You are on page 1of 25
Construction Management, End Term Examination (2009 Session) ‘Total Time Allowed = 90 Minutes 5 Semester BSe Civil Engineering, —— 5 gress monitoring of eonstrution project fallowing progress indicators have been achieved ‘we | BCWP | BOWS | [7600 _| 7600. 9000. 7600 [7400 |" 7600” | 9800 17,000 $ and’ duration Tor completion is 6 months, Prepare a char of ‘The total eost of the construction project is 204 sonitring project performance and comnrent gn the chart? a2 =a erosion company wants to get cevtiation of quality management system, Through what process Che ow it willbe upgraded into total quality management? company will get iLand 3 Fora mulistary buikling construction project at Lahore, fo |. Used equipments and plants; concrete batching pl tractor and broomer. 2. Materials; Cement, steel, crush, sand ‘You aie required to discuss: ‘1 How the purchase af equipments and p b. How the procurement of materials will How eoniract management will be caried out, keer FES lowing resources are required by contractor: ant concrete trast mixer, concrete pump, dump truck, ants will be caried out based on equipment and plant management? bye earried out based on procurement management? f ping in view of possible constraints? oF Dorenmine the PW. FW and ANV of the following project when the MARR is 12% per year and expected Tite is 8 yenrs and cxpected if is 8 years Tmveatment Coat $10,000 ‘Market (Salvage) Value 51,000 ‘Anngal Receipt 5,000 5 Expense The IRR ofthe Project Tot aocepale? for this Project? Assume, 5 = fora small investment project have been a riod is 8 yeats determine, which alternative shoutd be selected based on PW Four mutually exclusive alternatives snayzed in the following table. Fhe [MARR is 10% per year ad study per inethod. Confirm your selection using TRR method Alternatives A c D Tapio investment 200) 2500 “000 | ‘Anal Revenues less expences 200 “400 925, IRR 13% 8. 13.9% Discrete compounding factors for N= FP iE TR AF HP. arn Ti668 Bose [0.1874 2.4760-_| 0.4039 OE 5.0590 03269 0.072 0.2229 5.7589 0.3660, 0.0652 0882 43098 16.1991 1.0606 02606 ‘Year—2012 109) Final Examination in B.Se. Civil Engineering 5 Semester (Session-20 ‘Subject: Structural Analysis 40 ‘Time allowed 1 br 30 min MaxM xe: Answer all the questions given. No. (a) Analyze the given frame using slope deflection method. Also draw the bending moment (2403) ‘diagram only. archusing Numericel Integration method. The rust for the given parabolic im from each support. (05) (b) Determine the horizontal th Toads are applied ata distance of 20 ‘height of the crown is Bm and point ox! © \coKn “0m aon {QNo2. (0) Find out the Plastic Moment Capacity and cross sectional dimensions of square beam. Shr 2) 2mm 2m sm 3m om (b) Draw quantitative ILD for eactions of following beam. (08) & Te Oo 4m 3 nee TTS building. | eos a __ ee Enunvorate varie Sat ape tatares! aise eaaeribe aorent mades ot Fatirein cohesive-soil slopes patueses ee aca Wpical e-aeclion oF # zon ead nae Ts vargus componenss Stong with their function. __{04) Gay TR siratumn of clay with an average tiquid th YEAR 2012 (END TERM) Fitth Semestor B.Sc. Civil Engineering EXAMINATION ‘SUBJECT Geotechnical Engineering = 1! TIME ALLOWED «=: 1.5 Hours MAX. MARKS a) at] ei water table on the bearing capacity of 5 1 Ge 4 Me a Y “py [Atwhat depih ould a footing of sie 2m x 8 ‘bg Founded to provide a factor ae ar of ifthe sol is stiff clay having an unconfined compressive strength ote ine? The water table is close to the ground ‘surface and the unit Sight of soll is 18 kNim’. The ultimate bearing ‘capacity of the footing oo kNim?. Use Terzaghi’s theory. | ie oe ico ae AEH ay | Higtiiant the significance of Soll Stabilization ‘and differentiate between Terra a Probe and Vibrofiotation. = ee ap SO rot 46% is 7.8 wa thick. Tis surface iow the present ground surface. The natural water content of the clay is 38% “und the specific gravity of soll gré 2.18. star content oe oe ancl, the sub-sol consis of fin e800, Te und surtace aglow the ground, surface, The average kNim® and the unit weight of sand located above the water table is 47.2 kNim?. From the geological evidence, itis tocated above the wei rally consolidated, The woight of the ule known that the Cay ord a the clay, key tosnerease the eToetr ‘overburden pressure on the clay. ‘by 42 kNim*. Estimate ‘the settlement of the | jg located at a depth of 14.2 m bel submerged uri Saar Tas The prsiile shown ih Figure 7. The material of The The park Sy of unit weight 19 kNim’, cohesion above the fre ‘AE is 30 kNIm* ba rade ine is 36 KN, and the angle of internal etet of the soil may and belied as zero, For the trialslip circle shown, Ine-ares ‘ABCDE is 170 m’ be assumetraid is a G a8 shown the figure, A tenslon creck may develop at Sint Cup to a depth of 2.5 m. Find, for each of the following conditions, the factor of safety against this stip circle. a) Ifthe water in the.reservotrs eval wi Ne 1h of the bank Bp ifthe reservoir is emptied under rapid draw down condition. |The bank of a resé daly EXAMINATION: FINAL - 5™ SEMESTER (REGULAR) 26 SUBJECT: STEEL STRUCTURES TIME ALLOWED: 1:30 HOURS = "MAX. MARKS: 40 Notes: i) Attempt all dhe questions = i) “LRED Steel Design Aids" is allowed in the examination. i) Suggest reasonable values af any missing/nedrrect data, PG setect‘the most-economical drial doubte-angle section using column 6 seletin tables for P, = 50 KN, Kuby = 4m, Ky = 4.0m & A-36 sted ‘and waite table values of bP, Only perform the capacity check. Cemyece (int) ALE. ¢ (0). Select the lightest available trie! Wosecton forthe beam show inthe. gue (dedd figure using A36 stcel. Lateral support i provided a supports only and a maximum deflection equal to 1500 of the T2m span is pened Checks are not required. Ignore the sel weight. o ipl i, Cee a wee KhAy wu Po=LOOEN, PL=300kN v BE zon, = Pee dy fe Q.2 (@) Calculate critical compression flange stress (F.), for a plate girder 8 having the size of the web equal to 2650 x 10 mm and that ofthe flanges {equal to 350 x 22 mm for an unbraced length of 12m and Cp = 1.15, (b) Decide only the first spacing of intermediate stiffeners (size 1s-not~ 7 required) for the end panel, 7m long on the end (end is simply supported) of a plate girder having certain span. The size of the web is 2650 C10 mm and that of the Manges is 550 x 22 mm, The shear force at The end ig 2100 KN which decreases aT THETale of 200 kNim towards the inner side. ‘The flexural eapacity of the section is 7000 kN-m, Q3. (@) Caleulate the rivet value using A502 hot driven rivets (writing each 5 calculation step) for the following truss connection, Select and use reasonable rivet diameter. 2h 1028949.5 15m 4 (b) Explain the coneept of moment magnification in beam columns. 5 a EXAMINATION: FINAL - 8 SEMESTER (REGULAR) = YEAR: 2008 STEEL STRUCTURES SUBJEC TIME ALLOWED: 1:30 HOURS, MAX. MARKS: 40 ; Notes: 1) ldtempt all the g:zestions. RED Stee! Design Aids in SI Units” and *AISC 2005 Specifications” are allowed in the examination. iti) clssume reasonable vatues of any missing/acorrect date, a 1G Why lacing is required for built«up compression members? What 5 { kof force is developed inthe lacing elements? (0) A.W 250% 73 section is used as 8 4.0:m long besin-column, Mside- 10 Sway is possible for bending about the x-axis an a Toad Py = 1200 EN is applied 40 min eff-centre at both top and bottom ends so as 19 cause single curvature about the x-axis, comment whether che member is satisfaclry OF ROA, Kg = 1.5, 15 1.0, Ay ~ May = 0 0.2. (8) How the flesural strength ofa beam depends on LTB and how itis 5 evaluated? (b) Decide the spacing of intermediate stiffeners (size is not required) — 10 . for panel (end is simply supported) of a plate girder «.S m Jong, The al size of the web 38 2500 x 10 mm aul that of the flanges is 700 « 20 tim. ‘The shear fovee at the end is 2500 KN which decreases at the rate of 105 kN towards the inaer side, ‘The Nexural capacity of the section is 7000 KN-m. 10 Qs. Locate the most heavily stressed rivet for the bracket shown and hence desigi the connection using A902 hot driven rivets 100, maven a W 3100129 i STEEL STRUCTURES End Semester Examination-2011 Sth Semester B.Se. Civil Engineering (Session 2009) Notes , / Gi) Anomptat be questions Gi) LRRD steel Des Asis allowed nthe examination oc / G1) Steed come vas tmsigdan ax Marks 40 ‘Time Allowed =90 Minutes sri | Questions wer] \ | 2) Plot and briefly explain the variation in the nominal Rexural sirengih (Mi) of the | 6} ~\/ beam with the change inthe unbraced length (La) for Cy=t and for C1 Q.1 Ja) Select a W Section for a truss compression member under stress reversal having a length of 3.25m, Pp= 90KN (C), Py, = 2S0KN (C) and T,=260KN (T). Use A36 steel and AISC LRED specifications. iy xsaeste Pe Le |b) Design a most economical W-section for simply supported beam having a span | 13 length of 14m with Iteral support at midspan and atthe reaction points for the following loading. | Q2 ‘Concentrated live load at mid span=100KN, ‘Uniform live load = SOK N/m Uniform dead foad= 30 KN. | (Note: Deflection check is not required) | ') Briefly explain the Tension Field Action (TFA) in Plate Girder 3 |») Design welded connection for triss compression member shown inthe figure below | 8 using A36 Steel, Show the results on a net sketch, ec Tamas wo ays wel %, / EXAMINATION: FINAL - 5" SEMESTER (REGULAR) 2010 SUBJECT: STEEL STRUCTURES TIME ALLOWED: 1:30 HOURS MAX. MARKS: 40 Attempt all the questions. i) “ERED Steel Design Aids” is allowed in the examination. 7 iil) Suggest reasonable values of any missing/nedrrect data. Notes: fF sce the mastecmomicl (rial deibleangle seston sing colin selection tables for P, ~ 550 KN, KL, 4.0m, KL, = 4.0m & A-36 steel and write able values of g.P,.. Only perform the eapacity check: () Select the lightest available trial W-section for the beam shown in the figure using A36 steel. Lateral support is provided-at supports anfy and 4 maximum defection equal to 1/500 of the 12m span is permitted. ‘Cheeks are not required. Ignore the self weight. G@) Calculate citical compression Mange siress (,) for a plate wieder having the size of the web equal to 2650 10 mim and that ofthe flanges equal to 550° 22 mum for an unbraced length of 12m an C= 1.15. (0) Decide only the first spacing of intermediate stiffeners (size is not required) for the end panel, 7m long on the end (end is simply supported) of a plate girder having certain span, ‘The size of the web is 2650 x 10 mm and that of the flanyes is 350 x 22 mm, ‘The shear force at the end is 2100 kN which decreases atthe rate of 200 kN/ms towards the inner side. ‘The flexural capacity of the seetion is 7000 k-th 2 3. (@) Caleulate the rivet value using A502 hot driven vivets (writing eich cealeulation step) for the following truss connection. Select and use reasonable rivet diameter, () Explain the concept of moment magnification in beam colusins, Z Hassa SSSR Photostas 8 Yoar: 2010 (Session-2008) Examination: 5" Semester B.Sc. Civil Engineering (Nov, 2010) Subject: Engineering Hydrology =. Time Allowed: 1 hes ee * Max. Marks: 30 sods Sen — Note: Attempt all questions. Assume suitable values for the missing data, if any. ‘Q.No.1FEEniist major Tifling Mechanisms to codl the air’? Define a Cyclone’ | (08) and briefly describe ‘Cyclonic Precipitation’ ‘Q.No.2 | éfine a ‘Snow Gauge’. Discuss how il can be used to measure the | (05) depth of snowfall and equivalent amount of precipitation in mn of liquid water, Q.No.3 | Define "Gauge Density” of a precipitation gauge network? Brieliy |S) discuss factors affecting it QNo4 [Define “Water budget. What are the Inflows and outflows | (04) Considered while deriving hydrologic equation for a particular fegion. O phery waltrsd O Comer nc ed . Q.No.5 | What is a Rating Curve? Enist at least two Inethods for extension )Y04) of rating curve. Seemann] ‘Q.No.6 | The following data are obtained from the curreni meter gauging of | (07) @ stream at_a gauging station. Compute the stream discharge. Rating equation of current meteris as under. ‘ V=025N+0.04 where N=rev/s &V=Vvelocity in m/s [Distance Gepih of | Water | Revolution] Time frome | water)| aopin | “(Noe)” | (sec) [ank,¢my | Cm)" | my © do : = 2 12 aE 1s | ao ° 28 |S. | 96 ead] a8 / 20 eid| 50 / w 80 a0) | er 30 53 4 / ry 50 a8 3 7 33 a 2 ez 33 ai ne 23 49 2 az a 3 29 83 z is ie 50 005 5 = = EXAMINATION: 5™ SEMESTER (REGULAR) YEAR: 2010 SUBJECT: STEEL STRUCTURES © “TIME ALtoweD: 1:00 HOURS © = MAX. MARKS: 30 Notes: Attempt all the questions. i) “LRED Steel Design Aids in SE Units” is allowed in the ‘examination, if nothing extra is writen on it, it) Suggest reasonable values of any missing/incorrect data Explain LRED design method in detail giving. itsmerits and demerits. | {b) Determine the minimum net area of plate shown in Figure where the 8 I location of 22 mm diameter fasteners is also indigated. 1G) What is the liference between capacity analysis and design? 215 | ck Mae buckling with the change in slenderness ratio, (b).. For the truss shown in the Figure, to be covered with stec! corrugated sheets and total dead load on truss = 55 kg/m, suggest suitable Values of the live and wind loads and caleulite the 8 , corresponding paitel loads for the analysis. Span of the truss is 32 m and the center-to-center spacing is 3.25 m. hous ‘Year—2010 5 Semester (Session-2008) Mid Term Examination in B.Sc. Civil Engincering-2010 | Subject: Structural Analysis Max Marks-30 ‘Time allowed {he Note: Answer all the questions given, f . 10KNim ott! i in 3m i bE on } tr {| distribution method . Draw the shear | force and bending moment diagrams. (15) bo mar | Q-2 (a) Determine degree of indéterminacy, mention redundant forces and also write consistent deformation cquation for the given truss. 5 COnOLHol) ++ . aa (sing force method analyze the beam and also draw the shear force find bending mionient agfam. * ‘Assume El to be constant. (03105104) 7, hi UNIVERSITY OF ENGINEERING AND TECHNOLOGY, LAHORE 7 CIVIL ENGINEERING DEPARTMENT Examination: 5 Semester B.Sc. Civil Engineering. (Session-2008) - (oil Term) ag Subjest: Geotechnical Engineering I~ ‘Time Allowed: 1 hours Max Marks(30)) Ww) Notes: Attempt all questions “Assume reasonable values for any missing data. > ie Questions —— Tia). | Define the Tollowing terms, (@__ Deviator Stress —~ k t (Principal plan anc. on ove perwuiple Gi) UWLand CY test Gv) Gross and net safe bearing capacities ()_ Sensitivity of clays¢__ ee oe Fe eons: soll (oe @= 0) ejeted tw Wow test The it a intemal ition is estimated © be 30°, 1 the minoy placed ess io yur at what values ofthe main devitor creme rio |_| principal stesso) DD SHAT E plate Toad teat was performed on sand sing 0.6 m diameter plate A Pte oe The plate was 3 mm under a pressure of 100 KPa. Deleting selment oF ie protoype footing of 1-8 m square under the same presse Sin placed at the same depth as that of the plate Show u athatg het Jay] Wik the ep of an sets, ena he afin wslod oF Ss determination at a depth of Z below ground surface for: ~ : : ‘© a point load (P) and yl gy : the point load (P) is. y 3 Gay [ A ectangutar Tooting mx Amy subjected w UDL of 200 kPa te Aare et Aan! yas shown in Fig CLL ata depth of 10m using + wwestergaard equation. = the retaining wall shown in Fig. (2), plot the active eart ro dompute the total active thrust and its point of application 0 aie 4am 17 KNim? 2m See] pe 128) fen Note | UNIVERSITY OF ENGINEERING AND TECHNOLOGY, LAHORE CIVIL ENGINEERING DEPARTMENT ‘Examination 5 Semester B.Sc. Civil (Session-2007) (FINAL) Subject: Geotechnical Engineering -7———~ Time Allowed: 1.5 hours Max Marks: 40 ‘Assume reasonable values for any missing data. : i Seal Questions [aris I T ZX bearing wall for a proposed building is to be supported on a 24-inch deep | 8 } J tinuous féoting founded in an unsaturated clayey sand (SC). The toad from this wall will be 4.0 K/ft, and the soil has "= 100 Jb/2?, 6” = 28°, and y “119 Ib/f’, The groundwater table is at a very ‘great depth. Compute the \ required width to maintain a factor of safety 6f 3.0 against bearing capacity failure. Ne=28j Ny= IS3 Nee 8) \ | JPR 200 EN columns Toad isto be supported on a 0.5 m deep footing inthe | 8 jj sandy soil with N= 21 blows/30cm. The,maximum allowable settlement is | ° i sandy tit weight of sil is 20 KN/in? and that of cofierete is 23.6 kh ! ‘ Determine the requifed footing with. | 4 [4-H down'various injection grouts used Tor soil improvement, Which soil] 40) 6 y~ 2 oved diroulh dis wehnigue? fe sr aainsupported excavation is to be made in e- soil with its wall vertical up . | see depth of Sm below the existing ground surface. The soil has unit weight | & ~~ | ers im’, cohesion of 35 kPa ond angle of intemal friction of 20°. Determine: . 2a). active earth pressure at top and botton of the excavation )_ the maximum depth of potential tension crack ¢)_whether the unsupported excavation will be safe or nol? it | FB Bom high slope in c-f soil has a face inclination of 40 degree. The a confined. comnpression strength () determined through unconfined | Compression testi SEPA? The in-stt soil properties are e 0.68, Gs 2.68 : : sor the average depree of saturation of slope forming soil is 70%. What \ the factor of gafaty assuming Ns ic, Stability Number as 0.093? _B=2e" | i Supposing the ceieulated factor of safety is not adequate, suggest how safety factor ofthe slope canbe increaed forthe given conditions i ee LS ipical x-seetion of « zoned earthfill dam; name its vari pe ney ng te i | UNIVERSITY OF ENGINEERING AND TECHNOLOGY, LAHORE VIL ENGINEERING DEPARTMENT, Examination: 5" Semester B.Se. Civil (Session-2008) (FINAL) Subject: Geotechnical Engine: ye Allowed: 1.5 hours Max Marks: gl 40 Notes: Attempt all questions “Assume reasonable values for any missing data, Questions ATS mw wide, 25m long, 0.5m deep spread Footing is underlain by a soi with ef = 10 LPs, 4 = 32°, 7 = 18.8 KINim. The groundwater table is at « reat depth. Compute the maximum load this footing ean support while raintaining a factor of safety of 2.5 against shear failure. Use Ne= 44, Ny = 28.5 and N,= 28, [a 300 KN column Tead ipo be supported on a 2,0 m deep footing ip the sandy soil with = 15 blows/30em. The thaximum allowable settlement i TS mim, Unit weight of Soil is 20 kN? and that of eoncrete is 23.6 KN/i* etemine the required footing width. —_ Give your gorrect answers on the answer sheet ‘@ Soll improvement through cement grout is effective for (a) clayey soils (b) sandy sail (c) silty soils, (d) none of these: Gi) Vibro-compaction is suitable. for soils with silty content” upte w_% ity Phe pretoading weament is very. effective. for normally consolidated alluvial soils having (a) high moisture content, (b) Tow shear strength (e) high compressibility (d) all of them iv) Ground improvement through soil freezing is suitable for water bearing{a) fine grained soils (b) granular soils (¢) both of them “An unsupported excavation is @ be made in e-p soil with is wall vertical up to a depth of 5m below the existing ground surface. The in-site soil | 6 properties are €=0.68, Gs=2.69 and the average moisture content of soil is 122%, cohesion of 30 KPa and angle of internal friction of 20°, Determine: 12) active earth pressure at top and bottom of the excavation ) the maximum depth of potential tension crack ©) _whether the unsupported excavation will be safe or not? Talus; also describe different moves oF| 4 inerate various causes of slop fuilure ia cohesive-sol slopes 6 ‘An infinite slope of cohesion Tess soil has Toclination of 20%, The ground ‘Rater table and laure plane, being pacallel 1 slope face, ore Lm and 3m] 6 below the slope surface, respectively. The properties of slope forming soil der €=0, Y=20 KNitn’ and 430°, Determine what change in factor of Safety wil fake place i the water table is lowered by 2m. Draw & typical x-seelion of a zoned earthfill dam; ‘componenis along with their funetion, ene 4 §s® Semester (Session-2008) Final Examination in B.Se. C 7 Subject: Structural Analys (ax Marks-40 ‘Time allowed 1 hr tincoring Je: Answer all the questions given No.1 (@) Analyze the given frame using slope deflection method. Also draw the bending moment a - G Me O$O | \. : 7 | 4 ies i \ _ L HOR seg | Rin i Frbotermine the horizontal thrust for the given parabolit arch using Numerical Integration method. The sp j shit of the crown is 12m and point loads are applicd at a distance of 20m froin each stiprrt. or , | > | a 2 i | 0-2 Calculate the eotapse toad for the beam shown [201 kp 5 Einal Semester, 8.Sc, Civil Engineering, January-207% ‘Session: 2008 Subject: Engineering Hydrology Time Allowed: thesia é Maximum Marks: 40 ee [Water Atempt aif questions. Aspum ata, missing uilable value 2 [awe ‘GUESTION STATEMENT ark ila) | Eat various types of Pans. Define "Sunken, Pans Draw a neat,sKatch of | (03) _| Colorade Pan labeling its dimensions. os 1») | For the catchment shown inthe figure having total area of 380 km‘, find the average Precipitation over the watershed. Isohystal pregipitations are given in em and area in ke on Gia) | Name various amproachos to determine the peak lows Ih & steamiiver. Billy [ (03) discuss ‘Unit Hyarograph Method! : (@) | Write down procedure to determine the Muskingum's x and k for a river | “(07) reach. { ‘@.3{a) [a's certain alaviat basin of 190 kin", 120 Miia" oF ground water was pumped in @ | (0d) year and the ground water tabla dropped by 5 m during the year. Assuming no feplenishment, estimate the specific yield of aquifer. Ir the specific retention i . 19%, what i the poresity ofthe soil HF 1 Gy | Fora catchment, the mean monthly rainfal and temperatures are given below. (05) 7 moe Calculate annuisi ranoff and annual runoff cosfficient. [War [Ape —[ may [ion | aisen| grareeehia tesa 96 eo ees oaese| cia Sep | Oct | Now| Dee | 28 af Las Torte ‘Gaal | Bathe 8 Unit Hydrogeaphe ro (0) | The ordinatos of a3 he Unit nydeograph are given below, derive the ordinates of | (07) (1) the curve nydragraph (ii). 6-hr Unit hydragraph 7 [Time (heey po [s— Tee [1 | ne UNG TO "| 15 2 [oa mts) L Time (ire) [48 —| 29} 3a 3-hr UnG [ae | 23] 08 | 0 mts) Department of Civil Engineering University of Engineering and Technology, Lahore Year : 2010(Jan) Final Test 5t* Semester, B.Se Civil Engineering Marks = 40, Time = 1.5hes Subject: STRUCTURAL ANALYSIS ‘hel ueshons evel Write yeu answers neat Q.No. 1 (20) ‘Analyze the rigid frame shown below using Slope ~ Deflection method. Determine the axial forces, shears and bending moments Draw BMD ond elastic curve for the frame. Assume EJ. = constant ‘36kN 1200 Q.No. 2 0 (20) (6) draw the M/EZ Diagrom of the frame shown below and cleariy show oe ee the esate Toads onthe onlogous eal section Fo evsaseradlMavnsnenite i it % or aE 2 Fs os ap] x Ap » 12a "7 joad mentioned on AST (6) Design the beam shown below to carry the service | it, Use py = 250 MPa 7OKN 40KN ¥ are T e 8 a fo ta} a T westor F ion Managem ime Allowed: 1) Minutes Parts Maximum marks: 20 CQ.1 Defines Equin capital. Debt capital Sinple interest, and Compowne imerest. 0.2 Considering Money-Time relationship and Equivalence: (a) iE = 1,000, NEB years and i=15% per year, then Po? {b) if F=S 20,000, N=10 years and i=15% per year then A=? (e)iF P=S 1,000, A~ $ 200 an i=15% per year, then N=? years. 4 Q.3 Determine the value ofA” (unifuem annual ammount) that is equivalent {o the fallow ing cash pattern, The interest rate is 15% per year. 4 fea] ae seme ane er Ome ooo [Toy | 1500 | THU Son ra] Q.4__ Twoaltemative designs are being considered fora potential improvement project. The piospective nét Sash flows for these alfematives are shown blew. ‘The MARR is 15% ber year, Show that the same capital investment decision results fiom the IRR method thd PW method applied using the incremental investment analysis procedure. — Product 2 $310,000 ~$400,000 83,000 110,000 , q 85,000 110,000 85,000 10,000 ‘ 85,000 110,000, 5.000 110,000 83,000 __10,000 164d 16.55% 8 Pare ‘Maximum marks; 20 Q.1 Discuss the Following in context of eonstruetion management and planning: (a) Equipment and Plant Management (b) Contsact and Procurement Management {€) Project Manager’s Skills for Effective Team Work Year: 2008 Examination: 5" Semester B.Sc. Civil Engineering (Oct, 2009) Subject: Engineering Hydrology Time Allowed: 1 hrs | Max. Marks: 30 Note: Atlempt all questions. Assume suitable values for the missing data, if any. ‘@No.T_| Enlist various forms of precipitation, Differentiate between ‘Rainfall | (05) and ‘Snowfall ae . GNo2 | What are the main processes needed for the growth of Cloud (05) Elements? Discuss any one in detail Q.No.3 | Draw a neat sketch of the Standard Rain Gauge and label its | (05) components. G.No4 | Define " Engineering Hydrology ~ Derive hydrologic equation for a | (04) “| particilat region. 7 ‘QNo.S | Determine discharge trom the following current meter observations. | (07) Current meter equation is as under, V=0.3N + 0.04 where N= Rit (revisec) and V = velocity (m/sec) [Distance | Depth of | Current meter observations] from left | wator & KK pank(m) | (my [Woetrev(R) [Wmetecey] ——{ | . wits 08 [~~ 80 760 | wh a7 70 180 ws 12 [80 700) pe 7 72) 80 18 0 70) 1s “0 oo ia a oo QNo.6 | What is @ Rating Curve? Also write about is utty 4 UNIVERSITY OF ENGINEERING AND TECHNOLOGY, LATOR Examination 5" Semester B.Se. Civil Engineering, (Session (Mid Term) Subject: Geotechnical Engineering -Ii ‘Time Allowed: 1 hours Notes: Attempt all questions Assume reasonable values for any missing data, Max Marks:- 30 ‘CIVIL ENGINEERING DEPARTMENT 2007) [Sr ¥ | 8) | Define {_| G Deviator stress (ii) Principal (@) | Triaxial compression tests of three performed in a soil laboratory. Each test was eat failed. ‘The data obtained in the tests are tabulated below: Questions and Principal plane (ii) C - specimen of the same soil sample were ied out until the sample CUtest contact pressure (© | Differentiate between safe bearing capacity, Determine the cohesion and the angle of internal fiction of ‘Specimen | Minor principal aress, | Major principal Gs) is) St 7 2 110 2 4 15.2 3 a zy 2a) | interval of 3 m. Determine the ve round surface under the load of 50 kN using Boussinesq's equation, Define the Following sketches) Centre of the raft and at its conner. Use Westergaard’s equ (Hint: 1= 1/2P1 x tan" {@ma/@ns?#2n*+1)"3) 3. | Effective stress, Pore water stress and Geostatic stress allowable bearing capacity and ‘Two point loads oF 30 KN and 70 KN are acting at the ground surface al an cal stress at a depth of 5 m from the x 20 m carries a 2(b)_| pressure of 200 kNim?. Find the vertical sess at 10 m depth below its base at State two typical practical examples of lateral earth pressure (show with neat EXAMINATION FINAL - 5™ SEMESTER (REGULAR) YEAR: 2009 : SUBJECT: STEEL STRUCTURES TIME ALLOWED: 1:30 HOURS: MAX. MARKS: 40 2 Jotes; i) Attempt all the questions. iy “LRED Steet Design Aids" is allowed in the examination. fi) Assume reasonable values of any missingZncorreet dati 0.1. G@)_ How design compressive stress is evaluated in a column’ Explain in detail (b) Select the lightest available W-section for the beam shown in the: figure. Lateral support is provided st supports andy and a maximum deflection equal to 1/500 of the 8m span is permitted. Neglect beam ‘weight in all caleulations LOO, =3O0KN Wye 2040 fens ne 50.2.) Write anote on moment magnification in beam-columns, , (b) Decide the spacing of intermediate stiffeners (size is not required) ; for panel, Sm long on the end (end is simply supported) of a plate is girder having certain span. ‘The size of the web is 2500 * 8 mm and that of the flanges is 700 x25 mm, The shear force at the end is 3000 KN svhich decreases atthe rate of 200 kN towards the inner side. ‘The flexural capacity of the section is 8000 kN-m. Qs Design the given truss connection using A502 hot driven rivets Show placing of rivets by witing all the spacing and other dimensions Mann Thick Gusset DI, 10289%9.5 e=15m EXAMINATION: 5™ SEMESTER (REGULAR) YEAR: 2009 SUBJECT: ‘STEEL STRUCTURES TIME ALLOWED: 4:00 HOURS MAX. MARKS: 20 Notes: i) Attempt all the questions. 1 . “LRED Steel Design Atds in SI nits” is allowed in the ‘examination, if nothing extra is written on it. fii) Assume reasonable values of any missing/incorrect data, Q.1 @ Explain the differences between the behaviour of tension and compression members. (b) A welded tension member, 10 m Tong, isto consist of two channels ‘with flanges turned in. Te minimum width of built-up section isto bbe 300 mim (can be increased, if required). Select the channels if the factored axial tensile load ig 1000 kN. Q.2. (a) Explain any four advantages of ste! construction in detail. () For the truss shown’ in the Figure, to be covered with steel corniyated sheets, suggest suitable values ofthe dead, live and wind Toads and calculate the corregponding panel toads for the analysis. ‘Span of the russ is 18 m and the center-to-center spacing is 3.0m. =, Zooey 242° EXAMINATION: _ 5 TERM, SUPPL. / YEAR “2008 suBJECT, STEEL STRUCTURES TIME ALLOWED “3 HOURS MAX. MARKS: 70 Notes; 9) tempeany five questions. 2 eettbe see “LRED Steel Design Aisin SL Units” or 1efige' steel Manuals allowed inthe exeminatOn, ‘ay sshome rensnle vues of any missngfneorrect dt. pp Coen cM Bf L conyers in, | Ma = 145 pi, TANI = 007 Kp (re 1Nam= 0.75 feb oe abl : # ot pews Le cd expiin why yieltig of, gos section in tension 15 consietad ae Fake eve yelling of et ston alone [snot considered i y, beuk we failure. = (bch wetded tension mernber, 10 m Tong, i w be made Gp of me , Bava wt Ranges turned in, The waits of Bul-up seetiog Ss secs mm Select the channels ite axial tensile zal loss 7001 randall tensile live loud is 450 KN. Apply all the checks Compression members? rl 0 ere ig cakumn addon braced at mi-deph about wk (fale? ance i aanumed fo have pined ends, Select het eee coment compressive service leading of Po= 300KN. PL 10 : SOSOuN. @ io ar the mao ures int designees fmm wad 4 | TA ( IX B3 ] Wltes note on L.atoral Torsional Buckling of beams, How LTB is 4 y ‘controlled in practical designs? w () Select he lightest W-seation fr the beam show in igure \o 3 ogee Po 150kN Poe PL=LISKN wo “109 DO 4 wes iskNn 2 PLU Ts a 5. Stim / by oesrive the provedue 10 cle he saber frst fortass 6 ¢ design, BE 75.20 61 comugaed ae fora ose soof Horizont 8 al pas engd 775m, angle of soot is 15%, spacing of tuses is oy A\ XY 4.0m, and assumed dead load of roofing is 175 Nim’, Suggest and qi use suitable value of live laad. Number of sheets is not required. QS AW310« 74 section is used as 240 m Jong beam-column, If side sway is possible for bending about the xvaais and a load f= 1200 - EN as applied 40 mm off-cente at both top and bottom ends so as to cause single curvane about the x-axis, comment whether the M4 5 member is satisfactory or not. Ky = 1.8, Ky = 10, Mag" My =P. 5 Q.6 (@) Explain why stiffeners are provided in the plate giclers 4 {b) A simply supported plate girder of 10m span sbeuld have the sep 10 of its web equal to 2800 mn and web thickness of 12 mm. Ic hone: eae scala nan Oe ee both the ends along with uniformly ditibtted lead of wn 45 OS ences a Tefen eee nid acon feat eae eee ts ae | 27 (3) why lacing ic expired for bulleup compression mmr? Wht a i OE eree ete neletcusea! (b) Locate the most heavily streséed rivet for the brackel shown anil 10 Ihonee design the conection using AS02 hat driven rivets omm cach Ww shose12y [250 mm] >, 200 1mm thiek te Q.8 4) ‘Explain the differences between the allowable stress and LED 3 design methods, Go) Explain the importance of factor of safety indesign, 3 i (6) Explain the concept of moment magnification in calms. x “BEAM y | Tension — | Purline C&% / 4 Plate Grnen ~~ Theory | Wye UNIVERSITY OF ENGINEERING & TECHNOLOGY LAHORE. | 5 TERM BSc Civil Engg Examination 2009 Supply Subject: Siruetural Analysis ‘Time Allowed: 3h Maxx Marks:100 Noies \ 7 i) Attempt any four question selecting two questions from each section. fi) All question carry equal marks iil) Assume suitable values for any missing data hr Part eu ‘Analybe the fixed ended béam ‘by using, Force method. 10 Emm i Draw the shear force and bending, Ae pa B | ‘moment diagrams El is constant S ps1 im = oo Two Saye tas shown byte forse gf PN : 4 method find out the final forces rat i! members clearly identifying tension fy _ orcompression. EA=3000KN ¢ 2 ‘ PL 7 throughtoat : 5) : (Analyze the beam shown by the Slope dftestion mtd considering thetetlement of eSupport 'B by mn Draw the Sher force & heading moment diagrams also ssh ates E100" 10 KNinvand F=450°10" Eporiday son) i oo he 7) . orYn 0%) fm 6 )5(3" Partly eS -4 a) Analyze the frame shown by moment att = distribution method . Draw the shear D force and bending moment diagrams{20) 7 7 7 “ é 1SkW ‘Why the influence line diagrains for indeterminate C i structures are curves and for determinate straight line 2 i] segments [5] : D P Q- $ a) Use the column analogy method and Calculate the Bending moments at points A,B,C and D of the frame shown in figure [20] b)Catculate the shape factor for a rectangular section of width ‘bt and depth “h’[S] > sl x js ie es b)Using moment distribution method construct the influence line diagram for the support reactions at ‘A’ and “B" including for the support moment [15] S : | sleet

You might also like