You are on page 1of 61

2G & 3G Flexi Multiradio BTS-MoP-Comms and IntegCell C_ZA

RU30 CONCURRENT MODE/RF Sharing


Project Name

Customer Name

Cell C 900 UMTS Multiradio


:

Document No.

10

Version

1.3

Document Type
:
Document Number
Originator
:
Reviewed By
:
Approved By
:
Date Approved
:
Function
:

Cell C

Method of Procedure
:
Multiradio SiSo Team

10

Cornel Labuschagne

Brando B Rioflorido
16July2012
NI RSO Site Solutions Africa Region

Type of Document

TI HAND BOOK

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010


Page

2 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

Table of Content
1. INTRODUCTION
2. CONTACT INFORMATION
3. EQUIPMENT / MODULES
4. OPTICAL CABLING
5. COMMISSIONING THE 3G FLEXI WCDMA MR BTS
6. LAUNCH THE 3G BTS SITE MANAGER
7. 3G FILES FOR DOCUMENTATION
8. 3G FLEXI WCDMA BTS INTEGRATION
9. COMMISSIONING THE 2G FLEXI EDGE MR BTS
10.

LAUNCH THE 2G FLEXI EDGE SITE MANAGER

11.

EXTERNAL ALARM TESTING

12.

REFERENCES

13.

DISTRIBUTION

14.

DOCUMENT REVISION HISTORY

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

3 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

1.

Network
Implementation
Site Solutions
TI

Introduction
This document will highlight the steps in commissioning the 2g & 3g
Flexi Multiradio BTS in a Concurrent Mode/RF sharing configuration
and the correct Optical cabling between the 2 System Modules
(ESMB/C & FSMD/E) & RF Module (FXDA).

2.

Contact Information
The following are the contact details of the key persons needed for
escalation and coordination in the field as shown in Table 1 below.
Project Manager
TI Manager
OH&S Manager
Africa Region SEC
Table1. Contacts

Johannes Moolman
Shane Markram
Cornel Labuschagne
Johan Booysen
Brando B Rioflorido

+27
+27
+27
+27
+27

82
82
82
83
72

5764665
3740180
5769944
2760548
4526615

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

4 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

3.

Equipment/Modules
3.1 FSMD/E

3.2 ESMB/C

3.3 FXDA

Network
Implementation
Site Solutions
TI

Type of Document

Guidelines - Number

TI HAND BOOK

Revision Number

TI HB MEA NI SiSo 2010


Page

5 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

4.

Network
Implementation
Site Solutions
TI

Optical Cabling
4.1 FLEXI Multi Radio RF Sharing with RDSA (Diversity Cable)

Details:
Synchronization used is E1 ports IF 1 from the 2G system module (ESMB/C) is
Connected to IF1 (FSMD/E)
RDSA Diversity Cables used to connect Diversity Antenna Lines for 2G and 3g
system
Power for GSM FXDA is supplied by ESMB/ESMC
Power for WCDMA FXDA is supplied by FSMD/FSME
BTS Software:
2G BTS SW Version :
3G BTS SW Version :

EX3.1_MP2_Pre2_BL55_A51_A53
WN6.0_22.12-159_B

BTS Site Manager


2G BTS SW Manager : EX3.1_PP2.1_BL03_Site_Manager
3G BTS SW Manager : BTSSiteEM-WN60-6.2.1417

Type of Document

TI HAND BOOK

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010


Page

6 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

4.2 FLEXI Multi Radio RF Sharing without RDSA (Concurrent Mode with 1 RF
Module)

Details:
Synchronization used is Optical 3G System Moduel ( FSMD/E) ports OPT IF4
EXT1 is connected to 2G System Module (ESMB/C) OPT 4/EXT
Antenna Lines for Main and diversity is connected to single RF Module (FXDA).
Power for the shared RF Module (FXDA) is supplied by FSMD/FSME.
BTS Software:
2G BTS SW Version : EX4.1_M1.0_BL058_A51_A53
3G BTS SW Version : WN7.0_1104_1270_04
BTS Site Manager:
2G BTS SW Version : EX4.1_MP1.0_2G_BTS_Site_Manager_BL055
3G BTS SW Version : BTSSiteEM-WN70-7.1.1077

Type of Document

TI HAND BOOK

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010


Page

7 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

5.

Network
Implementation
Site Solutions
TI

COMMISSIONING the 3G Flexi WCDMA Multiradio


BTS
NOTE: During this setup, the 3G Flexi WCDMA Multiradio BTS must
be the Master, in that case it should be commissioned first before
commissioning the 2G Flexi Edge Multiradio BTS.

5.1 Define the laptop IP address as shown in the figure below. This will
allow you to interrogate locally the 3G Flexi Multiradio equipment.

A 10base-T Ethernet cable with RJ-45 connector is used for connection


to the system module (FSMD/E) LAN port.
Laptop OS should be Windows XP Home/Pro, Vista and Windows 7 (for
Windows 7 & Vista, open the BTS site manager as administrator for it
to work).
Nokia Flexi BTS Site Manager (BTSSiteEM-WN70-7.1.1077) should be
installed in your laptop.
3G Datafill file is needed for the BTS parameters.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

8 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

Concurrent mode/RF sharing licenses (Ru30) MUST be already


installed on the BTS by the ROC/NOC before starting.
Sec4.2 of this document MUST be satisfied.
Perform back up of the existing configuration of the Flexi BTS for fall
back procedure if needed.

6.

Launch the BTS Site Manager


Before starting, make sure that the preparations have been made as
highlighted in sec5. The following steps will guide you interrogating
the BTS equipment.
1. Start the Nokia BTS Site Manager by clicking the icon on your
desktop. The task selection view opens as shown below.

2. If you want to establish a local connection, select the Local option


from the IP adress list.
3. If you want to establish a remote connection, define the IP
address of the remote BTS.
4. Enter the Username and Password. The default username is
Nemuadmin and the password is nemuuser.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

9 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

5. Click connect.
If multiple versions of BTS Site manager are installed on the PC, the
appropriate BTS Site Manager version is selected automatically.
NOTE: If there is a Failure to connect to BTS, possible cause
below
-

Software not compatible with new FTLB transmission Module.


Swap FTLB with FTIB and reconnect, update software as indicated
below.
When software is successfully uploaded, replace FTIB with FTLB
and reload software to continue with commissioning.

6.1 Updating the BTS Site software


Updating the BTS software is optional. You should do it only if the BTS
does not have the required software version. Follow the steps below.
1. If there is mismatch in the software, a dialog box opens as
shown below. Otherwise you have to go to the update SW to
BTS site menu.

2. Select file button to locate the target build of the new SW as


shown below and click open.
3. The current target build is TargetBD_WN7.0_1104_1270
04 .zip

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

10 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

4. Select the activate SW after update check the box to enable the
activation of the new SW in accordance to SW updating. Click
the update button to begin the SW update.
5. Click the close button to close the Update SW to BTS Site dialog
box.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

11 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

6. Check SW release version: WN7.0 1104 1270 04 is


loaded
Note: This exercise will also update the SW versions of the RF
Module: FXDA. If any case there is incompatible SW alarm just
reload the SW.
6.2 Manual Commissioning
Before commissioning is done, click on Antenna line management and
un-tick all 3GPP/AISG communication boxes as indicated. This has to
be done before any 3G Multi-radio commissioning starts. Ensure
Reset after sending is enabled and send new configuration to BTS.
After reset check Antenna line management settings again to verify
3GPP/AISG communication boxes is unchecked. Only after this
proceed with commissioning

If no commissioning file(.xml) is available, Nokia Flexi Multiradio site


should be commissioned manually. The Flexi Multiradio BTS and/or the
flexi transport module (TRS) are commissioned with the
commissioning wizard in Nokia Flexi BTS Site Manager. The
commissioning can be started when the modules are on initialised
state. Follow the steps below.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

12 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

The wizard features back, next, cancel and help buttons for
navigating. The next button brings up the following page in each
commissioning file. It guides you through the commissioning process
and prompts you for the required parameters.
1. Click View tab, choose the commissioning button on the view bar
or choose the commissioning menu item. The commissioning
introduction menu opens as shown below.
2. Choose the BTS site (will commission the BTS and TRS
parameters) and choose manual commissioning type.

6.3 Define site properties


Commissioning requires that Name, BTS ID, A2EA and IP addresses are
defined.
1. Enter the name of the BTS site in the name field
2. Enter the location.
3. Enter the description or configuration of the site as per profile in
the plan.
4. Define the BTS Id ( for Cell C site name = BTS Id).
5. Define the IP address of the: TRS BTS, RNC and NTP server (refer
to the example IP Plan for Cell C Project).

Type of Document

TI HAND BOOK

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010


Page

13 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

WBTS-IP Plan-PROES
STREET Site RNC-3G CellC-SouthAfrica-version1 1-03 05 2010.xls

6. Pls refer to the figure as shown below.

6.4

Define security configuration

Not much is defined here as per plan. Only the ping and trace route is
enabled.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

14 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

6.5

Network
Implementation
Site Solutions
TI

Define the physical interface properties

We will define the Ethernet interface and use IuB IP transport mode as
per high level design in this Cell C project.
- IF1 previously activated in RF sharing with diversityis now
DEACTIVATED in
Concurrent Mode. Optical Interface OPT IF4 is now used as the
synchronization
Source for Concurrent Mode
- EIF 2 must be checked In Use, speed of 100mbps full duplex mode
-EIF 3 must be checked In Use, speed and duplex Autodetect, this
parameter enables the Fast Ethernet port for Ethernet connection to
2G ESMB/C module

Type of Document

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010

TI HAND BOOK

Page

15 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

6.6

Define transport
configuration

address

1. Ethernet Switching:

Queue Weights
o 1 - Strict
o 2-8
o 3-4
o 4, 5,6 -1
o 5
o 6

and

quality

of

Network
Implementation
Site Solutions
TI

service

Type of Document

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010

TI HAND BOOK

Page

16 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

DSCP Priority Mapping


o 1 46,48
o 2 -34, 36, 38
o 3 26, 28, 30
o 4 10, 12, 14, 18, 20, 22
o 5 no settings

All other parameters: default

Network
Implementation
Site Solutions
TI

2. VLAN Aware Configuration / Ethernet Interface Shaper

VLAN aware switching not in use


Ethernet Interface shaper for each Interface
o EIF 1
Egress Shaper Speed and Duplex
Ingress Rate Speed and Duplex
Speed and Duplex Autodetect
o EIF 2

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

17 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

EIF 23

Network
Implementation
Site Solutions
TI

Egress Shaper Speed and Duplex


Ingress Rate 100 Mbps Full duplex
Speed and Duplex Autodetect
Egress Shaper Speed and Duplex
Ingress Rate 100 Mbps Full duplex
Speed and Duplex Autodetect

3. Ethernet Link OAM - no setting needed, on this page the 2G


system module is introduced, this is for testing purpose only.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

18 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

4. Committed Information Rate Set according to planned datafill.

Type of Document

Guidelines - Number
TI HB MEA NI SiSo 2010

TI HAND BOOK

Page

19 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

5. Define Quality of Service as follows:

6.7

NBAP, Expedited Forwarding, DSCP 46


CES 2,3 and 4, DSCP 46
All other parameters: default

Define IP Interfaces
We need to define the following transport address:

1. Transport Ethernet Interface (refer to the IP plan). The BW is


100Mbps and includes Ethernet overhead with MTU of 1500 bytes.
2. Define VLAN mapping in use. The VLAN Id = Site Id ( refer to IP
Plan)

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

20 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

IP Interface:
- Total shaper information rate define at 24.0Mbit/s
- Commited Information rate as per RF planner/NPO configuration
- Include Ethernet overhead checked
-

IP Interface:
- New VLAN ID and define as per RF planner/NPO configuration
- Address define as per RF planner/NPO configuration
- Committed Information Rate define as per RF planner/NPO configuration
- Enable QoS checked

Network
Implementation
Site Solutions
TI

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

21 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

IP Interface:
- VLAN Type define all as per RF planner/NPO same as VLAN of Transport
Ethernet Interface

6.8

CES over PSN settings

Define Minimum UDP port to 49152

6.9 Define the Iub IP settings


Refer to the Datafill for Far end SCTP subnet, Minimum SCTP port,
Minimum UDP port, CAC committed bit rate same as Commited
information rate parameters. Signalling bit rate set to 450kbit/s
and DCN bit rate is at 100kbit/s, Local and remote UDP port.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

22 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

6.10 Configure the Timing over Packet parameters


Refer to the Datafill for Master clock address plan. Message rate is
16 T/S

6.11 Application Addresses

IP addresses are reflected on this page


o User Plane1, Control Plane, Synchronization plane IP same as Transport
Ethernet IP address.

Type of Document

TI HAND BOOK

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010


Page

23 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA
o

Management Plane IP same as transmission IP

6.12 RTT Measurement

Default settings, nothing to define

Network
Implementation
Site Solutions
TI

Type of Document

TI HAND BOOK

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010


Page

24 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

6.13 Define synchronization timing source


2.

Timing Source Priority 1 set to Timing


over packet
3. Priority 2 and 3 set to default
4. All other parameters set to default

6.14 Define BTS Static Route


- Default Gateway defined as per RF Planner/NPO datafill

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

25 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

6.15 Define IP Filtering exception rules for site support


equipment
This is not defined in this project.

6.16 Define settings for BTS

Type of Document

TI HAND BOOK

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010


Page

26 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

Define:
Configuration name is set as per Profile # accdg to Datafill.
Time Zone set to (GMT+2)Africa/Johannesburg
Transmission Sync(TDM/SuncE/Top) in use must be checked

6.17 Automatic License Distribution Settings

Module Locations as per RF planner/NPO datafill


Automatic licensing in use is enabled. Channel Elements are generated and we
leave it as it is. No need to change.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

27 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

6.18 Concurrent Mode Settings

RF sharing is enabled
Ensure System Module Product Code and Serial Number are filled up with the
valid data
FXDA Radio Module Connection is ENABLED for sharing (ESMX 1 Optical IF1)

6.19 Creating Local Resources

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

28 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

Create new cell and define the antennas that will be used for the 3/3
cells created. If 40W carrier power is used, a license is required to be
downloaded before the grace period expires.

6.20 Local Cell Settings


- RNC type used for CELL C is Nokia Siemens Network only

Type of Document

TI HAND BOOK

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010


Page

29 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

6.21 Define the WCDMA Carrier Candidates


Local cell group is not supported therefore not defined. The carrier
frequency, UARFCN, is defined for Frequency Band 900MHz -2961
(932.2Mhz)
and
for
Frequency
Band
2100MHz
10663(2132.6Mhz) in this Cell C Project.

6.22 Define HSDPA and HSUPA settings

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

30 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

The 16QAM modulation, PFRP and shared scheduler are enabled for
HSDPA. Resource Allocation should be at 16 HSDPA users per cell.
The HSUPA uses the default settings. The Iub delay threshold are
define as shown in the above snapshot.
6.23 Define HSUPA settings

HSUPA resource allocation enabled


Happy Bit Ratio Measurement
o Small transmission filtering in use
o User equipment power headroom filtering in use
UPH threshold is default no need to manually set it.
o BTS processing set is default no need to manually set it.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

31 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

6.24 Define HSUPA settings


1.For QoS, the default settings were used. Unless specified in this project.

Type of Document

TI HAND BOOK

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010


Page

32 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

6.25 Antenna Line Management

No settings defined for antenna line management

6.26 Antenna Line Settings


FXDA 1/2/3/4/5/6 feeder loss is set at a value defined by RF Planner/NPO.
Triplexer is used and The RTT measurement is DISABLED and define the
Antenna cable length as per RF Planner/NPO. No need to define the MHA
setting. Additional RX Gain 0.0dbm. Uplink Delay 85.0ns

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

33 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

6.27 No need to define settings for Siemens proprietary AI


SiemSG1.1 TMARET and RET Units since RET/TMARETS
are not used in this project.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

34 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

6.28 Define settings for external fault and control lines for
system module
The external alarms are defined on the 2G GSM equipment. No need
to define the external alarms on the 3G equipment.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

35 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

6.29 Send BTS Parameters to BTS


Click send parameters button to send the commissioning parameters
to BTS site. After the parameters have been successfully sent, the site
will reset and the new parameters are activated. The BTS and TRS will
now be in a commissioned state. An option to save, if needed for
documentation, is prompted prior to sending the parameters.

NOTE: 3G Commissioning File is needed


commissioning of the Flexi Multi Radio 2G System.

on

the

The commissioning file *.xml will be needed to configure the 2G BTS


in order
for the 3G system and 2G system to detect and share the same RF
Module.
(sample:
BTS_Commissioning_Teraco_Test_BTS2_RNC2_BTS_20120605.xml)
6.30 Define additional setting
No additional settings defined as per high level design.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

36 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

6.31 Site Tests


You can run tests on the commissioned BTS. The test results and
reports are attached to the commissioning report.
For this part, only the Ethernet Test is done and saved for
documentation. WCDMA loop test can be done if the site is on air or
when the BTS is on Test State (if not yet integrated).

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

37 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

6.32 Commissioning Report


View the contents of the commissioning report and save the report to
a file for documentation. Click finish to complete the commissioning
procedure.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

38 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

7. Files for documentation


7.1 Site information
This file contains all the details of the hardware elements installed at
site. This is needed in the BTS site folder documentation. From the tool
tab, check the site information menu and save the data.

7.2 Snapshot
This data contains the site log files and settings of the TRS and BTS.
From the File Tab, choose Snapshot menu and save the data.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

39 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

7.3 IP connectivity Test


This test will verify the IP routing of the BTS. Ping the remote address
(RNC, NTP server, Timing over Packet, BTS routing gateway) and if
there is no connectivity, this test fails. This can be done on the
commissioned state of the BTS prior to integration. Click the Tool Tab
and choose IP connectivity test.

Type of Document

TI HAND BOOK

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010


Page

40 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

8.

Network
Implementation
Site Solutions
TI

3G Flexi Multiradio BTS Integration


8.1 Pre-requisites
1. The BTS and TRS are commissioned; all parameters needed are
configured as per plan.
2. The IP connectivity test Passed. Ping test of the remote address is
possible.
3. Site parameters, DCN, Connection Configuration and AAL2 user
planes have been configured in RNC.
4. Call NOC to download Licences and Unlock the Site. See status
below.

7.

COMMISSIONING the 2G Flexi EDGE MULTIRADIO


BTS
NOTE: on the 2G BTS, First thing to be done is to run Undo
Commissioning & remove Traffic Bypass capacity to ensure all data is
cleared from the flash memory.

9.1 Define the laptop IP address as shown in the figure below. This will
enable you to interrogate the 2G Flexi Multi Radio BTS equipment.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

41 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

A 10base-T straight Ethernet LAN cable with rj-45 connector is used for
connection to the system module (ESMB/ESMC) LMP port.
2g
Flexi
BTS
Site
Manager
(EX4.1_MP1.0_2G_BTS_Site_Manager_BL055) should be installed in
your
laptop
with
the
latest
BTS
SW
release
(EX4.1_M1.0_BL058_A51_A53).
Laptop OS should be Windows XP Home/Pro, Vista and Windows 7 (for
Windows 7 & Vista, open the BTS site manager as administrator for it
to work).
Updated file for BTS parameters e.g. site id, bcf id, configuration, A-BIS
plan etc. This should be provided by Network Planning.
3G Commissioning file
commissioning earlier.

(XML)

previously

saved

from

the

3g

Sec4.2 of this document MUST be satisfied.


Perform back up of the existing configuration of the Flexi BTS for fall
back procedure if needed.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

42 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

8.

Network
Implementation
Site Solutions
TI

Launch the 2g Flexi BTS Site Manager


Before starting, make sure that the preparations have been made as
highlighted in sec4. The following steps will guide you interrogating
the BTS equipment.
Start the Nokia 2G Flexi BTS Manager by clicking the icon on your
desktop. The task selection view opens as shown below.

10.1 BTS SW Update


The first step of the commissioning is BTS SW Downloading/Update.
This is necessary to align the current SW packet of the BTS with the
new release BTS SW. It starts with selecting the BTS SW and
followed by SW update

Then, we must browse and select the header or master file to


start the download. The SW version BTSM4113.3A

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

43 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

It is recommended to select the option Forc Download to guarantee


the downloading of all files of the new SW. If we dont mark this
option, only the changes in between versions will be downloaded
(depending on the versions).
Press the update SW. The progress bar will help us to follow the
process. Notice that FIREWALL SW running on PC could BLOCK the
downloading. When the Download is finished, The BTS will restart and
the PC automatically connect to the BTS.
Multi Radio BTS doesnt autodetect un-commissioned radio modules,
thats the reason why only the system module appears on the screen.

Check Force BTS Download All Application


Files

ON-LINE commissioning is when you are physically connected


to the BTS via your straight LAN cable.

Type of Document

TI HAND BOOK

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010


Page

44 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

10.2 Perform Undo Commissioning of BTS


This will last a few minutes and when finished, the BTS will restart.
Notice that any change in the BTS configuration needs a BTS reset to
be effective.

This will last a few minutes and when finished, the BTS will restart.
Notice that any change in the BTS configuration needs a BTS reset to
be effective.
NOTE: 3g Commissioning file(XML) is needed to be downloaded into
the 2g Flexi Multiradio BTS.
After restarting, we choose again commissioning wizard and then
Commission manually to bring you to the Site Specific
Information.

10.3 Site Specific Information

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

45 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

Just populate the BCFID of the site, then proceed to the next step.
10.4 Hardware configuration
Specify from file and browse the 3G commissioning file (XML) earlier
saved then proceed to the next step.

10.5 Module configuration

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

46 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

Note that OPT1 is untick and your synchronization is also untick since
your 3G BTS is your master. Note also that the RF module (FXDA) is
already defined.
If DCS1800 is being used, then we need to add new RF chain for FXEA
using OPT2.

10.6 Local Sector Settings


Since we hav Rx Sharing of FXDA (sector 4,5 & 6), the mximum
allowable Carrier power is 60W. Since 3G BTS uses 40W carrier power
already, our 2G BTS will now have a mximum of 20W carrier power to
be used. It can be 10W depending on the RF plan. While your FXEA
(sector 1,2 &3) will still have a mximum 60W carrier power since its
not shared.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

47 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

10.7 Antenna Settings

Network
Implementation
Site Solutions
TI

Type of Document

TI HAND BOOK

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010


Page

48 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

Associated antennas are defined for the FXDA and FXEA. Antenna
settings use default values.

10.8 RET Settings


RETs are not used therefore this are not defined.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

49 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

10.9 FRM EAC Settings


FRM EAC settings are not used therefore this are not defined.

10.10 BBU Settings


No BBU used therefore this are not defined.

10.11 Passive Unit Settings

Network
Implementation
Site Solutions
TI

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

50 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

FSEB box is defined with its serial number, Product code is selfgenerated.

10.12 Transmission Parameter Settings


Transmission parameter is specified manually by choosing the correct
TRS PIU.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

51 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

10.13 Network Settings


Packet Switched Network is used with transmission mode as PWE.

10.14 Ethernet Settings


EIF1 is enabled for the BTS transmission.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

52 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

10.15 PWE Settings


PWE1 and PWE2 is enabled and the UDP ports are populated as per
plan.

10.16 Tunnel Settings

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

53 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

Tunnel settings of the PWE1 and PWE2 are populated according to


plan.

10.17 Ethernet OAM Settings


This setting is not defined.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

54 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

10.18 Synchronization Settings


TOP is enabled and Master clock IP address is populated (same as
what is defined in the 3G BTS). PWE1 and PWE2 are defined as
priority1 & 2 respectively.

10.19 ABIS Termination


Enable ABIS mapping and allow ABIS allocations from BTS Manager

Type of Document

TI HAND BOOK

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010


Page

55 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

10.20 ABIS Allocation


Populate the Abis Allocation as per ABIS plan per PWE for 900 and
1800 BTS.

10.21 Ethernet Monitoring


Ethernet monitoring is not defined in this BTS.

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

56 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

10.22 Local Management Port settings


This BTS setting is not defined.

10.23 Send SCF to BTS


Save the SCF before sending it to the BTS.

Network
Implementation
Site Solutions
TI

Type of Document

TI HAND BOOK

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010


Page

57 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

Commissioning in Progress
BTS will reset once completed

Local commissioning completed


successfully and O&M Link
Established

Type of Document

TI HAND BOOK

Guidelines - Number
TI HB MEA NI SiSo 2010
Page

58 of 61

Revision Number
1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Fetching the commissioning report

Network
Implementation
Site Solutions
TI

Type of Document

TI HAND BOOK

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010


Page

59 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

Site Information

9.

External Alarm Testing


Indoor Sites
Once the BTS is commissioned, test the alarms with the NOC. Ask the NOC to
save and email you the log file. The Alarms will be tested twice. First before
moving the Alarm cable and second when the alarm cable is moved. Ensure
that the alarms on the old BTS are the same as on the MR BTS. Please note
that not all the sites will have the same alarms. The most common alarms are
listed below. If the alarm is not listed below simulate the alarm to test that it
is functional.
1. Intruder (External Alarm 18)
Close the door and monitor on BTS manager for alarm to clear.
Open door and monitor to alarm condition
2. Movement(if installed) (External Alarm 19)
Cover movement sensor and wait for at least 3 minutes.
Remove cover from sensor and monitor alarm condition.
3. Rectifier Module Fail(External Alarm 8)
Switch off rectifier module at rectifier or disconnect module to generate

alarm.

Switch on again and see that alarm clears.


4. High Temp(External Alarm 7)
Warm-up the sensor near the aircon control box to generate an alarm.
Extractor fan will activate

Type of Document

TI HAND BOOK

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010


Page

60 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

Wait for sensor to cool down and alarms will clear.


5. AC Mains Fail(External Alarm 2)
Switch off AC Mains breaker inside container to generate an alarm. The
rectifier alarms will also
come on.
Switch on AC Mains breaker to clear the alarms.

alarm.

6. Rec SYS/Batt Low(External Alarm 3)


Switch off rectifier module at rectifier or disconnect module to generate
Switch on again and see that alarm clears.

clear.

7. Smoke(External Alarm 17)


Make some smoke and hold it near the smoke sensor. The light will come on
and all aircons will
switch off.
Remove the sensor by unscrewing it and put it back again. The alarm will
8. Aircon Fail(External Alarm 9)
Switch of aircons at the AC DB to generate alarms.
Switch on to clear the alarms

alarm.

9. DC Low/Batt Low(External Alarm 4)


Switch off rectifier module at rectifier or disconnect module to generate
Switch on again and see that alarm clears.

clears

alarm.

10. Dual Aircon(External Alarm 5)


Aircon alarm will activate when temp inside container exceeds 28degC
Close container door and wait +/- 10 min before entering and see if alarm
11. DC High/Rectifier SYS(External Alarm 6)
Switch off rectifier module at rectifier or disconnect module to generate
Switch on again and see that alarm clears.

Outdoor Sites
Once the BTS is commissioned, test the alarms with the NOC. Ask the NOC to
save and email you the log file. The Alarms will be tested twice. First before
moving the Alarm cable and second when the alarm cable is moved. Ensure
that the alarms on the old BTS are the same as on the MR BTS. Please note
that not all the sites will have the same alarms. The most common alarms are
listed below. If the alarm is not listed below simulate the alarm to test that it
is functional.
1. Intruder (External Alarm 18)
Close the DELTA cabinet door and monitor on BTS manager for alarm to clear.
Open DELTA cabinet door and monitor to alarm condition
2. Rectifier Module Fail(External Alarm 8)

Type of Document

TI HAND BOOK

Guidelines - Number

Revision Number

TI HB MEA NI SiSo 2010


Page

61 of 61

1.3
Date: 06/27/2012

Title

2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent


Mode - Cell C_ZA

Network
Implementation
Site Solutions
TI

Switch off rectifier module at rectifier or disconnect module to generate


alarm.

Switch on again and see that alarm clears.


3. High Temp(External Alarm 7)
Warm-up the sensor behind the DELTA rectifier control box to generate an

alarm.

Wait for sensor to cool down and alarms will clear.


4. AC Mains Fail(External Alarm 2)
Switch off AC Mains breaker inside DELTA Rectifier to generate an alarm. The
rectifier alarms will also come on.
Switch on AC Mains breaker to clear the alarms.
5. DC Low/Batt Low(External Alarm 4)
Switch off rectifier circuit breaker at DELTA rectifier or disconnect module to
generate alarm.
Switch on again and see that alarm clears.

10.

References
2G/3G Flexi Multiradio Commissioning

11.

Distribution
NSN TI Manager, Cell C
NI SISO Manager, Africa

12.

Document Revision History

DATE

Revision
No

Summary of changes

25Jan201
2
26June20
12

V1.2

Revised the antenna line settings for FXDA

V1.3

Added Module Photos cabling (item 3)


Added RF cabling (item 4)
Revised SW Versions
Revised antenna line settings
Commissioning File (4.25)