2. Three Questions.
a) How much money was spent in the bridges project?
A/ $2.6 million was spent in the bridges project.
b) How many designers were necessary to hire for the bridges project?
A/ Two designers were hired for the bridges project.
c) In which year did the bridges project start?
A/ The bridges project started in 2012.
3. Evaluation.
I loved the visit to the construction area so much because it taught how a big project, the bridges
project, is done in a small town. The fact that impressed me a lot was the time that they have
working in that project because they want to conclude that project without errors. The engineer
was really nice to us and I liked the way he was encouraging us to be engineers. I was
disappointed because it began to rain and we were unable to see the tiny details of the
construction.