ระบายน้ำ ลาดเชิงเขา PDF
ระบายน้ำ ลาดเชิงเขา PDF
HDPE
DEPARTMENT OF HIGHWAYS, MINISTRY OF TRANSPORT
HDPE
2554
1
1.1
1.2
1.3
1.4
2
2.1
2.2
2.3
2.4
2.5
2.6
3
3.1
3.2
3.3
3.4
3.5 Interceptor Ditch
3.6
3.7
4
4.1
4.2
4.3
4.4
4.5
1
2
2
4
4
5
6
6
6
11
17
27
32
37
37
39
39
39
40
40
41
42
42
42
43
45
52
( )
5
58
65
66
73
1.1
2.1
2.2
2.3 (time of concentration, Tc)
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14 Moody
2.15 basin type 1 ( 27)
2.16 basin type III
2.17 basin type III
2.18 basin type IV
2.19
2.20 shape factor K
3.1
3.2
3.3
3.4 33
3.5 Interceptor
3.6
3.7
2
12
14
15
17
18
19
19
20
20
21
23
28
29
31
32
33
34
35
36
36
37
37
39
40
40
41
41
( )
4.1
4.2
4.3 HDPT
4.4
4.5
4.6
4.7
HDPT (Interceptor Ditch)
4.8 HDPE
4.9 HDPE 150 .
5.1 Interceptor Ditch
5.2
5.3
5.4
5.5 HDPE
42
43
44
45
46
47
52
53
57
58
59
60
61
64
HDPE
( ) 1
4139 ()- () . 30+025-.
30+100
HDPE
1
1.1
( ) 4
4006 4 401
44
(Side Slope) (Back Slope) .. 2551 - .. 2554
(Side Slope)
(Back Slope)
( ) (Side Slope)
(Back Slope)
(Berm)
(Interceptor Ditch) (Stepped drain chute)
1.1
.. 2551
() 4139 ()-()
.30+025- . 30+100
1-3
4-6
Shotcrete Slope Protection
(Interceptor Ditch)
7 Ditch Linning
20
21
( 16.30 ) (Stepped drain
chute) 3
0.60 0.60 0.60
10.00
1.2
2552
4139 ()- () . 30+025-.30+100 0.075
. 2553 ( )
.27/2553 27 2553 23 2554
17,994,396.00
10
1.2.1
1.2.2
1.2.3
1.3
() .27/2553
27 2553 23 2554
1.3.1
25000
1.3.2 (Surface Runoff) Interceptor
() Interceptor
45
HDPE Interceptor
( HDPE 110 .
100 110 .
)
1.3.3
16.3 (Stepped drain
chute)
10
10
11
HDPE
1.4.
1.4.1
1.4.2
1.4.3 HDPE
12
2
2.1
9
58 98 38 580
3,425
2 60
4,275.4
203 794.1
27 24 460.9 22 2513
24 2505
25 26 2505
935 445
1,320
4 2515
24 94.0
2.2 (precipitation)
2.2.1
13
(hail)
(snow)
(condensation nuclei)
(sulphur) (nitrogen)
(freezing nuclei)
(coalescence)
(1) (collision-coalescence process) (capture
process) (warm rain process)
0.001 mm 0.1 mm
0c
(2) (ice crystal process)
0c (super cooled water)
(3) (lightening process)
(oxygen)
(nitrous oxide) (nitrogen oxide)
2.2.2 (forms of precipitation)
(1) (drizzle) (mist)
14
(trace)
P<0.1 mm
0.1 mm < P < 35 mm
(light rain)
10.1 mm < P < 35 mm
(moderate rain)
35.1 mm < P < 90 mm
(heavy rain)
90.1 mm < P
(very heavy rain)
P (mm) 1
2.2
(isolated)
(widely scattered)
(scattered)
(almost widespread)
(widespread)
(widespread)
20 %
20% 40%
40% 60%
60% 80%
80%
15
2.3
(mm/hr)
1-5
5 10
10 20
20
(3) (glaze)
0.8 0.9
0C
(4) (rime)
0.2 0.3
(5) (snow)
0.1
(6) (hail)
5mm 125 mm 0.2 in 5 in
0.8 Coffeyville, Kan
3 .. 2513 44 cm 766 gm
(7) (sleet)
0C 5 mm
2.2.3 4
(1) (convective rain)
16
17
3 4
(4) (frontal rain) 2
2
20 km 40 km
2.3
2.3.1 (run-off)
1. Rational
1.3
(C)
QR = CIA
SI
QR = 0.278 CIA
QR = 0.278 x 10-6 CIA
QR
C
I
A
=
=
=
=
(ft3 / s, m3 / s)
2.1 2.2
(mm/hr, in/hr)
(km2 , m2 )
. (run-off coefficient, C)
C=
18
2.1
C 1.0
2.1
n
SI
QR
= 0.278 I Cj Aj
2.1
j=1
n
QR
=
0.278 x 10-6 I
CA
2.2
j=1 j j
Cj
Aj
2.1
(C)
0.44-0.45
0.50-0.55
0.55-0.60
0.50-0.70
0.40-0.70
0.50-0.70
0.20-0.30
0.20-0.30
0.10-0.30
19
2.2
/
1. < 50%
0-2%
2-7%
> 7%
2. 50-75%
0-2%
2-7%
> 7%
3. 75%
0-2%
2-7%
> 7%
1.
0-2%
2-7%
> 7%
2.
0-2%
2-7%
> 7%
( )
10
25
50
100
0.73
0.75
0.77
0.80
0.81
0.83
0.86
0.88
0.90
0.92
0.95
0.97
0.32
0.37
0.40
0.34
0.40
0.43
0.37
0.43
0.45
0.40
0.46
0.49
0.44
0.49
0.52
0.47
0.53
0.55
0.25
0.33
0.37
0.28
0.36
0.40
0.30
0.38
0.42
0.34
0.42
0.46
0.37
0.45
0.49
0.41
0.49
0.53
0.21
0.29
0.34
0.23
0.32
0.37
0.25
0.35
0.40
0.29
0.39
0.44
0.32
0.42
0.47
0.36
0.46
0.51
0.31
0.35
0.39
0.34
0.38
0.42
0.36
0.41
0.44
0.40
0.44
0.48
0.43
0.48
0.15
0.47
0.51
0.54
0.20
0.31
0.35
0.25
0.34
0.39
0.28
0.36
0.41
0.31
0.40
0.45
0.35
0.43
0.48
0.39
0.47
0.52
. (rainfall intensity: I)
(I) 1
20
mm/hr in/hr
(rainfall depth) (rainfall duration)
2.2
21
(I)
2.3
2.3
( )
( .. 2535)
2-25
25-50
>50
5-10
10-25
50-100
5-10
10-25
50-100
5
: 5
2
. (duration)
(time of concentration, Tc)
2.3
L1 + L2
22
Tc 2.4
2.4 Tc
1. Kirpich (1940)
2. California Culverts
Practice
(1942)
3. Federal Aviation
Administration (1970)
4.U.S Department of
Agriculture Soil
Conservation Service
(SCS:1986)
5. CMD (..2511)
Tc (min)
Tc = 0.0078L0.77 S -0.385
L =
(FT)
S =
(FT/FT)
TC = 60(11.9L3/H)0.385
L =
(mi)
H =
(ft)
TC = ((0.87L3)/H)0.385
L =
(Km.)
H =
(m)
TC = 1.8 (1.1 C) L0.50/S0.333
C =
2.1, 2.2
L = (ft)
S = (%)
1 ___
L
TC = ___
60
L = (ft)
V = (ft/s)
( 2.4)
TC = 10 + L/V = 10+ +L /5/5
L = 45
(m)
V =
(m/min)
. 3-10 %
. TCR=TC x 0.4
. TCR=TC x 0.2
Kirpich
2.4
23
6. Kerbys
Equation(1959)
TC
L
c
S
n
7. Bransby Williams
Equation
(1922)
TC
L
A
S
Tc (min)
= c(n.Ls-0.5)0.467
= <
365 m (1000 ft)
= 1.44 L m
= 0.83 L ft
=
=
= 21.3 L/(A0.1 .S0.2)
=
()
= (.)
=
n 2.5
2.4
(atmospheric pressure)
(hydraulic grade line)
2
2.4.1 (natural open channel)
2.4
2.4
24
(contour)
(drainage ditch)
(roadsite gutter)
2.5
2.4.3
2
(type of flow) (state of flow)
2.4.3.1 2
1. (time criterion) 2
(steady flow)
y V Q
(dt)
d
(y, V, Q, ) = 0
dt
..2.3
2.3 2.6
25
2.6
(unsteady flow)
y V Q
d
dt
(y, V, Q, ) 0
..2.4
2.4 2.7
2.7
2. (space criterion) 2
(uniform flow) y
x 2.8
26
2.8
2.8 y x
y f (x)
dy
dx
..2.5
=0
..2.6
2.9
2.9 y x
y = f (x)
dy
0
dx
2
..2.7
..2.8
27
2.10
2.4.3.2 3
(viscous force) (gravity force)
(inertia force)
1.
Reynold number (Nr) =
VR
v
..2.9
V
R
v
2.9
3
(laminar flow)
500
28
(turbulent flow)
2000
(transitional flow)
500 2000
2.
(Froude number)
Froude number (Fr) =
V
gD
..2.10
V
g
D (hydraulic depth)
3
(critical state flow) 1
(subcritical state flow)
1
(supercritical state flow)
1
2.4.4
(gravity
force)
2.11
(normal flow)
2.11 (prismatic channel)
y1 y2
(bottom slope, s0) (surface slope, sw)
29
2.11
1. y, A, Q V
2. S0 = Sw = Sf S
(acceleration)
(deceleration)
(free-body diagram) 1
2 2.11 3
1. (hydrostatic pressure force) F1 F2
2. W
(Fg)
y
A
L
Fg = W sin
Fg = yAL sin
..2.11
30
sin
sin tan S 2.11
..2.12
Fg = yALS
3. (resistance force ; F1)
..2.13
Ff = T0PL
T0
(wall shear stress)
P (wetted perimeter)
L
.. 2316 Antoine Chezy
(To) (V)
To V2
..2.14
To = KV2
K
To 2.14 2.13
..2.15
Ff = KV2PL
..2.16
F1 + Fg F2 Ff = 0
1 2
F1 = F2 2.16
..2.17
Fg = Ff
2.17
Fg 2.12 Ff 2.15 2.17
yALS = KV2PL
R =
V =
A
P
y
K
V = C RS
(hydraulic radius)
A
P
S
..2.18
31
C = y Chezy
K
2.18 Antoine Chezy
V R
S S Sf
S0 Sw
Sf 2.18 S = S0 = Sw =Sf
Robert Manning (.. 2434 2438)
Chezy Manning
C=
1
n
1
6
..2.19
1
n
2
3
1
2
2
3
1
2
V= R S
Q = VA
1
..2.20
Q = n AR S
..2.21
2.20 2.21 Manning
(valid) (fully turbulent flow)
..2509 Henderson
Manning (n) (R)
(S)
..2.22
n6 RS 1.1 x 10 13
32
(1)
(2)
(3)
(4)
2.5 Manning
(natural channels)
(flood plains)
(excavated earth channels)
(artificially lined channels)
n
0.030
0.040
0.035
0.035
0.050
0.075
0.150
0.022
0.025
0.030
0.035
0.010
0.011
0.012
0.014
0.015
0.013
0.012
0.014
0.012
0.013
0.015
0.016
0.022
0.025
33
n
(judgement) (factors)
1. (surface roughness)
(fine grain) n (coarse grain) n
2. (vegetation)
n
3.
4. (scouring and silting)
2.5
1.
2.
3.
2.5.1
.. 2426 (Osborne Reynolds)
1)
2)
3)
34
........2.23
........2.24
V
D
3 2.6
2.6
4000< NR
4000<< NR
2.5.2
(major Losses)
2.12
35
2.12 1 2 h r
.....2.25
V1 =V2 2.25
.....2.26
2.13
1. dP dP.
2. (shear stess;
2.27
36
Darcy Weisbach
C
2.27 2.28
......2.28
2.29
g 2.29
.......2.30
2.30 2
.......2.31
f =
(friction factor)
2.31 Darcy
Weisbach
(velocity head)
(dimensional analysis)
..2.32
(relative roughness)
37
4000
2.14 Moody
2.7
38
2.7
(riveted steel)
(concrete)
(wood stave)
(cast iron)
(galvanized iron)
(asphalted cast iron)
(commercial steel or wrought iron)
(drawn tubing)
(PVC : Polyvinyl - Chloride)
(mm)
0.9-9
0.3-3
0.18-0.9
0.25
0.15
0.12
0.046
0.0015
0.0015
39
() y2
()
2 40% baffle
blocks chute block end sill 2.17 ()
40
V1
50-60 ft/s Fr1 4.5
cavitation baffle piers
41
42
2.19
Kindsvater
(1994)
K 2.20
43
3
4139 ()- ( ) .
30+025-.30+100
3.1 4139 ()- ( )
3.1
3.2
44
3.1
45
3.2
3.3
3.3
3.4
46
3.4 33
3.5 Interceptor Ditch Berm
Shotcrete Interceptor Ditch
Ditch Lining
3.5
3.5 Interceptor
3.6 (Stepped drain chute)
47
3.6
3.7 (Stepped drain chute)
(Stepped drain chute)
(Stepped drain
chute)
3.7
48
4.1
4.1
4.1
4.2 (Stepped drain chute)
(Stepped drain chute)
16.30
49
4.2
4.2
4.3
21
() 0.012 ../
() 21
HDPE 0.00
Z1+ P1 + V1
2g
P1
P2
Z2 + P2 + V2 + HL
V1 = 0
2g
50
HL = = (Hf)+(H
m)
2
Z1 - Z2 =
V2
2g
+ Hf + Hm
2
2
Z1 - Z2 = 1 + f L+ ki V
2g
2gH
V2 =
.4.1
1+f
V = Q/A
L
D
+ ki
2gH
Q = 0.785D2 1 + f
L
D
+ ki
.4.2
H = 21.00 .
L = 54.00 .
Ki = 0.8
f = 0.015 ( Moody diagram)
D = 0.102 .
4.1 4.2
V = ((2X9.81X21)/(1+0.015(54/0.102)+0.8)) = 6.50 /
Q = 0.785X0.1022 ((2X9.81X21)/(1+0.015(54/0.102)+0.8))
= 0.053 ../ 0.012 ../ FS = 4.41
51
4.3 HDPE
4.4 (Interceptor Ditch)
Berm Shotcrete Interceptor Ditch
Ditch Lining
Interceptor Ditch HDPE
Interceptor Ditch
HDPE
HDPE
110 .
HDPE
4.4
4.5
52
4.6
53
54
Interceptor Ditch
(Shotcrete Slope Protection )
Interceptor Ditch 6
Ditch Lining
Rational
..4.3
QR = 0.278 CIA
QR (../)
C
I (./.)
A (..)
(I) 5 (
) TC
TC = ((0.87L3)/H)0.385
L = (.)
H = . (.)
TC (I) I 170 ./.
Interceptor Ditch
1 +4.00
Interceptor Ditch ( 1 )
C = 0.40
I = 170 ./.
A = 0.004x0.035 = 0.00014 .. ( 4.5 )
QR = 0.278X0.40X170X0.00014 = 0.0026 ../
HDPE
2
Z1+ P1 + V1
2g
P1
P2
Z2 + P2 + V2 + HL
2g
V1 = 0
HL = = (Hf)+(H
m)
55
2
Z1 - Z2 = V 2 + Hf + Hm
2g
Z1 - Z2 = 1 + f
L+ ki
D
2g
2gH
V2 =
1+f
V = Q/A
V2
L + ki
D
2gH
Q = 0.785D2 1 + f
L
D
+ ki
H = 4.00 .
L = 15.00 .
Ki = 0.8
f = 0.015 ( Moody diagram)
D = 0.050 .
V = ((2X9.81X4)/(1+0.015(15/0.05)+0.8)) = 3.39 /
Q = (0.785X0.052) ((2X9.81X4)/(1+0.015(15/0.05)+0.8))
= 0.0036 ../ 0.0026 ../
FS = 1.38
56
NR
f
V
Qsum
Tc=
H =ST*L*1000
(0.87*L3/H)
Q1 = 0.278 x CIA
ST
Tc
Yard Area
(km)
(%/100)
(m)
(s)
(km2)
(mm/hr)
Land Plot
VD/
VD=seq(2*g*h/
QD=3.14*/
Qsum
Moody
(1.5+f(l/d))
4(D)^2*VD
(m3/s)
(m3/s)
(m3/s)
(m)
(m)
(m)
dia.
VD(m/s)
QD(m3/s)
55.00
0.05
46.00
372,682.126
0.01
8.497
0.017
3.28
50.00
0.05
39.00
357,765.154
0.01
8.157
0.016
3.65
43.00
0.063
30.00
464,668.632
0.01
8.408
0.026
1.85
32
0.05
21.00
316,745.721
0.01
7.222
0.014
3.31
25
0.05
12.5
269,409.548
0.01
6.143
0.012
2.50
Catchment Area C1
0.0046
170.00
0.390
0.0848
Catchment Area C2
0.00049
170.00
0.390
0.0090
0.0045
Catchment Area B1
0.00003
170.00
0.800
0.0011
0.0006
0.0051
0.00010
170.00
0.800
0.0036
0.0036
0.0036
0.00002
170.00
0.800
0.0008
0.0008
Catchment Area B2
0.0080
0.005
0.040
0.012
Catchment Area B3
4
0.00017
170.00
0.800
0.0063
0.0021
Catchment Area B5
0.00003
170.00
0.800
0.0012
0.0004
0.0025
Catchment Area A8
0.00033
170.00
0.400
0.0062
0.0021
0.0046
Catchment Area C3
0.00156
170.00
0.390
0.0288
0.0096
0.0142
0.00018
170.00
0.800
0.0068
0.0023
0.0023
0.00003
170.00
0.800
0.0011
0.0004
0.0026
0.0043
0.018
0.008
0.144
0.0193
Catchment Area A9
0.012
0.004
0.048
0.018
0.00026
170.00
0.400
0.0049
0.0016
Catchment Area B8
0.008
0.008
0.064
0.0103
0.00018
170.00
0.800
0.0068
0.0034
0.0034
Catchment Area A1
0.150
0.45
66.90
0.021
0.00015
170.00
0.400
0.0028
0.0014
0.0048
0.0012
Catchment Area A2
0.00013
170.00
0.400
0.0025
0.0012
Catchment Area A3
0.150
0.45
66.90
0.021
0.00007
170.00
0.400
0.0012
0.0006
0.0018
0.012
0.004
0.048
0.018
0.00013
170.00
0.400
0.0024
0.0012
0.0030
0.00011
170.00
0.400
0.0021
0.0007
0.0007
0.00001
170.00
0.400
0.0003
0.0001
0.0008
0.00024
170.00
0.400
0.0045
0.0015
0.0023
Catchment Area A6
0.0002
170.00
0.400
0.0038
0.00012
170.00
0.400
0.0023
0.00159
170.00
0.770
0.0579
0.00063
170.00
0.400
0.0119
0.00016
170.00
0.400
0.0030
0.2561
Catchment Area A4
Catchment Area A5
0.050
0.012
0.45
0.004
22.30
0.048
0.009
0.018
Catchment Area D1
10
0.0044
Catchment Area B4
Catchment Area B7
0.0045
0.0021
Catchment Area B6
0.015
0.0026
0.039
0.026
FS
Capacity full
Q1
Line
L
Velocity full
50
57
Tc=
H =ST*L*1000
Line
Land Plot
(0.87*L3/H)
ST
Tc
(km)
(%/100)
(m)
(s)
Qsum
(mm/hr)
VD/
VD=seq(2*g*h/
QD=3.14*/
Moody
(1.5+f(l/d))
4(D)^2*VD
(m3/s)
(m3/s)
(m3/s)
(m)
(m)
(m)
dia.
VD(m/s)
QD(m3/s)
16
0.05
18
380,191
0.01
8.668
0.017
3.35
22
0.06
35
648,155
0.01
11.729
0.037
1.29
19
0.05
30
462,208
0.01
10.538
0.021
3.22
16
0.05
24
439,007
0.01
10.009
0.020
4.07
0.05
10
348,926
0.01
7.956
0.016
5.13
0.05
256,201
0.01
5.841
0.011
2.50
0.0848
Catchment Area C2
0.00049
170.00
0.390
0.0090
0.0045
Catchment Area B1
0.00003
170.00
0.800
0.0011
0.0006
170.00
0.800
0.0036
0.00002
170.00
0.800
0.0008
Catchment Area B4
0.00017
170.00
0.800
0.0063
0.0042
Catchment Area B5
0.00003
170.00
0.800
0.0012
0.0008
0.0050
Catchment Area A8
0.00033
170.00
0.400
0.0062
0.0042
0.0092
Catchment Area C3
0.00156
170.00
0.390
0.0288
0.0192
0.0283
Catchment Area A9
0.018
0.008
0.144
0.0193
0.012
0.004
0.048
0.018
0.00018
170.00
0.800
0.0068
0.0034
0.0034
0.00003
170.00
0.800
0.0011
0.0006
0.0040
0.00026
170.00
0.400
0.0049
0.0025
0.0064
0.0034
0.008
0.008
0.064
0.0103
0.00018
170.00
0.800
0.0068
0.0034
Catchment Area A1
0.150
0.45
66.90
0.021
0.00015
170.00
0.400
0.0028
0.0014
0.0048
0.0012
Catchment Area A2
0.00013
170.00
0.400
0.0025
0.0012
Catchment Area A3
0.150
0.45
66.90
0.021
0.00007
170.00
0.400
0.0012
0.0006
0.0018
0.012
0.004
0.048
0.018
0.00013
170.00
0.400
0.0024
0.0012
0.0030
Catchment Area A4
0.050
0.45
22.30
0.009
0.012
0.004
0.048
0.018
Catchment Area D1
10
0.0042
Catchment Area B8
Catchment Area A5
0.0051
0.00010
Catchment Area B7
0.0045
Catchment Area B3
Catchment Area B6
0.012
0.015
0.0026
0.039
0.026
FS
0.390
0.040
Capacity
full
170.00
0.005
Velocity full
Qsum
0.0046
####
Catchment Area C1
Catchment Area B2
NR
Q1
0.00011
170.00
0.400
0.0021
0.0014
0.0014
0.00001
170.00
0.400
0.0003
0.0002
0.0016
0.00024
170.00
0.400
0.0045
0.0030
0.0046
0.0002
170.00
0.400
0.0038
0.00012
170.00
0.400
0.0023
0.00159
170.00
0.770
0.0579
0.00063
170.00
0.400
0.0119
0.00016
170.00
0.400
0.0030
0.2561
51
58
59
4. HDPE
HDPE
60
A
ZA = 7.0
5
() 2.19
V2A/2g+ZA = V12/2g+y1
VA = 0 V1 = q/y1
Trial & Error y1
q 1 0.23/0.6=0.383 m3
0 + 7 = (0.383/y1)2/(2x9.81)+y1
y1
= 0.0335
7
= 6.69
61
V1
= 11.43 /
Kindsvater(1994)
Fr1
= V1/gy1
=2 cos 38.65
8(19.98)2 cos338.65+1-1
1-2 (0) (tan 38.65)
y2 = 0.81
5 L 1
Fr1 L 2.15
L/y2 = 5.25
L = 5.25x0.81 = 4.45
0.268 ./ 0.81
1.00 3.00 8.00
(L = 4.45 ) 24 ..
0.15 . 0.10 .
SR-24
fc = 173 ksc
fc = 65 ksc
Vc = 3.81 ksc
fs = 1200 ksc
k = 0.351
Vp = 6.98 ksc
j = 0.883
R = 10.06 ksc
M = (1000X1X0.5)X1/3 = 166 .-. ()
62
50 % M = 249 .- .
MR = 10.06X1.00X72 = 492 .-. M
AS = 249/(1200X0.883X7) = 3.35 2
RB 9 @ 0.20# . ( )
HDPE
2
Z1+ P1 + V1
2g
P1
Z2 + P2 + V2 + HL
2g
P2
V1 = 0
HL = = (Hf)+ (Hm)
2
Z1 - Z2 =
V2
2g
+ Hf + Hm
2
Z1 - Z2 = 1 + f
L+ ki
D
2g
2gH
V2 =
1+f
V = Q/A
V2
L
+
D
ki
2gH
Q = 0.785D2 1 + f LD + ki
H = 10.00 .
L = 21.87 .
Ki = 0.8
f = 0.015 ( Moody diagram)
D = 0.150 .
V = ((2X9.81X10)/(1+0.015(21.87/0.150)+0.8)) = 7.01 /
63
Q = (0.785X0.152 )((2X9.81X10)/(1+0.015(21.87/0.150)+0.8))
= 0.123 ../ 0.268 ../ FS = 0.45
150 . 3 0.123x3 = 0.369
../ FS = 1.37
HDPE 150 .
3 3 150
.
64
65
5.1 HDPE
5.1 70 80 10
1. (
)
5.2
2.
66
(
)
5.3
67
10
GABION
10
5.4
68
5.2 HDPE
10
( 5.4)
2554
HDPE
HDPE
5.3 45
HDPE
HDPE
69
2.
3.
2.
4.
5.
6.
60
1. 110 .
1.
20 122 / ( 2.
)
1.
1.
5.4
HDPE
45 5.5
5.5 HDPE
HDPE
70
71
1. 1
2539
2. . 2
2539
3. . 3
2539
4.
2546
5.
2533
6. 1 2540
7.
2537
2546
8. (-)
9.
2531
10. 2541
11.