You are on page 1of 1

Report No.

Weld Repair Report

Client:

Subcontractor:

Project No.:

Subcontract P.O. No.:

Project Name:

Weld/repair No.:

Reference document:
1.0

Previous welder Name/No.

Date of initial weld:

2.0

Initial NDT carried out

Report No.:

Yes

No

3.0

Repair welder Name No.

Date of repair:

4.0

Company witnessed repair

Name of witness:

Yes

5.0

No

NDT after repair


Yes

6.0

Report No.:
No

Weld accepted after repair


By S/C
Yes

7.0

By Company
No

Yes

No

Copies of NDT reports attached:


Yes

8.0

Report No(s).:

No

Other attachments:
Yes

Attach. No(s).:
No

Remarks:

Attachments, No. of pages:

Accepted for Subcontractor


Name:

Signature:
Date:

Accepted for Company


Name:

Signature:

C:\RB_Forms\RB26C31.DOT\

Date:

Accepted for Client


Name:

Signature:

Date:

www.red-bag.com

You might also like