You are on page 1of 57

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

01
01.01
01.02
01.03

OBRAS PROVISIONALES
CARTEL DE OBRA DE( 3.60 X 2.40)
ALMACEN Y CASETA DE GUARDIANIA
TRANSPORTE DE MATERIALES, EQUIPOS Y HERRAMIENTAS

02
02.01
02.02

OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO NIVEL Y REPLANTEO

03
03.01

MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA MANUAL

Und

Cant.

UND
M2
Glb

1.00
1.00
1.00

4.00

M2
M2

1.00
1.00

19.23
17.23

1.00
1.00
2.00
1.00
1.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.40
0.40
0.80
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40

Ancho

M3
Corte 4-4 eje K del 1 - 2
Corte 4-4 eje K del 2 - 3
P3
Corte 4-4 eje K del 4-5
Corte 4-4 eje K del 5-6
Corte 4-4 eje 1,6 del J-k
Corte 4-4 eje 1,6 del I-J
Corte 4-4 eje 1,6 del J-H
Corte 4-4 eje 1,6 del J-H
Corte 5-5 eje J del 1-2
Corte 5-5 eje J del 2-3
Corte 5-5 eje J del 4-5
Corte 5-5 eje I del 1-2
Corte 5-5 eje 2
Corte 5-5 eje I
Corte 5-5 eje I
Corte 5-5 eje G del 1 al 2
Corte 5-5 eje 2
Corte 5-5 eje 2
Corte 5-5 eje 2
Corte 5-5 eje 2
Corte 5-5 eje 3
Corte 5-5 eje 3
Corte 5-5 eje H
Corte 5-5 eje 3
Corte 5-5 eje G
Corte 5-5 eje H
Corte 5-5 eje G
Corte 5-5 eje G
Corte 5-5 eje 4
Corte 5-5 eje 4
Corte 5-5 eje 4
Corte 5-5 eje 4
Corte 5-5 eje I
Corte 5-5 eje
Corte 5-5 eje
Corte 5-5 eje 5
Corte 5-5 eje 5
Corte 5-5 eje H

Pagina 1

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Und

Corte 5-5 eje H


Corte 5-5 eje H
Corte 5-5
Corte 5-5
Corte 5-5
Corte 5-5
Corte 5-5
Corte 5-5
Corte 5-5
Escalera
Escalera
Z-1
Z-2
Z-3
Z-4
Z-5
Z-6
Z-7
Z-8
Z-9
Z-10
Z-12
Z-13
Z-14
Z-18
03.02

REFINE Y COMPACTACION DE ZANJAS

Cant.

Ancho

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
2.00
2.00
6.00
2.00
4.00
1.00
4.00
1.00
1.00
1.00
2.00

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.50
0.50
0.70
1.05
2.00
1.15
2.20
1.00
1.50
1.40
1.20
1.20
0.90
0.90
1.40
0.90

1.00
1.00
2.00
1.00
1.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.40
0.40
0.80
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40

M2
Corte 4-4 eje K del 1 - 2
Corte 4-4 eje K del 2 - 3
P3
Corte 4-4 eje K del 4-5
Corte 4-4 eje K del 5-6
Corte 4-4 eje 1,6 del J-k
Corte 4-4 eje 1,6 del I-J
Corte 4-4 eje 1,6 del J-H
Corte 4-4 eje 1,6 del J-H
Corte 5-5 eje J del 1-2
Corte 5-5 eje J del 2-3
Corte 5-5 eje J del 4-5
Corte 5-5 eje I del 1-2
Corte 5-5 eje 2
Corte 5-5 eje I
Corte 5-5 eje I
Corte 5-5 eje G del 1 al 2
Corte 5-5 eje 2
Corte 5-5 eje 2
Corte 5-5 eje 2
Corte 5-5 eje 2
Corte 5-5 eje 3
Corte 5-5 eje 3

Pagina 2

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Und

Corte 5-5 eje H


Corte 5-5 eje 3
Corte 5-5 eje G
Corte 5-5 eje H
Corte 5-5 eje G
Corte 5-5 eje G
Corte 5-5 eje 4
Corte 5-5 eje 4
Corte 5-5 eje 4
Corte 5-5 eje 4
Corte 5-5 eje I
Corte 5-5 eje
Corte 5-5 eje
Corte 5-5 eje 5
Corte 5-5 eje 5
Corte 5-5 eje H
Corte 5-5 eje H
Corte 5-5 eje H
Corte 5-5
Corte 5-5
Corte 5-5
Corte 5-5
Corte 5-5
Corte 5-5
Corte 5-5
Escalera
Escalera
Z-1
Z-2
Z-3
Z-4
Z-5
Z-6
Z-7
Z-8
Z-9
Z-10
Z-12
Z-13
Z-14
Z-18
03.03
03.04
03.05
03.06

RELLENO COMPACTADO CON MATERIAL PROPIO


RELLENO COMPACTADO CON MATERIAL DE PRESTAMO
RELLENO COMPACTADO CON MATERIAL GRANULAR
ELIMINACION DE MATERIAL EXCEDENTE

04
04.01

OBRAS DE MORTERO SIMPLE


CIMIENTO CORRIDO C:A 1:8

M3
M3
M3
M3

Cant.

Ancho

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
2.00
2.00
6.00
2.00
4.00
1.00
4.00
1.00
1.00
1.00
2.00

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.50
0.50
0.70
1.05
2.00
1.15
2.20
1.00
1.50
1.40
1.20
1.20
0.90
0.90
1.40
0.90

1.00
1.00
1.00
1.00

29.00
28.70
28.70

1.00

0.40

M3
Corte 4-4 eje K del 1 - 2

Pagina 3

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Und

Corte 4-4 eje K del 2 - 3


P3
Corte 4-4 eje K del 4-5
Corte 4-4 eje K del 5-6
Corte 4-4 eje 1,6 del J-k
Corte 4-4 eje 1,6 del I-J
Corte 4-4 eje 1,6 del J-H
Corte 4-4 eje 1,6 del J-H
Corte 5-5 eje J del 1-2
Corte 5-5 eje J del 2-3
Corte 5-5 eje J del 4-5
Corte 5-5 eje I del 1-2
Corte 5-5 eje 2
Corte 5-5 eje I
Corte 5-5 eje I
Corte 5-5 eje G del 1 al 2
Corte 5-5 eje 2
Corte 5-5 eje 2
Corte 5-5 eje 2
Corte 5-5 eje 2
Corte 5-5 eje 3
Corte 5-5 eje 3
Corte 5-5 eje H
Corte 5-5 eje 3
Corte 5-5 eje G
Corte 5-5 eje H
Corte 5-5 eje G
Corte 5-5 eje G
Corte 5-5 eje 4
Corte 5-5 eje 4
Corte 5-5 eje 4
Corte 5-5 eje 4
Corte 5-5 eje I
Corte 5-5 eje
Corte 5-5 eje
Corte 5-5 eje 5
Corte 5-5 eje 5
Corte 5-5 eje H
Corte 5-5 eje H
Corte 5-5 eje H
Corte 5-5
Corte 5-5
Corte 5-5
Corte 5-5
Corte 5-5
Corte 5-5
Corte 5-5
04.02

SOLADO 4"

Cant.

Ancho

1.00
2.00
1.00
1.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.40
0.80
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40

1.00

0.40

M2
Corte 4-4 eje K del 1 - 2

Pagina 4

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Und

Corte 4-4 eje K del 2 - 3


P3
Corte 4-4 eje K del 4-5
Corte 4-4 eje K del 5-6
Corte 4-4 eje 1,6 del J-k
Corte 4-4 eje 1,6 del I-J
Corte 4-4 eje 1,6 del J-H
Corte 4-4 eje 1,6 del J-H
Corte 5-5 eje J del 1-2
Corte 5-5 eje J del 2-3
Corte 5-5 eje J del 4-5
Corte 5-5 eje I del 1-2
Corte 5-5 eje 2
Corte 5-5 eje I
Corte 5-5 eje I
Corte 5-5 eje G del 1 al 2
Corte 5-5 eje 2
Corte 5-5 eje 2
Corte 5-5 eje 2
Corte 5-5 eje 2
Corte 5-5 eje 3
Corte 5-5 eje 3
Corte 5-5 eje H
Corte 5-5 eje 3
Corte 5-5 eje G
Corte 5-5 eje H
Corte 5-5 eje G
Corte 5-5 eje G
Corte 5-5 eje 4
Corte 5-5 eje 4
Corte 5-5 eje 4
Corte 5-5 eje 4
Corte 5-5 eje I
Corte 5-5 eje
Corte 5-5 eje
Corte 5-5 eje 5
Corte 5-5 eje 5
Corte 5-5 eje H
Corte 5-5 eje H
Corte 5-5 eje H
Corte 5-5
Corte 5-5
Corte 5-5
Corte 5-5
Corte 5-5
Corte 5-5
Corte 5-5
Escalera
Escalera
Z-1

Cant.

1.00
2.00
1.00
1.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00

Ancho

0.40
0.80
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.50
0.50
0.70

Pagina 5

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Und

Z-2
Z-3
Z-4
Z-5
Z-6
Z-7
Z-8
Z-9
Z-10
Z-12
Z-13
Z-14
Z-18
05
05.01
05.01.01

OBRAS DE MORTERO ARMADO


ZAPATAS
MORTERO f'C= 175 Kg/cm. - ZAPATA

Ancho

2.00
2.00
2.00
2.00
6.00
2.00
4.00
1.00
4.00
1.00
1.00
1.00
2.00

1.05
2.00
1.15
2.20
1.00
1.50
1.40
1.20
1.20
0.90
0.90
1.40
0.90

2.00
2.00
2.00
2.00
2.00
6.00
2.00
4.00
1.00
4.00
1.00
1.00
1.00
2.00

0.70
1.05
2.00
1.15
2.20
1.00
1.50
1.40
1.20
1.20
0.90
0.90
1.40
0.90

M3
Z-1
Z-2
Z-3
Z-4
Z-5
Z-6
Z-7
Z-8
Z-9
Z-10
Z-12
Z-13
Z-14
Z-18

05.02.03

Cant.

ACERO DE REFUERZO f'c=4,200 Kg/cm


Z-1
Z-2
Z-3
Z-4
Z-5
Z-6
Z-7
Z-8
Z-9

Kg
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
6.00
6.00
2.00
2.00
4.00
4.00
1.00

Pagina 6

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Und

Z-10
Z-12
Z-13
Z-14
Z-18

05.02
05.02.01

SOBRECIMIENTO REFORZADO
MORTERO f'C= 175 Kg/cm. - SOBRECIMIENTO

1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"

Cant.

Ancho

1.00
4.00
4.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00

M3
Eje 1 entre G'-H
Eje 1 entre H-I
Eje 1 entre I-J
Eje 1 entre J-K
Eje 2 entre H-I
Eje 2 entre I-J
Eje 5 entre H-I
Eje 5 entre I-J
Eje 6 entre G'-H
Eje 6 entre H-I
Eje 6 entre I-J
Eje 6 entre J-K

Eje K entre 1-2


Eje K entre 5-6

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

Pagina 7

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Und

Cant.

Eje J entre 1-2

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

Eje J entre 2-3


Eje J entre 4-5
Eje I entre 4-5
Eje H entre 4-5
Eje H entre 5-6

Eje H entre 1-2

05.02.02

ENCOFRADO Y DESENCOFRADO - SOBRECIMIENTO

Ancho

M2
Eje 1 entre G'-H
Eje 1 entre H-I
Eje 1 entre I-J
Eje 1 entre J-K
Eje 2 entre H-I
Eje 2 entre I-J
Eje 5 entre H-I
Eje 5 entre I-J
Eje 6 entre G'-H
Eje 6 entre H-I
Eje 6 entre I-J
Eje 6 entre J-K

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

Pagina 8

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Und

Eje K entre 1-2


Eje K entre 5-6

Eje J entre 1-2


Eje J entre 2-3
Eje J entre 4-5
Eje I entre 4-5
Eje H entre 4-5
Eje H entre 5-6

Eje H entre 1-2

Cant.

Ancho

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

Pagina 9

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Und

Cant.

Ancho

2.00
2.00
05.02.03

ACERO DE REFUERZO f'c=4,200 Kg/cm

Kg
Longitudinales 3/8"
Eje 1 entre G'-H
Eje 1 entre H-I
Eje 1 entre I-J
Eje 1 entre J-K
Eje 2 entre H-I
Eje 2 entre I-J
Eje 5 entre H-I
Eje 5 entre I-J
Eje 6 entre G'-H
Eje 6 entre H-I
Eje 6 entre I-J
Eje 6 entre J-K

Eje K entre 1-2


Eje K entre 5-6

Eje J entre 1-2


Eje J entre 2-3
Eje J entre 4-5
Eje I entre 4-5
Eje H entre 4-5
Eje H entre 5-6

6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00

Pagina 10

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Und

Estribos de 1/4"
Distancia de 0.25
Distancia de 0.60
Distancia de 0.90 a 1.10
Distancia de 1.13 a 1.28
Distancia de 1.63 a 1.67
Distancia de 1.93 a 1.98
Distancia de 2.00 a 2.13
Distancia de 2.23
Distancia de 2.35 a 2.50
Distancia de 2.53 a 2.71
Distancia de 2.93
Distancia de 3.05
Distancia de 3.20 a 3.30
Distancia de 3.43 a 3.50
Distancia de 3.70
Distancia de 3.73 a 3.78
Distancia de 4.14
Distancia de 4.20
Distancia de 4.35 a 4.50
Distancia de 4.65
VIGAS Y COLLARIN
MORTERO F'C=210 KG/CM2. - VIGAS

Ancho

6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00

Eje H entre 1-2

05.03
05.03.01

Cant.

4.00
7.00
10.00
11.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00

M3
VC 101

0.30
0.30
0.30

Pagina 11

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Und

Cant.

0.30
0.30
0.30
0.30
0.30
0.30
0.30

VC 102
05.03.02

ENCOFRADO Y DESENCOFRADO EN VIGAS

Ancho

M2
VC 101

VC 102
05.03.03

ACERO DE REFUERZO f'c=4,200 Kg/Cm - VIGAS

KG
Longitudinales de 5/8"
Longitudinales de 1/2"
Estribos de 3/8"
Longitudinales de 5/8"
Longitudinales de 1/2"
Estribos de 3/8"
Longitudinales de 5/8"
Longitudinales de 1/2"
Estribos de 3/8"
Longitudinales de 5/8"
Longitudinales de 1/2"
Estribos de 3/8"
Longitudinales de 5/8"
Longitudinales de 1/2"
Estribos de 3/8"
Longitudinales de 5/8"
Longitudinales de 1/2"
Estribos de 3/8"
Longitudinales de 5/8"
Longitudinales de 1/2"
Estribos de 3/8"
Longitudinales de 5/8"
Longitudinales de 1/2"
Estribos de 3/8"
Longitudinales de 5/8"
Longitudinales de 1/2"
Estribos de 3/8"
Longitudinales de 5/8"
Longitudinales de 1/2"

4.00
2.00
14.00
4.00
2.00
18.00
4.00
2.00
13.00
4.00
2.00
28.00
4.00
2.00
28.00
4.00
2.00
24.00
4.00
2.00
17.00
4.00
2.00
22.00
4.00
2.00
17.00
2.00
6.00

Pagina 12

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Und

Estribos de 3/8"
05.04
05.04.01

COLUMNAS
MORTERO F'C=210 KG/CM2 - COLUMNAS

M3

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

2.00
7.00
16.00
2.00
13.00
2.00
2.00

ACERO DE REFUERZO f'c=4,200 Kg/cm - COLUMNAS

2.00
7.00
16.00
2.00
13.00
2.00
KG

Longitudinales
C-1
C-2
C-3
C-5
C-7
C-8
Estribos
C-1
C-2
C-3
C-5
C-7
C-8
05.05
05.05.01

PLACAS
CONCRETO F'C=210 KG/CM2. - PLACAS

1/2"
1/2"
5/8"
1/2"
5/8"
1/2"
1/2"
3/8"

6.00
8.00
4.00
4.00
6.00
4.00
4.00
8.00

3/8"
3/8"
3/8"
3/8"
1/4"
1/4"

26.00
26.00
26.00
26.00
26.00
26.00

M3
P-1
P-2
P-3

05.05.02

0.30
0.30
0.30
0.30
0.15
0.15
0.15

M2
C-1
C-2
C-3
C-5
C-7
C-8

05.04.03

Ancho

38.00

C-1
C-2
C-3
C-5
C-7
C-8
C-8
05.04.02

Cant.

ENCOFRADO Y DESENCOFRADO EN PLACAS

6.00
2.00
2.00
2.00

0.30
0.15
0.10
0.10

M2
P-1
P-2
P-3

6.00
2.00
2.00
2.00

Pagina 13

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

05.05.03

Und

ACERO DE REFUERZO f'c=4,200 Kg/Cm - PLACAS

Ancho

KG
Longitudinales
P-1
P-2
P-3
Estribos
P-1
P-2
P-3

05.06
05.06.01

Cant.

VIGAS DE AMARRE Y PRINCIPALES


CONCRETO F'C=210 KG/CM2. - VIGAS

5/8"
1/2"
3/8"
3/8"

4.00
6.00
4.00
8.00

3/8"
1/4"
1/4"

26.00
22.00
22.00

M3
VA-102
VA-102
VA-102
VP-105
VP-105
VP-105
VCH 03
VCH 03
VP-107
VP-107
VP-107
VP-104
VP-104
VP-104
VP-104
VP-103
VP-103
VP-101
VP-102
VP-102
VP-102
VP-102
VP-102
VP-102
VP-102
VP-106
VP-106
VP-106
VP-106
VP-106
VP-101
VCH 03
Corte A-A
Corte A-A
Corte A-A
Corte A-A

0.30
0.30
0.30
0.30
0.30
0.30
0.25
0.25
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.25
0.15
0.15
0.15
0.15

Pagina 14

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

05.06.02

Und

ENCOFRADO Y DESENCOFRADO EN VIGAS

Cant.

Ancho

M2
VA-102
VA-102
VA-102
VP-105
VP-105
VP-105
VCH 03
VCH 03
VP-107
VP-107
VP-107
VP-104
VP-104
VP-104
VP-104
VP-103
VP-103
VP-101
VP-102
VP-102
VP-102
VP-102
VP-102
VP-102
VP-102
VP-106
VP-106
VP-106
VP-106
VP-106
VP-101
VCH 03
Corte A-A
Corte A-A
Corte A-A
Corte A-A

05.06.03

ACERO DE REFUERZO f'c=4,200 Kg/Cm - VIGAS

KG
Longitudinales
VA-102
VA-102
VA-102
VP-105
Esquina
Central
Central
VP-105
Esquina

1/2"
1/2"
1/2"
5/8"
1/2"
5/8"
1/2"
5/8"
1/2"

4.00
4.00
4.00
4.00
1.00
2.00
1.00
4.00
1.00

Pagina 15

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Central
Central
VP-105
Esquina
Central
Central
VCH 03
VCH 03
VP-107
Esquina
Central
Central
VP-107
Esquina
Central
Central
VP-107
Esquina
Central
Central
VP-104
Esquina
Central
Central
VP-104
Esquina
Central
Central
VP-104
Esquina
Central
Central
VP-104
Esquina
Central
Central
VP-103
Esquina
Central
Central
VP-103
Esquina
Central
Central
VP-101
Central
Esquina
Esquina
VP-102
VP-102

Und

Cant.

5/8"
1/2"
5/8"
1/2"
5/8"
1/2"
5/8"
5/8"
5/8"
1/2"
5/8"
1/2"
5/8"
1/2"
5/8"
1/2"
5/8"
1/2"
5/8"
1/2"
5/8"
1/2"
5/8"
1/2"
5/8"
1/2"
5/8"
1/2"
5/8"
1/2"
5/8"
1/2"
5/8"
1/2"
5/8"
1/2"
5/8"
1/2"
5/8"
1/2"
5/8"
1/2"
5/8"
1/2"
3/4"
3/4"
5/8"
5/8"
5/8"
5/8"

2.00
1.00
4.00
1.00
2.00
1.00
4.00
4.00
4.00
1.00
2.00
1.00
4.00
1.00
2.00
1.00
4.00
1.00
2.00
1.00
4.00
1.00
2.00
1.00
4.00
1.00
2.00
1.00
4.00
1.00
2.00
1.00
4.00
1.00
2.00
1.00
4.00
1.00
2.00
1.00
4.00
1.00
2.00
1.00
4.00
1.00
2.00
2.00
7.00
7.00

Ancho

Pagina 16

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

VP-102
VP-102
VP-102
VP-102
VP-102
VP-106
Central
VP-106
Central
VP-106
Central
VP-106
Central
VP-106
Central
VP-101
Central
Esquina
Esquina
VCH 03
Estribos
VA-102
VA-102
VA-102
VP-105
VP-105
VP-105
VCH 03
VCH 03
VP-107
VP-107
VP-107
VP-104
VP-104
VP-104
VP-104
VP-103
VP-103
VP-101
VP-102
VP-102
VP-102
VP-102
VP-102
VP-102
VP-102
VP-106
VP-106
VP-106
VP-106

Und

Cant.

5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
3/4"
3/4"
5/8"
5/8"
5/8"

7.00
7.00
7.00
7.00
7.00
4.00
2.00
4.00
2.00
4.00
2.00
4.00
2.00
4.00
2.00
4.00
1.00
2.00
2.00
4.00

1/4"
1/4"
1/4"
3/8"
3/8"
3/8"
5/8"
5/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"

28.00
48.00
38.00
14.00

Ancho

4.53
14.00
20.00
6.00
25.00
14.00
11.00
34.00
28.00
16.00
24.00
34.00
28.00
46.00
34.00
23.00
6.00
19.00
20.00
18.00
28.00
34.00
23.00
24.00
20.00

Pagina 17

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

VP-106
VP-101
VCH 03
Corte A-A
Corte A-A
Corte A-A
Corte A-A
05.07
05.07.01

LOSA ALIGERADA
CONCRETO F'C=210 KG/CM2. - LOSA ALIGERADA

Und

Cant.

3/8"
3/8"
5/8"
1/2"
1/2"
1/2"
1/2"

26.00
45.00
45.00
4.00
4.00
4.00
4.00

M3
1
2
3
4
5
6
7
8
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
- Ladrillo

05.07.02

Ancho

ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA

1,857.00

3.50
5.43
5.43
1.68
2.28
1.68
4.20
3.33
2.53
2.60
2.60
6.73
2.23
1.68
4.20
2.28
1.68
3.50
5.43
5.43
1.68
0.83
0.83
0.30

M2
1
2
3
4
5
6
7
8
10
11
12
13
14
15

3.50
5.43
5.43
1.68
2.28
1.68
4.20
3.33
2.53
2.60
2.60
6.73
2.23
1.68

Pagina 18

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Und

Cant.

16
17
18
19
20
21
22
23
24
05.07.03

ACERO DE REFUERZO f'c=4,200 Kg/Cm - LOSA ALIGERADA


1
2
3
4
5
6
7
8
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Bastones segn diseno

Ancho

4.20
2.28
1.68
3.50
5.43
5.43
1.68
0.83
0.83
KG
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"

12.00
20.00
16.00
12.00
12.00
12.00
20.00
16.00
7.00
16.00
7.00
16.00
7.00
12.00
20.00
12.00
12.00
12.00
20.00
16.00
2.00
11.00
3.00

3/8"
3/8"
1/2"
1/2"
1/2"
1/2"
1/2"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
1/2"

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

Pagina 19

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

05.07.04

LADRILLO DE ARCILLA 0.30 X 0.30 X 0.15

05.08
05.08.01

ESCALERA
CONCRETO F'C=210 KG/CM2. - ESCALERA

Und

Cant.

1/2"
1/2"

1.00
1.00

Und

1,857.00

Ancho

M3
TRAMO INICIAL
TRAMO MEDIO
TRAMO FINAL

05.08.02

ENCOFRADO Y DESENCOFRADO EN ESCALERA

M2
TRAMO INICIAL
TRAMO MEDIO
TRAMO FINAL

05.08.03

ACERO DE REFUERZO f'c=4,200 Kg/Cm - ESCALERA

KG
Horizontales
TRAMO INICIAL
TRAMO MEDIO
TRAMO FINAL
Verticales
TRAMO INICIAL

TRAMO MEDIO

TRAMO FINAL

07
07.01

MUROS Y TABIQUES DE ALBAILERIA


MURO DE LADRILLO TUBULAR DE 12 X 15 X 24DE SOGA

3/8"
3/8"
3/8"

24.00
36.00
25.00

1/2"
3/8"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"

8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00

M2
1
2
3
4
5
6
7
8

1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00

Pagina 20

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Und

9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
08

Cant.

Ancho

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.00
1.00
2.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00

REVOQUES Y ENLUCIDOS

Pagina 21

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

08.01

Und

TARRAJEO DE MUROS INTERIORES Y EXTERIORES

TARRAJEO DE COLUMNAS - SUPERFICIES

1.00
4.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
M2

Columna C1

11.00
2.00
2.00
5.00

Columna C2
08.03

TARRAJEO DE VIGAS

M2
Eje 1,4,5
Eje A -F
FONDO

08.04

TARRAJEO EN VESTIDURAS Y DERRAMES

3.00
2.00
1.00
M

V-1
V-2
V-3
08.05

BRUAS EN MUROS

1.00
1.00
1.00
M

Frontal y Posterior
Laterales
08.06

08.07

10
10.01

TARRAJEO RAYADO PRIMARIO EN MESA DE CONCRETO

ENCHAPE CON MAYOLICAS DE 15 X 15 COLOR DE 1RA

PISOS Y VEREDAS
PISO DE CEMENTO PULIDO E=4"

Ancho

M2
Eje 1 entre A - C
Eje 1,5 entre C-D y D-E
Eje 1 entre E-F
Eje 4 entre B-C
Eje 5 entre A-C
Eje 5 entre E-G
Eje A entre 1-2
Eje A entre 2-3
Eje A entre 4-5
Eje C entre 1-2
Eje C entre 2-3
Eje C entre 4-5
Eje G entre 1,2 y 4-5
Eje G entre 2 - 4

08.02

Cant.

4.00
8.00
M2
1.00
1.00
1.00
1.00

0.70
0.70
0.70
0.40

1.00
1.00
1.00
1.00

0.70
0.70
0.70
0.40

M2

M2

Pagina 22

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Und

Tesoreria
Bobeda
Contabilidad y Presupuesto
Rentas
Tramite Documentario
Abastecimiento
Pasadizo
Hall
Pasadizo
Demuna
Cubiculo Limpieza
Registro Civil
Foyer
Entrada del auditorio
SS.HH.

11
11.01
11.02
11.03
11.05

CARPINTERIA DE MADERA Y METALICA


PUERTA DE CRISTAL TEMPLADO DOBLE HOJA DE 3.60 X 3.50 MT
PUERTA DE CRISTAL TEMPLADO DOBLE HOJA DE 1.80 X 3.50 MT
PUERTA DE CRISTAL TEMPLADO DOBLE HOJA DE 2.50 X 3.50 MT
PUERTA DE MADERA APANELADA (INC MARCO)

PUERTA CONTRAPLACADA DE SUPERBOARD (INC MARCO)

11.06

VENTANA DE MADERA TIPO PERSIANA

1.30
1.30
3.35

2.00

Und
Und
Und
M2

1.00
1.00
1.00
4.00
2.00
2.00
1.00

1.00
0.90
0.80
0.93

4.00

0.65

M2
VA-1
VA-2
VA-3
VA-4
VA-5
VA-6
VA-7
VA-8
VA-9
VA-10
VA-11
VA-12
VA-13
VA-14
VA-15
VA-16

11.07

Ancho

5.65
4.50
4.50

P-4
P-5
P-7
P-6
11.04

Cant.

VENTANA DE VIDRIO SIMPLE 4 MM CON MARCO DE MADERA

3.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
M2

V-4
V-5

1.00
1.00

Pagina 23

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Und

V-6
V-7
V-8
11.08

VENTANA DE VIDRIO DE BRONCE CON MARCO DE MADERA

M2

CERRAJERIA
CERRADURA PARA PUERTA EXTERIOR 3 GOLPES
CERRADURA DOS GOLPES ( INC. JALADOR)
BISAGRA CAPUCHINA DE 4"

5.00
2.00
1.00

Und
Und
Und
P-4
P-5
P-6

12.03
12.04

BISAGRA CAPUCHINA DE 3"


PICAPORTE DE FIERRO 3"

13
13.01

PINTURA
PINTURA LATEX EN MURO INTERIOR Y EXTERIOR

Und

4.00
4.00
1.00
4.00
4.00

PINTURA LATEX EN VIGA Y COLUMNAS

1.00
4.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
M2

Columna C1

11.00
2.00
2.00
5.00
3.00
2.00
1.00
3.00
2.00
1.00

Columna C2
Vigas
Eje 1 - 5
Medio
Vigas
Eje 1 - 5
Medio
13.03

3.00
9.00

M2
Eje 1 entre A - C
Eje 1,5 entre C-D y D-E
Eje 1 entre E-F
Eje 4 entre B-C
Eje 5 entre A-C
Eje 5 entre E-G
Eje A entre 1-2
Eje A entre 2-3
Eje A entre 4-5
Eje C entre 1-2
Eje C entre 2-3
Eje C entre 4-5
Eje G entre 1,2 y 4-5
Eje G entre 2 - 4

13.02

Ancho

1.00
1.00
1.00

V-1
V-2
V-3
12
12.01
12.02
12.03

Cant.

PINTURA BARNIZ EN PUERTAS DE MADERA

M2
P-1

1.00

2.00

Pagina 24

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
Proyecto :

CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Und

P-2
13.04

PINTURA BARNIZ EN VENTANAS DE MADERA

2.00

0.80

PINTURA EN ANTICORROSIVA Y ESMALTE EN FIERRO PASANTE

4.00
2.00
4.00
1.00
1.00
1.00
2.00
1.00
1.00
2.00
1.00
1.00
4.00
M2

V-1
V-2
V-3
V-4
V-5
VA-1
VA-2
VA-3
VA-4
VA-5
VA-6
VA-7
VA-8
13.06
13.07

Ancho

M2
V-1
V-2
V-3
V-4
V-5
VA-1
VA-2
VA-3
VA-4
VA-5
VA-6
VA-7
VA-8

13.05

Cant.

PINTURA BARNIZ EN CIELORRASO


PINTURA BARNIZ EN FRISO

4.00
2.00
4.00
1.00
1.00
1.00
2.00
1.00
1.00
2.00
1.00
1.00
4.00
M2
M

2.00
2.00
2.00

M2

3.00

Alero Lateral 1"x8"


13.08

PINTURA BARNIZ EN TIMPANO

14
04.01

INSTALACIONES SANITARIAS
APARATOS Y ACCESORIOS SANITARIOS

14.01.01

LAVADERO DE ACERO INOXIDABLE DE UNA POZA + ESCURRIDERO

UND

1.00

14.02
14.02.01
14.02.02
14.02.03
14.02.04
14.02.05
14.02.06

SISTEMA DE AGUA FRIA


SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
EXCAVACIN DE ZANJA MANUAL PARA CONEXIONES
REFINE Y NIVELACIN DE ZANJA
CONFORMACION DE CAMA DE APOYO
RELLENO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE

PTO
ML
ML
ML
M3
M3

1.00
1.00
1.00
1.00
1.00
1.00

5.55

0.20
0.20

Pagina 25

Municipalidad Distrital de Sarayacu

HOJA DE METRADOS
CONSTRUCCION DEL PALACIO MUNICIPAL - I ETAPA

Lugar

DOS DE MAYO
November-2007

Fecha

Descripcin

Und

Cant.

14.02.07
14.02.08
14.02.09

RED DE AGUA 1/2" PVC SAP


CODO DE PVC AGUA C-10 DE 1/2"
VALVULA DE COMPUERTA DE BRONCE DE 1/2"

ML
UND
UND

1.00
2.00
1.00

14.03
14.03.01
14.03.02
14.03.03
14.03.04
14.03.05
14.03.06

SISTEMA DE DESAGUE
SALIDA DE DESAGUE EN PVC 2"
EXCAVACIN DE ZANJA MANUAL PARA CONEXIONES
REFINE Y NIVELACIN DE ZANJA
CONFORMACION DE CAMA DE APOYO
RELLENO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE

PTO
ML
ML
ML
M3
M3

1.00
1.00
1.00
1.00
1.00
1.00

14.03.07

SUMINISTRO E INSTALACION DE TUBERIA DE PVC SAL DESAGUE LIVIANO 4"

ML

1.00

14.03.08
14.03.09
14.03.10
14.03.11

CAJA DE REGISTRO DE DESAGUE 12" X 24"


SALIDA DE VENTILACION 2" - PVC - SAP
SUMIDERO DE 2"
SUMINISTRO E INSTALACION DE YEE DE 2"

UND
PTO
PZA
UND

1.00
1.00
1.00
2.00

15
15.01
15.02
15.03
15.03.01
15.03.02
15.03.03

SISTEMA DE AGUA PARA LLUVIA


CANALETA GALVANIZADA D = 8"
BAJADA DE DRENAJE PLUVIAL D = 4"
COLUMNETA DE PROTECCION DE DESAGUE PLUVIAL
CONCRETO F'C=175 KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO GRADO 60 Fy=4,200 Kg/Cm2

M
PTO
UND
M3
M2
KG

2.00
6.00
6.00
1.00
1.00

Eje A y D

1/2"

4.00

Estribos

1/4"

12.00

16.04
16.05
16.06
16.07
16.08

INSTALACIONES ELECTRICAS
SALIDA PARA CENTRO DE LUZ
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE
INTERRUPTOR SIMPLE
INTERRUPTOR TRIPLE
TABLERO GENERAL (INC. CAJA METALICA)
POZO A TIERRA
PRUEBAS ELECTRICAS
CONEXIN A LA RED EXTERNA
SPOT LIGTH

PTO
PTO
UND
UND
UND
UND
GLB
M
UND

26.00
11.00
8.00
1.00
1.00
1.00
1.00
1.00
14.00

17
17.01
17.02

ARTEFACTOS ELECTRICOS
FLUORESCENTE RECTO 2 X 40 W INC. EQUIPO Y PANTALLA
ARTEFACTO DE ILUMINACION FOCO AHORRADOR

UND
UND

12.00
14.00

18
18.02

VARIOS
LIMPIEZA FINAL DE OBRA

GLB

1.00

16
16.01
16.02
16.03

Ancho

0.20
0.20

0.20
0.60
0.25 1.02

Proyecto :

Pagina 26

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones

Sub total

Total

6.00

1.00
24.00
1.00

1.00
24.00
1.00

31.00
29.00

596.13
499.67

596.13
499.67

Largo

6.15
4.28
1.00
4.28
6.15
4.45
1.28
2.80
1.95
4.68
3.85
3.50
3.83
8.55
4.13
1.05
4.28
1.48
2.60
4.07
4.87
0.20
0.63
1.90
2.80
2.30
1.48
2.53
2.68
0.45
0.53
1.73
0.53
2.91
4.10
1.05
1.48
2.85
1.08

Altura

1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80

Nveces

2.71
1.88
1.76
1.88
2.71
3.92
1.13
2.46
1.72
1.50
1.23
1.12
1.23
2.74
1.32
0.34
1.37
0.47
0.83
1.30
1.56
0.06
0.20
0.61
0.90
0.74
0.47
0.81
0.86
0.14
0.17
0.55
0.17
0.93
1.31
0.34
0.47
0.91
0.35

Pagina 27

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones
Largo

Altura

2.70
2.63
2.65
3.05
3.60
3.10
0.95
1.35
0.65
7.95
2.71
1.40
2.00
2.00
2.30
2.20
1.45
1.50
1.40
2.10
1.20
1.80
0.90
1.40
1.05

0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

6.15
4.28
1.00
4.28
6.15
4.45
1.28
2.80
1.95
4.68
3.85
3.50
3.83
8.55
4.13
1.05
4.28
1.48
2.60
4.07
4.87
0.20
0.63

Nveces

3.00

Sub total

Total

0.86
0.84
0.85
0.98
1.15
0.99
0.91
0.43
0.21
3.18
1.08
1.18
2.52
4.80
3.17
5.81
5.22
2.70
4.70
1.51
3.46
0.97
0.49
1.18
1.13

95.49

2.46
1.71
1.60
1.71
2.46
3.56
1.02
2.24
1.56
1.87
1.54
1.40
1.53
3.42
1.65
0.42
1.71
0.59
1.04
1.63
1.95
0.08
0.25

Pagina 28

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones
Largo

Altura

1.90
2.80
2.30
1.48
2.53
2.68
0.45
0.53
1.73
0.53
2.91
4.10
1.05
1.48
2.85
1.08
2.70
2.63
2.65
3.05
3.60
3.10
0.95
1.35
0.65
7.95
2.71
1.40
2.00
2.00
2.30
2.20
1.45
1.50
1.40
2.10
1.20
1.80
0.90
1.40
1.05

Nveces

3.00

Sub total

Total

0.76
1.12
0.92
0.59
1.01
1.07
0.18
0.21
0.69
0.21
1.16
1.64
0.42
0.59
1.14
0.43
1.08
1.05
1.06
1.22
1.44
1.24
1.14
0.54
0.26
3.98
1.36
1.96
4.20
8.00
5.29
9.68
8.70
4.50
7.84
2.52
5.76
1.62
0.81
1.96
1.89

128.67
74.95
348.71
23.25
20.54

17.23
16.20
16.20
20.54

0.15
0.75
0.05

74.95
348.71
23.25
20.54

6.15

0.70

1.72

Pagina 29

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones
Largo

Altura

4.28
1.00
4.28
6.15
4.45
1.28
2.80
1.95
4.68
3.85
3.50
3.83
8.55
4.13
1.05
4.28
1.48
2.60
4.07
4.87
0.20
0.63
1.90
2.80
2.30
1.48
2.53
2.68
0.45
0.53
1.73
0.53
2.91
4.10
1.05
1.48
2.85
1.08
2.70
2.63
2.65
3.05
3.60
3.10
0.95
1.35
0.65

0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70

6.15

Nveces

3.00

Sub total

Total

1.20
1.12
1.20
1.72
2.49
0.72
1.57
1.09
1.31
1.08
0.98
1.07
2.39
1.16
0.29
1.20
0.41
0.73
1.14
1.36
0.06
0.18
0.53
0.78
0.64
0.41
0.71
0.75
0.13
0.15
0.48
0.15
0.81
1.15
0.29
0.41
0.80
0.30
0.76
0.74
0.74
0.85
1.01
0.87
0.80
0.38
0.18

41.03

2.46

Pagina 30

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones
Largo

4.28
1.00
4.28
6.15
4.45
1.28
2.80
1.95
4.68
3.85
3.50
3.83
8.55
4.13
1.05
4.28
1.48
2.60
4.07
4.87
0.20
0.63
1.90
2.80
2.30
1.48
2.53
2.68
0.45
0.53
1.73
0.53
2.91
4.10
1.05
1.48
2.85
1.08
2.70
2.63
2.65
3.05
3.60
3.10
0.95
1.35
0.65
7.95
2.71
1.40

Altura

Nveces

3.00

Sub total

Total

1.71
1.60
1.71
2.46
3.56
1.02
2.24
1.56
1.87
1.54
1.40
1.53
3.42
1.65
0.42
1.71
0.59
1.04
1.63
1.95
0.08
0.25
0.76
1.12
0.92
0.59
1.01
1.07
0.18
0.21
0.69
0.21
1.16
1.64
0.42
0.59
1.14
0.43
1.08
1.05
1.06
1.22
1.44
1.24
1.14
0.54
0.26
3.98
1.36
1.96

Pagina 31

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones
Largo

Altura

Nveces

2.00
2.00
2.30
2.20
1.45
1.50
1.40
2.10
1.20
1.80
0.90
1.40
1.05

1.40
2.00
2.00
2.30
2.20
1.45
1.50
1.40
2.10
1.20
1.80
0.90
1.40
1.05

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

1.36
0.66
1.96
1.01
1.96
1.96
2.26
1.11
2.16
2.16
1.41
0.96
1.46
1.46
1.36
1.36
2.06

1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02

4.00
8.00
6.00
11.00
11.00
11.00
6.00
12.00
12.00
12.00
6.00
8.00
8.00
8.00
8.00
8.00
7.00

Sub total

Total

4.20
8.00
5.29
9.68
8.70
4.50
7.84
2.52
5.76
1.62
0.81
1.96
1.89

128.67

0.98
2.10
4.00
2.65
4.84
4.35
2.25
3.92
1.26
2.88
0.81
0.41
0.98
0.95

32.37

11.10
10.77
23.99
22.66
43.98
43.98
27.66
27.17
52.88
52.88
51.78
47.00
23.83
23.83
44.39
44.39
14.71

Pagina 32

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones
Largo

Altura

Nveces

1.16
1.16
1.16
1.76
0.86
0.86
0.86
1.36
1.36
1.01
0.86

1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02

11.00
7.00
7.00
5.00
10.00
5.00
5.00
8.00
8.00
5.00
6.00

3.70
4.65
2.68
4.36
3.50
2.68
3.50
2.68
3.70
4.65
2.68
4.36
3.78
2.13
2.35
1.05
1.10
0.90
3.70
1.63
3.70
3.70
3.70
3.70
1.63
1.20
1.23
1.28
1.10
0.90
1.05
1.13
4.14
2.71
1.13
1.13

1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10

Sub total

Total

13.02
33.13
33.13
8.98
8.77
4.39
4.39
11.10
11.10
10.30
10.53

715.82

0.61
0.77
0.44
0.72
0.58
0.44
0.58
0.44
0.61
0.77
0.44
0.72
0.62
0.35
0.39
0.17
0.18
0.15
0.61
0.27
0.61
0.61
0.61
0.61
0.27
0.20
0.20
0.21
0.18
0.15
0.17
0.19
0.68
0.45
0.19
0.19

Pagina 33

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones

Sub total

Total

1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10

0.53
0.32
0.33
0.32
0.69
0.69
0.69
0.20
0.41
0.19
0.72
0.69
0.74
0.48
0.33
0.48
0.33
0.54
0.10
0.42
0.17
0.50
0.54
0.57
0.62
0.37
0.20
0.20
0.20
0.28
0.15
0.04

28.41

1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10

8.14
10.23
5.90
9.59
7.70
5.90
7.70
5.90
8.14
10.23
5.90
9.59
8.32
4.69
5.17
2.31

Largo

Altura

3.20
1.93
1.98
1.93
4.20
4.20
4.20
1.20
2.50
1.13
4.35
4.20
4.50
2.93
2.00
2.93
2.00
3.30
0.60
2.53
1.00
3.05
3.30
3.43
3.73
2.23
1.20
1.20
1.20
1.67
0.90
0.25

3.70
4.65
2.68
4.36
3.50
2.68
3.50
2.68
3.70
4.65
2.68
4.36
3.78
2.13
2.35
1.05

Nveces

Pagina 34

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones
Largo

Altura

1.10
0.90
3.70
1.63
3.70
3.70
3.70
3.70
1.63
1.20
1.23
1.28
1.10
0.90
1.05
1.13
4.14
2.71
1.13
1.13
3.20
1.93
1.98
1.93
4.20
4.20
4.20
1.20
2.50
1.13
4.35
4.20
4.50
2.93
2.00
2.93
2.00
3.30
0.60
2.53
1.00
3.05
3.30
3.43
3.73
2.23
1.20
1.20
1.20
1.67

1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10

Nveces

Sub total

Total

2.42
1.98
8.14
3.59
8.14
8.14
8.14
8.14
3.59
2.64
2.71
2.82
2.42
1.98
2.31
2.49
9.11
5.96
2.49
2.49
7.04
4.25
4.36
4.25
9.24
9.24
9.24
2.64
5.50
2.49
9.57
9.24
9.90
6.45
4.40
6.45
4.40
7.26
1.32
5.57
2.20
6.71
7.26
7.55
8.21
4.91
2.64
2.64
2.64
3.67

Pagina 35

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones

Sub total

Total

1.10
1.10

1.98
0.55

378.80

0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58

13.98
17.30
10.42
16.29
13.28
10.42
13.28
10.42
13.98
17.30
10.42
16.29
14.26
8.49
9.26
4.72
4.89
4.19
13.98
6.75
13.98
13.98
13.98
13.98
6.75
5.24
5.35
5.52
4.89
4.19
4.72
5.00
15.52
10.52
5.00
5.00
12.23
7.79
7.97
7.79
15.73
15.73
15.73
5.24
9.79

Largo

Altura

0.90
0.25

4.00
4.95
2.98
4.66
3.80
2.98
3.80
2.98
4.00
4.95
2.98
4.66
4.08
2.43
2.65
1.35
1.40
1.20
4.00
1.93
4.00
4.00
4.00
4.00
1.93
1.50
1.53
1.58
1.40
1.20
1.35
1.43
4.44
3.01
1.43
1.43
3.50
2.23
2.28
2.23
4.50
4.50
4.50
1.50
2.80

Nveces

Pagina 36

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones
Largo

Altura

1.43
4.65
4.50
4.80
3.23
2.30
3.23
2.30
3.60
0.90
2.83
1.30
3.35
3.60
3.73
4.03
2.53
1.50
1.50
1.50
1.97
1.20
0.55

0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58

2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

1.94
3.74
1.59

0.60
0.60
0.60

Nveces

Sub total

Total

5.00
16.25
15.73
16.78
11.29
8.04
11.29
8.04
12.58
3.15
9.89
4.54
11.71
12.58
13.04
14.08
8.84
5.24
5.24
5.24
6.89
4.19
1.92
1.00
1.00
8.00
11.00
3.00
3.00
3.00
1.00
2.00
6.00
2.00
1.00
3.00
3.00
7.00
2.00
1.00
4.00
4.00
2.00

2.30
4.03
46.00
69.58
22.43
24.15
25.88
9.20
19.55
62.10
21.85
11.50
36.23
37.95
92.58
27.60
14.38
59.80
62.10
32.20

1,354.44

0.35
0.67
0.29

Pagina 37

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones
Largo

Altura

5.43
5.43
4.30
2.60
3.70
2.60
7.83

0.60
0.60
0.60
0.60
0.60
0.60
0.80

1.94
3.74
1.59
5.43
5.43
4.30
2.60
3.70
2.60
7.83

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.80

2.24
2.24
1.56
4.04
4.04
1.56
1.89
1.89
1.56
5.73
5.73
1.56
5.73
5.73
1.56
4.60
4.60
1.56
2.90
2.90
1.56
4.00
4.00
1.56
2.90
2.90
1.56
8.13
8.13

1.58
1.02
0.58
1.58
1.02
0.58
1.58
1.02
0.58
1.58
1.02
0.58
1.58
1.02
0.58
1.58
1.02
0.58
1.58
1.02
0.58
1.58
1.02
0.58
1.58
1.02
0.58
1.58
1.02

Nveces

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

Sub total

Total

0.98
0.98
0.77
0.47
0.67
0.47
1.88

7.52

2.33
4.49
1.91
6.52
6.52
5.16
3.12
4.44
3.12
12.53

50.12

14.18
4.57
12.72
25.57
8.24
16.36
11.96
3.86
11.81
36.27
11.69
25.44
36.27
11.69
25.44
29.12
9.38
21.81
18.36
5.92
15.45
25.32
8.16
19.99
18.36
5.92
15.45
25.73
49.76

Pagina 38

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones

Sub total

Total

0.58

44.27

569.06

0.30
0.30
0.30
0.60
0.30
0.15
0.30

4.70
4.70
4.70
4.70
4.70
4.70
4.70

0.85
2.96
6.77
1.69
2.75
0.21
0.42

15.65

1.20
1.20
1.20
1.80
0.90
1.20

4.70
4.70
4.70
4.70
4.70
4.70

11.28
39.48
90.24
16.92
54.99
11.28

224.19

1.02
1.02
1.58
1.02
1.58
1.02
1.02
0.58

6.30
6.30
6.30
6.30
6.30
6.30
6.30
6.30

2.00
7.00
16.00
16.00
2.00
2.00
13.00
2.00

77.11
359.86
638.06
411.26
119.64
51.41
334.15
58.72

0.58
0.58
0.58
0.58
0.25
0.25

1.10
1.10
1.10
1.70
0.80
1.70

2.00
7.00
16.00
2.00
24.00
2.00

33.32
116.62
266.55
51.49
124.80
22.10

2,665.09

0.75
0.60
0.60
0.40

4.70
3.50
3.50
3.50

2.00
2.00

6.35
0.63
0.84
0.56

8.38

2.10
1.50
2.40
1.60

4.70
3.50
3.50
3.50

59.22
10.50
16.80
11.20

97.72

Largo

Altura

2.00

Nveces

Pagina 39

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones

Sub total

Total

Largo

Altura

Nveces

1.58
1.02
0.58
0.58

5.30
5.30
4.10
4.10

6.00
6.00
2.00
2.00

201.29
194.62
19.11
38.21

0.58
0.25
0.25

2.00
0.80
2.30

6.00
2.00
2.00

181.74
8.80
25.30

669.07

2.68
4.67
3.70
1.45
4.53
1.50
2.68
0.45
3.70
1.45
0.98
5.43
4.20
1.94
3.47
5.43
4.20
7.95
5.43
3.33
0.58
2.53
2.60
2.23
4.20
5.43
3.33
3.40
2.60
3.85
7.70
7.62
1.68
2.60
0.60
0.98

0.30
0.30
0.30
0.50
0.50
0.50
0.20
0.20
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.70
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.70
0.20
0.20
0.20
0.20
0.20

4.00
4.00
5.00
2.00
2.00
2.00
4.00
4.00
2.00
2.00
2.00
2.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.00
1.00
2.00
2.00

0.96
1.68
1.67
0.44
1.36
0.45
0.54
0.09
1.11
0.44
0.29
1.63
1.26
0.58
0.52
1.63
1.26
1.67
1.63
0.50
0.09
0.38
0.39
0.33
0.63
0.81
0.50
0.51
0.39
0.58
1.62
0.38
0.20
0.08
0.04
0.06

26.68

Pagina 40

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones

Sub total

Total

4.00
4.00
5.00
2.00
2.00
2.00
4.00
4.00
2.00
2.00
2.00
2.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.00
1.00
2.00
2.00

9.65
16.81
16.65
3.77
11.78
3.90
6.97
1.17
9.62
3.77
2.55
14.12
10.92
5.04
4.51
14.12
10.92
13.52
14.12
4.33
0.75
3.29
3.38
2.90
5.46
7.06
4.33
4.42
3.38
5.01
13.09
4.95
3.70
1.43
0.66
1.08

243.11

4.00
4.00
5.00
2.00
2.00
2.00
2.00
2.00
2.00

52.49
91.46
90.58
22.03
3.14
13.29
0.29
68.82
3.14

Largo

Altura

Nveces

2.68
4.67
3.70
1.45
4.53
1.50
2.68
0.45
3.70
1.45
0.98
5.43
4.20
1.94
3.47
5.43
4.20
7.95
5.43
3.33
0.58
2.53
2.60
2.23
4.20
5.43
3.33
3.40
2.60
3.85
7.70
7.62
1.68
2.60
0.60
0.98

0.90
0.90
0.90
1.30
1.30
1.30
0.65
0.65
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.70
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.70
0.65
0.55
0.55
0.55
0.55

3.22
5.60
4.44
1.74
1.54
2.10
0.14
5.44
1.54

1.02
1.02
1.02
1.58
1.02
1.58
1.02
1.58
1.02

Pagina 41

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones
Largo

Altura

Nveces

2.10
3.84
1.80
1.54
2.10
0.20
3.22
0.54
4.44
1.54
2.10
2.84
1.74
1.54
2.10
0.14
1.18
1.54
2.10
0.18
6.52
1.54
2.10
5.52
5.04
1.54
2.10
4.04
2.33
1.54
2.10
1.33
4.16
1.54
2.10
3.16
6.52
1.54
2.10
5.52
5.04
1.54
2.10
4.04
9.74
7.54
3.42
3.10
6.52
4.00

1.58
1.02
1.58
1.02
1.58
1.02
1.58
1.58
1.58
1.02
1.58
1.02
1.58
1.02
1.58
1.02
1.58
1.02
1.58
1.02
1.58
1.02
1.58
1.02
1.58
1.02
1.58
1.02
1.58
1.02
1.58
1.02
1.58
1.02
1.58
1.02
1.58
1.02
1.58
1.02
1.58
1.02
1.58
1.02
2.25
2.25
1.58
1.58
1.58
1.58

2.00
2.00
2.00
2.00
2.00
2.00
4.00
4.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00
1.00

Sub total

Total

13.29
7.83
22.79
3.14
13.29
0.41
81.43
13.67
56.21
3.14
13.29
5.79
22.03
3.14
13.29
0.29
14.89
3.14
13.29
0.36
82.49
3.14
13.29
11.25
63.81
3.14
13.29
8.24
29.47
3.14
13.29
2.71
26.36
1.57
6.65
3.23
82.49
3.14
13.29
11.25
63.81
3.14
13.29
8.24
87.66
16.97
10.82
9.81
144.36
44.27

Pagina 42

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones

Sub total

Largo

Altura

Nveces

0.70
3.04
3.12
2.68
5.04
6.52
2.10
4.00
2.10
4.08
2.10
3.12
2.10
4.62
2.10
9.24
7.04
3.42
3.10
9.14

1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.58
2.25
2.25
1.58
1.58
1.58

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

7.71
33.63
34.56
29.64
55.83
41.25
6.65
25.29
6.65
25.83
6.65
19.75
6.65
29.24
6.65
83.16
15.84
10.82
9.81
57.88

1.10
1.10
1.10
1.45
1.45
1.45
0.80
0.80
1.45
1.45
1.45
1.45
1.45
1.45
1.45
1.45
1.45
1.85
1.45
1.45
1.45
1.45
1.45
1.45
1.45
1.45
1.45
1.45
1.45

0.25
0.25
0.25
0.58
0.58
0.58
1.58
1.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58

4.00
4.00
5.00
2.00
2.00
2.00
4.00
4.00
2.00
2.00
2.00
2.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

30.80
52.80
52.25
23.65
7.65
23.65
101.28
30.38
42.23
23.65
18.58
57.43
47.30
27.03
20.27
57.43
47.30
49.57
57.43
19.43
5.07
16.05
16.89
15.20
23.65
28.72
19.43
20.27
16.89

Total

Pagina 43

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones
Largo

Altura

Nveces

1.45
1.85
0.80
2.08
3.00
1.00
1.38

0.58
0.58
1.58
1.02
1.02
1.02
1.02

1.00
1.00
1.00
4.00
1.00
2.00
2.00

2.68
4.65
3.70
2.68
2.68
2.68
4.65
3.70
1.45
3.70
1.45
3.70
1.45
2.68
4.65
2.68
2.68
2.68
4.65
3.70
0.30
2.60
0.60
0.30

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.15

2.68
4.65
3.70
2.68
2.68
2.68
4.65
3.70
1.45
3.70
1.45
3.70
1.45
2.68

4.00
2.00

Sub total

Total

21.96
48.49
56.97
33.95
12.24
8.16
11.26

3,106.39

1.88
5.05
4.02
0.90
1.22
0.90
3.91
2.46
0.73
1.92
0.75
4.98
0.65
0.90
3.91
1.22
0.90
1.88
5.05
4.02
0.40
0.43
0.20
25.07

23.21

9.38
25.25
20.09
4.50
6.11
4.50
19.53
12.32
3.67
9.62
3.77
24.90
3.23
4.50

Pagina 44

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones
Largo

Altura

4.65
2.68
2.68
2.68
4.65
3.70
0.30
2.60
0.60

Nveces

4.00
2.00

4.10
6.03
6.03
2.28
2.88
2.28
4.80
3.93
3.13
3.20
3.20
7.33
2.83
2.28
4.80
2.88
2.28
4.10
6.03
6.03
2.28
1.43
1.43

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.85
1.55
2.75
3.30
9.25
3.10
3.80
1.80
1.70
1.20
2.10
1.85
3.45
2.70
6.90

0.58
0.58
1.02
1.02
1.02
1.02
1.02
0.58
0.58
0.58
0.58
0.58
0.58
0.58
1.02

Sub total

Total

19.53
6.11
4.50
9.38
25.25
20.09
2.02
2.16
1.00

241.42

2.00

12.30
30.15
24.12
6.84
8.64
6.84
24.00
15.72
5.48
12.80
5.60
29.32
4.95
6.84
24.00
8.64
6.84
12.30
30.15
24.12
4.56
3.93
2.15

4.00
7.00
7.00
4.00
7.00
1.00
3.00
3.00
7.00
8.00
1.00
1.00
2.00
1.00
1.00

1.98
6.32
19.64
13.46
66.05
3.16
11.63
3.15
6.93
5.59
1.22
1.08
4.02
1.57
7.04

4.00

Pagina 45

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones
Largo

Altura

Nveces

5.87
6.87

1.02
1.02

1.00
1.00

Sub total

Total

5.99
7.01

476.12

1,857.00

1,857.00

12.30
8.72
9.22

30.24

3.78
1.72
6.29
1.85
3.87
1.50

19.01

9.46
6.23
7.09

1.30
1.40
1.30

2.91
1.30
4.49
1.40
2.98
1.30

1.30
0.17
1.40
0.17
1.30
0.17

1.30
1.40
1.30

0.58
0.58
0.58

18.17
29.36
18.93

1.35
1.16
2.95
1.76
1.22
1.51
3.99
1.00
1.77
1.24
1.51
3.78
1.00
1.30

1.02
0.58
1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02
1.02

11.02
5.41
24.07
14.36
9.96
12.32
32.56
8.16
14.44
10.12
12.32
30.84
8.16
10.61

3.70
2.68
1.38
3.28
3.70
1.85
1.75
0.90

3.50
2.80
3.50
2.80
2.80
3.50
3.50
1.40

12.95
22.51
4.83
9.18
10.36
6.48
6.13
2.52

8.00
8.00
7.00

2.00

270.81

Pagina 46

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones
Largo

Altura

0.40
4.50
1.30
2.56
1.49
0.93
4.15
2.35
0.79
1.02
0.87
3.13
0.88
2.43
1.73
0.75
2.00
1.98
2.08
1.10
1.63
3.36
1.40
2.36
1.55
4.20
3.87
3.35
1.20
2.98
0.40
1.38
3.05
3.20
1.20
1.55
4.20
2.30
3.78
1.20
1.30
4.58
1.45
4.00
0.68
0.73
1.20
0.55

3.50
3.50
3.50
2.80
2.80
3.50
3.50
1.00
3.50
1.40
3.50
2.80
3.50
1.00
1.00
3.50
0.50
1.00
3.50
2.80
2.80
1.00
2.80
3.50
1.00
3.50
3.50
3.50
3.50
3.50
2.10
3.50
3.50
2.80
3.50
1.00
3.50
3.50
2.80
2.80
2.80
2.80
3.50
3.50
3.50
3.50
2.10
3.50

Nveces

Sub total

Total

1.40
15.75
4.55
7.17
4.17
3.26
14.53
2.35
2.77
1.43
3.05
8.76
3.08
2.43
8.65
2.63
2.00
1.98
7.28
6.16
4.56
3.36
3.92
8.26
1.55
14.70
13.55
11.73
4.20
10.43
0.84
4.83
10.68
8.96
4.20
1.55
14.70
8.05
31.75
3.36
3.64
12.82
5.08
14.00
2.38
2.56
5.04
3.85

392.87

Pagina 47

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones

Sub total

Total

1.70
1.20
1.20
2.00
2.00
1.20
1.20
1.20
2.33
1.70
1.00
2.00
1.20
1.20

5.44
15.36
1.14
4.40
6.40
3.78
2.80
1.61
5.43
3.96
1.36
4.66
5.59
2.81

64.73

0.70
0.85
0.55
0.55

2.80
2.80
2.80
2.80

21.56
4.76
3.08
7.70

37.10

7.60
14.00
3.40

0.65
0.65
0.65

14.82
18.20
2.21

35.23

7.60
14.00
3.40

25.00

32.40
70.40

102.80

1.70
1.72
0.98
0.54

4.95

1.70
1.72
0.98
0.54

4.95

Largo

Altura

3.20
3.20
0.95
2.20
3.20
3.15
2.33
1.34
2.33
2.33
1.36
2.33
2.33
2.34

7.60
14.00
3.40

Nveces

1.00
1.00
1.00

8.10
8.80

2.43
2.46
0.70
1.36

2.43
2.46
0.70
1.36

2.00

2.00

Pagina 48

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones

Sub total

Total

16.39
5.85
33.08
12.33
14.29
17.80
11.92
78.13
3.25
12.71
2.41
4.52
44.78
38.87
12.62

308.94

1.00
1.00
1.00

1.00
1.00
1.00

2.10
2.10
2.10
2.10

8.40
3.78
3.36
1.94

17.48

1.70

4.42

4.42

2.68
3.28
3.70
2.56
1.49
3.13
1.10
1.63
1.40
1.55
1.30
3.20
3.78
1.20
1.13
4.58

0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
1.40
0.70
0.70
0.70
0.70
0.70

5.63
2.30
2.59
1.79
1.04
2.19
1.54
1.14
0.98
1.09
1.82
2.24
7.94
0.84
0.79
3.21

37.12

1.55
2.43

2.50
2.50

3.88
6.08

Largo

Altura

2.90
1.30
7.35
12.33
14.29
17.80
11.92
78.13
2.50
12.71
1.85
1.35
44.78
38.87
6.31

Nveces

Pagina 49

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones

Sub total

Total

2.50
2.50
2.50

8.40
5.90
5.88

30.13

2.50
3.00
2.50

21.63
12.00
4.95

38.58

1.00
1.00

3.00
9.00

3.00
9.00

4.00
4.00
4.00
3.00
1.00

16.00
16.00
4.00
12.00
4.00

36.00
12.00
4.00

Largo

Altura

3.36
2.36
2.35

1.73
2.00
1.98

Nveces

3.20
3.20
0.95
2.20
3.20
3.15
2.33
1.34
2.33
2.33
1.36
2.33
2.33
2.34

1.70
1.20
1.20
2.00
2.00
1.20
1.20
1.20
2.33
1.70
1.00
2.00
1.20
1.20

5.44
15.36
1.14
4.40
6.40
3.78
2.80
1.61
5.43
3.96
1.36
4.66
5.59
2.81

64.73

0.70
0.85
0.55
0.55
7.60
14.00
3.40
7.60
14.00
3.40

2.80
2.80
2.80
2.80
0.65
0.65
0.65
0.20
0.20
0.20

21.56
4.76
3.08
7.70
14.82
18.20
2.21
4.56
5.60
0.68

83.17

2.10

4.20

Pagina 50

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones

Sub total

Total

2.00

3.20

7.40

3.20
0.95
2.33
3.15
1.34
2.00
0.80
3.20
2.20
2.33
2.36
3.20
1.55

1.60
1.60
1.60
1.60
1.60
0.70
0.80
1.10
0.80
0.80
1.10
0.80
0.53

20.48
3.04
14.91
5.04
2.14
1.40
1.28
3.52
1.76
3.73
2.60
2.56
3.29

65.75

3.20
0.95
2.33
3.15
1.34
2.00
0.80
3.20
2.20
2.33
2.36
3.20
1.55

1.60
1.60
1.60
1.60
1.60
0.70
0.80
1.10
0.80
0.80
1.10
0.80
0.53

20.48
3.04
14.91
5.04
2.14
1.40
1.28
3.52
1.76
3.73
2.60
2.56
3.29

65.75

Largo

Altura

Nveces

15.40
15.40
5.55

170.94
30.80
11.10

170.94

5.23

15.69

15.69

1.00

1.00

13.00
13.00
13.00
13.00
13.00

0.60
0.20

41.90

1.00
13.00
13.00
13.00
1.56
0.52

Pagina 51

DE METRADOS

Hecho Por:

Ing. Juan Veliz

Especialidad

General

Dimensiones
Largo

Altura

Nveces

13.00

12.50
12.50
12.50
13.00
13.00

0.60
0.20

19.00

13.00
2.00
1.00

58.08

6.50

15.40

1.00

Total

1.00
12.50
12.50
12.50
1.56
0.52

6.50

0.20

Sub total

1.00
1.00
1.00
2.00

52.08

30.80
6.00
6.00
0.25
3.78

1.05
1.05

6.00
6.00

30.80
6.00
6.00
0.25
3.78

1.05

6.00

25.70

6.00

18.00

43.70

26.00
11.00
8.00
1.00
1.00
1.00
1.00
19.00
14.00

26.00
11.00
8.00
1.00
1.00
1.00
1.00
19.00
14.00

12.00
14.00

12.00
14.00

1.00

1.00

Pagina 52

Municipalidad Distrital de Campo Verde

PESO DE MATERIALES - CLASIFICADOS POR SIMILITUD

OBRA : INSTALACION DEL SISTEMA DE AGUA POTABLE EN EL CASERIO SAN CRISTOBAL DE AGUA
Item
1.00

2.00

3.00

4.00

5.00

6.00

Descripcion
MATERIALES EN BOLSA:
CEMENTO PORTLAND TIPO I (42.5KG)
YESO EN BOLSAS DE 25 KG.

Und
BOL
BOL

MATERIALES POR GALON:


PEGAMENTO PVC
PINTURA ANTICORROSIVA
PINTURA ESMALTE
PINTURA LATEX
SELLADOR IMPRIMANTE
THINER

Cantidad

Peso

188.0000
6.0000

42.50
25.00

gln
gln
gln
gln
gln
gln

5.0000
2.0000
17.0000
0.0000
0.0000
13.0000

4.50
4.50
4.50
4.50
4.50
4.50

MATERIALES POR KILOS:


ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60
ALAMBRE NEGRO RECOCIDO # 16
ALAMBRE NEGRO RECOCIDO # 8
CLAVOS PARA CALAMINA
CLAVOS PARA MADERA C/C 2 "
CLAVOS PARA MADERA C/C 3"
CLAVOS PARA MADERA C/C 2 1/2, 3"
CLAVOS PARA MADERA C/C 3 1/2, 4"
VENTANA Y PUERTA DE FIERRO
SOLDADURA CELLOCORD

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

1,355.0000
58.0000
19.0000
8.0000
13.0000
14.0000
4.0000
25.0000
200.0000
0.0000

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

MADERA :
LISTON DE 2" X 3" QUINILLA
MADERA NACIONAL P/ENCOFRADO Y CARPINTERIA
MADERA QUINILLA O SIMILAR
MADERA TORNILLO Y/O SIMILAR CEPILLADA
REGLA DE MADERA

p2
p2
p2
p2
p2

0.0000
488.0000
208.7500
155.0000
6.0000

1.20
1.20
1.20
1.20
1.20

LADRILLOS
LADRILLO ARONT 18 HCOS. 9x12x24 CM IKARO
LADRILLO TUBULAR #2 12X15X24

Und
Und

0.0000
763.0000

3.00
3.00

TUBERIAS , ACCESORIOS , PEGAMENTO


TUBOS DE 1/2"
TUBOS DE 11/2"
TUBOS DE 2"
TUBOS DE 4"
TUBOS DE 6 "
TUBOS DE 1"
TUBOS DE 3/4"
TUBOS DE 5/8"

unid
unid
unid
unid
unid
unid
unid
unid

18.0000
135.0000
24.0000
4.0000
20.0000
18.0000
0.0000
0.0000

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

Municipalidad Distrital de Campo Verde

PESO DE MATERIALES - CLASIFICADOS POR SIMILITUD

OBRA : INSTALACION DEL SISTEMA DE AGUA POTABLE EN EL CASERIO SAN CRISTOBAL DE AGUA
Item

Descripcion
UNIONES , VALVULAS , CODOS , NIPLES
APARATOS SANITARIOS ,ACCESORIOS Y TUBERIAS

Und
glob
GLB

7.00

ACCESORIOS ELECTRICOS
ACCESORIOS Y TUBERIAS

GLB

MATERIALES POR PLANCHAS:


CALAMINA LISA GALVANIZADA
CALAMINA CORRUGADA GALVANIZADA DE 11 CANALES
PLANCHA ACERO 1.6mm x 1.22m x 2.40m
SUPERBOARD RECTO DE 1.22 X 2.44 MT E=4mm.

pln
pln
pln
pln

VARIOS
CERAMICA VITRIFICADA 20 X 30 CM
CERAMICO ANTIDESLIZANTE
FIERRO LISO DE 1/2"
OTROS

m2
m2
Ml
GLB

8.00

9.00

10.00

EQUIPOS: (MOVILIZ. Y DESMOVILIZ)


VIBRADORA DE CONCRETO
UND
MEZCLADORA CONCRETO TROMPO 18HP 7P3
UND
MOTOBOMBA DE 4" (12 HP)
UND
PLANCHA COMPACTADORA 7 HP
UND
ELECTROBOMBA DE ALTA PRESION 3HP/60HZ
UND
ELECTROBOMBA SUMERGIBLE DE 1.5 HP ( INC ACCESORIOS)UND
UND
MOTOSOLDADORA DE 250 AMP.
UND
ANDAMIO METALICO
HERRAMIENTAS, ACCESORIOS Y OTROS
KG

Cantidad
850.0000

Peso
1.00
700.00

1.00

85.00

5.0000
18.0000
0.0000
0.0000

4.00
4.00
150.00
10.00

1.0000

18.00
18.00
1.05
828.57

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

150.00
1,000.00
150.00
250.00
150.00
150.00
100.00
100.00
1,800.00

TERIALES - CLASIFICADOS POR SIMILITUD

E AGUA POTABLE EN EL CASERIO SAN CRISTOBAL DE AGUA BLANCA


Parcial
7,990.00
150.00

Acumulado

8,140.00

22.50
9.00
76.50
0.00
0.00
58.50
166.50

1,250.00
58.00
19.00
8.00
13.00
14.00
4.00
25.00
200.00
0.00

1,591.00

0.00
585.60
250.50
186.00
7.20
0.00

1,029.30

0.00
2,289.00

2,289.00

18.00
135.00
24.00
4.00
20.00
18.00
0.00
0.00

TERIALES - CLASIFICADOS POR SIMILITUD

E AGUA POTABLE EN EL CASERIO SAN CRISTOBAL DE AGUA BLANCA


Parcial
850.00
0.00

85.00

Acumulado
1,069.00

85.00

20.00
60.00
0.00
0.00
80.00

0.00
0.00
0.00
828.57
828.57

150.00
1,000.00
150.00
250.00
150.00
150.00
0.00
100.00
1,850.00

3,800.00

19078.37

Municipalidad Distrital de Campo Verde

FICHA N 01 DE CALCULO DE FLETE


OBRA : INSTALACION DEL SISTEMA DE AGUA POTABLE EN EL CASERIO SAN CRISTOBAL DE AGUA BLANCA
OBRA
UBIC.
FECHA

CASERIO SAN CRISTOBAL DE AGUA BLANCA


July-2015

RUTA:

Centro de Abasto - A pie de Obra

PESO DE MATERIALES INCIENTES


ITEM
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00

DESCRIPCION
MATERIALES EN BOLSA
MATERIALES POR GALON:
MATERIALES POR KILOS:
MADERA :
LADRILLOS Y OTROS
TUBERIAS , ACCESORIOS , PEGAMENTO
ACCESORIOS ELECTRICOS
MATERIALES POR PLANCHAS:
VARIOS
EQUIPOS: (MOVILIZ. Y DESMOVILIZ)

MATERIALES
Yeso, Cemento
Pinturas, Otros por galon
Fierro, alambres, clavos, etc
(Aserraderos)
Ladrillo
Tuberias , codos , tees ,
Accesorios electricos
Accesorios electricos
Triplay, Superboar, calamina, etc.
Mezcladora, Vibrador, Plancha, Herramientas

PESO.TOTAL
8,140.00
166.50
1,591.00
1,029.30
2,289.00
1,069.00
1,069.00
80.00
828.57
3,800.00

PESO TOTAL A TRANSPORTAR

20,062.37

CAPACIDAD DEL CAMION (KG)

10,000.00

COSTO DE TRANSPORTE / VIAJE


COSTO DE TRANSPORTE / KG.
COSTO DE TRANSPORTE

2,090.00
0.209
4,193.04

DESESTIBADO / TN.

37.60

TONELAJE A TRANSPORTAR

20.00

COSTO POR ESTIBAJE


COSTO TOTAL DE TRANSPORTE

752.00
4,943.73