You are on page 1of 14

LABORATORIUM

UNIVERSITAS MEKANIKA
NEGERI MAKASSAR.TANAH
Fakultas Teknik
TEKNIKTEKNIK
SIPIL DANBANGUN
PERENCANAAN
JURUSAN PENDIDIKAN
AN

FAKULTASLABORATORIUM
TEKNIK UNMUJI TANAH

Project : Teori & praktek Mektan II


Operator : Ardiansyah Idris
Kampus UNM Parangtambung, Jl. Dg Tata Raya Makassar, Telp. (0411) 864935 - 861507
Location : UNM Parangtambung
Checked : Silveter Tandi
Depth : Date : 07 - 05 - 2015

GRAFIK HUBUNGAN KADAR AIR DENGAN BERAT ISI KERING

Berat Isi Kering (gr/cm)

1.9
1.7
1.5
1.3
f(x) = - 0.0013426775x^2 + 0.1008600148x - 0.6206777116

1.1
0.9
0.7
0.5
30.00

32.00

34.00

Garis ZAV(Zero Air)

36.00

38.00

40.00

42.00

Kadar Air (%)

Persamaan garis regresi (dari grafik)


y = -0.0013
0.101
x +
y' =
-0.0026
x+
0.1009
0=
-0.0026
x +
0.1009
x= 38.808 %

44.00

46.00

48.00

50.00

-0.621

y =

2.58

gr/cm3

Jadi, kadar air optimum dicapai pada saat 38.808 % dan berat isi kering 2.58 gr/cm3

OPERATOR

CHECKED

Ardiansyah Idris

Silveter Tendi

PARAF

LABORATORIUM
TANAH
UNIVERSITAS NEGERIMEKANIKA
MAKASSAR
JURUSAN PENDIDIKAN TEKNIK BANGUN
AN
Jurusan Teknik Sipil dan Perencanaan SAND CONE

FAKULTAS TEKNIK UNM


LABORATORIUM UJI TANAH

Kampus UNM
Parangtambung,
Jl. Dg Tata
Raya Makassar, Telp. (0411) 864935 - 861507
Alamat:Kampus
UNM
Parang Tambung
Makassar,Telp.0411-864935

Operator
: MUH. AFWAN IRSYAD
Checked : Silvether Tandi
Date
: Mey 2015

Project : Teori & praktek Mektan II


Location : UNM Parangtambung
Depth : -

SAND CONE
Compaction Test Result
Optimun Laboratory Dry Density,dry Lab
Optimum Mouisture Content (OCM)
Weight of Sand in the Fannel, Wf

No Titik
Berat Botol + Corong
Berat Botol + Air + Corong
Berat Botol + Pasir + Corong
Berat Botol + Sisa Pasir + Corong
Berat Tanah Basah + Kaleng Lapangan
Berat Kosong kaleng Lapangan
Berat Pasir dalam Botol
Berat Air dalam Botol
Berat Tanah Basah di dalam Lubang
Berat Sisa Pasir di Lubang
Berat isi pasir
Volume Sisa Pasir di Lubang
Berat Isi Tanah Basah
Berat Isi Tanah Kering
Derajat Kepadatan
Derajat Kepadatan Rata-Rata
Water Content Sample
Berat Thin Box
Berat Thin Box + Tanah Basah
Berat Thin Box + Tanah kering
Berat Air
Berat Tanah Kering
Kadar Air (w)
Kadar Air Rata-Rata (w)

=
=
=

gr/cm3
%
gram

1.361
33.47
2000
Rumus

W1
W2
W3
W4
W5
W6
W7=W3-W1
W8=W2-W1
W9=W5-W6
W10=W3-W4-Wf
sand= W7/W8
Vp =W10/sand
w=W9/Vp
dry= w/(1 + w)
dry/dry Labx100%

Unit

688.9
5420
8560
772
5810
0
7871.1
4731.1
5810
5788
1.664
3,479.006
1.670
1.251
91.930

688.9
5420
8560
772
6830
0
7871.1
4731.1
6830
5788
1.664
3,479.006
1.963
1.471
108.070

Gram
Gram
Gram
Gram
Gram
Gram
Gram
Gram
Gram
Gram
Gram
Cm^3
Gram/Cm^3
Gram/Cm^3
%
%

100.000
Rumus
W1
W2
W3
W4=W2- W3
W5=W3- W1
W = (W4/W5) x 100%

1
122
422
371.2
50.8
249.2
20.39

Unit

160
460
415.7
44.3
255.7
17.32

Gram
Gram
Gram
Gram
Gram
%

18.855

Opertor

Checked

Muh. Afwan Irsyad

Silvether Tandi

Paraf

Muh. Afwan Irsyad

Silvether Tandi

Grafik Hubungan Kadar Air dengan Berat Isi Kering


1.55

f(x) = - 0.0054757162x^2 + 0.1869393613x - 0.0181443689

1.4
1.25
1.1
0.95
0.8
0.65
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

Persamaan garis regresi (dari grafik)


y = -0.0050
x +
0.186
y' =
-0.0100
x+
0.186
0=
-0.0100
x +
0.186
x=
18.60
%

-0.018

y=

1.590

gr/cm3

Jadi, kadar air optimum dicapai pada saat 18,60 % dan berat isi kering 1,590gr/cm3

UNIVERSITAS NEGERI MAKASSAR. Fakultas Teknik

TEKNIK SIPIL DAN PERENCANAAN

LABORATORIUM UJI TANAH


Proyek
Lokasi
Kelompok

:
:
:

Kadar Air
Tumbukan
No. Container
Berat tanah basah + Container
Berat tanah kering + Container
Berat air
Berat container
Berat tanah kering
Kadar air,
Kadar air rata-rata
Berat Isi
Berat Mould
Berat Tanah Basah + Mould
Berat Tanah Basah
Volume Cetakan
Berat Isi Basah,
gwet=Wwet/Vmould)
Berat Isi Kering,
gdry=gdry/(1+w)

x /lps
gram
gram
gram
gram
gram
%
%

Penurunan
(inch)

0
0.25
0.5
1
1.5
2
3
4
6
8
10

0.000
0.150
0.250
0.500
0.750
1.000
1.500
2.000
3.000
4.000
5.000

10

25

1
36.40
32.90
3.50
9.80
23.10
15.15

2
34.40
31.10
3.30
9.40
21.70
15.21

3
35.60
32.20
3.40
9.40
22.80
14.91

4
34.10
30.90
3.20
9.60
21.30
15.02

15.18

14.97

gram
gram
gram
cm3

2740
6115
3375
2113.3

2740
6355
3615
2113.3

gram/cm3

1.597

1.711

gram/cm3

1.387

1.488

Penetrasi
Proving ring Calibration 28 KN cap, lbs/Dev =
Waktu
(menit)

TEORI DAN PRAKTEK MEKANIKA TANAH II


Kampus/LAB Uji Tanah UNM
I (SATU)

10 X TUMBUKAN

25 X TUNBUKAN

10.056
Bacaan
Dial
(Div)
0
50.28
80.448
150.84
216.204
271.512
372.072
467.604
633.528
774.312
854.76

Beban
(lbs)
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

Bacaan
Dial
(Div)
0
50.28
100.56
221.232
351.96
467.604
643.584
789.396
1035.77
1277.11
140

Beban
(lbs)
0
0
0
0
0
0
0
0
0
0
0

CBR
LABORATORY

EK MEKANIKA TANAH II

60
5
37.70
34.10
3.60
9.40
24.70
14.57

6
27.50
25.30
2.20
9.70
15.60
14.10
14.34

2740
6640
3900
2113.3
1.845
1.614
60 X TUMBUKAN

Bacaan
Dial
(Div)
0
9
17
38
58.5
80
115
145
195
229
267.5

Beban
(lbs)
0
0
0
0
0
0
0
0
0
0
0

UNIVERSITAS NEGERI MAKASSAR. Fakultas Teknik

TEKNIK SIPIL DAN PERENCANAAN

LABORATORIUM UJI TANAH

Beban
(lbs)

PEMERIKSAAN CBR LABORATORIUM


(25x Tumbukan)

Grafik Hubungan Penurunan-Beban

1600
1400
1200
1000
800
600
400
200
0

f(x) = 396.6768134414 ln(x) + 597.6936986646

Perhitungan
CBR
Beban (lbs)
y =396.6ln(x) +597.6

Penurunan, x
(inchi)
1
2

597.600
872.502

Nilai CBR rata-rata :

19.65

3
Penurunan
(inch)

CBR (%)
19.92
19.39

Catatan ;
Untuk penurunan 1 inchi , CBR = Beban / (3x1000)
Untuk penurunan 2 inchi , CBR = Beban / (3x1500)

Tabel 14.9 Kriteria Daya Dukung Tanah


No CBR

General rating

Uses

0-3
3-7
7-20
20-50
>50

Very Poor
Poor to Fair
Fair
Good
Excellent

Subgrade
Subgrade
Subbase
Base,Subbase
Base,Subbase

Classification
Unifield
OH,CH,MH,OL
OH,CH,MH,OL
OL,CL,ML,SC,SM,SP
GM,GC,SW,SM,SP,GI
GW,GM

UNIVERSITAS NEGERI MAKASSAR. Fakultas Teknik

TEKNIK SIPIL DAN PERENCANAAN

LABORATORIUM UJI TANAH

AASTHO
A5,A6,A7
A4,A5,A6,A7
A2,A4,A6,A7
A1-6,A2-6,A3,A2A5a,A2-4,A3

UNIVERSITAS NEGERI MAKASSAR. Fakultas Teknik

TEKNIK SIPIL DAN PERENCANAAN

LABORATORIUM UJI TANAH

PEMERIKSAAN CBR LABORATORIUM


(60x Tumbukan)

Grafik Hubungan Penurunan-Beban

3000

Beban
(lbs)

2500
f(x) = 747.0700632757 ln(x) + 1091.0806132159

2000
1500
1000
500
0
0

Perhitungan
CBR
Beban (lbs)
y =747.0,ln(x) +1091

Penurunan, x
(inchi)
1
2

1091.000
1608.781

Nilai CBR rata-rata :

36.06

3
Penurunan
(lbs)

CBR (%)
36.37
35.75

Catatan ;
Untuk penurunan 1 inchi , CBR = Beban / (3x1000)
Untuk penurunan 2 inchi , CBR = Beban / (3x1500)

Tabel 14.9 Kriteria Daya Dukung Tanah


No CBR

General rating

Uses

0-3
3-7
7-20
20-50
>50

Very Poor
Poor to Fair
Fair
Good
Excellent

Subgrade
Subgrade
Subbase
Base,Subbase
Base,Subbase

Classification
Unifield
OH,CH,MH,OL
OH,CH,MH,OL
OL,CL,ML,SC,SM,SP
GM,GC,SW,SM,SP,GI
GW,GM

AASTHO
A5,A6,A7
A4,A5,A6,A7
A2,A4,A6,A7
A1-6,A2-6,A3,A2A5a,A2-4,A3

UNIVERSITAS NEGERI MAKASSAR. Fakultas T

CBR

TEKNIK SIPIL DAN PERENCANAAN

LABORATORIUM UJI TANAH

LABORATORY

PEMERIKSAAN CBR LABORATORIUM


(10x Tumbukan)

nan-Beban

Grafik Hubungan

1000

Beban
(lbs)

800

f(x) = 233.5324442296 ln(x) + 365.4675

600
400
200

Perhitungan
CBR
Beban (lbs)
y =233.5ln(x)+365.4

Penurunan, x
(inchi)
1
2

365.400
527.250

Nilai CBR rata-rata :

11.95

Catatan ;
Untuk penurunan 1 inchi , CBR = Beban / (3x1000)
Untuk penurunan 2 inchi , CBR = Beban / (3x1500)

Tabel 14.8 Kriteria Daya Dukung Tanah

fication
AASTHO
A5,A6,A7
A4,A5,A6,A7
A2,A4,A6,A7
A1-6,A2-6,A3,A2-5
A5a,A2-4,A3

CBR
LABORATORY

No CBR

General rating

Uses

0-3
3-7
7-20
20-50
>50

Very Poor
Poor to Fair
Fair
Good
Excellent

Subgrade
Subgrade
Subbase
Base,Subbase
Base,Subbase

Unifield
OH,CH,MH,OL
OH,CH,MH,OL

OL,CL,ML,SC,SM,SP

GM,GC,SW,SM,SP,G
GW,GM

CBR
LABORATORY

nan-Beban

fication
AASTHO
A5,A6,A7
A4,A5,A6,A7
A2,A4,A6,A7
A1-6,A2-6,A3,A2-5
A5a,A2-4,A3

MAKASSAR. Fakultas Teknik

AN PERENCANAAN

CBR

UM UJI TANAH

LABORATORY

k Hubungan Penurunan-Beban

42296 ln(x) + 365.4675324302

3
Penurunan
(inch)

BR
CBR (%)
12.18
11.72

Dukung Tanah
Classification
Unifield
OH,CH,MH,OL
OH,CH,MH,OL
OL,CL,ML,SC,SM,SP
GM,GC,SW,SM,SP,GI
GW,GM

AASTHO
A5,A6,A7
A4,A5,A6,A7
A2,A4,A6,A7
A1-6,A2-6,A3,A2-5
A5a,A2-4,A3

LABORATORIUM MEKANIKA TANAH


JURUSAN PENDIDIKAN TEKNIK BANGUN AN

FAKULTAS TEKNIK UNM


Kampus UNM Parangtambung, Jl. Dg Tata Raya Makassar, Telp. (0411) 864935 - 861507

Operator
: Abd. Kahar
Checked : Anwar, S.Pd
Date
: 22-05-2013

Project : Teori & praktek Mektan II


Location : UNM Parangtambung
Depth : -

PERMEABILITAS
CONSTAN HEAD
Diameter Buret (d)
Diameter sampel (D)

:
:

1.03
6.31

No Tes
Luas potongan melintang buret (a=1/4d )
2

Luas potongan melintang sampel (A=1/4D )


Ketinggian Hidrolik (h)
Panjang Sampel (L)
Waktu Pengujian (t)
2

cm
cm
Satuan

cm

0.833

31.271
65
9.46
108
27

cm3
cm/detik

500
0.022

cm
cm
cm
detik
2

Temperatur (T)

Volume Air Yang Terkumpul (Q)


Koefisien Permeabilitas (Q.L/h.A.t)
FALLING HEAD
Diameter Buret (d)
Diameter sampel (D)

:
:

1.03
6.31

No Tes

cm
cm
Satuan

Luas potongan melintang buret (a=1/4d2)

cm2

0.833

Luas potongan melintang sampel (A=1/4D2)


Ketinggian Hidrolik Awal (hl)
Ketinggian Hidrolik Akhir (hf)
Panjang Sampel (L)
Waktu Pengujian (t)

cm
cm
cm
cm
detik

31.271
55
10
8
108
27

Temperatur (T)

Koreksi Vikositas (T/20)


cm3
Koefisien Permeabilitas,KT=(a.L/A.t)xln(hl/hf)
cm/detik
Koefisien Permeabilitas Standar,k20(kT(T/20)) cm/detik
untuk temperatur 27oC
hT
=
h20
=

0.831840796
0.0033646677
0.0027988678

0.00836
0.01005

Operator

Checked

Abd. Kahar

Anwar, S.Pd

Paraf

Abd. Kahar

Anwar, S.Pd

You might also like