Professional Documents
Culture Documents
Preguntas API 578 PDF
Preguntas API 578 PDF
2.
3.
all materials.
all alloy materials.
only non-ferrous materials.
only high-alloy materials.
Usually substituting an alloy for carbon steel would not cause a problem. List 3
process services where substituting an alloy for carbon steel could result in a problem.
a.
___________________________________________
b.
___________________________________________
c.
___________________________________________
An alloy material is any metallic material that contains alloying elements that are
added:
a.
b.
c.
4.
5.
8/19/03
Copyright MSTS
7.
8.
Authorized inspector
Owner/User
Repair organization
Engineering organization
Who has the responsibility to review and approve the adequacy of the PMI program
used by fabricators and material suppliers?
a.
b.
c.
d.
8/19/03
Authorized inspector
Owner/User
Repair organization
Engineering organization.
Who has the responsibility to verify that the material verification program is properly
implemented?
a.
b.
c.
d.
11.
low-risk systems.
low alloy systems.
stainless steel systems.
ferritic steel systems.
10.
9.
Authorized inspector.
Owner/User.
Repair organization.
Engineering organization.
Authorized inspector
Owner/User
Repair organization
Engineering organization
2
Copyright MSTS
12.
13.
14.
c.
d.
never be used.
be used only if the Quality Factor is 1.0.
receive random PMI testing of weld and base metal.
receive 100% PMI testing of weld and base metal.
Who has the responsibility to determine the extent of PMI testing required on existing
piping systems?
a.
b.
c.
d.
8/19/03
is not necessary.
is not necessary provided appropriate documentation is provided by the
supplier.
could be conducted on any of the production welds.
could be conducted on a weld button prior to production welds.
17.
If alloy element(s) are contained in the flux of a welding electrode, PMI testing:
a.
b.
16.
15.
Authorized inspector
Owner/User
Repair organization
Engineering organization
3
Copyright MSTS
19.
List 4 important factors to consider when prioritizing the need for PMI on existing
piping systems.
a.
_____________________________________________________
b.
_____________________________________________________
c.
_____________________________________________________
d.
_____________________________________________________
20.
Which of the following piping components is most likely to have a substitution with
the wrong material?
a.
b.
c.
d.
21.
Authorized inspector
Owner/User
Repair organization
Engineering organization
8/19/03
Who has the responsibility to determine the extent of PMI testing required during
repairs and alterations of piping systems?
a.
b.
c.
d.
22.
chrome steels.
stainless steels.
any ferritic steel.
any non-ferrous.
Copyright MSTS
24.
25.
An alloy weld overlay is applied to carbon steel base metal. Who has the
responsibility to establish the minimum alloy requirements of the as-deposited weld
metal?
a.
b.
c.
d.
8/19/03
27.
26.
carbon content.
chrome content.
iron content.
molybdenum content.
Authorized inspector
Owner/User
Repair organization
Engineering organization
Copyright MSTS
28.
What is the appropriate action to take when an incorrect material is located during a
PMI sampling of new materials.
a.
b.
c.
d.
29.
8/19/03
Carbon.
Chrome.
Oxides.
Sulfur.
Copyright MSTS