You are on page 1of 7

ISSN 1738-480X (Print)

ISSN 2288-3592 (Online)


Journal of the Korea Society of Systems Engineering
vol.9, No.1: 25p~31p, June 2013

A Study on a Modified Documentation Set based on Systems


Engineering for Unitary Development Phase of an Weapon System
Il Sung, Jin Seok Kim and Bong Ki Lee
Agency for Defense Development

Abstract : In this paper, we have analyzed documentation cases since DAPA establishment, in which
documents must be produced as a result of weapon system development corresponding to systems
engineering procedures. To develop documentation materials based on systems engineering, instructions of
DAPA and US military standards that define development phases, are presented and analyzed in the point of
standardizing documents. As a result, we propose a kind of documentation based on systems engineering
which is essential for the weapon system development.

Key Words : Systems Engineering(), Documentation Case(), Development Phase(


), Weapon System Development()

* corresponding author : Il Sung, Agency for Defense Development, isung@add.re.kr


* This is an Open-Access article distributed under the terms of the Creative Commons Attribution
Non-Commercial

License(http://creativecommons.org/licenses/by-nc/3.0) which permits unrestricted non-

commercial use, distribution, and reproduction in any medium, provided the original work is properly cited.

25

9 1. 2013. 6

1.

[5] , ,
.

) ( )

(SP, Summary Plan),

[1-3].

, ,

(FSDP, Full Scale De-

velopment Plan)

2007

(SDP, Software De-

velopment Plan) .

(systems engineering)

(DTP, Development Test Plan)

[3],

(DTR, Development Test Report)

[4].

(OTP,

Operational

(20092020,

Test Plan) (OTR,

-III ) ,

Operational Test Report)

(KDS, Korea Defense Specification),

[5-6]

(QAR, Quality Assurance Require-

[7-8]

ment), (drawing), (DL, Data List)

1 2

(SRS, Software Requirement Specifi-

cation), (IRS, Interface Re-

quirement Specification),

(SDD, Software Design Description),

, 3 -III

(IDD, Interface Design Description),

4 .

(DBDD, Data Base Design


Description), (STD, Soft-

2.

ware Test Description),


(STR, Software Test Report),

2.1
1)

1)

26

(SPS, Software Product Specification),


(SVD, Software Version
Description), (FSM, Firmware

9 1. 2013. 6

Support Manual)

(LOA, Letter Of

(tailoring)

Agreement)

11

(DR, Development Re-

(LOA),

port) , ()

(PTEMP, Preliminary Test & Evaluation

Management Plan),

. 1

(RFP, Request

< 1>

for Proposal), ,

, ,

SP

(WBS, Work Breakdown Structure),

FSDP

(ILS-P, Integrated Logistics Support Plan)

SDP

S/W

DTP

DTR

OTP

OTR

KDS


.

.

QAR

drawing

DL

SRS

S/W

IRS

I/F

SDD

S/W

IDD

I/F

DBDD

DB

(SRR, System Requirement Review / SFR,

STD

S/W

System Functional Review)

STR

S/W

SPS

S/W

SVD

S/W

FSM

Firmware

(STP, Software Test Plane) ,

DR


()
() 8

[7-9].


(SDP)

(SRS) (IRS)
2.2
2)

.
/(PDR,

[3-9]

Preliminary Design Review / CDR, Critical

Design Review)

(SDD), (IDD),

2)

27

9 1. 2013. 6

(DBDD)

< 2>

(SPS)

LOA

PTEMP

TEMP


RFP

(TEMP, Test and Evaluation Master Plan)

(TRR, Test Readi-

ness Review)

(STD)

WBS

(STR) .

ILS-P


(FSM),

(TEMP)
(DTP,
Evaluation

Development

Plan)

Test

and

(OTP,

S/W

STP

S/W

SRS

S/W

IRS

I/F

SDD

S/W

PDR/

IDD

I/F

CDR

DBDD

DB

SRR/
SFR

(SVD)
(SIP, Software Installation Plan) .

SDP

Operational Test and Evaluation Plan)


.

SPS

S/W

STD

S/W

STR

S/W

TEMP

(TDP, Technical Data Package)

,
,

(TM, Technical Manual)


. 2
.

DTP

DTR

OTP

OTR

FSM

Firmware

SVD

S/W

SIP

S/W

3.
TDP

- KDS, , DL,
SW,
S/C, QAR

/ ,

SEI(System Engineering Institute)

CMMI(Capability Maturity Model

Integration) 3

,
.

28

TM


10 /

9 1. 2013. 6

and

(, ) 1

Supplier Agreement Management Plan),

(RMP, Risk Management Plan)

Control

Plan),

(SAMP,

(RDP, Requirement Development

(WBS),

Plan) (REQMP, Requirement

(WBS Dictionary), (SOW,

Management Plan), / (TSP,

Statement Of Work),

Technical Solution Management Plan),

(CDA, Context Diagram Analysis),

(PIP, Project Integration Plan), /

(BDA, Behavior Diagram Analysis),

(VVP, Verification and Validation Plan)

(SSP, Simulation Support

, / (Measurement

Plan),

and

(ILS-P) .

Decision Analysis and Resolution Plan),

Analysis

Plan),

(DARP,

(PPQAP, Process and Product Quality Assurance

Plan) (CMP, Configuration Management

, CDRL(Contract Data Re-

Plan) .

quirements List)

(PMP, Project Management Plan),

(EVMP, Earned Value Management Plan)

(SEMP, System Engineering Management

(DMP, Data Management Plan)

Plan), (PMCP, Project Monitoring

[ 1] -III

29

9 1. 2013. 6

(OT&E, Operational

(OCD,

Test and Evaluation)

Operational Concept Description),

(), , /

(URS, User Requirements Specification),

(SSS, System Sub- system Specification)

(TRR)

(PMP,

SEMP) .

, ,

/(SSDD,

System Subsystem Design Descrip- tion),


(IRS), (ICD, Interface

4.

Control Description), (PTEMP)


(HRS/SRS),

(HDP/SDP)

-III

(HTP/STP)

CMMI 3

(SITP, System Integration Test Plan)

(DBDD),

(IDD), (HDD),

(SDD),

, ILS .

FAT(Factory Acceptance Test)

(SITD),

(SITR), (SPS),

(STD), (STR),

(HTD), (HTR)

(SVD),

(DT&E, Development Test and

Evaluation) (),

, , ,

30

9 1. 2013. 6

2, pp.73-79, 2008 4.

References

6. , (-I
1. 733, , 2003.

), 2008 (/
),

5.13.
2. 1388, ,

, pp.74-84, 2008.9.23.
7. 2009-17,

2012.2.3.
3. 216, ,

, 2009.2.5.
8. 2011-26,

2013.4.15.
4. , (),

, 2011.8.26
9. 2006-9,

2009.11.
5. 2,

, 2006.1.25.

, , 11,

31

You might also like