RAB SUMUR BOR

THE WELL SHALLOW 40 METER PVC 4" LURUS


Nomor

NO.

J E N I S

P E K E R J A A N

: 112 / 02 / SKP / X / 2016

VOL.

SAT.

HARGA SATUAN
(Rp.)

JUMLAH HARGA
(Rp.)

PEKERJAAN DEEP WELL

PEKERJAAN PERSIAPAN

3,250,000.00
3.00

ls

500,000.00

1,500,000.00

1.00

ls

500,000.00

500,000.00

3 Penqadaan air Kerja

1.00

ls

500,000.00

500,000.00

4 Pengadaan Bentonite

5.00

zak

150,000.00

1 Mobilisasi dan

Demobilisasi Mesin,

2 Landasan Kerja &

II

Material

Setting Mesin

PEKERJAAN PELAKSANAAN
1
2

III

Pengeboran Pilot
Reaming

Hole

4"

Hole 5"

40.00

300,000.00

12,000,000.00

40.00

150,000.00

6,000,000.00

PEKERJAAN PIPA DAN POMPA

3,375,000.00

Pipa PVC AW dia 4"

40.00

50,000.00

2,000,000.00

Pipa PVC AW dia 1 1/4"

35.00

9,000.00

315,000.00

Semen

1.00

zak

60,000.00

60,000.00

Gravel pack

2.00

m3

500,000.00

1,000,000.00

1.00

unit

2,700,000.00

2,700,000.00

50.00

unit

12,000.00

600,000.00

IV

3,300,000.00

PENGADAAN & PEMASANGAN MEKANIKAL ELEKTRIKAL

Submersible Pump

Kabel 3 x 1,5mm

0,5

HP 220V

PEKERJAAN PENYEMPURNAAN (FINISHING)

750,000.00
18,000,000.00

100,000.00

Pumping Test

1.00

ls

50,000.00

50,000.00

Pembersihan Bekas Lokasi Kerja

1.00

ls

50,000.00

50,000.00

TOTAL

28,025,000.00

Palu, 6 Oktober 2016


Keterangan :

CV. STATIKA KAJI PERSADA

- Garansi Air Selama 5 Tahun


( kecuali pompa)

FITRI YANTI
Direktris

PEK. MEP