SIR #

Fit up-1

STAGE INSPECTION REPORT

Job No.:

J-120125

Project:

ASME Demo Vessel

Description:

Air Storage Vessel

Serial No.:

V12001

Drawing No.:

J120125-V11-001-000

Rev.:

ITP No.:

J120125-ITP-001

Rev.:

00

Activity No.:

3.12

Activity Description: Fit up of Half Coupling with End Cap for Nozzle Mark N3 (Weld # N31)
Sketch / Drawing:
Sr.
No.

Attached

Part / Sub Assembly / Assembly

Not Attached
Size(s)
Remarks

No.

Description

As per drg

Actual

Difference

50 + 10, - 0

50

ACCEPTED

02,12

Bevel Angle

02,12

Root Gap

2 ~ 3 mm

2 ~ 3.5 mm

-0, +0.5 mm

ACCEPTED

02,12

Root Face

1 mm

1 mm

0 mm

ACCEPTED

02,12

Misalignment

ACCEPTED

0
0
0
0
0
0
0
0
0
0
0
0
Inspection Comments:

QC Supervisor/Inspector
Name:

Adeel Omer

Sign:
Date:

2/Apr/12

Exhibit No: 6-2 Rev.0


05-FEB-2012
Sheet 1 of 1

Authorized Inspector

Customer Representative

Name:

Name:

Sign:

Sign:

Date:

Date: