring.
6" x 36" x 2mm Vinyl tiles.
200 x 200 mm Ceramic Tiles.
1.3
14-Feb
13-Feb
12-Feb
11-Feb
10-Feb
ITEM DESCRIPTION
A. CIVIL WORKS/ STRUCTURAL WORKS/ LAND DEVELOPMENT
WORKS
Long Span Roofing including Metal Frames and Insulation and
5
louver blocks.
6 Walkway, 75mm thick, 3000 psi (no reinforcement).
9-Feb
8-Feb
4
5
5
5
5
2
5
2
3
2
CEILING FINISHES
3.1
3.2
Leadman
Mason
Carpenter
Welder
Tinsmithman
Electrician
Door/Window Installer
Painter
Labor
3
3
3
1
1
1
1
1
1
1
1
1
1
3
6
2
5
2
5
2
5
2
5
3
3
1
4
2
2
Total
5
14
1
4
2
2
5
14
1
4
2
2
5
14
1
4
2
2
5
14
1
4
2
2
5
14
1
4
3
1
4
3
1
4
3
1
4
3
5
15
5
15
5
15
5
15
1
4
3
4
12
1
2
3
3
9
1
2
3
4
3
13
1
2
3
4
3
13
1
2
3
4
3
13
1
2
3
4
3
13
1
2
4
3
10
1
2
3
4
3
13
2
2
4
3
12
2
2
4
3
12
2
2
4
3
12
2
2
4
3
12
1
2
3
4
3
13
1
2
3
4
3
13
1
1
4
6