Professional Documents
Culture Documents
PRICING DOCUMENT
SECTION 4 - SCHEDULES SUMMARY
Section
Description
Amount HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
PDSS 1/2
AA 23/09/16
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
PDSS 2/2
AA 23/09/16
Description
Amount HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
PDSOP 1/2
AA 23/09/16
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
PDSOP 2/2
AA 23/09/16
Description
Unit
Quantity
Allow for all site overheads and running costs, head office Item
overheads and finance charges
Allow for all costs for the preparation and submission of Item
documents including Works Programme, method statement
and progress reports for all purposes in respect of the Works
as required in the Specification
Allow for all costs for the provision of all Temporary Works Item
as required in the Specification for the completion of the
Works
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 1 1/4
AA 23/09/16
Description
Unit
Allow for all costs for the application and renewal of Airport Item
Restricted Area Permits
Quantity
-
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 1 2/4
AA 23/09/16
Description
Unit
Quantity
Allow for all costs for the provision of temporary electrical Item
power and water supplies for the completion of the Works
Allow for all costs in complying with the requirements for Item
co-ordination with the relevant Employer's departments and
interfacing with the works of Other Contractors, suppliers,
utility companies, Relevant Authorities etc. for the
completion of the Works
Allow for all costs for the preparation and submission of Item
Contractors design items as described in the Specification
and any matters relating to the execution of the Works
Allow for all costs for the preparation and submission of Item
O&M manuals and As-constructed drawings including test
records and statutory certificates WR1/WR1A, Form FS 251
and Form FS 314A in accordance with the Specification
Allow for all costs for the disposal of all debris and wastes Item
arising from carrying out of the Works to the public refuse
collection facilities
Allow for all costs for the provision of Responsible Person Item
(RP) and Authorised Person (AP) of Building E&M System
in accordance with Airport Authority's Maintenance
procedure TSD-P/T/003 for the execution of Electrical
Works
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 1 3/4
AA 23/09/16
Description
Unit
Allow for all costs for the provision of working platform as Item
required for the completion of the Works
Quantity
-
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 1 4/4
AA 23/09/16
Description
Unit
Quantity
ADDITIONAL ITEMS
A
Allow for all other costs* necessary to complete the Works Item
as required by the Contract but not included elsewhere in
this part of the Pricing Make-up. All additional items shall
be separately priced and itemized hereunder:
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 1 5/4
AA 23/09/16
Description
Unit
Quantity
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 1 6/4
AA 23/09/16
Description
Unit
Quantity
COLLECTION - PART 1
From page Part 1 1/4
From page Part 1 2/4
From page Part 1 3/4
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 1 7/4
AA 23/09/16
Description
Unit
Quantity
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 1 8/4
AA 23/09/16
Rate
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 1 9/4
AA 23/09/16
Amount
HK$
Rate
-
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 1 10/4
AA 23/09/16
Rate
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 1 11/4
AA 23/09/16
Amount
HK$
Rate
-
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 1 12/4
AA 23/09/16
Rate
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 1 13/4
AA 23/09/16
Amount
HK$
Rate
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 1 14/4
AA 23/09/16
Rate
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Amount
HK$
Part 1 15/4
AA 23/09/16
Amount
HK$
Rate
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 1 16/4
AA 23/09/16
Unit
Quantity
Rate
2400mm high
ARCHITECTURAL WORKS
DEMOLITION AND ALTERATION WORKS
Form opening on existing block wall for new door;
including making good all works disturbed; all in
accordance with the Specification and as shown on the
Employer's Drawing No. TS/T16S033/A/1001
nr
nr
m2
Existing blockwall
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 1/15
AA 23/09/16
Existing door
Unit
Quantity
nr
Rate
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 2/15
AA 23/09/16
Unit
Quantity
m2
80
m2
27
Rate
nr
nr
nr
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 3/15
AA 23/09/16
Unit
Quantity
Rate
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 4/15
AA 23/09/16
Unit
Quantity
nr
m2
212
Rate
600mm x 600mm
WALL FINISHES
Cement and sand plaster
m2
nr
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 5/15
AA 23/09/16
Unit
Quantity
Rate
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 6/15
AA 23/09/16
Unit
Quantity
Rate
m2
159
m2
53
m2
m2
21
nr
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 7/15
AA 23/09/16
Unit
Quantity
Rate
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 8/15
AA 23/09/16
Unit
Quantity
12
95
Rate
ELECTRICAL WORKS
GENERAL LIGHTING AND POWER
Galvanized steel cable trunking at high level, surface
mounted or suspended, including hanging framework,
joints, tees, connections, bends, terminations, brackets,
fittings and all necessary accessories; all in accordance
with the Specification and as shown on the Employer's
Drawing No. TS/T16S033/E/5101
100mm x 100mm
Galvanized steel cable tray at high level, surface mounted
or suspended, including hanging framework, joints, tees,
connections, bends, terminations, brackets, fittings and all
necessary accessories; all in accordance with the
Specification and as shown on the Employer's Drawing
Nos. TS/T16S033/E/5101 and 5102
200mm wide
Isolators; including all cables, conduits, wiring, fittings
and necessary accessories; all in accordance with the
Specification
63A; DP
nr
63A; TPN
nr
63A; DP
nr
63A; TPN
nr
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 9/15
AA 23/09/16
Unit
Quantity
Rate
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 10/15
AA 23/09/16
Unit
Quantity
nr
Rate
Data point
Final circuits; approved cables; drawn into and including
conduit, wirings, all necessary fixings and accessories; all
in accordance with the Specification and as shown on the
Employer's Drawing Nos. TS/T16S033/E/5001, 5101 and
5102
From existing distribution board (ref. NTENDB501)
nr
nr
nr
nr
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 11/15
AA 23/09/16
Unit
Quantity
Rate
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 12/15
AA 23/09/16
Unit
Quantity
nr
nr
10
set
17
Rate
Ceiling mounted
Lighting switches; fixed to walls and columns; including
all necessary conduits, wiring, fittings and accessories
Allow for all costs for the provision of labeling and Item
painting for all new and modified electrical installations
Allow for all costs for testing and commissioning for all Item
new and modified electrical installations
Allow for all costs for all other associated builder's works Item
in connection with electrical installations; including
forming wall/slab openings, reinstatement and making
good of all disturbed areas to match existing
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 13/15
AA 23/09/16
Unit
Quantity
Rate
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 14/15
AA 23/09/16
Unit
Quantity
set
set
m2
104
nr
nr
Rate
MECHANICAL WORKS
MECHANICAL VENTILATION AND AIR
CONDITIONING SYSTEM
Dismantle and remove from Site the existing mechanical
installation and/or equipment; including pipework,
ductwork, dampers, diffusers, fixings and all associated
accessories; all in accordance with the Specification and
as shown on the Employer's Drawing Nos.
TS/T16S033/M/6101, 6102, 6201 and 6202
0.8mm thick
Volume control dampers; including all necessary fittings
and accessories
400mm x 400mm
Fire dampers; including all necessary fittings and
accessories
400mm x 400mm
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 15/15
AA 23/09/16
Unit
Quantity
Rate
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 16/15
AA 23/09/16
Unit
Quantity
nr
nr
Rate
2000mm x 1000mm
Outside air louvres; complete with all associated fittings
and accessories
600mm x 600mm
CHILLED WATER SYSTEM
Black steel pipes; complete with thermal insulation;
including fittings (e.g. bends, tees, reducers, caps and the
like), supporting frame and fixings
32mm diameter
40mm diameter
100mm diameter
50
Isolating valves
F
32mm diameter
nr
40mm diameter
nr
100mm diameter
nr
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 17/15
AA 23/09/16
Unit
Quantity
Rate
32mm diameter
18
80mm diameter
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 18/15
AA 23/09/16
Unit
Quantity
Rate
Allow for all costs for the modification of the existing Item
motor control centre (MCC); all in accordance with the
Specification and as shown on the Employer's Drawing
No. TS/T16S033/M/6401
Allow for all costs for the provision of labeling and Item
painting for all new and modified mechanical installations
Allow for all cost for testing and commissioning for all Item
new and modified mechanical installations
Allow for all costs for draining off, refilling and repeling Item
air from the affected chilled water system to facilitate the
Works
Allow for all costs for carrying out chilled water Item
balancing, air balancing and air flow measurement upon
completion of the Works
Allow for all costs for all other associated builder's works Item
in connection with mechanical installations; including
forming wall/slab openings, reinstatement and making
good of all disturbed areas to match existing
Allow for all costs for the provision of labour, tools and Item
material for carrying out hot tapping works to the existing
chilled water pipes; all in accordance with the
Specification
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 19/15
AA 23/09/16
Unit
Quantity
Rate
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 20/15
AA 23/09/16
Unit
Quantity
nr
nr
nr
set
Rate
FIRE SERVICES
SPRINKLER SYSTEM
Dismantle and remove from Site
A
Sprinkler head
Relocate and modify the existing sprinkler system and/or
equipment including pipework, fittings and all associated
accessories; all in accordance with the Specification and
as shown on the Employer's Drawing Nos.
TS/T16S033/F/8101, 8102, 8201 and 8202
Sprinkler head
Design, supply and install sprinkler system including
sprinkler heads, pipeworks, couplings, bends, tees,
sockets, nipples, reducers, lockouts, plugs, saddles,
hangers, brakcets and all necessary accessories and
connection to the existing fire services pipes; all in
accordance with the Specification and as shown on the
Employer's Drawing Nos. TS/T16S033/F/8101, 8102,
8201 and 8202
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 21/15
AA 23/09/16
Unit
Quantity
Rate
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 22/15
AA 23/09/16
Unit
Quantity
nr
Rate
Smoke detector
Relocate and modify the existing AFA system and/or
equipment including VAC interface control modules,
probe type smoke detectors installed inside return air
ductwork, break glass unit, alarm bell, signal cables,
conduits, fittings and all associated accessories; all in
accordance with the Specification and as shown on the
Employer's Drawing Nos. TS/T16S033/F/8101, 8102,
8201 and 8202
nr
Smoke detector
nr
nr
nr
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 23/15
AA 23/09/16
Unit
Quantity
Rate
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 24/15
AA 23/09/16
Unit
Quantity
Rate
Allow for all costs for the draining off, repeling and Item
refilling of the sprinkler and fire hydrant systems to
facilitate the fire services modification and installations
Allow for all costs for the isolation and reactivation of the Item
fire services system to facilitate the fire services
modification and installations
Allow for all costs for the modification of the existing fire Item
services system to suit the new fire services installations
including all connection works to the existing system
Allow for all costs for the provision of labeling and Item
painting for all new and modified fire services
installations
Allow for all cost for testing and commissioning for all Item
new and modified fire services installations
Allow for all cost for the enabling works for the execution Item
of the fire services works
Allow for all costs for all other associated builder's works Item
in connection with fire services installations; including
forming wall/slab openings, reinstatement and making
good of all disturbed areas to match existing
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 25/15
AA 23/09/16
Unit
Quantity
Rate
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 26/15
AA 23/09/16
Unit
Quantity
Rate
ADDITIONAL ITEMS
A
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 27/15
AA 23/09/16
Unit
Quantity
Rate
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 28/15
AA 23/09/16
Unit
Quantity
Rate
COLLECTION - PART 2
From page Part 2 1/15
From page Part 2 2/15
From page Part 2 3/15
From page Part 2 4/15
From page Part 2 5/15
From page Part 2 6/15
From page Part 2 7/15
From page Part 2 8/15
From page Part 2 9/15
From page Part 2 10/15
From page Part 2 11/15
From page Part 2 12/15
From page Part 2 13/15
From page Part 2 14/15
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 29/15
AA 23/09/16
Unit
Quantity
Rate
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 30/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 31/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 32/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 33/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 34/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 35/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 36/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 37/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 38/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 39/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 40/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 41/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 42/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 43/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 44/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 45/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 46/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 47/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 48/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 49/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 50/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 51/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 52/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 53/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 54/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 55/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 56/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 57/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 58/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 59/15
AA 23/09/16
Amount
HK$
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Part 2 60/15
AA 23/09/16
Quantity
Unit
Rate
20
Unskilled labour
hr
10
Joiner
hr
10
Plasterer
hr
20
Electrical fitter (including electrician)
hr
20
Refrigeration/air-conditioning/ventilation
hr
mechanic
20
Fire services mechanic
hr
Total of Daywork: Labour to Total of Schedule of Daywork (D)
Amount
(HK$)
HK$
Provisional Amount
Adjustment Percentage (Contractor to insert + or % and
adjustment amount based on the Provisional Amount and the
inserted %)
Amount (HK$)
5,000.00
HK$
Provisional Amount
Adjustment Percentage (Contractor to insert + or % and
adjustment amount based on the Provisional Amount and the
inserted %)
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
Amount (HK$)
5,000.00
HK$
PDSDW 1/2
AA 23/09/16
Contract T16S033
Partitioning Works at Unit 4MC450 in Midfield Concourse
Appendix 2 to Form of Tender
Pricing Document
HK$
PDSDW 2/2
AA 23/09/16