Inspection & Test Record For Bus Bar-HV Switchgear
Inspection & Test Record For Bus Bar-HV Switchgear
Assemblies - HV Switchgear
Client:
Subcontractor:
Project No.:
Project Name:
Substation No.:
Record No.:
page 1 of 2
Additional Information:
Manufacturer:
Section:
P.O. No.:
System Voltage
Location:
Rating:
Switchboard No.:
Reference Document:
Subcontractor
Items to inspect
inspected
initials/date
Company
Hold
Point
Remarks
inspected*
initials/date
Note: Tests marked (C) are required for precommissioning inspection only
1.0
Leakage current mA
3.0
Signature:
Date:
Signature:
Date:
Signature:
Date:
C:\RB_Forms\RB26E11.DOT\
www.red-bag.com
Subcontractor:
Project No.:
Project Name:
Substation No.:
Record No.:
page 2 of 2
Additional Information:
Manufacturer:
Section:
P.O. No.:
System Voltage
Location:
Rating:
Switchboard No.:
Reference Document:
Subcontractor
Items to inspect
inspected
initials/date
4.0
Company
Hold
Point
Remarks
inspected*
initials/date
Earthing system:
Check the conditions of ...........................
earthing bar and connections
Measure the continuity of ..............................
earthing bar to main earth
5.0
6.0
Signature:
Date:
Signature:
Date:
Signature:
Date: