BILL OF QUANTITY
BOOK No.2
Sarajevo, 2015.
BILL OF QUANTITIES
I.
PREAMBLE
The Tenderers shall price separately each Item in the Bills of Quantities (B/Q) including all alternative
designs for works where applicable and shall follow the instructions regarding transfer of alternative totals of
the summary given in the B/Q.
The B/Q must be read with all the other Contract Documents and the Contractor shall be deemed to have
thoroughly acquainted himself with the detailed descriptions of the works to be done and the way in which
they are to be carried out. The whole of the works is to be executed to their true intent and meaning and to the
entire satisfaction of the Engineer.
1. Measurement of Quantities
1.1 Quantity of Items
The quantities set forth against the Items in each Bill are an estimate of the quantity of each kind of the work
likely to be carried out under the Contract and are given for the convenience of forming a common basic for
bids. There is no guarantee to the Contractor that he will be required to carry out the quantities of work
indicated under any one particular items in the B/Q or that the quantities will not differ in magnitude from
those stated in the Bills.
The brief descriptions of items given in the B/Q are purely for the purpose of identification and it shall in no
way modify or supersede the detailed description given in the Conditions of Contract or Specifications. When
pricing items, reference should be made to the Conditions of Contract, Specifications and relevant drawings
for directions and descriptions of works and materials involved.
The quantities given in the B/Q are provisional, as estimated on the basis of Detailed Designs, which have
been taken as a basis for the present Tender Documents and are given to provide a common basis for Bidding.
The Tenderers shall consider carefully all things included in the tender Documentation in order to make their
Tenders aware of all responsibility.
Except where specifically and expressly otherwise stated in the Technical Specifications or in the B/Q, the
Permanent Works only shall be measured. The works shall be measured net to the dimensions shown on the
Drawings or ordered in writing by the Engineer, except where otherwise specifically described or prescribed
in the Contract.
In adjusting extras or variations on the Contract, the works shall be measured on the same basis as that for
which the quantities have been prepared and all works not specifically mentioned in the bill will be taken as
included in the prices of various items.
Where in the opinion of the Engineer extra works cannot be properly measured or valued, the Contractor, if so
directed by the Engineer, shall carry out the work at daywork rates which shall be rates shown in the Schedule
of daywork. The Engineer must sign on all completed daywork sheets before the end of week in which the
work is executed.
No allowance will be made for loss of materials or volume thereof during transport or compacting.
3. Pricing
The prices and rates inserted in the B/Q are to be the full inclusive values of the works described under the
items, including all costs and expenses which may be required in and for the construction of the Works
described together with any temporary works and installations which may be necessary and all general risks,
liabilities and obligations set forth or implied in the documents on which the Bid is based. It will be assumed
that establishment charges, overheads, profit and allowances for all obligations are spread evenly over all the
unit rates.
Rates and prices shall be entered against each item in the B/Q. The rates shall cover all tax, duty or other
liabilities, which are gross, stated separately in the B/Q and Tender.
Description of works
General items
Alternative Roads
Alignment Section 2
Signalling
Relocation of Lighting
Utility relocation (water supply)
Utility relocation (sewerage)
Utility relocation (mixed sewer redesigned)
Poles of overhead line
Poles of overhead line - Roundabout
emerlia
Specification of poles
Suport structures - landslides rehabilitation
Wall 1
Wall 2
Wall 3
Wall 4
Rondo indoor plumbing and sewerage
Roundabout water supply
Roundabout sewerage system
Roundabout drainage
Subway Architecture
Subway Ventilating
Subway El. Installations
Trolleybus overhead line - electrical works
Traffic lighting for crossroads
Total (from A to R) (excluding VAT)
Contingencies
Total [X1+X2]
VAT 17%
Total contract price [X3+X4]
Price in words:
Y1
X5
Y2
H.
POS
Description
Position
SPECIAL REQUIREMENTS
Establishment of Engineer's offices including
A1
equipment
A2
Maintain Engineer's offices
A3
Remove Engineer's offices
A4
Provide Contractor's Site Establishment
A5
Maintain Contractor's Site Establishment
Remove Contractor's Site Establishment on
A6
completion
A7
Usage of vehicles for Engineer's staff
A8
Maintenance of vehicles for Engineer's staff
A9
Provide Laboratory with special equipment
A10
Operate and maintain Laboratory
A11
Remove Laboratory on completion
Preparation of As-Built drawings by the
A12
Contractor
Laboratory investigations and reports for
A13
geotechnical, road bed, pavement and
structures
A14
Traffic regulation during construction
A15
Provision of Permits for Works
Provide and implement Environmental
A16
Management and Monitoring plan
A17
Personal Protective Equipment
A18
Communication Equipment
A19
Survey Equipment
Providing IT and telecommunications
equipment for the Head of Project and
coordinator from investors (3 persons). The
item includes the purchase of portable
computers (laptops 2x) and procurement of
A20
three mobile phones (smart) with numbers
with the possibility of using mobile Internet, as
well as the cost of using mobile phones and
mobile internet for the duration of the contract
for all three numbers.
Cost for diversion and protection of public
A20
utilities during the implementation of the
project
10% uplift for the cost for diversion and
A21
protection of public utilities during the
implementation of the project
Unit
Quantity
L.Sum
1,00
month
L.Sum
L.Sum
month
12,00
1,00
1,00
12,00
L.Sum
1,00
L.Sum
month
L.Sum
month
L.Sum
1,00
12,00
1,00
12,00
1,00
L.Sum
1,00
L.Sum
1,00
L.Sum
L.Sum
1,00
1,00
L.Sum
1,00
L.Sum
month
month
1,00
1,00
1,00
L.Sum
1,00
P.Sum
1,00
P. Sum
1,00
Unit rate in
[]
Amount in []
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
ALIGNMENT
TRASA
SECTION 2 - ALTERNATIVE ROADS
(Gradaaka,Prijedorska,Kraljice Jelene i
Azize airbegovi)
DIONICA: Gradaaka-Prijedorska L=186 m
BILL OF QUANTITIES / PREDMJER RADOVA
No. ITEM
DESCRIPTION OF WORKS
UNIT
R.B POZ
VRSTA RADA
J/M
UNIT
QUANTIT
PRIC
Y
E
KOLIIN J/C
A
EUR
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
km
0,25
m2
384,00
m2
1.183,71
m1
56,00
m1
378,00
TOTAL
EUR
UKUPNO
EUR
12 391
12 392
5
1251
12511
m1
300,00
101,00
m1
m2
1.183,71
lump
sum
paus
Subgrade formation
Planum temeljnog tla
Arrangement
compacting
of
subgrade
formation/upper surface of the foundaion soil
(subgrade compacting, working lane):
Ureenje - zbijanje planuma/gornje povrine
temeljnog tla (zbijanje podtla, radna staza):
c) incoherent soil, category 3b / nekoherentni
22113
zemljani materijal, kategorija 3b
2.2.2.5
m3
701,36
m2
1.183,71
m2
119,00
3. PAVEMENT STRUCTURES
3. KOLOVOZNE KONSTRUKCIJE
Unbound roadbases
Nevezani nosivi slojevi
10
m3
734,48
m2
1.183,71
m2
384,00
11
12
13
32634
m2
2.367,42
m2
2.367,42
2.367,42
m1
m1
327,00
108,00
pcs
kom
14,00
350,00
14
15
16
35224
4. DRAINAGE
4. ODVODNJAVANJE
Shafts
ahtovi
17
18
19
pcs
14,00
19
14,00
Izrada novih kaca. Poklopac uvuenog slivnika prema
DIN 19596-600, klase nosivosti B 125 according to
DIN EN 124 / DIN 1229. Svijetlog otvora 600 mm,
graevinske visine 35 mm. Ram od livenog eljeza,
okrugli poklopac kombinacija livenog eljeza i
betonske ispune teine ca. 60,0 kg
20
21
22
kom
pcs
14,00
kom
pcs
kom
9,00
pcs
9,00
kom
TOTAL DARAINAGE:
SVEGA ODVODNJAVANJE:
5. ROAD MARKINGS
5. SAOBRAAJNA OPREMA I SIGNALIZACIJA
62412
m1
229,00
m1
11,00
m1
60,00
24
m1
24,00
m1
88,00
m2
186,00
m2
22,00
m2
6,00
25
Izrada strelice duine 5 m od debeloslojne oznake
na
kolovozu s viekomponentnom hladnom
plastikom sa umjeanim komadiima / kuglicama
stakla, ukljuujui 200 g/m2 dodatnoga posipa s
komadiima stakla, mainski, debljina sloja 3 mm
One-way, 5 m long / Jednosmjerne, duine 5 m.
pcs /kom
Two-way, 5 m long / Dvosmjerne, duine 5 m.
pcs /kom
13,00
16,00
OPREMA
RECAPITULATION
REKAPITULACIJA
1
2
3
4
5
PREPARATORY WORKS
PRIPREMNI RADOVI
EARTH WORKS AND FOUNDATION
ZEMLJANI RADOVI I TEMELJENJE
PAVEMENT STRUCTURES
KOLOVOZNE KONSTRUKCIJE
DRAINAGE
ODVODNJAVANJE
ROAD MARKINGS
SVEGA
SAOBRAAJNA
OPREMA
SIGNALIZACIJA:
TOTAL:
UKUPNO:
3,00
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
UNIT
QUANTIT
UNIT
PRIC
Y
E
KOLIIN J/C
J/M
A
EUR
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
km
0,25
m2
1.796,00
m2
3.049,00
m1
10,00
m1
200,00
m1
1.608,00
m2
3.426,50
1251
TOTAL
EUR
UKUPNO
EUR
lump
sum
paus
Subgrade formation
Planum temeljnog tla
Arrangement
compacting
of
subgrade
formation/upper surface of the foundaion soil
(subgrade compacting, working lane):
Ureenje - zbijanje planuma/gornje povrine
temeljnog tla (zbijanje podtla, radna staza):
c) incoherent soil, category 3b / nekoherentni
22113
zemljani materijal, kategorija 3b
2.2.2.5
m3
1.524,25
m2
3.049,00
m2
120,00
3. PAVEMENT STRUCTURES
3. KOLOVOZNE KONSTRUKCIJE
Unbound roadbases
Nevezani nosivi slojevi
10
m3
1.650,25
m2
522,00
m2
1.796,00
m2
2.526,50
m2
5.953,05
m2
522,00
11
12
13
14
15
15
16
17
32634
m2
522,00
m2
3.426,50
m2
3.426,50
m1
m1
1.186,00
722,00
pcs
kom
19,00
350,00
18
4. DRAINAGE
4. ODVODNJAVANJE
Shafts
ahtovi
19
20
21
pcs
19,00
21
19,00
Izrada novih kaca. Poklopac uvuenog slivnika prema
DIN 19596-600, klase nosivosti B 125 according to
DIN EN 124 / DIN 1229. Svijetlog otvora 600 mm,
graevinske visine 35 mm. Ram od livenog eljeza,
okrugli poklopac kombinacija livenog eljeza i
betonske ispune teine ca. 60,0 kg
22
23
24
25
26
kom
pcs
19,00
kom
pcs
kom
pcs
5,00
14,00
kom
pcs
kom
3,00
pcs
15,00
kom
27
660,00
m3
396,00
28
29
30
31
m3
99,00
m3
277,20
13,00
15,00
m1
790,00
m1
0,00
m1
25,00
m1
25,00
m1
70,00
TOTAL DARAINAGE:
SVEGA ODVODNJAVANJE:
5. ROAD MARKINGS
5. SAOBRAAJNA OPREMA I SIGNALIZACIJA
Machine execution of thick-layer longitudinal
carriageway marking with multi-component cold
plastic with admixed glass beads, including
additional spreading of 200 g/m2 of glass beads,
dry film thickness 3 mm
62412
32
33
Izrada
debeloslojne
poprene
i
ostalih
oznaka
na
kolovozu
s viekomponentnom
hladnom plastikom sa umjeanim komadiima /
kuglicama stakla, ukljuujui 200 g/m2 dodatnega
posipa s komadiima stakla, mainski, debljina sloja
3 mm, irina crte 50 cm
a) width line 50 cm / irina crte 50 cm (pedestrian
crossings) / (pjeaki prelazi). (Calculation of the
surface caused mass) / (obraun po povrini
nanesene mase)
b) width line 50 cm / irina crte 50 cm (stop lines) /
(stop linije)
m2
72,00
m2
12,00
m2
0,00
8,00
4,00
35
OPREMA
2,00
RECAPITULATION
REKAPITULACIJA
1
2
3
4
5
PREPARATORY WORKS
PRIPREMNI RADOVI
EARTH WORKS AND FOUNDATION
ZEMLJANI RADOVI I TEMELJENJE
PAVEMENT STRUCTURES
KOLOVOZNE KONSTRUKCIJE
DRAINAGE
ODVODNJAVANJE
ROAD MARKINGS
SVEGA
SAOBRAAJNA
OPREMA
SIGNALIZACIJA:
TOTAL:
UKUPNO:
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
UNIT
QUANTIT
UNIT
PRIC
Y
E
KOLIIN J/C
J/M
A
EUR
TOTAL
EUR
UKUPNO
EUR
m2
100,00
m2
5.447,50
m1
50,00
80,00
m1
m1
850,00
m2
100,00
lump
sum
paus
m3
669,75
Subgrade formation
Planum temeljnog tla
Arrangement
compacting
of
subgrade
formation/upper surface of the foundaion soil
(subgrade compacting, working lane):
Ureenje - zbijanje planuma/gornje povrine
temeljnog tla (zbijanje podtla, radna staza):
c) incoherent soil, category 3b / nekoherentni
22113
zemljani materijal, kategorija 3b
m2
250,00
m2
800,00
m3
669,75
m2
5.447,50
3. PAVEMENT STRUCTURES
3. KOLOVOZNE KONSTRUKCIJE
Unbound roadbases
Nevezani nosivi slojevi
10
11
12
13
m2
100,00
m2
5.447,50
m2
100,00
m2
100,00
m1
850,00
pcs
kom
27,00
800,00
14
15
of
cement
concrete
raised
kerb
16
section:
Izrada izdignutog ivinjaka iz cementnog betona
skupa sa podlogom i fugovanjem presjeka:
a) 18/24cm
TOTAL PAVEMENT STRUCTURES:
SVEGA KOLOVOZNE KONSTRUKCIJE:
4. DRAINAGE
4. ODVODNJAVANJE
Shafts
ahtovi
17
18
18
19
20
21
22
23
TOTAL DARAINAGE:
SVEGA ODVODNJAVANJE:
5. ROAD MARKINGS
5. SAOBRAAJNA OPREMA I SIGNALIZACIJA
Machine execution of thick-layer longitudinal
carriageway marking with multi-component cold
plastic with admixed glass beads, including
additional spreading of 200 g/m2 of glass beads,
dry film thickness 3 mm
800,00
pcs
27,00
kom
pcs
27,00
kom
pcs
kom
20,00
pcs
20,00
kom
pcs
kom
3,00
62412
24
m1
650,00
m1
0,00
m1
0,00
m1
0,00
m1
420,00
m2
120,00
m2
20,00
25
m2
0,00
16,00
10,00
27
OPREMA
0,00
RECAPITULATION
REKAPITULACIJA
1
2
3
4
5
PREPARATORY WORKS
PRIPREMNI RADOVI
EARTH WORKS AND FOUNDATION
ZEMLJANI RADOVI I TEMELJENJE
PAVEMENT STRUCTURES
KOLOVOZNE KONSTRUKCIJE
DRAINAGE
ODVODNJAVANJE
ROAD MARKINGS
SVEGA
SAOBRAAJNA
OPREMA
SIGNALIZACIJA:
TOTAL:
UKUPNO:
RECAPITULATION
REKAPITULACIJA
1
2
3
4
5
PREPARATORY WORKS
PRIPREMNI RADOVI
EARTH WORKS AND FOUNDATION
ZEMLJANI RADOVI I TEMELJENJE
PAVEMENT STRUCTURES
KOLOVOZNE KONSTRUKCIJE
DRAINAGE
ODVODNJAVANJE
ROAD MARKINGS
SVEGA
SAOBRAAJNA
OPREMA
SIGNALIZACIJA:
TOTAL:
UKUPNO:
DESIGN SUPERVISION OF WORKS 1.5%
PROJEKTANTSKI NADZOR 1.5%
TOTAL WORKS:
UKUPNO RADOVI:
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
ALIGNMENT
TRASA
SECTION 2: FROM P51 TO P112
DIONICA 2: OD P51 DO P 112
BILL OF QUANTITIES / PREDMJER RADOVA
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
KOLIINA
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
Clearing of construction site
ienje terena
80,00
66,00
17,00
2,00
62,00
18,00
J/C EUR
UKUPNO EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
J/M
12 211
12 222
10
12 223
11
12 252
12
12323
13
12383
14
12391
15
12 476
pcs
Dismantling of traffic sign on one socle
Demontaa saobraajnog znaka na
kom
jednom stalku
Dismantling of informational board of
pcs
an area between 1.1 m2 to 3 m2
Demontaa informativne table povrine 1,1
do 3 m2
kom
Dismantling of informational board of
pcs
an area above 3 m2
Demontaa informativne table povrine
preko 3 m2
kom
Dismantling of protective fence of
height between 1.1 m and 1.5 m
Demontaa zatitne ograde visine 1,1 do
1,5 m
made of concrete
m1
od lgustruma
made of steel wire
m1
od eline ice
Demolition and removal of asphalt
surfacing in a thickness above 10 cm
m2
Ruenje i uklanjanje asfaltnih zastora u debljini:
c) preko 10cm
Cutting asphalt layer with floor diamond
saw in a thickness between 11 cm and
15 cm
m1
Rezanje asfaltnih slojeva sa podnom dijamantnom
pilom, debljine:
c) 11 do 15cm
Demolition and removal of cement
concrete kerb
Ruenje i uklanjanje ivinjaka od cement.
betona
m1
- 18/24 cm
m1
- 10/15 cm
Demolition and removal of cement
concrete wall
m2
Ruenje i uklanjanje zida od cementnog
betona
Demolition and removal of structures
Ruenje i uklanjanje objekata
of solid material
m2
KOLIINA
2,00
71,00
8,00
8,00
80,00
40,00
31.591,44
235,00
4.759,00
5.876,00
253,00
J/C EUR
UKUPNO EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
16
- od tvrdog materijala
of the weak material
- od slabog materijala
concrete stairs
betonskog stepenita
12485
prefabricated newsstand with concrete
foundations 3x5 m
-montani kiosk sa betonskim temeljima
3x5 m
2 canopy on stops JGS 2x5m
- pet nadstrenica na stajalitima JGS 2x5 m
1 canopy for garbage 1x8 m
- jedna nadstrenica za smee 1x8 m
J/M
m2
m2
m2
m2
m2
KOLIINA
7.742,00
112,00
57,00
30,00
22,00
8,00
17
pcs
kom
69,00
18
19
20
m3
4.265,74
m3
54.757,37
m3
280,00
J/C EUR
UKUPNO EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
21
KOLIINA
m3
787,44
m2
38.132,00
m2
940,72
m3
2.013,68
m2
5.136,45
m2
26.478,50
Subgrade formation
Planum temeljnog tla
22
23
24
25
26
J/C EUR
UKUPNO EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
27
25137
KOLIINA
m2
8.426,54
m3
75.113,19
Prijevoz
iskopanog
materijala
na
udaljenost preko 10000m
TOTAL
EARTH
WORKS
AND
FOUNDATION:
SVEGA
ZEMLJANI
RADOVI
I
TEMELJENJE:
3. PAVEMENT STRUCTURES
3. KOLOVOZNE KONSTRUKCIJE
Unbound roadbases
Nevezani nosivi slojevi
29
30
m3
16.316,00
m3
2.142,00
m2
31.149,03
Bound Subbases
Vezani donji nosivi slojevi
31
Execution
of
cement
bound
(stabilized) sub-base of crushed-stone
in a thickness of 20 cm
31228
Izrada
sa
cementom
vezanog
(stabiliziranog)nosivog sloja drobljenca u
debljini:c) 20cm
J/C EUR
UKUPNO EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
32
KOLIINA
m2
m2
27.756,75
27.756,75
m2
5.313,00
m2
27.756,00
m2
12.644,02
33
34
35
32265
m2
J/C EUR
UKUPNO EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
J/M
KOLIINA
m2
6.646,00
m1
m1
6.299,00
3.218,00
37
4. DRAINAGE
4. ODVODNJAVANJE
Surface drainage
Povrinsko odvodnjavanje
38
m1
39
Execution
of
longitudinal
and
transverse drainage of depth up to 4.0
42134 m, on cement concrete unerlay course, m1
with flexible perforated pipes PHED of
15 cm diameter
791,50
J/C EUR
UKUPNO EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
KOLIINA
J/C EUR
4.276,00
40
41
pcs
pcs
41,00
102,00
42
51331
m2
1.218,30
kg
35.550,00
m3
355,50
43
44
52223
Supply and placing ribbed wires of highperformance naturally hard steel 0551 RA 400/500-2 of diameter up to 12 mm,
for complex reinforcement
UKUPNO EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
KOLIINA
45
46
RECAPITULATION
REKAPITULACIJA
1
2
3
4
5
6
PREPARATORY WORKS
PRIPREMNI RADOVI
EARTH WORKS AND FOUNDATION
ZEMLJANI RADOVI I TEMELJENJE
PAVEMENT STRUCTURES
KOLOVOZNE KONSTRUKCIJE
DRAINAGE
ODVODNJAVANJE
CIVIL AND CRAFTSMEN WORKS
GRAEVINSKI I ZANATSKI RADOVI
OTHER WORKS
OSTALI RADOVI
TOTAL:
UKUPNO:
DESIGN SUPERVISION OF WORKS
1.5%
PROJEKTANTSKI NADZOR 1.5%
TOTAL WORKS:
UKUPNO RADOVI:
46,00
354,00
J/C EUR
UKUPNO EUR
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
TRAFFIC SIGNALIZATION AND EQUIPMENT
SAOBRAAJANA SIGNALIZACIJA I OPREMA
SECTION 2: FROM P51 TO P112
DIONICA 2: OD P51 DO P 112
BILL OF QUANTITIES / PREDMJER RADOVA
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
R.B
POZ
VRSTA RADA
J/M
KOLIINA
93.
10.1.
ROAD EQUIPMENT
OPREMA PUTA
m1
m1
pcs
kom
pcs
kom
550,00
5,00
5,00
pcs
140,00
kom
2. TRAFFIC SIGNALIZATION
2. SAOBRAAJNA SIGNALIZACIJA
101.
10.2.
102.
10.2.1.
TRAFFIC SIGNALIZATION
10.2 SAOBRAAJNA
SIGNALIZACIJA
Traffic signs with poles
UNIT
PRICE
J/C
EUR
TOTAL
EUR
UKUPNO
EUR
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
R.B
POZ
VRSTA RADA
J/M
KOLIINA
102.
10.2.1.
103.
pcs
119,00
kom
pcs
10,00
kom
pcs
7,00
kom
pcs
4,00
kom
pcs
43,50
kom
m1
620,00
UNIT
PRICE
J/C
EUR
TOTAL
EUR
UKUPNO
EUR
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
R.B
POZ
VRSTA RADA
J/M
KOLIINA
2.
m2
801,00
VARIOUS WORKS
RAZNI RADOVI
a. Construction of foundation for
traffic signs
a. Izrada temelja saobraajnih
znakova
b. Construction of foundation for
informative signs IV-10, ccording
to attached detail 2.8.
b. Izrada temelja za znakove
obavjetenja IV-4 prema detalju
1.
m1
RECAPITULATION:
REKAPITULACIJA:
ROAD EQUIPEMENT:
OPREMA PUTA:
TRAFFIC SIGNS AND MARKINGS
SAOBRAAJNA SIGNALIZACIJA
TOTAL :
UKUPNO:
DESIGN SUPERVISION OF
WORKS 1.5%
PROJEKTANTSKI NADZOR 1.5%
TOTAL
SIGNALING
AND
EQUIPMENT:
UKUPNO
SIGNALIZACIJA
I
OPREMA:
pcs
kom
pcs
32,00
kom
UNIT
PRICE
J/C
EUR
TOTAL
EUR
UKUPNO
EUR
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
RELOCATION (RECONSTRUCTION) OF PUBLIC LIGHTING
IZMJETANJA (REKONSTRUKCIJA) JAVNE RASVJETE
SECTION 2: FROM P51 TO P58
DIONICA 2: OD P38 DO P 58
BILL OF QUANTITIES: EQUIPMENT, MATERIAL AND WORKS
PREDMJER OPREME, MATERIJALA I RADOVA
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
1.1.
1.2.
pcs /
kom
4,00
pcs
24,00
2.
3.
4.
5.
pcs
4,00
kom
4,00
28,00
36,00
set
6.1.
24,00
Isporuka i montaa na stub vanjske rasvjete
sa jednom i dvije lire (visina 10m) svjetiljke za
ulinu rasvjetu sa LED izvorom svjetlosti tipa
kompl
kao TECEO 2 56LED / 5102 / 123W / 700mA
et
/ NW, Minel-schreder ili ekvivalent. Svjetiljka
omoguava
kontinuirano
bezstepeno
slabljenje fluksa
Delivery and installation to the external
lighting pole with one and two lire (height
10m) lamps for street lighting with LED
light source type TECEO 2 56LED / 5117 /
set
123W / 700mA / NW, Minel-Schreder or
equivalent. All complete with the original
light.
6.2.
7.
8.
9.
10.
12,00
Isporuka i montaa na stub vanjske rasvjete
sa jednom i dvije lire (visina 10m) svjetiljke za
ulinu rasvjetu sa LED izvorom svjetlosti tipa
kompl
kao TECEO 2 56LED / 5117 / 123W / 700mA
et
/ NW, Minel-schreder ili ekvivalent. Svjetiljka
omoguava
kontinuirano
bezstepeno
slabljenje fluksa
Supply and laying of cables in the ditch
and partially JC 100 mm for the supply
of public lighting.
Isporuka i polaganje kablova u zemljani rov i
m
djelimino u J.C f 100 mm za napajanje javne
rasvjete.
- PP00-A 4x 25 + 2,5 mm2
Supply and laying of tape Fe/Zn mm in
trench along the cables of external
lighting.
m
Isporuka i polaganje eljezno- pocinane
trake Fe/Zn 25x4 mm u zemljani rov uz
kablove vanjske rasvjete.
Making of conectors on poles with tape Fe
/ Zn 25x4 mm
pcs
Izrada prikljunih mjesta na stubovima
pocinanom trakom Fe/Zn 25x 4 mm
kom
Delivery and installation of cross link
60x60 for mutual connecting of tapes
including bitumen pouring
pcs
Isporuka i ugradnja ukrsnog komada 60x60
za spoj traka-traka sa zalivanjem bitumenom
kom
900,00
850,00
30,00
40,00
11.
12.
13.
14.
17.
2. INSTALLATION TESTING
2.ISPITIVANJE INSTALACIJA
1.
1
-
1.
1.
m3
300,00
3.
4.
2.
5.
m3
set
20,00
kpl
set
3,00
60,00
20,00
sati
6.
Perform the other construction works
set
such as geodetic surveys, staking out the
alignmen, development of design, etc.
Obaviti ostale graevinske radove kao to su
geodetska snimanja, iskolienje trase i kompl
stubnih
mjesta
te
izrada
projektne
et
dokumentacije i sl.
TOTAL CIVIL AND DISMOUNTING WORKS
UKUPNO GRAEVINSKI I DEMONTANI RADOVI
1,00
RECAPITULATION
REKAPITULACIJA
2
3
4
DESCRIPTION OF WORKS
UNIT
R.B POZ
VRSTA RADA
J/M
QUANTIT UNIT
TOTAL EUR
Y
PRICE
KOLIIN
UKUPNO
J/C EUR
A
EUR
1.
2
kom.
topljivi
osigura
6A
- 4 kom. trofazni kontakter 40A, sa pomonim
radnim kontaktom, pula 220VAC, CTACTo+f,
Shneider
Electric
-1 kom. jednopolna dvopaketna grebenasta
preklopka sa poloajem 0,1,2,3; 10A;
-1 kom.aktivno trofazno direktno brojilo
3x220/380V,50Hz,
40
A;
-1 kom. Uklopni sat sa dva kanala i komplet
astronomskim
vremenom;
-1 kom vremenski relej 0-5min sa zatezanjem
uklopa;
220VAC/8A,
tip
RE7-LT11BU
Schneider Electric;
-1 kom pomoni
kontakter 220VAC/10A sa 4 radna kontakta,
CA2, Schneider Electric
-4 kom. signalna arulja 220V,50 Hz
Sve komplet sa temeljom, sabirnicama,
klemama i oienjem.
1,00
1.278,23
1.278,23
2.
3.
4.
5.
118,00
pcs
4,00
4,00
118,00
6.
pcs
kom
set
7.1.
8.1.
8.2.
9.
10.
11.
126,00
126,00
Isporuka i montaa na stub vanjske rasvjete
sa jednom i dvije lire (visina 10m) svjetiljke za
kompl
ulinu rasvjetu sa LED izvorom svjetlosti tip
et
kao TECO 2 56LED / 5102 / 123W / 700 Ma /
NW, Minel-schreder ili ekvivalent. Sve
komplet sa izvornom svjetlosti.
Supply and laying of cables in the ditch
and partially JC 100 mm for the supply
of public lighting.
Isporuka i polaganje kablova u zemljani rov i
m
djelimino u J.C f 100 mm za napajanje javne
rasvjete.
- PP00-A 4x 25 + 2,5 mm2
Supply and laying of cables in the ditch
and partially JC 100 mm for the supply
of public lighting.
Isporuka i polaganje kablova u zemljani rov i
m
djelimino u J.C f 100 mm za napajanje
trolejbuske kontaktne mree.
- 4xPP00-A 4x 185 mm2
Supply and laying of tape Fe/Zn mm in
trench along the cables of external
lighting.
m
Isporuka i polaganje eljezno- pocinane
trake Fe/Zn 25x4 mm u zemljani rov uz
kablove vanjske rasvjete.
Making of conectors on poles with tape Fe
/ Zn 25x4 mm
pcs
Izrada prikljunih mjesta na stubovima
pocinanom trakom Fe/Zn 25x 4 mm
kom
Delivery and installation of cross link
60x60 for mutual connecting of tapes
including bitumen pouring
pcs
Isporuka i ugradnja ukrsnog komada 60x60
za spoj traka-traka sa zalivanjem bitumenom
kom
2.350,00
200,00
2.150,00
122,00
150,00
12.
13.
14.
16.
17.
2. INSTALLATION TESTING
2.ISPITIVANJE INSTALACIJA
1.
1.
1.
m3
800,00
3.
4.
2.
5.
m3
set
75,00
kpl
set
7,00
160,00
30,00
sati
6.
Perform the other construction works
set
such as geodetic surveys, staking out the
alignmen, development of design, etc.
Obaviti ostale graevinske radove kao to su
geodetska snimanja, iskolienje trase i kompl
stubnih
mjesta
te
izrada
projektne
et
dokumentacije i sl.
TOTAL CIVIL AND DISMOUNTING WORKS
UKUPNO GRAEVINSKI I DEMONTANI RADOVI
1,00
RECAPITULATION
REKAPITULACIJA
2
3
4
RECAPITULATION
REKAPITULACIJA
2
3
4
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
UTILITY RELOCATION (WATER ) FROM P51 T P114
IZMJETANJE INSTALACIJA (VODOVODNE INSTALACIJE) OD P51 DO P114
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
UNIT QUANTITY
J/M
m1
TOTAL EUR
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
Staking out and mark the alignment of the
designed water supply system.
m1
Iskolavanje i obiljeavanje trasa projektovanog
vodovoda
Bridging the excavated ditches for pedestrian
crossing and its dismantling after completion
of works. Made of timber with protecting pcs
fences, 1,1m height on both sides. Calculation
per pcs.
Postavljanje premotenja preko rovova radi
osiguranja pjeakog saobraaja sa njihovom
demontaom
nakon
zavretka
radova.
kom
Premotenja su od drvenih greda i fosni sa
zatitnom ogradom visine 1,10m na obje
strane.Obraun po komadu premotenja
Steel plate bridging the excavated ditches for
vehicle crossing. Paying only the rent of plate.
pcs
Made of steel plates of dim 200x100x2cm.
Calculation per pcs.
Postavljanje premotenja preko rovova od
elinih tabli dimenzija 200x100x2cm radi
osiguranja automobilskog saobraaja. Plaa se kom
samo iznajmljivanje ploa. Obraun po komadu
ploe
UNIT
PRICE
1.755,49
35,00
20,00
1.755,49
m1
1.755,49
m1
1.755,49
m1
1.755,49
Obiljeavanje
postojeih telekomunikacijskih
podzemnih instalacija.Obraun prema fakturi
vlasnika instalacija. Cijena prema duini
projektovanog vodovoda.
8,00
5,00
10
11
12
13
14
15
16
17
1,00
2,00
2,00
1,00
1,00
5,00
1,00
pcs
3,00
18
2,00
m3
2.153,66
m3
113,35
45,00
1.474,60
m2
m3
238,42
m3
691,52
m3
690,25
m3
537,79
m3
2.833,76
m1
5,00
1
2
3
4
5
m
m
m
m
m
1.331,25
131,98
10,49
264,00
17,77
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Zbog
nepouzdanosti
katastra
podzemnih
instalacija, to moe prouzrokovati manje izmjene
trasa i niveleta cjevovoda u odnosu na
projektovanje, izvoa je duan na gradilitu imati
rezervu zavojnica MMK i MK svih uglova i
projektovanig profila. Takoer je potrebno imati u
pripravnosti reperaturne spojnice od DN40 i
DN350 radi eventualnih nepredvienih oteenja
postojeih cjevovoda u toku izvoenja radova
U FLEX - DN300 MULTI JOINT COUPLING/
SPOJNICA
U FLEX - DN200 MULTI JOINT COUPLING/
SPOJNICA
U FLEX - DN100 MULTI JOINT COUPLING/
SPOJNICA
U FLEX - DN80 MULTI JOINT COUPLING/
SPOJNICA
U FLEX - DN350 MULTI JOINT COUPLING/
SPOJNICA
U FLEX - DN50 MULTI JOINT COUPLING/
SPOJNICA
U FLEX - DN40 MULTI JOINT COUPLING/
SPOJNICA
FFR-DN300/150
FFR-DN100/50
FFR-DN100/40
FFK 30- DN150
EU - DN300
EU - DN150
EU - DN100
MMK 45- DN300
MMK 11 1/4- DN300
MMK 22 1/2- DN300
MMK 45- DN200
MMK 11 1/4- DN200
MMK 30- DN150
MMK 22 1/2- DN150
MMK 45- DN100
MMK 11 1/4- DN100
X -BLIND FLANGE DN150 / X SLIJEPA
PRIRUBNICA DN150
Supply, transportation, delivery along the
trench, lowering into the trench and
installation of BAIO of ductile iron filtings
(ductile iron) with epoxy protection thickness
240.
Calculation per piece.
pcs
2,00
pcs
2,00
pcs
2,00
pcs
2,00
pcs
1,00
pcs
1,00
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
4,00
1,00
1,00
4,00
1,00
1,00
2,00
3,00
3,00
8,00
1,00
2,00
2,00
2,00
1,00
10,00
4,00
pcs
1,00
pcs
Nabavka, transport, raznoenje du rova
sputanje u rov i montaa BAIO fazonskih
komada od nodularnog liva (ductile iron) sa
epoksidnom zatitom debljine 240,
Obraun po komadu
kom
31
32
33
34
35
36
37
38
39
40
41
42
pcs
5,00
pcs
1,00
pcs
8,00
pcs
1,00
pcs
2,00
pcs
1,00
pcs
14,00
pcs
pcs
pcs
16,00
4,00
1,00
pcs
1,00
pcs
1,00
pcs
18,00
pcs
2,00
pcs
20,00
pcs
71,00
pcs
8,00
pcs
4,00
pcs
39,00
pcs
38,00
pcs
1,00
43
MMN - DN80/80 with BAIO connection ends/
REDUKCIJA sa BAOI spijnim zavrecima
44
45
46
47
48
49
50
51
52
53
54
55
56
57
pcs
3
kom
pcs
3
kom
pcs
1
kom
pcs
17
kom
pcs
16
kom
pcs
1
kom
58
59
60
61
pcs
21
kom
pcs
kom
pcs
kom
pcs
kom
62
63
64
13
65
66
77
60
55
V SURVEYING WORKS
V GEODETSKI RADOVI
m1
1.755,49
m1
1.755,49
1.755,49
1.755,49
Ispitivanje
pritisak.
vodovodnih
instalacija
na
probni
Cleaning
and
disinfection
of
water
installations. Obtaining the potable water
certification from an authorized organization.
Pranje i dezinfekcija vodovodnih instalacija I
pribavljanje certifikata o ispravnosti vode od
ovlatene organizacije.
Development of the as built design as a layout
for the development of cadastre of
underground installations.
Izrada projekta izvedenog stanja kao podloge za
izradu katastra podzemnih instalacija
TOTAL FINISHING WORKS:
UKUPNO ZAVRNI RADOVI:
m1
1.755,49
m1
1.755,49
m1
1.755,49
RECAPITULATION
REKAPITULACIJA
I PREPARATORY WORKS
I PRIPREMNI RADOVI
II EARTH WORKS
II ZEMLJANI RADOVI
III CONCRETE WORKS
III BETONSKI RADOVI
IV ASSEMBLING WORKS
IV MONTANI RADOVI
V SURVEYING
V GEODETSKI RADOVI
VI OTHER WORKS
VI OSTALI RADOVI
VII FINISHING WORKS
VII ZAVRSNI RADOVI
TOTAL
UKUPNO
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
UTILITY RELOCATION (SEWERAGE)
IZMJETANJE INSTALACIJA (KANALIZACIJA)
SECTION 2: FROM P51 TO P112
DIONICA 2: OD P51 DO P 112
BILL OF QUANTITIES / PREDMJER RADOVA
No. ITEM
DESCRIPTION OF WORKS
UNIT
QUANTIT
Y
UNIT
PRICE
TOTAL EUR
R.B POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
Site
preparation,
installation
of
container
for
the
office,
the
establishment of the desposal area for
material
and
warehouse,
and
transportation and deployment of
equipment and machinery.
Priprema
gradilita,
postavljanje
kontejnera za kancelariju, uspostava
deponije materijala i magacina, dovoz i
rasporivanje opreme i mehanizacije
THE ROAD DRAINAGE REDESIGN
PREPROJEKTOVANA ODVODNJA
SAOBRAAJNICE
STORM SEWER
KINA KANALIZACIJA
A SANITARY SEWER
FEKALNA KANALIZACIJA
TOTAL
UKUPNO
lump sum
paual
lump sum
paual
lump sum
paual
lump sum
paual
0,60
0,20
0,20
1,00
Iskolavanje
trase
kanalizacija,
obiljeavanje
i
osiguravanje
visina.Obraun po iskolenom tjemenuahtu kanalizacije.
THE ROAD DRAINAGE REDESIGN
PREPROJEKTOVANA ODVODNJA
SAOBRAAJNICE
STORM SEWER
KINA KANALIZACIJA
A SANITARY SEWER
FEKALNA KANALIZACIJA
TOTAL
UKUPNO
pcs
kom
pcs
kom
pcs
kom
pcs
kom
57,00
20,00
22,00
99,00
lump sum
paual
lump sum
paual
lump sum
paual
lump sum
paual
0,60
0,20
0,20
1,00
pcs
kom
pcs
kom
pcs
kom
pcs
kom
35,00
14,00
17,00
66,00
pcs
kom
pcs
kom
pcs
kom
pcs
kom
19,00
14,00
17,00
50,00
lump sum
paual
lump sum
paual
lump sum
paual
lump sum
paual
0,60
0,20
0,20
1,00
lump sum
0,60
paual
lump sum
paual
lump sum
paual
lump sum
paual
0,20
0,20
1,00
0,60
0,20
10
11
A SANITARY SEWER
FEKALNA KANALIZACIJA
TOTAL
UKUPNO
Finding and marking of existing gas
line underground installations to
preserve them during operations.
Calculation per invoice of the owner
of the installation.
Iznalaenje i obiljeavanje postojeih
podzemnih instalacija gasovoda radi
njihovog ouvanja tokom izvoenja
radova.
Obraun
prema
fakturi
vlasnika
instalacija.
THE ROAD DRAINAGE REDESIGN
PREPROJEKTOVANA ODVODNJA
SAOBRAAJNICE
STORM SEWER
KINA KANALIZACIJA
A SANITARY SEWER
FEKALNA KANALIZACIJA
TOTAL
UKUPNO
Finding and marking of existing
underground hot water installations
to preserve them during operations.
Calculation per invoice of the owner
of the installation.
Iznalaenje i obiljeavanje postojeih
podzemnih toplovodnih instalacija radi
njihovog ouvanja tokom izvoenja
radova.
Obraun
prema
fakturi
vlasnika
instalacija.
THE ROAD DRAINAGE REDESIGN
PREPROJEKTOVANA ODVODNJA
SAOBRAAJNICE
STORM SEWER
KINA KANALIZACIJA
A SANITARY SEWER
FEKALNA KANALIZACIJA
TOTAL
UKUPNO
lump sum
paual
lump sum
paual
0,20
1,00
lump sum
paual
lump sum
paual
lump sum
paual
lump sum
paual
0,60
0,20
0,20
1,00
lump sum
paual
lump sum
paual
lump sum
paual
lump sum
paual
0,60
0,20
0,20
1,00
PREPROJEKTOVANA ODVODNJA
SAOBRAAJNICE
STORM SEWER
KINA KANALIZACIJA
A SANITARY SEWER
FEKALNA KANALIZACIJA
TOTAL
UKUPNO
paual
lump sum
paual
lump sum
paual
lump sum
paual
0,60
0,20
0,20
1,00
2.EARTH WORKS
2. ZEMLJANI RADOVI
Mechanical excavation of trench in the
soil III and IV class, in a depth of 0.00
to 2.00m, width according to attached
cross section, including removal of
excavated material to the required
distance from the trench. Strutting is
included in the price. (95% of the total
excavation up to 2.0 m). Calculation
per m3 of excavated material.
m3
3.500,66
m3
753,68
m3
768,00
m3
5.022,34
m3
480,85
m3
119,25
m3
322,22
m3
922,32
m3
184,24
m3
39,67
m3
40,42
m3
264,33
m3
25,31
m3
6,28
m3
16,96
m3
48,55
93,99
h
h
h
h
m2
23,71
23,17
140,87
1.971,64
STORM SEWER
KINA KANALIZACIJA
A SANITARY SEWER
FEKALNA KANALIZACIJA
TOTAL
UKUPNO
m2
484,79
m2
416,84
m2
2.873,26
m3
391,66
m3
79,00
m3
71,97
m3
542,63
m3
1.054,11
m3
224,55
m3
206,78
m3
1.485,44
Nabavka,transport
materijala
i
zatrpavanje rova jednozrnim kamenitim
materijalom, granulacije 8mm 50% i
16mm 50%, visine do 30 cm iznad cijevi,
zajedno sa propisnim nabijanjem, a sve
prema
projektu
i
tehnikim
propisima.Obraun po m3 gotovog posla.
THE ROAD DRAINAGE REDESIGN
PREPROJEKTOVANA ODVODNJA
SAOBRAAJNICE
STORM SEWER
KINA KANALIZACIJA
A SANITARY SEWER
FEKALNA KANALIZACIJA
TOTAL
UKUPNO
10
m3
1.678,85
m3
399,96
m3
679,25
m3
2.758,06
m3
5.238,81
m3
1.149,00
m3
1.439,91
m3
7.827,72
3. CONCRETE WORKS
3. BETONSKI RADOVI
Supply
and
installation
of
prefabricated
concrete,
precast
manhole base, depth of 1.00 m and
1.00 m in diameter, made of concrete
panels for MB40 to DN600mm, all in
accordance with the project, the
technical regulations for concrete and
reinforced concrete, and according to
manufacturers instruction. Manhole
bases are equipped with rubber
couplings of corresponding profile
for input and output of collector and
input of the connections. Calculation
per piece.
pcs/kom
55,00
pcs/kom
20,00
pcs/kom
22,00
pcs/kom
97,00
pcs
55,00
PREPROJEKTOVANA ODVODNJA
SAOBRAAJNICE
STORM SEWER
KINA KANALIZACIJA
A SANITARY SEWER
FEKALNA KANALIZACIJA
TOTAL
UKUPNO
kom
pcs
kom
pcs
kom
pcs
kom
55,00
20,00
22,00
97,00
m1
47,02
m1
38,82
m1
55,17
m1
141,01
pcs
Nabavka
i
ugradnja
gotovih
betonskih, montanih baza ahtova,
dubine 1,00m i prenika 1,20m, od
betona MB40 za kolektore do
DN600mm, u svemu prema projektu,
prema tehnikim propisima za beton i
armirani beton i prema uputstvu
prizvoaa.
Baze
ahtova
su
opremljene
gumenim spojnicama odgovarajueg
profila za uljev i izljev kolektora i
uljeve prikljuaka. Obraun po
komadu.
THE ROAD DRAINAGE REDESIGN
PREPROJEKTOVANA ODVODNJA
SAOBRAAJNICE
STORM SEWER
KINA KANALIZACIJA
A SANITARY SEWER
FEKALNA KANALIZACIJA
TOTAL
UKUPNO
Supply and installation of concrete,
prefabricated, and manholes ending
with cone diameter 1.20 / 0.60 m and
0.60 m in length, made of concrete
MB40, all in accordance with the
design, the technical regulations for
concrete and reinforced concrete and
according
to
manufacturers
instructions.Calculation per piece.
Nabavka
i
ugradnja
gotovih
betonskih,
montanih,
konusnih
zavretaka
ahtova
prenika
1,20/0,60m i duine 0,60m, od
betona MB40, u svemu prema
projektu, prema tehnikim propisima
za beton i armirani beton i prema
uputstvu prizvoaa.Obraun po
komadu.
THE ROAD DRAINAGE REDESIGN
PREPROJEKTOVANA ODVODNJA
SAOBRAAJNICE
STORM SEWER
KINA KANALIZACIJA
A SANITARY SEWER
FEKALNA KANALIZACIJA
TOTAL
UKUPNO
kom
pcs
kom
pcs
kom
pcs
kom
pcs
kom
2,00
0,00
0,00
2,00
pcs
kom
pcs
kom
pcs
kom
pcs
kom
pcs
kom
2,00
0,00
0,00
2,00
m1
1,00
m1
0,00
m1
0,00
m1
1,00
pcs
kom
pcs
kom
pcs
kom
pcs
kom
0,00
2,00
9,00
11,00
pcs
kom
0,00
STORM SEWER
KINA KANALIZACIJA
A SANITARY SEWER
FEKALNA KANALIZACIJA
TOTAL
UKUPNO
Supply of necessary materials and
manufacture of pipe fitting ("lula")
made of GRP pipes DN150mm for
cascade manholes. Calculation per
piece.
10
11
pcs
kom
pcs
kom
pcs
kom
3,00
4,00
7,00
pcs
kom
pcs
kom
pcs
kom
pcs
kom
6,00
6,00
2,00
14,00
m1
57,00
m1
20,00
m1
22,00
m1
99,00
pcs
kom
pcs
kom
pcs
kom
285,00
100,00
110,00
TOTAL
UKUPNO
Supply and installation of ductile
manhole cover Pamrex type for highintensity heavy traffic. The sanitary
sewer covers are full and at a storm
sewer cover are ventilated. Covers
are equipped with hinged for opening
and anti-shock pad. Calculation of the
piece.
12
13
14
pcs
kom
495,00
pcs
kom
pcs
kom
pcs
kom
pcs
kom
57,00
20,00
22,00
99,00
pcs
kom
pcs
kom
pcs
kom
pcs
kom
57,00
20,00
22,00
99,00
pcs
kom
pcs
kom
0,00
8,00
A SANITARY SEWER
FEKALNA KANALIZACIJA
TOTAL
UKUPNO
pcs
kom
pcs
kom
13,00
21,00
16
20
pcs
kom
30,75
m3
24,38
pcs
kom
75,00
4. ASSEMBLY WORKS
4. MONTANI RADOVI
Supply, transport and installation of
GRP sewer pipes with nominal
diameter DN 300 mm, nominal
stiffness SN 10000 N/m2, made of the
centrifugal
polyesters
produced
according toEN 14364:2007 and
NORM B 5161. Individual pipe length
is 6 m, and at one end is mounted
polyester connector with seal made
of EPDM-a. Protective inner layer of
polyester tubes with no fillers and
glass fibers for increased water
resistance, chemical resistance and
resistance to wear and cleaning, must
have minimum thickness of 1 mm. For
these pipes the bidder must submit in
offer certificate issued by competent
authorities according to EN 45011 for
this type of material, and certification
that an independent test laboratory
accredited according EN ISO / IEC
17025 confirms that the inner
protective polyester layer with no
fillers and glass fibers has a thickness
of at least 1 mm. Calculation per m1 of
pipeline.
m1
1.124,12
STORM SEWER
KINA KANALIZACIJA
A SANITARY SEWER
FEKALNA KANALIZACIJA
TOTAL
UKUPNO
m1
354,25
m1
354,03
m1
1.832,40
190,14
PREPROJEKTOVANA ODVODNJA
SAOBRAAJNICE
STORM SEWER
KINA KANALIZACIJA
A SANITARY SEWER
FEKALNA KANALIZACIJA
TOTAL
UKUPNO
Supply, transport and installation of
GRP sewer pipes with nominal
diameter DN 500 mm, nominal
stiffness SN 10 000 N/m2, made of the
centrifugal
polyesters
produced
according toEN 14364:2007 and
NORM B 5161. Individual pipe length
is 6 m, and at one end is mounted
polyester connector with seal made
of EPDM-a. Protective inner layer of
polyester tubes with no fillers and
glass fibers for increased water
resistance, chemical resistance and
resistance to wear and cleaning, must
have minimum thickness of 1 mm. For
these pipes the bidder must submit in
offer certificate issued by competent
authorities according to EN 45011 for
this type of material, and certification
that an independent test laboratory
accredited according EN ISO / IEC
17025 confirms that the inner
protective polyester layer with no
fillers and glass fibers has a thickness
of at least 1 mm. Calculation per m1 of
pipeline.
m1
190,14
m1
66,18
m1
109,13
m1
365,45
m1
120,37
m1
41,27
m1
0,00
m1
161,64
m1
82,64
m1
0,00
m1
0,00
TOTAL
UKUPNO
m1
82,64
m1
288,77
m1
0,00
A SANITARY SEWER
FEKALNA KANALIZACIJA
TOTAL
UKUPNO
m1
0,00
m1
288,77
m1
71,71
STORM SEWER
KINA KANALIZACIJA
A SANITARY SEWER
FEKALNA KANALIZACIJA
TOTAL
UKUPNO
Making of the compound of storm and
sanitary sewerage in the Kupreka
street made from PVC - UCC - SN8
sewage pipes and arches 45 DN 160
mm
Izrada spoja kine i fekalne kanalizacije u
Kuprekoj ulici od PVC - UKC - SN8
kanalizacionih cijevi i lukova 45 DN 160
7
m1
0,00
m1
0,00
m1
71,71
m1
0,00
m1
2,50
m1
0,00
m1
2,50
mm
10
m1
pcs
kom
pcs
kom
900,00
132,00
75,00
11
pcs
kom
75,00
5. FINISHING WORKS
5. ZAVRNI RADOVI
Recording of the works and making
geodetic surveys for cadastre of
communal devices. The calculation
per m1 of recorded sewage.
m1
1.877,75
m1
461,70
m1
463,15
m1
2.802,60
m1
1.877,75
m1
461,70
m1
463,15
m1
2.802,60
m1
1.434,63
m1
461,70
m1
463,15
m1
2.359,48
m1
443,12
m1
0,00
m1
0,00
m1
443,12
m1
1.890,89
m1
464,93
m1
466,40
m1
2.822,23
RECAPITULATION
REKAPITULACIJA
1.PREPARATORY WORKS
1. PRIPREMNI RADOVI
2.EARTH WORKS
2. ZEMLJANI RADOVI
3. CONCRETE WORKS
3. BETONSKI RADOVI
4.ASSEMBLY WORKS
4. MONTANI RADOVI
5. FINISHING WORKS
5. ZAVRSNI RADOVI
TOTAL
UKUPNO
1.5%
PROJEKTANTSKI NADZOR 1.5%
TOTAL WORKS:
UKUPNO RADOVI:
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
REDESIGNED MIXED SEWERAGE
PREPROJEKTOVANA MJEOVITA KANALIZACIJA
SECTION 2: FROM P51 TO P112
DIONICA 2: OD P51 DO P 112
BILL OF QUANTITIES / PREDMJER RADOVA
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
UNIT PRICE
J/C EUR
TOTAL EUR
UKUPNO
EUR
pcs
kom
pcs
kom
lump
sum
paual
lump
sum
paual
lump
sum
paual
II EARTH WORKS
II ZEMLJANI RADOVI
m3
m3
295,28
m3
m3
295,28
h
h
10
m2
m2
143,76
m3
m3
22,77
6
Nabavka,transport materijala i
zatrpavanje rova jednozrnim
kamenitim materijalom, granulacije
8mm 50% i 16mm 50%, visine do 30
cm iznad cijevi, zajedno sa propisnim
nabijanjem, a sve prema projektu i
tehnikim propisima.Obraun po m3
gotovog posla.
MIXED SEWER REDESIGN
PREPROJEKTOVANA MJEOVITA
KANALIZACIJA
The backfill of the rest of trench
with stone material that is suitable
for making road bed, including
proper compaction, all in
accordance with the design and
technical regulations. Calculation
per m3 of finished work.
m3
m3
50,02
m3
m3
353,91
m3
m3
738,2
kom
pcs
pcs
kom
m
m
7,65
pcs
kom
pcs
kom
pcs
15
PREPROJEKTOVANA MJEOVITA
KANALIZACIJA
Supply and installation of ductile
manhole cover Pamrex type for
high-intensity heavy traffic. The
sanitary sewer covers are full and
at a storm sewer cover are
ventilated.
kom
15
pcs
kom
pcs
kom
IV.ASSEMBLY WORKS
IV. MONTANI RADOVI
m
m
151,26
V FINISHING WORKS
V ZAVRNI RADOVI
m1
m1
151,26
m1
m1
151,26
m1
m1
m2
151,26
PREPROJEKTOVANA MJEOVITA
KANALIZACIJA
TOTAL FINISHING WORKS
UKUPNO ZAVRNI RADOVI
RECAPITULATION
REKAPITULACIJA
I PREPARATORY WORKS
I PRIPREMNI RADOVI
II EARTH WORKS
II ZEMLJANI RADOVI
III CONCRETE WORKS
III BETONSKI RADOVI
IV ASSEMBLING WORKS
IV MONTANI RADOVI
V FINISHING WORKS
V ZAVRSNI RADOVI
TOTAL
UKUPNO
DESIGN SUPERVISION OF WORKS
1.5%
PROJEKTANTSKI NADZOR 1.5%
TOTAL WORKS:
UKUPNO RADOVI:
m2
152,32
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
POLES OF OVERHEAD LINE FROM P38 TO P58
STUBOVI KONTAKTNE MREE OD P38 DO P58
SECTION 2: FROM P38 TO P58
DIONICA 2: OD P38 DO P 58
BILL OF QUANTITIES / PREDMJER RADOVA
No.
ITE
M
R.B POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
pcs
32,00
32,00
UNIT
PRICE
TOTAL EUR
J/C EUR
UKUPNO
EUR
Removing
the
existing
concrete
foundation to a depth of 50 cm or
complete removing depending on the
situation on the site. The unit price
includes possible excavation of soil
around the existing foundation, breakingup of concrete, backfilling and leveling
with excavated material and transport to
disposal area. a) to a depth of 30cm
Uklanjanje postojeih betonskih temelja do
dubine 50 cm ili cijelokupnog temelja u
zavisnosti od stanja na terenu. U jedininu
cijenu ulazi eventualni iskop zemlje oko
postojeih temelja, temenja betona,
zatrpavanje iskopanim materijalom sa
poravnanjem te odvoz na deponiju.a) do
dubine 30cm
m3
15,00
2.METAL WORKS
2.METALNI RADOVI
4
kg
989,04
kg
721,92
c) TO5 =134+20=154kg+9,83kg=163,84kg
d) TO6 = 10,22kg
kg
kg
1802,24
30,66
96,00
160,00
pcs
12,00
12,00
Nabavka materijala, izrada stubova sa
eonom ploom i ukrutnim limovima za
vezu, vrue pocinavanje stubova, ukrutnih
limova i eone ploe sa transportom i kom
ugradnjom stubova (tip stuba T03). U
jedininu cijenu ukljueni svi materijali i
radovi potrebni za izvoenje stubova sa
eonom ploom, izuzev ankera M36.
pcs
6,00
pcs
11,00
10
pcs
3,00
10
Nabavka materijala, izrada stubova sa
eonom ploom i ukrutnim limovima za
vezu, vrue pocinavanje stubova, ukrutnih
limova i eone ploe sa transportom i kom
ugradnjom stubova (tip stuba T06). U
jedininu cijenu ukljueni svi materijali i
radovi potrebni za izvoenje stubova sa
eonom ploom, izuzev ankera M36.
TOTAL METAL WOKRS
UKUPNO METALNI RADOVI
3. EARTH WORKS
3.ZEMLJANI RADOVI
11
12
13
m3
44,93
m3
26,08
14
m3
54,46
m3
18,23
4. CONCRETE WORKS
4. BETONSKI RADOVI
15
16
m3
m3
m3
18,84
11,76
25,96
17
9,42
4,71
8,64
m3
m3
m3
m3
0,96
0,48
0,99
18,23
101,00
18
m3
m3
m3
4. OTHER WORKS
4. OSTALI RADOVI
21
30,00
21
233.576,00
RECAPITULATION
REKAPITULACIJA
PREPARATORY WORKS
PRIPREMNI RADOVI
METAL WORKS
METALNI RADOVI
EARTH WORKS
ZEMLJANI RADOVI
CONCRETE WORKS
BETONSKI RADOVI
OTHER WORKS
OSTALI RADOVI
TOTAL:
UKUPNO:
TOTAL WORKS:
UKUPNO RADOVI:
1
2
3
4
5
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
POLES OF OVERHEAD LINE FROM P58 TO P112
STUBOVI KONTAKTNE MREE OD P58 DO P112
SECTION 2: FROM P58 TO P112
DIONICA 2: OD P58 DO P 112
BILL OF QUANTITIES / PREDMJER RADOVA
No.
ITE
M
R.B POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
Note: In the bill of quantities is foreseen
supply of the new poles. If it is possible
to use existing poles, it is necessary to
make corrections in the bill of quantities
items.
Napomena: U predmjeru je predviena
nabavka novih stubova. Ukoliko je mogue
iskoristiti postojee stubove potrebno je
izvriti korekcije u stavkama predmjera.
UNIT
PRICE
TOTAL EUR
J/C EUR
UKUPNO
EUR
pcs
122,00
m3
63,00
33,40
2.METAL WORKS
2.METALNI RADOVI
4
kg
3461,64
kg
4090,88
c) TO5 =134+20=154kg+9,83kg=163,84kg
d) TO6 = 10,22kg
e) TO7 = 11,00kg
kg
kg
kg
2271,83
672,82
6973,31
10
11
pcs
336,00
kom
pcs
56,00
kom
pcs
440,00
kom
pcs
16,00
kom
pcs
96,00
kom
pcs
32,00
kom
pcs
42,00
12
pcs
34,00
13
pcs
13,00
14
pcs
8,00
15
pcs
25,00
3. EARTH WORKS
3.ZEMLJANI RADOVI
16
17
m3
157,25
m3
147,80
18
19
20
21
m3
59,41
m3
36,45
m3
225,00
m3
60,48
4. CONCRETE WORKS
4. BETONSKI RADOVI
22
23
m3
m3
m3
65,94
66,64
28,32
m3
3,36
m3
m3
m3
32,97
26,69
9,42
24
25
m3
m3
m3
3,36
2,72
1,08
m3
m3
m3
1,94
36,45
225,00
m3
m3
m3
m3
33,20
0,50
9,10
5,85
293,00
4. OTHER WORKS
4. OSTALI RADOVI
21
107,00
21
1
2
3
4
5
1
2
3
4
5
RECAPITULATION
REKAPITULACIJA
PREPARATORY WORKS
PRIPREMNI RADOVI
METAL WORKS
METALNI RADOVI
EARTH WORKS
ZEMLJANI RADOVI
CONCRETE WORKS
BETONSKI RADOVI
OTHER WORKS
OSTALI RADOVI
TOTAL:
UKUPNO:
TOTAL WORKS:
UKUPNO RADOVI:
RECAPITULATION
REKAPITULACIJA
PREPARATORY WORKS
PRIPREMNI RADOVI
METAL WORKS
METALNI RADOVI
EARTH WORKS
ZEMLJANI RADOVI
CONCRETE WORKS
BETONSKI RADOVI
OTHER WORKS
OSTALI RADOVI
TOTAL / UKUPNO
DESIGN SUPERVISION OF WORKS
1.5%
PROJEKTANTSKI NADZOR 1.5%
TOTAL WORKS:
UKUPNO RADOVI:
3.495,00
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
POLES OF OVERHEAD LINE ROUNDABOUT H. EMERLIA
STUBOVI KONTAKTNE MREE KRUNI TOK H. EMERLIA
SECTION 2: ROUNDABOUT H. EMERLIA
DIONICA 2: KRUNI TOK H. EMERLIA
BILL OF QUANTITIES / PREDMJER RADOVA
No.
ITE
M
R.B POZ
DESCRIPTION OF WORKS
VRSTA RADA
J/M
4.
5.
TOTAL
EUR
UKUPNO
KOLIINA J/C EUR
EUR
UNIT QUANTITY
983,00
75,00
147,00
kom
74,00
25,00
UNIT
PRICE
6.
7.
8.
set
37,00
koplet
pcs
8,00
kom
m
775,00
Ukupno / Total
Vrijednost opreme za elektromontani dio /Value of equipment for electrical installation part
Vrijednost montanih i demontanih radova 45 % vrijednosti opreme /
The value of the assembly and disassembling works 45% of the equipment alue
TOTAL / UKUPNO
ITE
M
R.B POZ
DESCRIPTION OF WORKS
VRSTA RADA
J/M
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
Note: In the bill of quantities is foreseen
supply of the new poles. If it is possible to
use existing poles, it is necessary to make
corrections in the bill of quantities items.
Napomena: U predmjeru je predviena nabavka
novih stubova. Ukoliko je mogue iskoristiti
postojee stubove potrebno je izvriti korekcije u
stavkama predmjera.
TOTAL
EUR
UKUPNO
KOLIINA J/C EUR
EUR
UNIT QUANTITY
UNIT
PRICE
11,00
5,00
m3
m3
m3
4,86
16,20
2.METAL WORKS
2.METALNI RADOVI
4
kg
kg
165,64
485,00
88,00
11
pcs
6,00
12
pcs
5,00
3. EARTH WORKS
3.ZEMLJANI RADOVI
16
17
m3
m3
92,90
48,52
m3
30,03
Zatrpavanje
temelja
stubova
kamenitim
materijalom u slojevima debljine 30cm sa
nabijanjem do potrebne zbijenosti (70 Mpa), sa
prilagoavanjem gornje povrine temeljne jame
okolnom terenu ili obliku kojim se projektom
zahtijeva.
TOTAL EARTH WORKS
UKUPNO ZEMLJANI RADOVI
4. CONCRETE WORKS
4. BETONSKI RADOVI
18
20
m3
m3
m3
pcs
13,61
58,44
39,44
11,00
4. OTHER WORKS
4. OSTALI RADOVI
21
21
66,00
0,00
1
2
3
4
5
6
RECAPITULATION
REKAPITULACIJA
ELECTRICAL INSTALLATION WORKS
ELEKTROMONTANI RADOVI
PREPARATORY WORKS
PRIPREMNI RADOVI
METAL WORKS
METALNI RADOVI
EARTH WORKS
ZEMLJANI RADOVI
CONCRETE WORKS
BETONSKI RADOVI
OTHER WORKS
OSTALI RADOVI
TOTAL:
UKUPNO:
DESIGN SUPERVISION OF WORKS 1.5%
PROJEKTANTSKI NADZOR 1.5%
TOTAL / UKUPNO
TOTAL WORKS:
UKUPNO RADOVI:
6,58
weight (kg)
teina (kg)
522,00
0,00
522,00
weight (kg)
teina (kg)
167,28
2,46
10,48
0,80
6,24
120,78
3,08
311,12
833,12
3
kom ukupno (m )
6,58
jed.mj.
kol
m3
4,95
3
kom ukupno (m )
4,95
unit
mj.
kg
m3
m3
sum
iznos
833,12
4,95
6,58
pcs
kom
weight (kg)
teina (kg)
670,00
0,00
670,00
weight (kg)
teina (kg)
167,28
4,10
pcs
kom
8
10
8
8
16
2
10,48
0,80
6,24
120,78
3,10
312,78
982,78
3
kom ukupno (m )
5,0116
5,0116
jed.mj.
kol
m3
4,45
3
kom ukupno (m )
4,45
unit
mj.
kg
m3
m3
sum
iznos
982,78
4,45
5,0116
pcs
kom
weight (kg)
teina (kg)
707
707,00
790
0,00
707,00
weight (kg)
teina (kg)
167,28
4,10
10,48
0,80
6,24
5,7134
pcs
kom
16
10
8
8
16
2
120,78
3,10
312,78
1019,78
3
kom ukupno (m )
5,7134
jed.mj.
kol
3
kom ukupno (m )
m3
5,302
5,302
unit
mj.
kg
m3
m3
sum
iznos
1019,78
5,302
5,7134
pcs
kom
weight (kg)
teina (kg)
707,00
0,00
pcs
kom
8
707,00
weight (kg)
teina (kg)
141,04
8
8
16
11,84
0,80
6,24
120,78
2,81
100,83
161,62
545,96
1252,96
110,8
52,8
Concrete / Beton
Concrete grade MB30 / Beton
MB30
Concrete corbel / Betonska
konzola
jed.mj.
kol
m3
0,5
3
kom ukupno (m )
0,5
unit
mj.
kg
m3
sum
iznos
1252,96
0,5
pcs
kom
weight (kg)
teina (kg)
808,00
0,00
808,00
pcs
kom
8
10
weight (kg)
teina (kg)
163,00
4,10
8
8
16
9,84
0,80
6,24
120,78
3,05
307,81
1115,81
3
kom ukupno (m )
6,6825
6,6825
jed.mj.
kol
m3
5,841
3
kom ukupno (m )
5,841
unit
mj.
kg
m3
m3
sum
iznos
1115,81
5,841
6,6825
pcs
kom
weight (kg)
teina (kg)
1358
1358,00
1438
0
pcs
kom
8
12
0,00
1358,00
weight (kg)
teina (kg)
191,77
4,92
8
8
16
10,48
0,80
6,24
120,78
3,35
338,34
1696,34
3
kom ukupno (m )
m3
21,516
21,516
jed.mj.
kol
m3
18,75
3
kom ukupno (m )
18,75
unit
mj.
kg
m3
m3
sum
iznos
1696,34
18,75
21,516
pcs
kom
weight (kg)
teina (kg)
1358
1358,00
1438
0
pcs
kom
8
0,00
1358,00
weight (kg)
teina (kg)
242,91
8
8
16
11,84
0,80
6,24
120,78
3,83
58,19
159,93
11,09
615,59
1973,59
27,65
63,94
98,72
27,04
3
kom ukupno (m )
27,65
Beton
Concrete grade MB30 / Beton
MB30
for pole foundation T07 /za temelj
stuba T07
Concrete grade MB20 subbase / Beton MB20 podloni
for pole foundation T07 /za temelj
stuba T07
jed.mj.
kol
m3
8,37
jed.mj.
kol
m3
0,962
3
kom ukupno (m )
8,37
3
kom ukupno (m )
0,962
unit
mj.
kg
m3
m3
sum
iznos
1973,59
9,332
27,65
pcs
kom
weight (kg)
teina (kg)
1358,00
0
pcs
kom
8
0,00
1358,00
weight (kg)
teina (kg)
131,20
8
8
16
11,84
0,80
6,24
120,78
2,71
113,40
270,864
334,56
992,39
2350,39
180
167,2
163,2
Concrete / Beton
Concrete grade MB30 / Beton
MB30
Concrete compound / Betonsko
ojaanje
jed.mj.
kol
m3
1,3
3
kom ukupno (m )
1,3
unit
mj.
kg
m3
sum
iznos
2350,39
1,3
pcs
kom
weight (kg)
teina (kg)
1358,00
0,00
1358,00
weight (kg)
teina (kg)
141,04
pcs
kom
8
8
8
16
11,84
0,80
6,24
120,78
2,81
100,83
161,62
545,96
1903,96
110,8
52,8
Concrete / Beton
Concrete grade MB30 / Beton
MB30
Concrete corbel / Betonska
konzola
jed.mj.
kol
m3
0,5
3
kom ukupno (m )
0,5
unit
mj.
kg
m3
sum
iznos
1903,96
0,5
pcs
kom
weight (kg)
teina (kg)
1358,00
0,00
1358,00
weight (kg)
teina (kg)
164,00
pcs
kom
8
8
8
16
11,84
120,78
3,03
63,32
59,49
428,70
1786,70
154,44
36,72
6,24
Concrete / Beton
Concrete grade MB30 / Beton MB30
jed.mj.
3
Concrete corbel / Betonska konzola m
kol
1,95
3
kom ukupno (m )
1
1,95
unit
mj.
kg
m3
sum
iznos
1786,70
1,95
Pole type.
unit price
Tip stuba
jed. cijena
T03 - footing foundations / duboko temeljenje
T04 - footing foundations / duboko temeljenje
T05 - footing foundations / duboko temeljenje
T05 - at wall compound / na ojaanju zida
T06 - footing foundations / duboko temeljenje
T07 - footing foundations / duboko temeljenje
T07 - shallow foundations / plitko temeljenje
T07 - at subway / na pothodniku
T07 - at corbel /na kratkoj konzoli
T07 - at wall compound / na ojaanju zida
pcs
kom
Total price
Ukupna cijena
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
SUPPORT STRUCTURES -REHABILITATION OF LANDSLIDES
POTPORNE KONSTRUKCIJE - SANACIJA KLIZITA
SECTION 2: FROM P51 TO P112
DIONICA 2: OD P51 DO P 112
BILL OF QUANTITIES / PREDMJER RADOVA
ITE
M
R.B POZ
No.
UNIT
TOTAL EUR
PRICE
VRSTA RADA
J/M
KOLIINA J/C EUR UKUPNO EUR
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
DESCRIPTION OF WORKS
UNIT
QUANTITY
1,00
paual
1,00
paual
2,00
kom
2,00
kom
2.EARHT WORKS
2. ZEMLJANI RADOVI
Mechanical excavation in soil class
III and IV for construction of RC
retaining wall. The works should be
carried out under the conditions of
works given in the technical report.
Calculation per m3 of excavated
material.
1.924,00
m3
ITE
M
R.B POZ
No.
DESCRIPTION OF WORKS
UNIT
VRSTA RADA
J/M
m
UNIT
TOTAL EUR
PRICE
KOLIINA J/C EUR UKUPNO EUR
QUANTITY
m3
144,40
m3
78,00
m3
155,50
m3
1.550,00
ITE
M
R.B POZ
No.
5
UNIT
TOTAL EUR
PRICE
KOLIINA J/C EUR UKUPNO EUR
DESCRIPTION OF WORKS
UNIT
QUANTITY
VRSTA RADA
J/M
3
1.550,00
m3
2.068,40
3. CONCRETE WORKS
3. BETONSKI RADOVI
Supply,
transportation
and
installation of concrete, MB 30 in the
two-sided
formworks,for
construction of RC foudnation of
159,00
retaining wall.
m3
Nabavka, transport i ugradnja betona,
marke MB 30 u dvostranoj oplati, za
izradu a.b. temelja potpornog zida.
316,5 m2*0,5m=158,25
Supply, transportation and
installation of concrete, MB 30 in the
two-sided formworks,for
construction of RC retaining wall.
3,0*10*0,5*15+413,4*0,45=276,03
m3
277,00
m3
144,40
1,75*5,5*1,0*15=144,38
4. REINFORCEMENT WORKS
4. ARMIRAKI RADOVI
kg
11.026,80
ITE
M
R.B POZ
No.
DESCRIPTION OF WORKS
UNIT
VRSTA RADA
J/M
Supply,
cleaning,
cutting
and
assembly of rebar mesh BSt 500 in
reinforced concrete construction,
according to the reinforcement plan.
Nabavka, ienje, rezanje i montaa
armaturnih mrea BSt 500 u armiranobetonsku konstrukciju, prema planu
armature.
kg
UNIT
TOTAL EUR
PRICE
KOLIINA J/C EUR UKUPNO EUR
QUANTITY
19.351,94
5.OTHER WORKS
5.OSTALI RADOVI
Supply,
transportation
and
installation of drainage pipes PHD
150 mm, for drainage.
Nabavka,
transport
i
ugradnja
drenanih PHD cijevi 150 mm, za
izradu drenae.
Supply,
transportation
and
installation of concrete canals,
length 1.00 m along a crown of
retaining wall.
Nabavka, transport i ugradnja betonskih
kanalica, duine 1,00 m uz krunu
potpornog zida.
Supply,
transportation
and
placement of concrete inspection
shafts, as given in detail.
Nabavka, transport i ugradnja betonskih
revizionih okana, kao na datom detalju
okna.
Supply,
transportation
and
installation of cast iron covers for
inspection shafts, as given in detail.
Nabavka,
transport
i
ugradnja
poklopaca od livenog eljeza za
reviziona okana, kao na datom detalju.
Supply,
transportation
and
installation of PVC barbican pipes
(80mm/2m).
Nabavka, transport i ugradnja PVC
cijevi za barbakane (80mm/2m).
Development of the as built design
Izrada projekta izvedenog stanja.
TOTAL OTHER WORKS:
UKUPNO OSTALI RADOVI:
m1
113,00
m1
113,00
pcs
3,00
kom
pcs
3,00
kom
pcs
50,00
kom
lump sum
paual
1,00
ITE
M
R.B POZ
No.
DESCRIPTION OF WORKS
UNIT
VRSTA RADA
J/M
RECAPITULATION
REKAPITULACIJA
1. PREPARATORY WORKS
1.PRIPREMNI RADOVI
2. EARTH WORKS
2. ZEMLJANI RADOVI
3. CONCRETE WORKS
3. BETONSKI RADOVI
4. REINFORCEMENT WORKS
4. ARMIRAKI RADOVI
5. OTHER WORKS
5. OSTALI RADOVI
TOTAL:
UKUPNO:
DESIGN SUPERVISION OF WORKS
1.5%
PROJEKTANTSKI NADZOR 1.5%
TOTAL WORKS:
UKUPNO RADOVI:
UNIT
TOTAL EUR
PRICE
KOLIINA J/C EUR UKUPNO EUR
QUANTITY
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
SUPPORT STRUCTURES WALL NO. 1
POTPORNE KONSTRUKCIJE ZID BR.1
SECTION 2: FROM P51 TO P112
DIONICA 2: OD P51 DO P 112
BILL OF QUANTITIES / PREDMJER RADOVA
No. ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
R.B POZ
VRSTA RADA
J/M
KOLIINA
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
Finding
and
marking
of
existing
underground installations to preserve
them during operations. Have to see
cadastre of underground installations!
1
1,00
Iznalaenje
i
obiljeavanje
postojeih
podzemnih instalacija radi njihovog ouvanja
tokom izvoenja radova. Obavezno pogledati
katastar podzemnih instalacija!
paual
1,00
paual
2,00
kom
2,00
kom
m3
444,00
UNIT
TOTAL
PRICE
EUR
J/C
UKUPNO
EUR
EUR
m3
23,10
m3
35,80
m3
444,00
m3
(0,38+0,57)*0,5*14,9+0,57*5,2+(0,43+0,57)0,5*9,
73=14,91
4. REINFORCEMENT WORKS
4. ARMIRAKI RADOVI
17,90
14,90
kg
205,53
kg
1.774,61
5.OTHER WORKS
5.OSTALI RADOVI
m1
30,00
m1
30,00
pcs
2,00
2,00
14,00
1,00
RECAPITULATION
REKAPITULACIJA
1. PREPARATORY WORKS
1.PRIPREMNI RADOVI
2. EARTH WORKS
2. ZEMLJANI RADOVI
3. CONCRETE WORKS
3. BETONSKI RADOVI
4. REINFORCEMENT WORKS
4. ARMIRAKI RADOVI
5. OTHER WORKS
5. OSTALI RADOVI
TOTAL:
UKUPNO:
DESIGN SUPERVISION OF WORKS
1.5%
PROJEKTANTSKI NADZOR 1.5%
TOTAL WORKS:
UKUPNO RADOVI:
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
SUPPORT STRUCTURES WALL NO. 2
POTPORNE KONSTRUKCIJE ZID BR.2
SECTION 2: FROM P51 TO P112
DIONICA 2: OD P51 DO P 112
BILL OF QUANTITIES / PREDMJER RADOVA
No.
ITE
M
R.B POZ
TOTAL
EUR
UKUPNO
VRSTA RADA
J/M
KOLIINA J/C EUR
EUR
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
DESCRIPTION OF WORKS
UNIT
QUANTITY
1,00
Iznalaenje i obiljeavanje postojeih
podzemnih instalacija radi njihovog
ouvanja tokom izvoenja radova.
Obavezno
pogledati
katastar
podzemnih instalacija!
Site clearing of vegetation and
various waste materials, site
organization
Raiavanje lokacije od rastinja i
raznog
otpadnog
materijala,
organizacija gradilita
Fabrication and assembly of
ramps or lighting device for
providing transportation.
Izrada i montaa rampi ili svjetlosnih
ureaja za obezbjeenje saobraaja.
paual
1,00
paual
2,00
kom
2,00
kom
UNIT
PRICE
No.
ITE
M
R.B POZ
DESCRIPTION OF WORKS
UNIT
VRSTA RADA
J/M
2.EARHT WORKS
2. ZEMLJANI RADOVI
Mechanical excavation in soil
class III and IV for construction of
RC retaining wall. The works
should be carried out under the
conditions of works given in the
technical report. Calculation per
m3 of excavated material.
m3
TOTAL
EUR
UKUPNO
KOLIINA J/C EUR
EUR
QUANTITY
588,90
Supply,
transportation
and
installation of filter material with
prescribed grain size in the filter
behind the retaining structure.
Granulometric composition of the
filter material is:
grain 4-8 mm .... 20%;
grain 8-16 mm .... 20%
grain 16-32 mm.... 60%.
Nabavka, transport i ugradnja
filterskog materijala propisane
granulacije u filter iza potporne
konstrukcije.Granulometrijski sastav
filterskog materijala je:
zrna 4- 8 mm . 20 %;
zrna 8-16 mm . 20 %;
zrna
16-32 mm . 60 % .
Supply, transportation and placing
of stone material behind the wall
in layers.
Nabavka, transport i ugradnja
kamenog materijala iza zida, u
slojevima.
Loading and transport of material
to the desposal area.
Utovar i odvoz materijala iz iskopa na
deponiju.
TOTAL EARTH WORKS:
UKUPNO ZEMLJANI RADOVI:
m3
141,60
m3
320,00
m3
588,90
UNIT
PRICE
No.
ITE
M
R.B POZ
DESCRIPTION OF WORKS
UNIT
VRSTA RADA
J/M
TOTAL
EUR
UKUPNO
KOLIINA J/C EUR
EUR
QUANTITY
3. CONCRETE WORKS
3. BETONSKI RADOVI
Supply,
transportation
and
installation of concrete, MB 30 in
the
two-sided
formworks,for
construction of RC foudnation of
retaining wall.
m3
Nabavka, transport i ugradnja
betona, marke MB 30 u dvostranoj
oplati, za izradu a.b. temelja
potpornog zida.
Supply,
transportation
and
installation of concrete, MB 30 in
the
two-sided
formworks,for
construction of RC retaining wall.
70,50
m3
60,50
kg
6.810,98
kg
3.834,74
UNIT
PRICE
No.
ITE
M
R.B POZ
DESCRIPTION OF WORKS
UNIT
VRSTA RADA
J/M
5. OTHER WORKS
5. OSTALI RADOVI
Supply,
transportation
and
installation of drainage pipes PHD
150 mm, for drainage.
m1
Nabavka, transport i ugradnja
drenanih PHD cijevi 150 mm, za
izradu drenae.
Supply,
transportation
and
installation of PVC barbican pipes
pcs
(80mm/2m).
Nabavka, transport i ugradnja PVC
kom
cijevi za barbakane (80mm/2m).
Development of the as built design lump sum
Izrada projekta izvedenog stanja.
paual
TOTAL OTHER WORKS:
UKUPNO OSTALI RADOVI:
RECAPITULATION
REKAPITULACIJA
1. PREPARATORY WORKS
1.PRIPREMNI RADOVI
2. EARTH WORKS
2. ZEMLJANI RADOVI
3.CONCRETE WORKS
3. BETONSKI RADOVI
4. REINFORCEMENT WORKS
4. ARMIRAKI RADOVI
5. OTHER WORKS
5. OSTALI RADOVI
TOTAL:
UKUPNO:
DESIGN SUPERVISION OF
WORKS 1.5%
PROJEKTANTSKI NADZOR 1.5%
TOTAL WORKS:
UKUPNO RADOVI:
TOTAL
EUR
UKUPNO
KOLIINA J/C EUR
EUR
QUANTITY
122,00
58,00
1,00
UNIT
PRICE
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
SUPPORT STRUCTURES WALL NO.3
POTPORNE KONSTRUKCIJE ZID BR.3
SECTION 2: FROM P51 TO P112
DIONICA 2: OD P51 DO P 112
BILL OF QUANTITIES / PREDMJER RADOVA
No.
ITE
M
R.B POZ
TOTAL
EUR
UKUPNO
VRSTA RADA
J/M
KOLIINA J/C EUR
EUR
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
DESCRIPTION OF WORKS
UNIT
QUANTITY
1,00
paual
1,00
paual
2,00
kom
2,00
kom
UNIT
PRICE
No.
ITE
M
R.B POZ
DESCRIPTION OF WORKS
UNIT
VRSTA RADA
J/M
2.EARHT WORKS
2. ZEMLJANI RADOVI
Mechanical excavation in soil
class III and IV for construction
of RC retaining wall. The works
should be carried out under the
conditions of works given in the
technical report. Calculation per
m3 of excavated material.
m3
TOTAL
EUR
UKUPNO
KOLIINA J/C EUR
EUR
QUANTITY
95,00
Supply,
transportation
and
installation of filter material with
prescribed grain size in the filter
behind the retaining structure.
Granulometric composition of the
filter material is:
grain 4-8 mm .... 20%;
grain 8-16 mm .... 20%
grain 16-32 mm.... 60%.
Nabavka, transport i ugradnja
filterskog materijala propisane
granulacije u filter iza potporne
konstrukcije.Granulometrijski sastav
filterskog materijala je:
zrna 4- 8 mm . 20 %;
zrna 8-16 mm . 20 %;
zrna 16-32 mm . 60 % .
Supply,
transportation
and
placing of stone material behind
the wall in layers.
Nabavka, transport i ugradnja
kamenog materijala iza zida, u
slojevima.
Filling of bumps on the slope
below the retaining wall material
from the excavation, with proper
planning and compaction.
Zapunjavanje neravnina na padini
ispod potpornog zida materijalom iz
iskopa, uz propisno zbijanje i
planiranje.
Loading and transport of material
to the desposal area.
Utovar i odvoz materijala iz iskopa
na deponiju.
m3
46,20
m3
15,50
m3
22,30
m3
72,70
UNIT
PRICE
No.
ITE
M
R.B POZ
DESCRIPTION OF WORKS
UNIT
VRSTA RADA
J/M
TOTAL
EUR
UKUPNO
KOLIINA J/C EUR
EUR
QUANTITY
23,10
20,80
kg
1.040,69
kg
1.249,47
UNIT
PRICE
No.
ITE
M
R.B POZ
DESCRIPTION OF WORKS
UNIT
VRSTA RADA
J/M
TOTAL
EUR
UKUPNO
KOLIINA J/C EUR
EUR
QUANTITY
5. OTHER WORKS
5.OSTALI RADOVI
Supply,
transportation
and
installation of drainage pipes
PHD 150 mm, for drainage.
m1
Nabavka, transport i ugradnja
drenanih PHD cijevi 150 mm, za
izradu drenae.
Supply,
transportation
and
installation of PVCbarbican pipes
pcs
(80mm/2m).
Nabavka, transport i ugradnja PVC
kom
cijevi za barbakane (80mm/2m).
Development of the as built
design
lump sum
Izrada projekta izvedenog stanja.
paual
TOTAL OTHER WORKS:
.
RECAPITULATION
REKAPITULACIJA
1. PREPARATORY WORKS
1. PRIPREMNI RADOVI
2.EARTH WORKS
2. ZEMLJANI RADOVI
3. CONCRETE WORKS
3. BETONSKI RADOVI
4.REINFORCEMENT WORKS
4.ARMIRAKI RADOVI
5. OTHER WORKS
5. OSTALI RADOVI
TOTAL:
UKUPNO:
DESIGN SUPERVISION OF
WORKS 1.5%
PROJEKTANTSKI NADZOR
1.5%
TOTAL WORKS:
UKUPNO RADOVI:
39,00
19,00
1,00
UNIT
PRICE
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
SUPPORT STRUCTURES WALL NO.4
POTPORNE KONSTRUKCIJE ZID BR.4
SECTION 2: FROM P51 TO P112
DIONICA 2: OD P51 DO P 112
BILL OF QUANTITIES / PREDMJER RADOVA
No. ITEM
DESCRIPTION OF WORKS
UNIT
R.B POZ
VRSTA RADA
J/M
UNIT
TOTAL
PRICE
EUR
J/C
UKUPNO
KOLIINA
EUR
EUR
QUANTITY
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
1,00
paual
1,00
paual
2,00
kom
2,00
m3
248,38
m3
72,80
m3
65,15
m3
41,22
207,16
60,63
88,75
5.090,31
3.105,80
48,50
RECAPITULATION
REKAPITULACIJA
1. PREPARATORY WORKS
1. PRIPREMNI RADOVI
2.EARTH WORKS
2. ZEMLJANI RADOVI
3. CONCRETE WORKS
3. BETONSKI RADOVI
4.REINFORCEMENT WORKS
4.ARMIRAKI RADOVI
5. OTHER WORKS
5. OSTALI RADOVI
TOTAL:
UKUPNO:
DESIGN SUPERVISION OF WORKS
1.5%
PROJEKTANTSKI NADZOR 1.5%
TOTAL WORKS:
UKUPNO RADOVI:
23,00
1,00
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
RONDABOUT INDOOR PLUMBING AND SEWERAGE
RONDO- UNUTRANJI VODOVOD I KANALIZACIJA
SECTION 2: FROM P51 TO P112
DIONICA 2: OD P51 DO P 112
BILL OF QUANTITIES / PREDMJER RADOVA
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
UNIT QUANTITY
J/M
1. INDOOR PLUMBING
1. VODOVOD
1.1. EARTH WORKS
1.1. ZEMLJANI RADOVI
Manual excavation of trench, 80cm
wide,in material III and IV class, together
with loading and transport of excavated
material and planning trench. Calculation
per m3 of finished work.
1
m3
1,60
m3
0,24
m3
0,48
m3
0,88
UNIT
PRICE
TOTAL EUR
UKUPNO
EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
J/M
m3
UNIT QUANTITY
1,60
UNIT
PRICE
1,00
6,00
TOTAL EUR
UKUPNO
EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
UNIT QUANTITY
J/M
1.3. ASSEMBLY
1.3. MONTANI RADOVI
m1
16,05
m1
16,10
m1
2,00
pcs
UNIT
PRICE
5,00
TOTAL EUR
UKUPNO
EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
UNIT QUANTITY
J/M
1,00
m1
16,05
m1
16,10
UNIT
PRICE
TOTAL EUR
UKUPNO
EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
UNIT QUANTITY
J/M
m1
32,15
32,15
TOTAL ASSEMBLY
UKUPNO MONTANI RADOVI
TOTAL WATER SUPPLY
UKUPNO VODOVOD
2.HYDRANT SYSTEM
2. HIDRANTSKA MREA
2.1. EARTH WORKS
2.1. ZEMLJANI RADOVI
UNIT
PRICE
m3
1,60
m3
0,24
TOTAL EUR
UKUPNO
EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
J/M
m3
0,48
m3
0,88
m3
1,60
UNIT QUANTITY
UNIT
PRICE
1,00
3,00
TOTAL EUR
UKUPNO
EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
UNIT QUANTITY
J/M
m1
3,00
2.3. ASSEMBLY
2.3. MONTANI RADOVI
Supply and installation of galvanized
steel water pipes 2"(50mm), together
with associated fittings and suspension
material. Calculation per m3 of finished
work.
m1
Nabavka i ugradnja elinih pocinanih
vodovodnih cijevi 2" (50mm), zajedno sa
pripadajuim
fitinzima
i
ovjesnim
materijalom.Obraun po m3 gotovog posla.
Supply and installation of PEHD PE 80
pipes (DN25mm), according to the
design's
drawings,
together
with
associated fittings. Calculation per m3 of
finished work
Nabavka i ugradnja PEHD PE 80
vodovodnih cijevi (DN63mm), prema
nacrtima
iz
projekta,
zajedno
sa
pripadajuim fitinzima.Obraun po m3
gotovog posla.
Supply and installation of fire hydrant
F50 mm, class A, with the supply and
installation of full two part fire hydrant
cabinet free standing made of stainless
steel sheet, according to the design
dimensions: width 500mm, depth 150mm
and height 1200mm. The hydrants set
includes: brass hose union taps F50 mm,
pressure hose - Trevira rubber length 20
m and brass at the end of hose.
Calculation per pcs.
m1
UNIT
PRICE
14,50
2,00
pcs
1,00
TOTAL EUR
UKUPNO
EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
UNIT QUANTITY
J/M
1,00
pcs
1,00
5
Nabavka i ugraivanje aparata za gaenje
poetnih poara klase A, B, C, D i E (svih
poara) ugljendioksidom. Predvieno je da
se aparat ugradi u svaki hidrantski ormari kom.
(po2 komada). Vrijeme djelovanja mlaznice
je 22 sec, domet mlaznice 3 4 m, a
temperaturno podruje od 20OC do
+60OC.Obraun po komadu.
UNIT
PRICE
TOTAL EUR
UKUPNO
EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
UNIT QUANTITY
J/M
16,50
16,50
3. FEKALNA KANALIZACIJA
3.1. EARTH WORKS
3.1. ZEMLJANI RADOVI
UNIT
PRICE
m3
11,52
m3
1,73
m3
3,46
TOTAL EUR
UKUPNO
EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
UNIT QUANTITY
J/M
m3
6,34
m3
11,52
UNIT
PRICE
m1
2,00
m1
2,00
TOTAL EUR
UKUPNO
EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
UNIT QUANTITY
J/M
1,00
pcs
UNIT
PRICE
1,00
TOTAL EUR
UKUPNO
EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
UNIT QUANTITY
J/M
3.3. ASSEMBLY
3.3. MONTANI RADOVI
Supply and installation of PVC sewer
pipe. Pipe DN50 mm with spigot and
rubber gasket with fittings.Calculation
per m1 finished work.
m1
Nabavka i ugradnja PVC kanalizacionih
cijevi Cijevi DN50 mm sa naglavkom i
gumenom brtvom zajedno sa fazonskim
komadima. Obraun po m1 gotovog posla.
Supply and installation of PVC sewer
pipe. Pipe DN110 mm with spigot and
rubber gasket with fittings.Calculation
per m1 finished work.
7,00
m1
3,50
m1
8,00
m1
1,50
m1
11,00
4
Nabavka i ugradnja PVC - UKC - SN8
kanalizacionih cijevi Cijevi DN110 mmsa
naglavkom i gumenom brtvom zajedno sa
fazonskim komadima.
Obraun po m1 gotovog posla.
UNIT
PRICE
TOTAL EUR
UKUPNO
EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
UNIT QUANTITY
J/M
9,00
pcs
UNIT
PRICE
3,00
2,00
1,00
TOTAL EUR
UKUPNO
EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
10
UNIT QUANTITY
J/M
2,00
TOTAL ASSEMBLY
UKUPNO MONTANI RADOVI
TOTAL SEWERAGE
UKUPNO FEKALNA KANALIZACIJA
4. EQUIPMENT
4. OPREMA
UNIT
PRICE
TOTAL EUR
UKUPNO
EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
UNIT QUANTITY
J/M
Nabavka
i
ugraivanje
keramikog
konzolnog klozeta - koljke, zajedno sa
poklopcem noseom pod konstrukcijom i
ugradnim vodokotliem sa dvostepenim
kom.
ispiranjem i svim ostalim radovima i
materijalom. Tip i oblik koljke prema izboru
investitora i projektanta enterijera. Obraun
po komadu.
Supply and installation of faience toilet
bowl for disabled people including
cover, bearing substructure and flushing
cistern with dual-flush. All necessary pcs
works and materials are included. Type
and shape of the toilet bowl according to
Client and Interior Designers choice.
Calculation per piece.
Nabavka
i
ugraivanje
keramikog
konzolnog klozeta - koljke za invalide,
zajedno sa poklopcem noseom pod
konstrukcijom i ugradnim vodokotliem sa
dvostepenim ispiranjem i svim ostalim
radovima i materijalom. Tip i oblik koljke
prema izboru investitora i projektanta
enterijera.Obraun po komadu.
kom.
Provision and installation of nickel
single-handle standing faucets 15 mm
for warm and cool water for lavatories.
All other wiring and sealing materials
and accessories are included. The price
includes sensor with electromagnetic
valve for flow control, automatic
electronic mixer and trafo.Type and
shape of the faucets according to Client
and
Interior
Designers
choice.
Calculation per piece.
pcs
UNIT
PRICE
1,00
4,00
TOTAL EUR
UKUPNO
EUR
No. ITEM
DESCRIPTION OF WORKS
UNIT QUANTITY
R.B POZ
VRSTA RADA
J/M
pcs
1,00
6
Nabavka i ugraivanje poniklovane stojee
mi baterije F15 mm za toplu i hladnu vodu,
sa dugom ruicom za otvaranje iznad
invalidskog umivaonika zajedno sa svim
ostalim spojnim i zaptivnim materijalom i
priborom. U cijenu uraunat bodi senzor sa
elektromagnetnim ventilom za kontrolu
protoka, automatski elektronski mjea i
trafo.
Tip i oblik baterije prema izboru investitora i
projektanta enterijera.
Obraun po komadu.
kom.
7
UNIT
PRICE
1,00
1,00
TOTAL EUR
UKUPNO
EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
UNIT QUANTITY
J/M
pcs
3,00
4,00
3,00
3,00
kom.
pcs
3,00
kom.
pcs
4,00
kom.
pcs
kom.
UNIT
PRICE
3,00
TOTAL EUR
UKUPNO
EUR
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
1.
RECAPITULATION
REKAPITULACIJA
WATER SUPPLY SYSTEM
VODOVOD
2.
HYDRANT SYSTEM
HIDRANTSKA MREA
3.
SEWERAGE
FEKALNA KANALIZACIJA
4.
EQUIPMENT
OPREMA
TOTAL:
UKUPNO:
DESIGN SUPERVISION OF WORKS 1.5%
PROJEKTANTSKI NADZOR 1.5%
TOTAL WORKS:
UKUPNO RADOVI:
UNIT QUANTITY
J/M
UNIT
PRICE
TOTAL EUR
UKUPNO
EUR
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
ROUNDABOTU WATER SUPPLY
RONDO- VANJSKI VODOVOD
SECTION 2: FROM P95 TO P107
DIONICA 2: OD P95 DO P 107
BILL OF QUANTITIES / PREDMJER RADOVA
No. ITEM
R.B POZ
QUANTI UNIT
TOTAL
TY
PRICE
EUR
KOLIIN J/C
UKUPNO
VRSTA RADA
J/M
A
EUR
EUR
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
DESCRIPTION OF WORKS
UNIT
24,93
1,00
1,00
24,93
m1
24,93
m1
24,93
m1
24,93
1,00
14,00
m3
13,05
m3
5,59
4,00
19,51
m2
Zatrpavanje
ostatka
rova
kamenitim
materijalom pogodnim za izradu donjeg sloja
saobraajnice, zajedno sa propisnim
nabijanjem, a sve prema projektu i tehnikim
propisima.
Obraun po m3 gotovog posla.
Supply of material and making sub -base
at places before arrangement of
pavement.Calculation per m3 of finished
work.
Nabavka materijala i izrada tamponskog
sloja na mjestima prije ureenja kolovozne
konstrukcije
Obraun po m3 gotovog posla.
Transport of surplus excavated material
to disposal area up to 6 km away.
(looseness coefficient 1.25) Calculation
per m3 of finished work.
Odvoz vika iskopanog materijala na
deponiju udaljenu do 6 km. (koeficijent
rastresitosti 1,25). Obraun po m3 gotovog
posla.
m3
2,24
m3
6,69
m3
3,30
m3
6,63
m3
18,64
1,00
m1
24,39
2
3
4
5
6
7
8
9
pcs
pcs
pcs
pcs
pcs
pcs
pcs
2,00
1,00
1,00
1,00
1,00
2,00
1,00
pcs
1,00
10
11
12
13
14
15
16
60
1,00
1,00
2,00
m1
24,93
m1
24,93
24,93
24,93
RECAPITULATION
REKAPITULACIJA
I PREPARATORY WORKS
I PRIPREMNI RADOVI
II EARTH WORKS
II ZEMLJANI RADOVI
III CONCRETE WORKS
III BETONSKI RADOVI
IV ASSEMBLING WORKS
IV MONTANI RADOVI
V SURVEYING
V GEODETSKI RADOVI
VI OTHER WORKS
VI OSTALI RADOVI
VII FINISHING WORKS
VII ZAVRSNI RADOVI
TOTAL
UKUPNO
m1
24,93
m1
24,93
m1
24,93
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
ROUNDABOTU SEWERAGE SYSTEM
RONDO- VANJSKA KANALIZACIJA
SECTION 2: FROM P95 TO P107
DIONICA 2: OD P95 DO P 107
BILL OF QUANTITIES / PREDMJER RADOVA
No. ITEM
DESCRIPTION OF WORKS
UNIT
R.B POZ
VRSTA RADA
J/M
TOTAL
EUR
UKUPN
KOLIINA J/C EUR
O EUR
QUANTITY
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
m1
17,52
pcs
1,00
kom
Steel plate bridging the excavated
ditches for vehicle crossing. Paying only
the rent of plate. Made of steel plates of
dim 200x100x2cm. Calculation per pcs.
pcs
3
1,00
kom
m1
17,52
UNIT
PRICE
Obiljeavanje
postojeih
vodovodnih
podzemnih instalacija. Obraun prema
fakturi vlasnika instalacija. Cijena prema
duini projektovanog vodovoda.
Finding and marking of existing
sewerage underground installation to
preserve them during the execution of
works. Calculation per invoice of owner
of installation.
Obiljeavanje postojeih kanalizacionih
podzemnih instalacija.
Obraun prema fakturi vlasnika instalacija.
Cijena
prema
duini
projektovanog
vodovoda.
Finding and marking of existing
underground
electrical
power
installations to preserve them during
operations. Calculation per invoice of
the owner of the installation.
Obiljeavanje
postojeih
elektro
energetskih podzemnih instalacija.
Obraun prema fakturi vlasnika instalacija.
Cijena
prema
duini
projektovanog
vodovoda.
Finding and marking of existing
underground
telecommunications
installation to preserve them during
operations. Calculation per invoice of
the owner of the installation.
Obiljeavanje
postojeih
telekomunikacijskih
podzemnih
instalacija.Obraun prema fakturi vlasnika
instalacija.
Cijena
prema
duini
projektovanog vodovoda.
m1
17,52
m1
17,52
m1
17,52
pcs
kom
1,00
29,88
m3
12,80
6,00
m2
14,70
2,26
m3
6,63
m3
27,89
m3
5,51
m3
42,68
6
Zatrpavanje rova jednozrnim kamenitim
materijalom, granulacije 8mm 50% i
16mm 50%, visine do 30 cm iznad
cijevi,
zajedno
sa
propisnim
nabijanjem, a sve prema projektu i
tehnikim propisima.Obraun po m3
gotovog posla.
m
Odvoz vika iskopanog materijala na
deponiju udaljenu do 6 km. (koeficijent
rastresitosti 1,25). Obraun po m3 gotovog
posla.
TOTAL EARTH WORKS:
UKUPNO ZEMLJANI RADOVI:
III CONCRETE WORKS
III BETONSKI RADOVI
Supply and installation of prefabricated
concrete, precast manhole base, depth
of 1.00 m and 1.00 m in diameter, made
of concrete panels for MB40 to
DN600mm, all in accordance with the
project, the technical regulations for
concrete and reinforced concrete, and
pcs
according to manufacturers instruction.
Manhole bases are equipped with
rubber couplings of corresponding
profile for input and output of collector
and input of the connections.
Nabavka i ugradnja gotovih betonskih,
montanih baza ahtova, dubine 1,00m i
prenika 1,00m, od betona MB40 za
kolektore do DN600mm, u svemu prema
projektu, prema tehnikim propisima za
beton i armirani beton i prema uputstvu
prizvoaa.
Baze ahtova su opremljene gumenim
spojnicama odgovarajueg profila za uljev i
izljev kolektora i uljeve prikljuaka. Obraun
po komadu.
Supply and installation of concrete,
prefabricated, and manholes ending
with cone diameter 1.00 / 0.60 m and
0.60 m in length, made of concrete
MB40, all in accordance with the design,
the technical regulations for concrete
and reinforced concrete and according
to
manufacturers
instructions.Calculation per piece.
Nabavka i ugradnja gotovih betonskih,
montanih, konusnih zavretaka ahtova
prenika 1,00/0,60m i duine 0,60m, od
betona MB40, u svemu prema projektu,
prema tehnikim propisima za beton i
armirani
beton
i
prema
uputstvu
prizvoaa.Obraun po komadu.
42,68
1,00
kom
pcs
1,00
kom
kom
pcs
m1
pcs
0,50
1,00
6,00
kom
pcs
1,00
kom
pcs
1,00
1,00
IV MONTANI RADOVI
m1
6,84
RECAPITULATION
REKAPITULACIJA
I PREPARATORY WORKS
I PRIPREMNI RADOVI
II EARTH WORKS
II ZEMLJANI RADOVI
III CONCRETE WORKS
III BETONSKI RADOVI
IV ASSEMBLING WORKS
IV MONTANI RADOVI
VINISHING WORKS
m1
10,68
17,52
17,52
6,84
m1
10,68
m2
200,00
VZAVRSNI RADOVI
TOTAL
UKUPNO
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
ROUNDABOUT DRAINAGE
ODVODNJA RONDOA
SECTION 2: FROM P95 TO P107
DIONICA 2: OD P95 DO P 107
BILL OF QUANTITIES / PREDMJER RADOVA
No. ITEM
DESCRIPTION OF WORKS
UNIT
R.B POZ
VRSTA RADA
J/M
QUANTITY
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
1,00
1,00
paual
3
Bridging the excavated ditches for
pedestrian
crossing
and
its
dismantling after completion of
works. Made of timber with
protecting fences, 1,10m height on
both sides. Calculation per pcs.
pcs
UNIT
PRICE
4,00
TOTAL EUR
UKUPNO
EUR
4,00
kom
pcs
2,00
kom
m3
192,11
m3
137,76
m3
137,76
m3
8,88
Mechanical
excavation
of
construction pit for accommodation
of the pumping station in the soli III
and IV class according to the
dimensions given in the draft.
Calculation per m3 of excavated
material.
Mainski iskop graevinske jame za
smjetaj pumpne stanice u zemljitu III
i IV kategorije prema dimenzijama
datim u nacrtu. Obraun po m3
iskopanog materijala.
m3
64,47
m3
27,00
m3
31,00
m2
122,40
2
Mainski iskop rova za polaganje
kanalizacione cijevi u zemljitu III i IV
kategorije, dubine od 2,00-4,00 m i
irine prema priloenom poprenom
presjeku sa odbacivanjem iskopanog
materijala na potrebnu udaljenost od
rova. Obraun po m3 iskopanog
materijala.
10
m2
122,40
m3
21,35
m3
61,65
m3
5,40
m3
25,92
Nabavka,
transport
i
ugradnja
posteljice drenane cijevi uz objekat
podhodnika, prema datom detalju.
Obraun po m3 ugraenog materijala
11
12
13
14
m2
270,00
m3
246,63
576,5
m2
79,20
Supply,
transportation
and
disposition of concrete for RC walls
and slabs of pump station with
waterproof concrete MB30 with the
addition of 4% gamma cementol.
Concreting made at the appropriate
two-sided formwork.
Nabavka transport i ugradnja betona
za AB zidova i ploe objekta pumpne
stanice
hidrotehnikim
vodonepropusnim betonom MB30 sa
dodatkom 4% gama cementola.
Betoniranje vriti u odgovarajuoj
dvostranoj oplati.
m3
10,05
Supply,
transportation,steel
reinforcement shaping and placing
of rebar in formwork and fixing with
washers and spacers. Make all
according to the rebar drawing. The
calculation per kg of reinforcing
steel for m3 of embedded in
concrete. For the calculation is
taken 100kg/m3 of concrete
Nabavka, transport, krojenje, prenos i
ugradnja armature u postavljenu oplatu
sa povezivanjem, podmetaima i
distancerima. Izvesti sve prema
armaturnom nacrtu. Obraun po kg
armaturnog elika za m3 ugraenog
betona. Za obraun uzeto 100kg/m3
betona
kg
1.005,00
Making
of
semi-prefabricated
inspection manholes revision, with
bulk concrete MB30 and manhole
pipes diameter 1 m and an eccentric
tapered end and a reinforced
concrete ring for leveling and
support to manhole cover all in
accordance with the technical
regulations
for
concrete.
Calculation per piece.
Izrada polumontanih revizionih okana,
nabijenim betonom MB30 i betonskim
ahtovskim cijevima prenika 1 m i
ekscentrinim konusnim zavretkom i
armirano betonskim prstenom za
izravnavanje i oslonac poklopca ahta
u svemu prema tehnikim propisima
za
beton.
Obraun po kom
Supply and installation of the
flanged spigot piece with clamping
ring for a connection of pipe with
concrete
inspection
chamber.
Calculation per piece, according to
specification.
Nabavka i ugradnja spojnog komada
sa zaptivnim prstenom za nepropusni
spoj cijevi sa betonskim revizionim
oknom.
Obraun
po
komadu,
prema
specifikaciji.
DN 300 mm
DN 150mm
Supply,
transportation
and
installation of concrete catch basins
450 mm with concrete relief ring
and grid for heavy traffic, according
to a given detail. Calculation per
piece.
Nabavka transport i montaa betonskih
ulinih slivnika 450 mm sa betonskim
rasteretnim prstenom i slivnikom
reetkom za teki saobraaj, prema
datom detalju.
Obraun po kom.
Supply,
transportation
and
installation of concrete MB 10 as the
base under inspection manholes
and catch basins. Calculation per
m3 of embedded concrete.
Nabavka, transport i ugradnja betona
MB 10 kao podloge ispod revizionih
okana i ulinih slivnika. Obraun po m3
ugraenog betona
TOTAL CONCRETE WORKS:
UKUPNO BETONSKI RADOVI:
pcs
7,00
kom
pcs
kom
12,00
10,00
pcs
11,00
kom
m3
1,77
5. ASSEMBLY WORKS
5. MONTANI RADOVI
m1
132,00
m1
72,00
m1
12,00
Supply,
transportation
and
installation of PP pipe DN 160 for
connection of gullies and manhole
or pipe, for extreme load class SN 8,
color: blue inside, black outside.
The price includes all connection
elements and fitting elements.
Nabavka, transport i ugradnja PP cijevi
DN 150 za prikljuak ulinog slivnika
do ahta odnosno cjevovoda, za
extremna optereenje klase SN 8 U
cijenu ukljueni svi spojni elementi i
fazonski komadi.
Supply,
transportation
and
installation of PEHD pipes DN 160
for discharge line from pump
station to sewage, (6 bar). The price
includes all fittings.
Nabavka, transport i ugradnja PEHD
cijevi DN 160 za potisni vod iz pumpne
stanice prema kanalizaciji, (6 bara). U
cijenu ukljueni svi spojni elementi i
fazonski komadi.
Supply,
transportation
and
installation of appropriate saddles
for connection of PP pipe DN160
with GRP main sewer.
4
Nabavka,
transport
i
ugradnja
odgovarajuih sedla za spoj PP cijevi
DN160 sa GRP cijevi glavnih kolektora
DN300
DN500
Supply,
transportation
and
installation of drainage PEHD pipes
DN 200 around the structure of
subway according to the attached
detail. The price includes all fittings.
Nabavka,
transport
i
ugradnja
drenanih PEHD cijevi DN 200 oko
objekta podhodnika prema priloenom
detalju. U cijenu ukljueni svi spojni
elementi i fazonski komadi.
Supply, transport and placing
Multytop cover manhole type
PEWEPREN, load classe D400 in
accordance with DIN EN 125, clear
opening 605mm, clear height
125mm BEGU-ram, circural shape
with
PEWEPREN
with
anti
clapping inlay, cover from cast iron
with
ventilation
opennings.
Calculation per pcs.
Multitop poklopaca revizionih okana
PEWEPREN,klase nosivosti D 400
prema DIN EN 125, svijetlog otvora
605 mm , gradj. visine 125 mm,
BEGU-ram, okrugli saPEWEPRENulokom protiv klaparanja, poklopac od
livenog zeljeza, sa otvorima za
ventilaciju
Nabavka,
transport
i
ugradnja
slivnikog kanala (SL.KANAL 1,2 i 3)
V150 od polimernog betona otpornog
na mraz, soli i ostale agresivne uticaje
sa pokrovnom reetkom od plemenitog
elika i za klasu opterecenja C250.
Ugradnja prema uputama proizvoaa
i datim detaljima u ukupnoj duini od
11,00 m'.Obraun po m'
kom
kom
m1
pcs
2,00
2,00
108,00
7,00
kom
m1
11,00
Supply,
transportation
and
installation of gully channel (1.2 and
3) V150 made of polymer concrete
is resistant to frost, salt and other
aggressive actions with cover grid
of stainless steel and loading class
C250. Installation according to
manufactures
instructions
and
given details, in the total length of
11.00 m '. Calculation per m'
Nabavka,
transport
i
ugradnja
slivnikog kanala (SL.KANAL 3 i 4)
V150 - plitki kanal od polimernog
betona otpornog na mraz, soli i ostale
agresivne uticaje sa pokrovnom
reetkom od plemenitog elika i za
klasu opterecenja C250. Ugradnja
prema uputama proizvoaa i datim
detaljima u ukupnoj duini od 8,00 m'.
Obraun po m'
Supply,
transportation
and
installation of gully channels in
front of lifts V100 made of polymer
concrete is resistant to frost, salt
and other aggressive actions with
cover grid of stainless steel and
loading class C250. Installation
according
to
manufactures
instructions and given details, in the
total length of 11.00 m '. Calculation
per m'
m1
8,00
m1
4,00
Nabavka,
transport
i
ugradnja
slivnikih kanala ispred liftova V100 od
polimernog betona otpornog na mraz,
soli i ostale agresivne uticaje sa
pokrovnom reetkom od plemenitog
elika i za klasu opterecenja C250.
Ugradnja prema uputama proizvoaa
i datim detaljima u ukupnoj duini od
4,00 m'. Obraun po m'
10
Supply,
transportation
and
installation of equipment and
materials as per specification of
materials and equipment, point B hydro-mechanical part.
Nabavka transport i montaa opreme i
materijala prema specifikaciji
materijala i opreme iz take B hidomainski dio.
TOTAL ASSEMBLY WORKS:
UKUPNO MONTANI RADOVI
set
koml.
1,00
6. SURVEYING
6. GEODETSKI RADOVI
Stake out and levelling of alignment,
survey of completed works and
preparation of as built design.
Calculation per m1
m1
Iskolavanje i nivelisanje trase,
gedoetsko snimanje zavrenih radova i
izrada projekta izvedenog stanja.
Obraun po m1
Development of survey report for
permanent cadastral record of utility
instalations. Calculations per m1
Izrada geodetskog elaborata za stalni
katastar
komunalnih
instalacija.
Obraun po m1
152,00
152,00
m1
TOTAL SURVEYING:
UKUPNO GEODETSKI RADOVI
7. FINISHING WORKS
7. ZAVRNI RADOVI
Leak testing of sewerage system
before trench backfilling.
Calculation per m.
m1
Ispitivanje
kanalizacije
na
vodopropusnost prije zatrpavanja rova
TOTAL FINISHING WORKS:
UKUPNOZAVRNI RADOVI
RECAPITULATION
REKAPITULACIJA
1
2
3
4
5
6
7
PREPARATORY WORKS
PRIPREMNI RADOVI
EARTH WORKS
ZEMLJANI RADOVI
CARPENTRY WORKS
TESARSKI RADOVI
CONCRETE WORKS
BETONSKI RADOVI
ASSEMBLY
MONTANI RADOVI
SURVEYING
GEODETSKI RADOVI
FINISHING WORK
ZAVRNI RADOVI
TOTAL:
UKUPNO:
DESIGN SUPERVISION OF
WORKS 1.5%
PROJEKTANTSKI NADZOR 1.5%
TOTAL WORKS:
UKUPNO RADOVI:
152,00
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
PEDESTRIAN SUBWAY UNDER THE SOUTH LONGITUDINAL
PJEAKI PODHODNIK ISPOD JUNE LONGITUDINALE
SECTION 2: FROM P51 TO P112
DIONICA 2: OD P51 DO P 112
BILL OF QUANTITIES / PREDMJER RADOVA
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
I EARTH WORKS
I ZEMLJANI RADOVI
Introduction - note: relocation of underground
installations - if they exist in the cadastre
installation.
Uvod - napomena: izmjetanje podzemnih instalacijaako iste postoje prema katastru instalacija.
Before beginning works on the construction pits
excavation and assurance of construction pit it is
necessary to relocate underground installations
and equipment according to the cadastre
underground installations and equipment plan. All
in accordance with issued approvals and the
technical solutions by authorised public utility
companies, in order to ensure continuous
excavation of the construction pit and
construction pit itself.
KOLIINA
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
m3
7.900,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
m3
m3
32,00
30,00
m3
15,00
m3
23,00
100,00
m2
1.700,00
m3
4.500,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
UNIT QUANTITY
VRSTA RADA
J/M
KOLIINA
m2
700,00
m3
190,00
m2
290,00
m3
8
Iskop zemlje za izradu potpornih zidova oko i iznad
krunog toka. Svu iskopanu zemlju odvesti na
odgovarajuu deponiju pri emu izvoa mora voditi
rauna da se moraju istiti gume na kamionima kako
se ne bi prljale gradske saobraajnice. Stavkom
predvidjeti i eventualno crpanje procjedne vode , sa
uputanjem u najblii kini kolektor. Iskop nasipa ,
pomjeanog sa stabiliziranom zemljom zajedno sa
slojevima saobraajnice, asfalt, podtlo, tampon. Za
potporne zidove.
Supply and spreading of a buffer and drainage
material in layers of 20 cm, with mechanic
tamping, after the construction of retaining walls.
1.100,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
UNIT QUANTITY
VRSTA RADA
J/M
KOLIINA
m3
410,00
1
Nabavka materijala i betoniranje temeljnih traka
krunog zida u iskopu. Sve radove izvesti prema
uputama statiara pridravajui se PRAB -a.Beton
mora biti dobro nabijen vibratorom bez vidljivih
upljina, te potpuno ravan. Beton se mora izlijevati u
spiralnim trakama cijelom duinom odreene
kampade temeljne trake, sa konstantnim vibriranjem i
bez prekida betoniranja. Armatura se posebno
obraunava, obezbjediti kontinuitet betoniranja,
nastavci moraju biti korektno izvedeni. Obraun po m3
ugraenog betona.
Strip foundation round wall 65/60
temeljne trake krunog zida 65/60
m3
32,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
m3
30,00
m3
m3
8,00
15,00
2
Nabavka materijala i betoniranje temeljnih stopa
stubova,djelimino u iskopu, a djelimino u
etverostranoj oplati. Sve radove izvesti prema
uputama statiara pridravajui se PRAB -a .Beton
mora biti dobro nabijen vibratorom bez vidljivih
upljina, te potpuno ravan. Betoniranje izvoditi sa
konstantnim vibriranjem i bez prekida betoniranja.
Armatura se posebno obraunava, obezbjediti
kontinuitet betoniranja, nastavci moraju biti korektno
izvedeni. Obraun po m3 ugraenog betona.
Foot foundations 220/220+134/134
temeljne stope 220/220+134/134
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
m3
32,00
m3
46,00
5
Nabavka materijala, izrada podlonog betona kao
podloge za hidroizolaciju. Podloni beton betonirati
betonom marke MB 30 , armiran mreom Q 196, to
ulazi u njedininu cijenu ugraenog betona. Podloni
beton se izvodi prekopredhodno stabiliziranog i
nabijenog podla od postojee zemlje.Obraun po m3
ugraenog betona.
part under slab of central communication
dio ispod ploe centralne komunikacije
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
6
Nabavka materijala i betoniranje armirano -betonske
kontra ploe debljine 40 cm. Sve radove izvesti prema
uputama statiara pridravajui se PRAB -a. Beton
mora biti dobro nabijen vibratorom bez vidljivih
upljina, te potpuno ravan. Beton se mora izlijevati u
spiralnim trakama cijelom duinom odreene
kampade temeljne trake, sa konstantnim vibriranjem i
bez prekida betoniranja. Betoniranje se vri pomou
betonske pumpe.U beton koji se ugrauje pomou
pumpi za beton mora se dodati aditiv koji vee viak
vode iz pumpanog betona. Armatura mora biti paljivo
postavljena
i
distancerima
odvojena
od
podloge.Prilikom betoniranja temeljne ploe voditi
rauna da je cijelo vrijeme betoniranja osigurano
crpljenje vode iz graevinske jame, kako se spojnice
na prekidima betoniranja ne bi mogle uprljati. Ploe
prilaznih tunela d = 40cm.Obraun po m3 ugraenog
betona
tunnel 1/ tunel 1
tunnel 2/ tunel 2
tunnel 3/tunel 3
tunnel 4/ tunel 4
total/ ukupno:
m3
m3
m3
m3
24,00
25,00
30,00
28,00
107,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
m3
m3
3,00
3,00
6,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
m3
6,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
Material supply and concreting inner reinforced
concrete load-bearing walls Thk 30 cm with
concrete Grade MB 30 in two-sided smooth
formwork. Provide continuity of concreting to
prevent interruption, segregation of concrete and
visible joints during the continuation of
concreting. The walls must be smooth and flat
without visible joints. The formwork must be
smooth, straight and well stiff to prevent buckling
of the formwork. Joints between slab formwork
must be carefully constructed and sealed with
cement paint. During concrete placement, joints
between slabs and columns require treatment
with respect. These joints shall be at right angles
unless otherwise specified. Concrete should be
well compacted using vibrator without visible
pores, and completely flat. All holes of formwork
must be completely sealed after disassembling to
assure strether bond. The reinforcement must be
laid carefully, placed on spacer blocks. All
reinforcements is calculated separately. Fully
comply with PRAB regulations. Unit price per m
of built wall of natural cement concrete. Any
subsequent hick-joint pointing, repairing or
plastering operations will be permitted. Therefor,
the necessary installations should lay immediately
into concrete during the works.
UNIT QUANTITY
J/M
KOLIINA
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
m3
m3
m3
m3
KOLIINA
28,00
26,00
34,00
31,00
119,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
10
POZ
DESCRIPTION OF WORKS
UNIT QUANTITY
VRSTA RADA
J/M
m3
Material supply and concreting interior RC loadbearing wall Thk 20 cm with concrete Grade MB
30 in two-sided smooth formwork. Provide
continuity of concreting to prevent interruption,
segregation of concrete and visible joints during
the continuation of concreting. The walls must be
smooth and flat without visible joints. The
formwork must be smooth, straight and well stiff
to prevent buckling of the formwork. Joints
between slab formwork must be carefully
constructed and sealed with cement paint. During
concrete placement, joints between slabs and
columns require treatment with respect. These
joints shall be at right angles unless otherwise
specified. Concrete should be well compacted
using vibrator without visible pores, and
completely flat. All holes of formwork must be
completely sealed after disassembling to assure
strether bond.
KOLIINA
64,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
11
m3
m3
21,00
21,00
42,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
Material supply and concreting RC load-bearing
outer walls of the stairs Thk 25 cm with concrete
Grade MB 30 in two-sided smooth formwork.
Provide continuity of concreting to prevent
interruption, segregation of concrete and visible
joints during the continuation of concreting. The
walls must be smooth and flat without visible
joints. The formwork must be smooth, straight
and well stiff to prevent buckling of the formwork.
Joints between slab formwork must be carefully
constructed and sealed with cement paint. During
concrete placement, joints between slabs and
columns require treatment with respect. These
joints shall be at right angles unless otherwise
specified. Concrete should be well compacted
using vibrator without visible pores, and
completely flat. All holes of formwork must be
completely sealed after disassembling to assure
strether bond. The reinforcement must be laid
carefully, placed on spacer blocks. All
reinforcements is calculated separately. Fully
comply with PRAB regulations. Unit price per m
of built wall of natural cement concrete. Any
subsequent hick-joint pointing, repairing or
plastering operations will be permitted. Therefor,
the necessary installations should lay immediately
into concrete during the works. Wall 25 cm, twosided formwork, MB30
12
Nabavka materijala i betoniranje a.b. Vanjskih nosivih
zidova stepenita d= 25 cm sa betonom MB 30 u
dvostranoj glatkoj oplati.Obezbjediti kontinuitet
betoniranja kako ne bi dolo do prekida, segregacije
betona i vidljivih spojeva prilokom nastavka
betoniranja. Zidovi moraju biti glatki i ravni bez vidljivih
nastavaka. Oplata mora biti glatka, ravna i dobro
ukruena da ne bi dolo do izvijanja iste. Spojevi
izmedu ploa oplate moraju biti pajivo obradjeni i
zaptiveni cementnim mlijekom. Prilikom ugradbe
betona spojeve izmedju ploa i zidova takodje dobro
obraditi. Ovi spojevi su pod pravim kutom ako se
drugacije ne zahtijeva. Beton se mora dobro nabiti i
izvibrirati, tako da bude ravan i bez vidljivih upljina.
UNIT QUANTITY
J/M
KOLIINA
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
UNIT QUANTITY
VRSTA RADA
J/M
m3
KOLIINA
35,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
13
POZ
DESCRIPTION OF WORKS
VRSTA RADA
J/M
m3
14
UNIT QUANTITY
KOLIINA
24,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
m3
103,00
m3
m3
m3
m3
34,00
24,00
21,00
21,00
100,00
15
Nabavka materijala i betoniranje A.B. ploa sa MB 30
u glatkoj oplati.Spojevi ploa oplate su paljivo
obradjeni i zaptiveni da ne bi dolo do curenja
cementnog mlijeka prilikom ugradjivanja i nabijanja
betona. Spojevi izmjedju zidova i ploe su takodjer
dobro zaptiveni i obezbijedeni od procurivanja
cementnog mlijeka. Beton mora biti dobro nabijen
vibratorom bez vidljivih supljina, te potpuno ravan.
Sve upljine radi stezanja oplate moraju biti paljivo
zaptivene. Armatura mora biti paljivo postavljena i
distancerima odvojena od oplate. Oplata 103-106,
ploe tunela d = 140 cm.
slab pos 103/ ploa poz 103
slab pos 104 /ploa poz 104
slab pos 105 /ploa poz 105
slab pos 106 /ploa poz 106
total/ ukupno:
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
m3
9,00
16
Nabavka materijala i betoniranje A.B. greda dim.
30/100cm sa MB 30 u trostranoj glatkoj oplati, sa
svim potrebnim. Oplata mora biti glatka, ravna i dobro
ukruena da ne bi dolo do izvijanja iste. Spojevi
izmedu ploa oplate moraju biti pajivo obradjeni i
zaptiveni cementnim mlijekom. Prilikom ugradbe
betona spojeve izmedju ploa i greda takodje dobro
obraditi. Ovi spojevi su pod pravim kutom ako se
drugacije ne zahtijeva. Beton se mora dobro nabiti i
izvibrirati, tako da bude ravan i bez vidljivih upljina.
Sve upljine radi stezanja oplate moraju biti nakon
demontae oplate potpuno zaptiveni. Armatura mora
biti pajivo postavljana i distancerima odvojena od
oplate.
Sva
armatura
se
posebno
obraunava.Obraun po m3 izbetoniranog zida u
NATUR BETONU Nikakvo naknadno dersovanje,
popravljanje niti malterisanje nee se dozvoliti. Iz tih
razloga, prilikom izvoenja radova potrebno je odmah
u beton polagati potrebne istalacije.
beams dim 30/100m, MB 30, three-sided formwork
grede dim. 30/100m, MB 30, trostr. oplata
beam pos 102, circular edge beam of the dome
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
17
Nabavka materijala i betoniranje A.B. greda dim.
30/80cm sa MB 30 u trostranoj glatkoj oplati, sa svim
potrebnim. Oplata mora biti glatka, ravna i dobro
ukruena da ne bi dolo do izvijanja iste. Spojevi
izmedu ploa oplate moraju biti pajivo obradjeni i
zaptiveni cementnim mlijekom. Prilikom ugradbe
betona spojeve izmedju ploa i greda takodje dobro
obraditi. Ovi spojevi su pod pravim kutom ako se
drugacije ne zahtijeva. Beton se mora dobro nabiti i
izvibrirati, tako da bude ravan i bez vidljivih upljina.
Sve upljine radi stezanja oplate moraju biti nakon
demontae oplate potpuno zaptiveni. Armatura mora
biti pajivo postavljana i distancerima odvojena od
oplate.
Sva
armatura
se
posebno
obraunava.Posebnu panju obratiti na prodore
instalacija prema planu oplate, nacrtima instalacija i
lic planu , jer se naknadna temanja greda nee
priznavati.
beams dim. 30/80m, MB 30, three-sided formwork
grede dim. 30/80m, MB 30, trostr. oplata
circular edge beam on road and tunnel dilatation
19,00
3
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
DESCRIPTION OF WORKS
POZ
VRSTA RADA
kruna rubna greda na dilataciji ceste i tunela
UNIT QUANTITY
J/M
KOLIINA
m3
STAIRWAYS
STEPENITA
Material supply and concreting RC treads slab and
landing slabs thickness 35-45 cm of concrete
Grade MB 30 in smooth formwork, including all
required preliminary. All work in accordance to
given blueprints, detailing and structural engineer
instructions. Joints of slabs formwork are
carefully constructed and sealed to avoid leakage
of cement paint during installation and
compaction of concrete. Joints between walls and
slabs are also well-sealed and secured from
leaching of the cement paint. Concrete should be
well compacted using vibrator without visible
pores, and completely flat. All holes of formwork
must be completely sealed after disassembling to
assure strether bond. The reinforcement must be
laid carefully, placed on spacer blocks. Slabs
treads and landing of stairs, Thk 35-45 cm, MB 30.
Unit price per m of built in concrete staiways.
18
m3
20,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
19
m3
16,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
20
m3
11,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
21
m3
10,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
pcs
kom
2,00
22
Nabavka meterijala i betoniranje u tanko oplati, sa
zaglaivanjem AB kapa dimnjaka i ventilacija u vidu
takne obrubne ploe. U Betonskoj kapi izvesti s donje
strane kaneluru, kao okapnicu. Sav rad prema datim
nacrtima, detaljima i zahtijevu statiara. Pridrzavati se
vaeih standarda i propisa u gradjevinarstvu, kao i
optih tehnikih uslova i PRAVILNIKA ZA BETON I
ARMIRANI BETON.Obraun po komadu kape, sa
armaturom.
chimney pots and ventilation dim.40/40/10 cm
kape dimnjaka i ventilacija dim40/40/10 cm
RETAINING WALLS
POTPORNI ZIDOVI
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
23
m3
m3
210,00
195,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
DESCRIPTION OF WORKS
POZ
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
THE REINFORCEMENTS
ARMATURE
Supply, transport, corrections, cutting, bending
and assembly of the reinforcement. The price
includes the kg of placed reinforcement all
expansion joint for slabs, beams, columns, walls,
welding reinforcement if necessary and spacer,
and will not be separately calculated or paid. The
price is for kg of placed reinforcement to the
reinforcement
specification,
drawings
and
structural analysis.
24
MA500/560
RA 400/500
II
kg
kg
32.058,00
114.584,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
III MASONRY
III ZIDARSKI RADOVI
Partition walls masonry Thk 12 cm, as
POROTHERM 11,5 in p.c.m 1:2:6. Unit price per
m. The price include all the necessary material
and work and the use of lightweight mobile
scaffold. The openings are not included in the
price and are not entitled to any additions which
should be taken into account when issuing the
price. The price includes making correct joint with
the existing structure (craft and aestheticly), and
also necessary reinforced lintels with the
reinforcement of steel mesh +/- 2 12 m., and are
performing in all partition walls on height of 300
cm and horizontal and vertical ring beam. All
vertical and horizontal ring beams are included in
the price of the walls. Unit price per m of the
partitions walls.
1
Zidanje unutarnjih pregradnih zidova d= 12 cm, kao
POROTHERM 11,5 u p.c.m 1:2:6. Obraun po m2.U
cijenu uraunati sav potreban materijal i rad te
upotrebu lake pokretne skele.Otvori se odbijaju bez
prava na bilo kakve dodatke o emu treba voditi
rauna pri davanju cijene. U cijenu ukljuena i izrada
korektnog spoja sa postojeom konstrukcijom
(zanatski i estetski), kao i potrebni AB nadvratnici koji
se armiraju konstruktivnom armaturom +/- 2 12 m.,
a izvode se u svim pregradnim zidovima na visini 300
cm, kao i svi vertikalni i horizontalni serklai.Svi
serklai, vertikalni, horizontalni ukljueni su u
jedininu cijenu zidova.Obraun po m2 pregradnih
zidova
partition walls, toilette, security
pregradni zidovi toalet, obezbjeenja
Mechanical plastering of all masonry and concrete
surfaces with plaster mortar; the note: partitions
of the sanitary rooms are plastering with
mechanical cement mortar. With all the necessary
preparations, cleaning, priming, etc. All edges of
the beams passing through the area are necessary
to handle with edged rails, which are included in
this item.
m2
116,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
J/M
KOLIINA
UNIT QUANTITY
m2
m2
m2
m2
m2
370,00
138,00
130,00
167,00
60,94
m2
150,00
1.015,94
m2
m2
m2
m2
m2
m2
402,40
54,69
52,03
65,78
60,94
6,76
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
UNIT QUANTITY
VRSTA RADA
J/M
KOLIINA
m2
m2
m2
m2
7,59
8,82
8,71
11,83
679,55
m2
3,00
III
MASONRY TOTAL
UKUPNO ZIDARSKI RADOVI
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
IV HYDROINSULATION WORKS
IV HIDROIZOLATERSKI RADOVI
Material supply and manufacture of horizontal
hydroinsulation under the concrete slab to detail 1
and detail 5 from the section. Horizontal
hydroinsulation lay over the sleek concrete slabs,
and it consists of three layers of welded felt roof
and a layer of cold coating. Waterproofing is
performed first on RC wall with cold coating
bitulit. Then lay down three layers of felt
waterproof: first layer is with a pad of polyester
felt, second layer a pad of aluminium foil type
polyvap 4 mm and third layer again a pad of
polyester felt, Type elastoflex S6 4 mm.
Waterproofing done so that the first layer welds
over a cold coating, and that the second and third
layer are welded 100% for the previous at the
counter directions. Horizontal overlapping
perform min 10 cm. Waterproofing is type
POLYGLASS or equivalent previously approved by
the designer and supervising engineer. Horizontal
waterproofing on the site of RC walls and
columns perform by coating Kemperol or the
epoxy system waterproofing type "STIGOLIT".
Bitumenous waterproofing overlaps perform
minimum 50 cm! Each anchor at a height of 50 cm
handle elastic with waterproof coating
"STIGOELAST". The item predict and geotextil 200
g/m as a protection over waterproofing as the
same would not be damaged during concreting
the concrete floor slabs.
KOLIINA
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
m2
m2
m2
m2
63,00
60,00
78,00
88,00
m2
405,00
694,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
Material supply and manufacture of vertical
hydroinsulation of outer load-bearing walls to
detail 3 from the section. Vertical hydroinsulation
is done over the reinforced concrete walls, and
consists of three layers of welded felt waterproof
and a layer of cold coating. Waterproofing is
performed first on RC wall with cold coating
bitulit. Then lay down three layers of felt
waterproof: first layer is with a pad of polyester
felt, second layer a pad of aluminium foil type
polyvap 4 mm and third layer again a pad of
polyester felt, Type elastoflex S6 4 mm.
Waterproofing done so that the first layer welds
over a cold coating, and that the second and third
layer are welded 100% for the previous at the
counter
directions.
Horizontal
overlapping
perform min 10 cm. Waterproofing is type
POLYGLASS or equivalent previously approved by
the designer and supervising engineer. Vertical
insulation min 50 cm overlap with horizontal
isolation of RC counter plate. The item predict and
placing of thermal insulation EXPANDED
POLYSTYRENE type PERIMATE DI 6 CM and cork
foil type "Tefond". All include in unit price per m.
Unit price per m of horizontal projection.
UNIT QUANTITY
J/M
KOLIINA
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
m2
m2
m2
m2
m2
135,00
78,00
102,00
120,00
320,00
755,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
m2
220,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
4
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
m2
730,00
m2
5,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
IV
m2
m2
8,00
10,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
V STEEL CONSTRUCTION
V ELINA KONSTRUKCIJA
THE BOX STEEL DOME STRUCTURE
KUTIJASTA ELINA KONSTRUKCIJA KUPOLE
Manufacture and assembly of steel construction
to the static calculation, technical description,
approved dispositions and construction schemes,
given drawings and architectural details, made
workshop drawings and specifications in the
constructive phase. Prior to execution of works
the Contractor is required to make detailed
workshop drawings and to adjust details its
technological capabilities, and prior to
commencement of works to submit them to the
designer and structural engineer for approval.
Steel construction is necessary to make with
professionallity and quality and in accordance
with the technical conditions. Steel
superstructures are derived from basic material
which shall correspond in response to DIN
171000/1980. Into construction can be built in
steel with better chemical and mechanical
characteristics of the given project documents
without changing the dimensions of the adopted
elements of steel superstructure. Additional
material for welded steel structures (electrodes)
must match JUS C.H3. 011 or appropriate DIN
1913. Quality of screws, nuts and support pads
must correspond to JUS M.B1.023 and JUS
M.B1.028 or appropriate DIN 267. In principle, if
not specifically indicated on the drawings, the
static calculation and other documentation, the
screws have the strength class 5.8.
KOLIINA
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
In forming a price use the plan of steel structure
and specification of materials listed in the
constructive phase of the project. The amount as
specified for all positions with the included steel
profiles. In calculation is specified also the weight
of welds, and all the connection elements. All
links conformed to the static calculation, and the
construction is hot galvanized and plastic coated
with the color chosen by the designer. Parts of the
construction to adapt to their technological
capabilities. Unit price per kg of total installed
steel.
UNIT QUANTITY
J/M
KOLIINA
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
DESCRIPTION OF WORKS
POZ
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
kg
390,00
kg
1605,00
kg
kg
450,00
122,00
2567,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
VILOCKSMITH'S WORKS
VI BRAVARSKI RADOVI
INNER DOOR POSITIONS
POZICIJE UNUTARNJIH VRATA
POS1
Material supply, workshop production and
assembly on the site of double-wing window.
Window frame and casement perform of the
plasticised aluminum profiles with a breakdown of
thermal
barrier.
Processing
profiles
by
electrostatic coating color is given to the choice
of the designer. Type of profile Feal THERMO 65
or equivalent. Vitrify the window with thermopane
Low-E insulating double glazing 4+16+6 mm. Type
of glass "Sun-Guard", completely transparent
"float", Klimaguard N or equivalent. Hardware is
appropriate, calculated on the weight positions,
GU, or equivalent. The one window casement
dim.82x120 opens around the lower horizontal
and vertical axis. All measures to control on-site,
the contractor is obligated to make manufacturing
drawings and submit them to the supervising
engineer and the designer for approval.
POS1
Nabavka materijala, radionika izrada i montaa na
licu mjesta dvokrilnog prozora.Okvir prozora i krilo
prozora izvesti od aluminijskih plastificiranih profila sa
prekunutim termikim mostom. Obrada profila
elektrostatka plastifikacija u boji po izboru projektanta.
Tip profila Feal TERMO 65 ili equivalent.Prozor
ustakliti termopan Low-E duplo izolirajucim staklom
4+16+6 mm. Staklo tip "Sun-Guard", potpuno
transparentno
"float",
Klimaguard-N
ili
equivalent.Okov je okovarajui, proraunat na teinu
pozicije, GU ili equivalent.Jedno krilo prozora dim
82x120 se otvara oko donje horizontalne i oko
vertikalne osovine.Sve mjere kontrolisati na licu
mjesta, a izvoa je duan napraviti radionike nacrte
i dostaviti ih nadzodnom inzinjeru i projektantu na
usvajanje.
POS 1 164x120
kom
1,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
POS 2
Material supply, workshop production and
assembly on the site of complex casement
opening. The position consists of doors and
window made segmently of forming arc radius 600
cm. Position's frame and door's casement
perform out of the plasticised aluminum profiles
with a breakdown of thermal barrier. Processing
profiles by electrostatic coating color is given to
the choice of the designer. Type of profile Feal
THERMO 65 or equivalent. Masonry opening
position dim. 93x220+210x120 cm. Hardware is
appropriate, calculated on the weight positions,
GU, or equivalent. Two window casement are
fixed and one opens as tilt-wriggle around the
vertical and horizontal axis. On the door inox
handle on both sides, independent from the
locking system. The lock is coded. All measures
control on-site, the Contractor is obligated to
make manufacturing drawings and submit them to
the supervising engineer and the designer for
approval.
POS 2
Nabavka materijala, radionika izrada i montaa na
licu mjesta viekrilne sloene stijene.Pozicija se
sastoji od vrata i prozora izraenih segmentno da
formiraju luk poluprenika 600 cmOkvir pozicije i krilo
vrata izvesti od aluminijskih plastificiranih profila sa
prekunutim
termikim
mostom.Obrada
profila
elektrostatka plastifikacija u boji po izboru projektanta.
Tip profila Feal TERMO 65 ili equivalent.Zidarski
otvor pozicije dim. 93x220+210x120 cm Okov je
okovarajui, proraunat na teinu pozicije, GU ili
equivalent.Dva krilo prozora su fiksna a jedno se
otvara kao otklopno zaoktretno, oko vertikalne i donje
horizontalne ose.Na vratima je teka inox sa obje
strane, neovisna od brave za zakljuavanje.Brava je
kodirana.Sve mjere kontrolisati na licu mjesta, a
izvoa je duan napraviti radionike nacrte i dostaviti
ih nadzodnom inzinjeru i projektantu na usvajanje.
kom
POS 2 93x220+210x120
1,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
POS3
Material supply, workshop production and
assembly on the site of single panel door. Door
frame and casement perform out of the plasticised
aluminum profiles with a breakdown of thermal
barrier. Processing profiles by electrostatic
coating color is given to the choice of the
designer. Type of profile Feal THERMO 65 or
equivalent. The infill door- aluminium panel
thickness of 24 cm. Hardware is appropriate,
calculated on the weight positions, GU, or
equivalent. The masonry measurement door
111x220 cm. Inox handle door on both sides,
independent from the locking system, doors
equipped with an integrated hydraulic sliding
closure type GU or equivalent. The lock is
cylindical with coded key. Doors at the bottom
have jalousies for ventilation. All measures
control on-site, the Contractor is obligated to
make manufacturing drawings and submit them to
the supervising engineer and the designer for
approval.
POS3
Nabavka materijala, radionika izrada i montaa na
licu mjesta jednokrilnih vrata Okvir i krilo vrata izvesti
od aluminijskih plastificiranih profila sa prekunutim
termikim mostom.Obrada profila elektrostatka
plastifikacija u boji po izboru projektanta. Tip profila
Feal TERMO 65 ili equivalent.Ispuna vrata al. panel
debljine 24 mm. Okov je okovarajui, proraunat na
teinu pozicije, GU ili equivalent.Zidarska mjera vrata
111x220teka vrata inox sa obje strane, neovisna od
brave za zakljuavanje, vrata opremiti hidraulikim
kliznim integrisanim zatavaraem tipa GU ili
equivalent.Brava je cilidndrina sa kodiranim
kljuem.Vrata u dnu imaju aluzinu za ventilaciju.Sve
mjere kontrolisati na licu mjesta, a izvoa je duan
napraviti radionike nacrte i dostaviti ih nadzodnom
inzinjeru i projektantu na usvajanje.
POS 3 111x220
kom
1,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
POS4
Material supply, workshop production and
assembly on the site of single panel door. Door
frame and casement perform out of the plasticised
aluminum profiles with a breakdown of thermal
barrier. Processing profiles by electrostatic
coating color is given to the choice of the
designer. Type of profile Feal THERMO 65 or
equivalent. Vitrify door with thermopane glass
4+16+6, inner side blasted. Hardware is
appropriate, calculated on the weight positions,
GU, or equivalent. The masonry measurement
door 81x220 cm. Inox handle door on both sides,
independent from the locking system. The lock is
cylindical with coded key. All measures control onsite, the Contractor is obligated to make
manufacturing drawings and submit them to the
supervising engineer and the designer for
approval.
POS4
Nabavka materijala, radionika izrada i montaa na
licu mjesta jednokrilnih vrata Okvir i krilo vrata izvesti
od aluminijskih plastificiranih profila bez prekinutog
termikog
mosta.Obrada
profila
elektrostatka
plastifikacija u boji po izboru projektanta. Tip profila
Feal TERMO 65 ili equivalent.Vrata ustakliti
termopan staklom 4+16+6, sa unutarnje strane
pjeskareno.Okov je okovarajui, proraunat na teinu
pozicije,
GU
ili
equivalent.Zidarska
mjera
vrata81x220teka vrata inox sa obje strane, neovisna
od brave za zakljuavanje.Brava je cilidndrina sa
kodiranim kljuem.Sve mjere kontrolisati na licu
mjesta, a izvoa je duan napraviti radionike nacrte
i dostaviti ih nadzodnom inzinjeru i projektantu na
usvajanje.
POZ 4 81 x220
kom
1,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
POS5
Material supply, workshop production and
assembly on the site of single panel door. Door
frame and casement perform out of the plasticised
aluminum profiles with a breakdown of thermal
barrier. Processing profiles by electrostatic
coating color is given to the choice of the
designer. Type of profile Feal THERMO 65 or
equivalent. The infill door- aluminium panel
thickness of 24 cm. Hardware is appropriate,
calculated on the weight positions, GU, or
equivalent. The masonry measurement door
91x220 cm. Inox handle door on both sides,
independent from the locking system, doors
equipped with an integrated hydraulic sliding
closure type GU or equivalent. The lock is
cylindical with coded key. The casement redused.
All measures control on-site, the Contractor is
obligated to make manufacturing drawings and
submit them to the supervising engineer and the
designer for approval.
POS5
Nabavka materijala, radionika izrada i montaa na
licu mjesta jednokrilnih vrata. Okvir i krilo vrata izvesti
od aluminijskih plastificiranih profila sa prekunutim
termikim mostom. Obrada profila elektrostatka
plastifikacija u boji po izboru projektanta. Tip profila
Feal TERMO 65 ili equivalent.Ispuna vrata al. panel
debljine 24 mm. Okov je okovarajui, proraunat na
teinu pozicije, GU ili equivalent.Zidarska mjera vrata
91x220teka vrata inox sa obje strane, neovisna od
brave za zakljuavanje, vrata opremiti hidraulikim
kliznim integrisanim zatavaraem tipa GU ili
equivalent.Brava je cilidndrina sa kodiranim
kljuem.Krilo skraeno.Sve mjere kontrolisati na licu
mjesta, a izvoa je duan napraviti radionike nacrte
i dostaviti ih nadzodnom inzinjeru i projektantu na
usvajanje.
POS 5 91x220
kom
2,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
POS6
Material supply, workshop production and
assembly on the site of single panel door for
disabled persons. Door frame and casement
create of the plasticised aluminum profiles with a
breakdown of thermal barrier. Processing profiles
by electrostatic coating color is given to the
choice of the designer. Type of profile Feal
THERMO 65 or equivalent. The infill dooraluminium panel thickness of 24 cm. Hardware is
appropriate, calculated on the weight positions,
GU, or equivalent. The masonry measurement
door 111x220 cm. Inox handle door on both sides,
independent from the locking system, is adjusted
to the disabled persons. The lock from the outside
is key-locked, and from the inside with no key, as
the toilete lock. The casement redused. All
measures control on-site, the Contractor is
obligated to make manufacturing drawings and
submit them to the supervising engineer and the
designeica mora odgova
1,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
VI
3,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
VII DOME
VII KUPOLA
Note: construction seperately calculated in the
steel work.
Napomena konstrukcija posebno obraunata u
radovima elika.
pcs
KOLIINA
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
VII
VIII
TOTAL DOME
UKUPNO KUPOLA
CERAMIC WORKS
KERAMIARSKI RADOVI
All works are to be performed in accordance to
applicable standards, regulations and norms in
civil engineering and to accordance to JUS B.D1.
300-301.
Svi radovi treba da budu izvedeni u skladu sa
vaeim standardima, propisima i normativima u
graevinarstvu i da zadovolje JUS B.D1. 300-301.
KOLIINA
1,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
DESCRIPTION OF WORKS
POZ
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
m2
m2
m2
m2
m2
6,76
7,59
8,82
8,71
11,83
43,71
m1
12,42
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
VIII
m2
m2
m2
m2
34,00
38,00
32,00
52,00
156,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
IX GYPSUM WORKS
IX GIPSARSKI RADOVI
Material supply and suspended ceiling production
from waterproof gypsum cardboards Thk 12.5 mm
on standard subconstruction of metal profiles.
The price ceiling manufacture include cutting the
holes for lighting to the electro installation
project, setting the adhesive tape armed out of
glass fibres and puttying compounds. Suspended
ceilings, with a lowering in the level scheme of the
ceiling and installation of lighting scheme. Unit
price per m of horizontal projection.
m2
m2
m2
m2
m2
6,76
7,59
8,82
8,71
11,83
43,71
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
2
POZ
DESCRIPTION OF WORKS
VRSTA RADA
J/M
KOLIINA
UNIT QUANTITY
m2
m2
2,00
4,00
m2
8,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
4
DESCRIPTION OF WORKS
VRSTA RADA
J/M
KOLIINA
IX
UNIT QUANTITY
IX GYPSUM WORKS
UKUPNO GIPSARSKI RADOVI
m1
175,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
1
Nabavka materijala, radionika izrada i montaa
ograde zranih prostora i konstrukciju ograde izvesti u
kombinaciji inox kutijastih profila, finalno obraemi
kao eljani, na koje su navareni inox trapezni flahovi
koji nose polirane inox rukohvate. Nosa ograde od
kitijastog inox profila se preko stope privrsti za
betonsku konsrukciju. Stopica se sastoji od inox anker
ploe 10,5x8 cm debljine 10 mm koja se sa 4 ukrasna
inox vijka privsti za betonsku podlog. Za anker plou
je zavarena vertikala od inox punog prifila d=1,5 cm i
visine 13 cm od kojih 5,5 "ulazi" u cijev ograde i
kutijasti profil se vijcima sa ukrasnom inox glavom
zaarafi za inoxni puni vertikalni dio stope ograde.
Stubovi su na meusobnom odstojanju od 150 cm,
na visini od 40 cm su spojeni inox poliranom cijevi
prmijera 30 mm.Na ogradi se nalaze dva rukohvata
izvedena od inox polirane civi promjera 40 mm,
odmnosno 50 mm. Prvi na visini od 65 cm, a drugi na
100 cm. stepenite 1
part by the street/ sa dijelom uz ulicu
stairway 2/ stepenite 2
m1
m1
8,00
12,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
J/M
stairway 3/ stepenite 3
stairway 4/ stepenite 4
part to the St. Varazdinskoj/ dio prema Varadinskoj
ulici
along with the terrain/ ravno sa terenom
terrain/ ukupno:
Material supply, fabrication and installation of
handrails in polished stainless steel, diameter 42
mm, which are fixed on the walls using polished
inox profiled components height 5 cm, Thk 5 mm.
In the calculation take all inox connecting
elements. All joints welded and polished. Unit
price per m.
m1
m1
9,00
20,00
m1
m1
150,00
180,00
379,00
KOLIINA
m1
m1
39,00
12,00
51,00
UNIT QUANTITY
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
3
POZ
DESCRIPTION OF WORKS
UNIT QUANTITY
VRSTA RADA
J/M
m1
KOLIINA
25,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
1
Postavljanje u ljepilu kamenih granitnih ploa 80x40,
debljina ploa d= 3 cm ili sl. po izboru projektanta
Kamen granit tamno sivo-crno ili neki drugi po izboru
projektanta. kamene ploe se polau prema emi
polaganja datim u nacrtima koje e projektant
dostaviti naknadno. Kamen se postavlja u ljepilu za
kamen .Kamen mora imati visoku vrstou na pritisak
i veliku otpornost na habanje.Razdjelnice pri ugradnji
kamena treba da prate konstruktivne razdjelnice, a
izrauju se od tipskih Inox profila koje treba predvidjeti
ovom stavkom.Kamene ploe postaviti prema emi
polaganja podova: u nacrtu. Ugraivanje lajsni na
spojevima razliitih vrsta podova ne obraunava se
posebno.Pri polaganju izvesti radne dilatacije i
zatvoriti ih tipskom inox lajsnom, dilataciju izvesti tako
da je max. povrina jednog polja 40m2. Obraun po
m2 . Debljina d=3cm
central communication/ centralna komunikacija
corridor 1/ hodnik 1
corridor 2/ hodnik 2
corridor 3/ hodnik 3
corridor 4/ hodnik 4
total/ ukupno:
m2
m2
m2
m2
m2
402,40
54,69
52,03
65,78
60,94
635,84
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
m1
m1
m1
m1
m1
68,00
28,00
26,00
34,00
30,00
186,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
m1
66,00
m1
50,00
m2
m2
9,00
10,00
m1
28,00
m1
60,00
m1
53,00
m2
m2
10,00
10,00
m1
35,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
stairway3/ stepenite 3
risers stairway h=15, t=2 cm, w=240 cm, pcs 18
43,00
m
treads stairway w=30, t=3 cm, w=250 cm, pcs 17
gazita stepenita =30 d= 3cm =240cm kom 17
stone socle on staircases (stepped and flat t=2
cm)
kameni sokl na stepenicma (stepenasto i ravno d= 2
cm)
m1
41,00
m1
19,00
m1
58,00
m1
51,00
m1
21,00
m2
10,00
stairway 4/ stepenite 4
risers stairway h=15, t=2 cm, w=240 cm, pcs 24
ela stepenita h=15 d=2 cm =300 cm kom 24
treads stairway w=30, t=3 cm, w=300 cm, pcs 21
gazita stepenita =30 d= 3cm =300cm kom 21
stone socle on staircases (stepped and flat t=2
cm)
kameni sokl na stepenicma (stepenasto i ravno d= 2
cm)
landing d=3 cm/ medjupodest d=3 cm
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
stairway 5/ stepenite 5
risers stairway h=15, t=2cm, w=540 cm(3x180),
pcs 7
ela stepenita h=15 d=2 cm =540 cm(3x180), kom
7
treads stairway w=30, t=3cm, w=540cm (3x180),
pcs 6
gazita stepenita =30 d=3 cm =540 cm(3x180),
kom 6
stringers staircase (stepped and flat d=2 cm)
obrazni nosai (stepenasto i ravno d= 2 cm)
Material supply and manufacture of a bench on a
concrete stairs fence. The bench set in adhesive
for stone thk 3 cm; the granite stone at long
positions in which is not possible to perform onepiece; continuation of two benches must be finely
processed so the joints would not be visible; and
the pieces shorter than 60 cm can not be
continued. Cost include all items necessary to
complete. Unit price per m of completly finished
bench.
UNIT QUANTITY
J/M
KOLIINA
m1
40,00
m1
33,00
m2
10,00
4
Nabavka materijala i izrada klupice na betonskoj
ogradi stepenica, klupica se postavlja u ljepilu za
kamen d=3 cm, kamen paljeni granit kod dugih
pozicija kod kojih nije mogue izvesti klupicu iz jednog
komada, nastavak dvije klupice mora biti fino obraen
kako se ne bi vidjela fuga i ne mogu se nastavaljati
komadi krai od 60 cm. Cijenom obuhvatiti sve
potrebno za zavretak stavke.Obraun po m1 komplet
zavrene klupice R 40cm
stairway 1/ stepenite 1
stairway 2/ stepenite 2
XI
m1
m1
55,00
27,00
82,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
m2
m2
180,00
150,00
330,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
Production of thermo-facade with thermo
insulation layer of 10 cm. On the concrete or brick
walls are to be set the rigid polystyrene insulation
panel for facade Thk 10 cm and dim. 100/50 cm by
gluing and anchoring screws operations
(17kg/m). Bonding is done with appropriate
adhesive and anchoring appropriate steel molly
bolt with oval head. Consumption 6 psc/m, and
the lenght adjusted to the total thickness of
thermal-facade. Mass for the reinforcement is an
organic binding mass, elastic and resistant to
cracking. Upon this is placed reinforcement fabric mesh, and re-glue. Over performed thermo
insulation layer and fabric aplly silicate plaster
facade color chosen by the designer according to
the color chart of choosen manufacturer plaster.
Plaster facade; acrylic marble mortar grain size 2
mm. Impregnation derived with water repellents
for in-depth grounding containing a solvent based
on silicone microemulsions in the form of
concentrate diluted with water in a ratio of 1:10.
Thermo-facade type "STO" or equivalent.
UNIT QUANTITY
J/M
KOLIINA
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
DESCRIPTION OF WORKS
POZ
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
XIII
m2
m2
m2
45,00
75,00
72,00
192,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
260,00
54,69
52,03
65,78
60,94
6,76
7,59
8,82
8,71
11,83
537,15
m2
m2
m2
m2
m2
m2
220,00
78,00
70,00
80,00
82,00
38,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
DESCRIPTION OF WORKS
POZ
VRSTA RADA
UNIT QUANTITY
J/M
total/ ukupno:
XIII
KOLIINA
568,00
PAINTING WORKS
UKUPNO MOLERSKI RADOVI
XIV TINSMITH'S WORKS
XIV LIMARSKI RADOVI
Material supply, manufacture and installation of
roof cornice fascia to drawing in project RS 60 cm.
Fascias to perform over the made base,
waterproofed plywood thk 18 mm with wooden
battens in gable wall what included in the price.
The price include all the small combining material
for a mutual bonding and connection to
substructure. Be aware of correctly executed drip.
1
Nabavka materijala, izrada i ugradnja opava krovnih
vijenaca prema nacrtu u projektu R 60 cm. Opave
izvesti preko uraene podloge, voodootpornom
perom d=18 mm sa drvenim paknama u nadzidku
to ulazi u cijenu U cijeni sav sitni spoj materijal za
meusobnu vezu i vezu za podkonstrukciju. Voditi
rauna o korektno izvedenim okapnicama.
attics on the elevators/ atike na liftovima
Manufacture and installation of the gutter for
drainage from the flat roof. The detail is necessary
to agree with the designer, the gutter ('lulu')
perform of polished inox thk 1 mm, for vertical
section 60 mm, with an angled finish total lenght
55 cm. The item predict flat sheet metal that must
be correcty associated with waterproofing, as well
as the penetration through the attic.
m1
18,00
2
Izrada i postavljanje lule olluka za odvodnju vode sa
ravnog krova. Detalj je potrebno usuglasiti sa
projektantom, lulu izvesti od od poliranog inox lima
d=1 mm, za vertikalni presjeka 60 mm, sa kosim
zavretkom ukpne duine 55 cm. Stavkom predvidjeti
i sampleh koji se mora korektno povezati sa
hidroizolacijom, kao i prodor kroz atiku.
from the flat room of the elevator/ sa ravnog krova
lifta
kom
2,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
3
Nabavka materijala, radionika izrada i montaa na
licu mjesta vertikalnog inox oluka promjera 60 mm
zajedno sa pripadajuim inox obujmicama i
kazaniem za sakuplanje vode na spoju kosog i
vertikalnog oluka. Kazani dim 30x20x20 cm, se
posebnim
zakakama
privrsti
za
betonsku
kontrukciju
lifta,
vodei
rauna
o
debljini
termoizolacije fasade. Obraun po m1 oluka, zajedno
sa kazaniem i svim navedenim.
from the flat room of the elevator/ sa ravnog krova
lifta
XIV
TINSMITH'S WORKS
UKUPNO LIMARSKI RADOVI
m1
20,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
XV CLOCK
XV SAT
Material supply, workshop fabrication and
assembly of the physical clock in the crown point
dome of roundabout. The clock is a prism with
four sides in a form of classic hands, and the
temperature are read on the display above and
below hands. The body clock is covered with
aluminium sheet coated in a color chosen by the
designer. On the clock is a mercury thermostat
with a display where the temperature is visible. In
the clock is installed GSM antenna through which
the time and date can be programmed.
1,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
XV
TOTAL CLOCKS
UKUPNO SATOVI
XVI ELEVATORS
XVI LIFTOVI
Workshop fabrication, transport and installation of
elevator with the next technical characteristics.
Type of elevator: electrical for people. Capacity:
630 kg or 8 persons, lift adapted for the disabled.
Speed 1.0 m/s. Number of stops/entrances 2/2 the
opposite sides. Lifting height: 4,80 and 3,65 m.
Suspension lifts and counterweights:2:1. Control
type: Simplex, in both directions. Engine type:
asynchronous electric motor, non-reduction,
frequently regulated. Mechanic room: without.
Cabin doors (WxH): Automatic telescopic,
measures 900x2100 mm, wings covered with
brushed stainless steel-inox with an infrared
curtain, frequently regulated, fire resistance T=90
minutes. The shaft doors (WxH): Automatic
telescopic, 900x2100 mm, light measure, wings
covered with brushed stainless steel. Cabin: lining
of brushed stainless steel, ceiling with indirect
fluorescent lighting, device for overload, the
granite floor, inox handles, mirror on the back
side, digital display indicator floors and direction
of travel in the cabin and the cells, with an audible
signal for landing, fan, intercom link between
security and cabins, panic lighting, cable
management panel with a key priority for the ride.
Dimensions cabin: 1100 x 1400 x 2200 mm.
Dimensions shaft : 1700 x 2100 mm from
reinforced concrete
KOLIINA
1,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
. The pit of the shaft: 1400 mm. Cost include the
preparation of project documentation, and
certification
of
elevators
by
authorized,
independent, local institutions. Cost include
Commissioning and Use Permit and all other
required documentation. Cost to include all
necessary supporting works, such as arranging
the shaft, lighting, electrical and all that is needed
to safely set the elevator in motion.
UNIT QUANTITY
J/M
KOLIINA
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
UNIT QUANTITY
J/M
KOLIINA
XVI
TOTAL ELEVATORS
LIFTOVI
TOTAL ELEVATORS
UKUPNO LIFTOVI
kom
2,00
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
RECAPITULATION
REKAPITULACIJA
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV
XV
XVI
EARTH WORKS
ZEMLJANI RADOVI
CONCRETE AND RC WORKS
BETONSKI I AB RADOVI
MASONRY
ZIDARSKI RADOVI
HYDROINSULATION WORKS
HIDROIZOLATERSKI RADOVI
STEEL CONSTRUCTION
ELINA KONSTRUKCIJA
LOCKSMITH'S WORKS
BRAVARSKI RADOVI
DOME
KUPOLA
STONE CUTTING WORKS
KERAMIARSKI RADOVI
GYPSUM WORKS
GIPSARSKI RADOVI
FENCES AND HANDRAILS
OGRADE
STONE CUTTING WORK
KAMENOREZAKI RADOVI
FACADE WORKS
FASADERSKI RADOVI
PAINTING WORKS
MOLERSKO RADOVI
TINSMITH'S WORKS
LIMARSKI RADOVI
CLOCK
SAT
ELEVATORS
LIFT
TOTAL
UKUPNO
DESIGN SUPERVISION OF WORKS 1.5%
PROJEKTANTSKI NADZOR 1.5%
TOTAL WORKS:
UKUPNO RADOVI:
UNIT QUANTITY
J/M
KOLIINA
UNIT
PRICE
J/C EUR
TOTAL
EUR
UKUPNO
EUR
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
VENTILATING OF SUBWAY
VENTILACIJA PODHODNIKA
SECTION 3: FROM P95 TO P107
DIONICA: OD P95 DO P 107
BILL OF QUANTITIES / PREDMJER RADOVA
No. ITEM
R.B
1.
2.
POZ
DESCRIPTION OF WORKS
UNIT
VRSTA RADA
J/M
KOLIINA
m
m
m
m
m
6,00
4,50
1,00
1,50
1,50
kom.
kom.
1,00
1,00
kom.
kom.
kom.
kom.
kom.
1,00
1,00
1,00
1,00
1,00
kom.
1,00
Manufacture,
transport
and
assembling of ventilation ducts
made of galvanized steel sheet,
thickness 0,5mm. Ducts with
thermal and acoustic insulation.
Dimensions of channels:
Izrada,
transport
i
montaa
ventilacionih kanala izraenih od
pocinanog lima debljine 0,5 mm.
Kanali sa termikom i zvunom
izolacijom. Dimenzije kanala :
150 x 100 mm
175 x 100 mm
200 x 100 mm
200 x 150 mm
300 x 150 mm
Manufacture, transportation and
assembling
of
fittings
of
ventilation
ducts
made
of
galvanized steel sheet, thickness
of 0.5 mm.
Izrada,
transport
i
montaa
fazonskih elemenata ventilacionih
kanala izraenih od pocinanog
lima debljine 0,5 mm.
Elbow/ Luk :
300 x 150 mm, 90L
300 x 150 mm, 120L
Reduction elements/ Redukcioni
elementi :
150x100 / 175x100 mm
175x100 / 200x100 mm
200x100 / 200x150 mm
200x150 / 400x200 mm
300X150 / 400x200 mm
T - pieces/T - komadi :
200x150 / 150x100 mm
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
UNIT
VRSTA RADA
J/M
Note:
Connection
of
the
ventilation ducts and fittings
perform with sliding fittings and
flanges made of the profiled
steel.
Napomena :Spajanje ventilacionih
kanala i fazonskih komada izvesti
kliznim spojem i prirubnicama od
profilisanog elika.
Supply,
transportation
and
installation of a in line fan duct
IMP AIR - type Hidria IRB 4020
2SM, features:
3.
pcs
1
kom.
5.
6.
7.
2
Nabavka, transport i montaa
fleksibilne spojnice IMP KLIMA Hidria, FS 4020, 400x200 mm.
Supply,
transportation
and
placing of air flow control unit
IMP AIR - Hidria, RZ-1 3015/3 / R,
300x150 mm.
Nabavka, transport i montaa
regulacione aluzine IMP KLIMA Hidria, RZ-1 3015 / 3 / R, 300x150
mm.
Supply,
transportation
and
installation of protection louvres
IMP KLIMA - Hidria, ZM 3015,
300x150 mm.
Nabavka, transport i montaa
zatitne mree IMP KLIMA - Hidria,
ZM 3015, 300x150 mm.
Supply,
transportation
and
installation of ventilating grilles
for supply air and exhaust air
application IMP KLIMA - Hidria
with thermostat
Nabavka, transport i montaa
reetki za dovod i odsis zraka IMP
KLIMA - Hidria, sa regulatorom
protoka :
JR - 3 / V - F, 150x100 mm
kom.
pcs
1
kom.
kom.
pcs
J/C EUR
TOTAL
EUR
UKUPNO
EUR
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
UNIT
VRSTA RADA
J/M
JR - 3 / V - F, 200x150 mm
JR - 3 / V - F, 250x150 mm
AR - 5 / 2 - F, 200x100 mm
8.
9.
10.
Supply,
transportation
and
installation of miscellaneous
lump sum
small material (taking 50% of
items 1, 2, 3, and installation
work)
Nabavka, transport i ugradnja sitno
potronog materijala (uzima se 50 paual.
% od stavki 1., 2., 3. i montanih
radova)
Final
works,
tests,
measurements, coarse and fine
tuning the system, issue the
lump sum
documentation attesting and
protocols of the measurements
and tests.
Zavrni
radovi,
ispitivanja,
mjerenja, grubo i fino podeavanje
sistema,
izdavanje
atestne
paual.
dokumentacije i
protokola o
provedenim
mjerenjima
i
ispitivanjima.
PROJEKTANTSKI NADZOR
1.5%
TOTAL WORKS:
UKUPNO RADOVI:
KOLIINA
pcs
pcs
pcs
pcs
TOTAL:
UKUPNO:
DESIGN SUPERVISION OF
WORKS 1.5%
6
6
2
7
J/C EUR
TOTAL
EUR
UKUPNO
EUR
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
SUBWAY'S ELECTRICAL INSTALLATION
ELEKTROINSTALACIJE PODHODNIKA
SECTION 2: FROM P51 TO P112
DIONICA 2: OD P51 DO P 112
BILL OF QUANTITIES / PREDMJER RADOVA
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
I DISTRIBUTION CABINETS
I RAZVODNI ORMARI
1.
2.
pcs
1,00
kom
set
1,00
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
1.
cca50
Obligation of competent
power company/
Obaveza nadlene
el.distribucije
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
20,00
100,00
70,00
3.
4.
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
70,00
10,00
4.
5.
III ELECTRICAL INSTALLATION OF LIGHTING AND SOCKETS IN TOILET AND SECURITY FACILITIES
III. ELEKTRINE INSTALACIJE RASVIJETE I UTINICA WC-a i prostorije obezbeenja
1.
10,00
80,00
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
157,50
3.
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
1.
2.
150,00
120,00
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
40,00
90,00
3.
4.
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
35,00
20,00
5.
6.
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
25,00
7.
1.
2.
pcs
4,00
kom
60,00
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
60,00
3.
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
30,00
pcs
kom
3,00
4.
5.
6.
7.
set
kpl
1,00
set
1,00
kpl
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
4.1.
4.2.
4.3.
20,00
pcs
20,00
4.4.
4.5.
kom.
pcs
kom.
pcs
20,00
4.6.
2
4.7.
4.9.
5.1.
5,00
kom.
pcs
5,00
kom.
pcs
kom.
lump
sum
paual
10,00
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
pcs
5.2.
5.3.
5.4.
5.5.
5.6.
5.7.
kom.
1,00
pcs
3,00
kom.
pcs
3,00
kom.
pcs
4,00
kom.
pcs
4,00
kom.
lump
sum
paual
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
6.1.
6.2.
6.3.
6.4.
6.5.
6.6.
pcs
5,00
kom.
pcs
9,00
pcs
6,00
pcs
1,00
kom.
pcs
2,00
kom.
pcs
23,00
kom.
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
pcs
6.7.
6.8.
6.9.
6.10.
6.11.
7,00
kom.
pcs
kom.
Delivery
and
installation
of
LED
illumination (LED strips, white LED IP
65.60 / -6 m power 4.8 W / m) length of the
tape: L1 = 13 m, L2 = 17 m, 20 m = L3, L4 =
20 m; L5 = 15m, 15m = L6, L7 = 20 m, 20 m
= L8, and L9 = 25 m; Total: L1 + L2 + L3 +
L4 + L5 + L6 + L7 + L8 + L9
Isporuka i ugradnja led rasvijete (led traka,
bijela IP 65,60 led/m snage 4,8 -6
W/m)Duine trake:L1=13 m; L2=17 m; L3=20
m; L4=20 m; L5=15m; L6=15m; L7=20 m;
L8=20
m;
i
L9=25
m;
Ukupno:
L1+L2+L3+L4+L5+L6+L7+L8+L9
Delivery and installation of transformer for
power of LED lighting 230/12 V, 100 W
with boxes.
4,00
165,00
pcs
4,00
kom.
kom.
pcs
4,00
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
pcs
6.12.
1,00
kom.
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
1.
2.
3.
4.
5.
pcs
10,00
kom.
pcs
kom.
pcs
kom.
pcs
kom.
pcs
kom.
pcs
kom.
1,00
4,00
1,00
1,00
1,00
Conductors
Gromobranski vodii
1.
2.
3.
4.
5.
15,00
50,00
pcs
kom.
4,00
pcs
25,00
kom.
100,00
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
100,00
5.
6.
Povezivanje
na
instalaciju
uzemljenja,Liftova,ograda
na
stepenicama,pumpnog
postrojenja
i
razvodnih ormara FeZn trakom 20x3 mm,sve
ukupno cca.
Testing the lightning installation
Ispitivanje gromobranske instalacije
TOTAL LIGHTNING INSTALLATION
UKUPNO GROMOBRANSKA INSTALACIJA
1.
2.
3.
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
pcs
4.
1,00
kom.
1.
pcs
8,00
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
kom.
pcs
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
1,00
2.
kom.
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
3.
4.
pcs
1,00
kom.
pcs
7,00
kom.
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
140,00
125,00
5.
6.
7.
8.
lump
sum
paual
1,00
lump
sum
1,00
paual
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
pcs
2.
IX.1.
IX.2.
RECAPITULATION
REKAPITULACIJA
I
II
III
DISTRIBUTION CABINETS
RAZVODNI ORMARI
SUPPLY CABLES
NAPOJNI KABLOVI
ELECTRICAL
INSTALLATION
OF
LIGHTING AND SOCKETS IN TOILET AND
SECURITY FACILITIES
EL. INSTALACIJE RASVJETE I UTINICA
III 1
III 2
IV
1,00
kom.
m2
1,20
No.
ITEM
DESCRIPTION OF WORKS
UNIT
QUANTITY
UNIT
PRICE
TOTAL EUR
R.B
POZ
VRSTA RADA
J/M
KOLIINA
J/C EUR
UKUPNO
EUR
VI
VII
VIII 1
LIGHTING BODIES
RASVJETNA TIJELA
LIGHTNING INSTALLATION
GROMOBRANSKA INSTALACIJA
TELEPHONE INSTALLATION
TELEFONSKA INSTALACIJA
CCTV SYSTEM INSTALLATION
VIII 2
IX
IX 1
IX 2
TOTAL:
UKUPNO:
DESIGN SUPERVISION OF WORKS
1.5%
PROJEKTANTSKI NADZOR 1.5%
TOTAL WORKS:
UKUPNO RADOVI:
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
TROLLEYBUS OVERHEAD LINE - ELECTRICAL WORKS
TROLEJBUSKA KONTAKTNE MREA - ELEKTROMONTANI RADOVI
SECTION 2: FROM P51 TO P112
DIONICA 1: OD P051 DO P112
BILL OF QUANTITIES / PREDMJER RADOVA
No. ITEM
DESCRIPTION OF WORKS
R.B POZ
VRSTA RADA
8.1.
1.
J/M
KOLIINA
2.
pcs
62
kom
pcs
314
J/C EUR
TOTAL
EUR
UKUPNO
EUR
2.
3.
314
Nabavka i montaa elastinih portala od
Parafil-a 3.5T, sa svim mjerenjima i
oznaavanjima, sjeenjem i blankiranjem,
montaom zavretaka 3.5F i 3.5P,
montaom stubnih obujmica tipa "BANDkom
IT" sa stubnim kukama, prstenovima
110/10, montaom nosaa stezaljki i
ugradnjom stezaljki 0-10, dotezanje na
propisanu silu zatezanja i fino podeavanje
parametara kontaktne mree
Supply and assembly of assemblies for
hanging KM in direction, insulator
bracket and installation of clamps 0-5,
with all measurements, designations and pcs
refining at the required distance and
height, adjustment the direction and
poligonation overhead line
Nabavka i montaa sklopova za vjeanje
KM u pravcu, izolatorskih nosaa i ugradnja
stezaljki 0-5, sa svim mjerenjima,
oznaavanjima i dotjerivanjem na propisanu
udaljenost i visinu, podeavanje pravca i
poligonacije voznog voda
4.
79
kom
pcs
96
5.
pcs
89
6.
pcs
10
7.
8.
km
km
pcs
9.
10.
11.
12.
13.
14
pcs
kom
pcs
kom
km
1.
ITEM
POZ
SUPPLY CABLES
NAPOJNI KABLOVI
Excavation of the cable channel
dimensions 0,4x0,8 m and removal of
excess soil to the dump
Iskop kablovskog kanala dimenzija 0,4x0,8
m i odvoz vika zemlje na deponiju
2.
3.
4.
8.3.
1.
2.
82
m
5.
250
82
pcs
2
kom
58
m
m
m
41
3.
4.
5.
6.
m
m
m
12
29
25
SOUTH LONGITUDINAL
JUNA LONGITUDINALA
TRAFFIC LIGHTING FOR CROSSROADS
SEMAFORIZACIJA RASKRSNICA
SECTION 2: FROM P51 TO P112
DIONICA 2: OD P51 DO P 112
BILL OF QUANTITIES / PREDMJER RADOVA
No. ITEM
R.B
POZ
DESCRIPTION OF WORKS
VRSTA RADA
TOTAL
EUR
UKUPNO
KOLIINA J/C EUR
EUR
UNIT QUANTITY
J/M
1.PREPARATORY WORKS
1.PRIPREMNI RADOVI
1.1.
m1
480,00
UNIT
PRICE
1.2.
set
1,00
kpl
2.1.
2.2.
m1
63,00
2.3.
m1
94,00
2.4.
m1
161,00
2.5.
pcs
7,00
2.6.
7,00
2.7.
2.8.
1,00
pcs
1,00
Izrada
temelja
semaforskog
ureaja
sa
pripadajuim ahtom (prema nacrtu temelja za
postojei ureaj TCS BM-D) obuhvata: iskop rupe,
alovanje i betonitanje temelja, uvoenje plastine
kom
cijevi i trake za uzemljenje, isporuku i ugradnju
sidrenih ankera, metalnog okvira i metalnog
poklopca ahta dimenzija 60x60 (sve zatieno
vruim cinanjem). Odvoz vika materijala na
deponiju. Beton marke MB 20 (1,3 m2).
Supply and delivery of the metal frame and
anchor bolts set for the basis of the cantilever
pole. Protected by hot dip galvanizing.
2.9.
2.10.
1,00
Nabavka i isporuka metalnog okvira i kompleta
anker vijaka temelja signalnog ureaja . Zatien
vruim cinanjem.
Construction of cantilever pole foundation with
concrete
grade
MB
30,
dimensions
120x120x120 cm, with installation of the plastic
pipes and earthing strips laying, delivery and
installation of metal frame and anchor bolts.
Transport of excess material to disposal area.
pcs
5,00
5,00
2.12.
2.13.
2.14.
2.15.
2.16.
9,00
2,00
335,00
6,00
325,00
480,00
3.1.
3.2.
4,00
7,00
Reparacija i isporuka semaforskog reduciranog
stuba f 115 mm, visine 3400 mm, sa temeljnom
ploom i vratacima za pristup elek. instalaciji kom
(Sanacija oteenja, bojenje zatitnom bojom i
zatita vruim cinanjem.)
pcs
3.3.
3.4.
1,00
Nabavka i isporuka semaforskog konzolnog stuba
sa konzolom prilagoenoj instalacijama kontaktne
mree. (Sanacija oteenja, bojenje zatitnom kom
bojom i zatita vruim cinanjem) Prema skici iz
projekta.
Repair and delivery of semaphore cantilever
pole with adjusted cantilever to the installation
overhead. (Repair of damage, protective paint pcs
and hot deep galvanizing protection)According
to the sketch of the project.
4,00
3.7.
8,00
Nabavka i isporuka signala za vozila (laterne)kuite od polikarbonata crne boje sa 3 signalna
polja (crveno, uto, zeleno), sa protufantomskom
kom
optikom izraenom od polikarbonata otpornog na
UV zraenje, promjer optike 300 mm, sa LED
izvorom svjetlosti i komplet sa AJ nosaem
(ruicom). Optika strelica lijevo.
Supply and delivery of signals for vehicles
(lantern)-polycarbonate casing black with 3
signal boxes (red, yellow, green), with anti
phantom optics made of polycarbonate UV pcs
resistant, 300 mm diameter optics, LED light
source and a set of AI bracket (handle). Optics
full.
Nabavka i isporuka signala za vozila (laterne)kuite od polikarbonata crne boje sa 3 signalna
polja (crveno, uto, zeleno), sa protufantomskom
optikom izraenom od polikarbonata otpornog na kom
UV zraenje, promjer optike 210 mm, sa LED
izvorom svjetlosti i komplet sa Pl nosaem
(ruicom). Puna optika
3,00
pcs
3.8.
3.10.
3.12.
3.13.
2,00
Nabavka i isporuka signala za vozila (laterne)kuite od polikarbonata crne boje sa 3 signalna
polja (crveno, uto, zeleno), sa protufantomskom
kom
optikom izraenom od polikarbonata otpornog na
UV zraenje, promjer optike 210 mm, sa LED
izvorom svjetlosti i komplet sa Pl nosaem
(ruicom). Optika strelica desno
Repair of traffic lantern with optical unit
diameter of 210 mm with 2 colour signal ( red,
green). Replacement of damaged visors, rubber
sealing, wiring and defective parts. Delivery
and installation of optical unit, diameter of 210 pcs
mm with LED light source with pedestrian don't
cross and cross symbol (Red 12W, Yellow 12W,
green 14W) with the PI mounting bracket kit.
Reparacija vozake laterne promjera optike 210
mm sa 3 signalna polja (crveno, uto, zeleno).
Zamjena oteenih sjenila, gume za dihtovanje,
oienja i neispravnih djelova. Isporuka i ugradnja kom
pune optike 210mm (crvena 12W, uta 12W,
zelena 14W) sa LED izvorom svjetlosti i komplet
sa PI nosem (ruicom).
Repair of traffic lantern with optical unit
diameter of 210 mm with 2 colour signal ( red,
green). Replacement of damaged visors, rubber
sealing, wiring and defective parts. Delivery
and installation of optical unit, diameter of 210
mm with LED light source with pedestrian don't
cross and cross symbol (Red 8W, green 9W)
with the PI mounting bracket kit. Symbols for
Pedestrian Signals.
pcs
Reparacija pjeake laterne promjera optike 210
mm sa 2 signalna polja (crveno, zeleno). Zamjena
oteenih sjenila, gume za dihtovanje, oienja i
kom
neispravnih djelova. Isporuka i ugradnja LED
optike promjera 210 mm sa simbolom pjeaka u
mirovanju i pokretu (crvena 8W, zelena 9W) sa PI
nosaima. Optika pjeak.
Supply and delivery of the pedestrians signal
(lantern) - black Housing with two light signals
(red 8W, 9W green), UV resistant, optical unit pcs
diameter of 210 mm, LED technology and a set
of PI mounting brackets. Symbols for
Pedestrian Signals.
7,00
6,00
6,00
3.13.
3.14.
3.15.
3.16.
6,00
Nabavka i isporuka signala za pjeake (laterne)kuite od crne boje sa 2 signalna polja (crvena
kom
8W, zelena 9W), otpornog na UV zraenje,
promjer optike 210 mm, LED tehnologije i komplet
sa PI nosaem (ruicom). Optika pjeak.
Supply and delivery of the traffic singnal cable
PP00 24 x 1,5 mm2.
1
Nabavka i isporuka signalnog kabla PP00 24 x 1,5 m
mm2.
Supply and delivery of the traffic signal cable
PP00 5 x 1,5 mm2.
Nabavka i isporuka signalnog kabla PPOO 5 x 1,5 m1
mm2.
Supply and delivery of the fiber optic cable
(telecommunication cable) TK 59 10x4x0,8
mm2
Nabavka i isporuka koordinacionog kabla TK 59
10x4x0,8 mm2
24-pin connector for signal cables in traffic
light pole
m1
403,00
78,00
450,00
pcs
3.17.
12,00
Nabavka i isporuka 24-polne redne stezaljke za
spajanje signalnih kablova u semaforskom stubu.
kom
TOTAL TRAFFIC LIGHT EQUIPMENT
SEMAFORSKA OPREMA UKUPNO KM:
4.1.
4.2.
4.3.
4.4.
4.5.
4.6.
4. ASSEMBLING WORKS
4. MONTANI RADOVI
Signal device wiring with connecting signal
pcs
cables
0ienje signalnog ureaja sa spajanjem signalnih
kom
kablova
pcs
Erection of the cantilever pole with lifting
Montaa konzolnog stuba uz pomo dizalice
kom
pcs
Erection of the tapered traffic poles
Montaa reduciranih semaforskih stubova
kom
Installation of terminal blocks with connection
of underground signaling cables in the traffic pcs
light poles.
Montaa rednih stezaljki sa spajanjem podzemnih kom
signalnih kablova u semaforskim stubovima.
Installation and connection of signal cables
with measuring of cable properties
m1
Provlaenje i spajanje signalnih kablova sa
izvrenim mjerenjima kablovskih karakteristika
Installation and connection of signal cables
with measuring of cable properties
m1
Provlaenje i spajanje koordinacionih kablova sa
izvrenim mjerenjima kablovskih karakteristika
1,00
5,00
7,00
12,00
393,00
450,00
pcs
4.7.
4.8.
4.9.
4.11.
4.12.
8,00
Montaa i spajanje vozakih 3-strukih laterni na
kom
konzole sa upotrebom autokorpe
Installation and connection of 3-color traffic
pcs
signal lanterns on poles
Montaa i spajanje vozakih 3-strukih Iaterni na
kom
stubove
Installation and connection of 2-color traffic
pcs
signal lanterns on poles
Montaa i spajane pjeakih 2-strukih laterni na
stubove
kom
Connection of earthing stip with cross coupling
pcs
Spajanje trake za uzemljenje pomou ukrsnih
spojnica
kom
Connection of earthing stip at poles and in
pcs
traffic signal device
Spajanje trake za uzemljene na stubnim mjestima i
u semaforskom ureaju.
kom
TOTAL ASSEMBLING WORKS
MONTANI RADOVI UKUPNO KM:
12,00
12,00
7,00
5,00
5.2.
5.3.
pcs
Programiranje
semaforskog
signalnog
mikroprocesorskog
ureaja sa funkcionalnom provjerom signalnih
programa.
kom
- programiranje signalnih grupa,
- programiranje Iogike rada u runom radu,
- programiranje logike rada u vremenskom radu
Signal devices functionality testing and
complete
external
equipment
testing.
Preparation and issuing protocol for executed
pcs
tests
Isprtivanje rada signalnog ureaja i kompletne
vanjske opreme. Izrada i izdavanje protokola o kom
izvedenim ispitivanjima.
Potential-free testing for signal cables,
telecommunication cables, power supply
set
cables and detector cables.
Beznaponsko ispitivanje signalnih, koordinacionih,
napojnih i detektorskih kablova.
kpl
1,00
1,00
1,00
5.4.
5.5.
5.6.
5.7.
RECAPITULATION
REKAPITULACIJA
1
4
5
PREPARATORY WORKS
PRIPREMNI RADOVI
CIVIL ENGINEERING WORKS FOR TRAFFIC
LIGHTING
GRAEVINSKI RADOVI ZA SEMAFORIZACIJU
SUPPLY AND DELIVERY OF TRAFFIC LIGHT
EQUIPMENT
NABAVKA I ISPORUKA SEMAFORSKE
OPREME
ASSEMBLING WORKS
MONTAZNI RADOVI
SIGNAL EQUIPMENT TESTING
ISPITIVANJE SIGNALNE OPREME
TOTAL:
UKUPNO:
DESIGN SUPERVISION OF WORKS 1.5%
PROJEKTANTSKI NADZOR 1.5%
TOTAL WORKS:
UKUPNO RADOVI:
1,00
1,00
1,00
1,00
SCHEDULE 1
DAYWORKS: LABOUR
Item
Description
Unit
Quantity
DR101
Unskilled labour
hour
1.000
DR102
Skilled labour
hour
500
DR103
Vehicle driver
hour
500
DR104
Plant operator
hour
250
DR105
Artisan
hour
500
DR106
Mechanic
hour
500
DR107
Foreman
hour
500
DR108
Technician
hour
500
DR109
Surveyor
hour
250
DR110
hour
500
DR111
hour
500
Unit rate
EUR
Total
Euro
Quantity
EUR
Total
Euro
Total
SCHEDULE 2
DAYWORK: EQUIPMENT
Item
Description
Unit
Quantity
DR201
hour
100
DR202
Truck, dumper 10 t
hour
100
DR203
Truck, dumper 15 t
hour
100
DR204
Truck, dumper 20 t
hour
100
DR205
hour
100
DR206
Bulldozer <100 HP
hour
50
DR207
Bulldozer <200 HP
hour
50
DR208
Excavator 0.65 m3
hour
100
DR209
Excavator 1.50 m3
hour
100
DR210
Excavator 2.50 m3
hour
100
DR211
hour
100
DR212
hour
100
DR213
hour
50
DR214
hour
100
DR215
hour
100
DR216
Concrete mixer 6 m3
hour
100
DR217
Mobile vibrator
hour
50
DR218
Mobile generator 10 kW
hour
50
DR219
hour
50
DR220
Compressor 10 m3/hour
hour
100
DR221
Pneumatic drill
hour
50
DR222
Roller, vibratory 8 t
hour
50
DR223
Roller, pneumatic 15 t
hour
50
DR224
Asphalt paver
hour
50
Total
SCHEDULE 3
DAYWORKS: MATERIALS
Item
Description
Unit
DR301
Portland cement
DR302
m3
100
DR303
m3
100
DR304
Sand
m3
50
DR305
m3
100
DR306
Bitumen emulsion
DR307
Diesel fuel
DR308
Polymerized bitumen
DR311
DR312
DR313
Quantity
t
t
100
1
10
10
10
10
10
Unit rate
in EUR
Total
Euro
DR314
DR315
t
t
DR316
10
10
2
Total
1
2
3
Description
Daywork schedule 1 (labour)
Daywork schedule 1 (equipment)
Daywork schedule 1 (material)
GRAND TOTAL DAYWORKS
Total
SCHEDULE 1
DAYWORKS: LABOUR
Item
Description
Unit
Quantity
DR101
Unskilled labour
hour
1.000,00
DR102
Skilled labour
hour
500,00
DR103
Vehicle driver
hour
500,00
DR104
Plant operator
hour
250,00
DR105
Artisan
hour
500,00
DR106
Mechanic
hour
500,00
DR107
Foreman
hour
500,00
DR108
Technician
hour
500,00
DR109
Surveyor
hour
250,00
DR110
hour
500,00
DR111
hour
500,00
Unit
Quantity
hour
250
hour
250
hour
250
hour
250
hour
250
hour
100
hour
100
hour
250
hour
250
hour
100
hour
250
hour
250
Unit rate
EUR
SCHEDULE 2
DAYWORK: EQUIPMENT
Item
Description
Quantity
EUR
hour
250
hour
100
hour
100
hour
100
hour
100
hour
100
hour
100
hour
250
hour
250
hour
100
hour
100
hour
100
Unit
Quantity
250
m3
500
m3
500
DR304 Sand
m3
250
m3
500
10
100
100
100
100
100
100
100
20
SCHEDULE 3
DAYWORKS: MATERIALS
Item
Description
Unit rate
in EUR