PDVSA N
LTP2.7
TITULO
SEP.96
REVISION GENERAL
29
AGO.88
PARA APROBACION
13
REV.
FECHA
E PDVSA, 1983
DESCRIPCION
FECHA AGO.88
PAG.
APROB. Antonio Ortiz
L.T.
E.J.
A.N.
J.S.
REV.
APROB. APROB.
FECHA AGO.88
ESPECIALISTAS
PROCEDIMIENTO DE INGENIERIA
PDVSA
.Men Principal
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
Indice manual
Indice volumen
PDVSA LTP2.7
REVISION
FECHA
SEP.96
Pgina 1
Indice norma
Indice
1 INTRODUCCION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5 REQUISICION DE HORNOS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7 FORMATOS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PROCEDIMIENTO DE INGENIERIA
PDVSA
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
Indice volumen
PDVSA LTP2.7
REVISION
FECHA
SEP.96
Pgina 2
Indice norma
INTRODUCCION
La coordinacin de Ingeniera Mecnica tiene la responsabilidad de hacer las
especificaciones, requisiciones y seguimiento de fabricacin de los Hornos de
Proceso.
Se debern aplicar los procedimientos generales establecidos en su
organizacin para requisitos de equipos, anlisis de ofertas, compra y
seguimiento.
PROCEDIMIENTO DE INGENIERIA
PDVSA
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
PDVSA LTP2.7
REVISION
FECHA
SEP.96
Indice volumen
Pgina 3
Indice norma
REQUISICION DE HORNOS
La siguiente lista define las responsabilidades del ingeniero especialista bajo la
direccin del Gerente de Proyecto, al efectuar la requisicin de calentadores.
a.
b.
c.
d.
e.
FORMATOS
Formato No. 1 Hoja de Datos Sistema Internacional
Formato No. 2 Hoja de Datos Unidades Inglesas
(Ambos en ingls)
Formato No. 3 Lista de especificaciones particulares
El Formato No. 3 se considera parte de las hojas de datos y conforman las
preferencias de PDVSA y/o las excepciones del proyecto para adquisicin o
modificacin de hornos.
PROCEDIMIENTO DE INGENIERIA
PDVSA
.Men Principal
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
Indice manual
PDVSA LTP2.7
REVISION
FECHA
SEP.96
Indice volumen
Pgina 4
Indice norma
PROCEDIMIENTO DE INGENIERIA
PDVSA
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
Service
Unit
Type
Owner
Purchaser
Vendor
Date
2
* 12 Average radiant flux density (allowable), W/m
13 Average radiant flux density (calculated), W/m 2
2
* 14 Average convection flux density (allowable),W/m 2
15 Average convection flux density (calculated), W/m
PDVSA LTP2.7
* 32 Temperature, C
* 33 Pressure, kPa
* 34 Liquid flow, kg/s
* 35 Vapor, flow, kg/s
* 36 Gravity, liquid, API (specific gravity at 15 C)
* 37 Vapor, molecular weight
* 38 Viscosity, liquid, mPa.s
* 39 Viscosity, vapor, mPa.s
* 40 Specific heat, liquid, kJ/kg C
* 41 Specific heat, vapor, kJ/kg C
* 42 Thermal conductivity, liquid, W/m C
* 43 Thermal conductivity, vapor, W/m C
REVISION
FECHA
SEP.96
Indice volumen
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page
1 of
Pgina 5
Indice norma
PROCEDIMIENTO DE INGENIERIA
PDVSA
PDVSA LTP2.7
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
Fuel Characteristics
Design
Alternates
*22
*23
*24
*25
*26
*27
*28
*29
Viscosity, @
Total salts, ppm
Vanadium, ppm
Sodium, ppm
*30
*31
*32
*33
*34
*35
*36
*37
*38
*39
*40
C, mPa.s
General:
*41 Plot limitations
*42 Tube limitations
SEP.96
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page
2 of
*1 Type of fuel
8
9
10
11
FECHA
Indice volumen
Service
Unit
Type
Owner
Purchaser
Vendor
Date
REVISION
Pgina 6
Indice norma
PROCEDIMIENTO DE INGENIERIA
PDVSA
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
Heater Section:
Coil Design
4
5
6
7
8
9
* 10
* 11
* 12
13
* 14
15
16
Coil Configuration:
17
18
19
20
21
22
Tubes(vertical or horizontal)
No. of flow passes / tubes per row
Effective tube length, m
Bare tubes, number
Bare tubes, total exposed surface, m2
Extended surface tubes, number
Return Bends:
* 41
42
FECHA
SEP.96
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page
3 of
* 1 Wind velocity
* 2 Wind exposure
* 3 Minimum ambient air temperature, C
REVISION
Indice volumen
Service
Unit
Type
Owner
Purchaser
Vendor
Date
*
*
*
*
*
*
PDVSA LTP2.7
Pgina 7
Indice norma
PROCEDIMIENTO DE INGENIERIA
PDVSA
PDVSA LTP2.7
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Para llenar el formato, haga click AQUI
FIRED HEATER DATA SHEET
SI UNITS
Indice manual
REVISION
FECHA
SEP.96
Indice volumen
Service
Unit
Type
Owner
Purchaser
Vendor
Date
Pgina 8
Indice norma
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page
4 of
Design
Temperature
Lining: Thickness
34
35
36
Design
Temperature
PROCEDIMIENTO DE INGENIERIA
PDVSA
PDVSA LTP2.7
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
REVISION
FECHA
SEP.96
Pgina 9
Indice volumen
Service
Unit
Type
Owner
Purchaser
Vendor
Date
Indice norma
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page
5 of
Design
Temperature
Arch:
5 Lining: thickness
Hot face temperature: calculated
6
Materials / thickness / service temperature
7
Anchor (type and materials)
8 Casing: Materials and thickness
Design
Temperature
Convection Walls:
9 Lining: Thickness
Hot face temperature: calculated
10
Material / thickness / service temperature
Design
11
Temperature
Breeching:
13 Lining: Thickness
Hot face temperature: calculated
14
Materials / thickness / service temperature
15
Anchor (type and materials)
16 Casing: Materials and thickness
Flue Gas Ducts:
17 Location
18 Lining (internal of external)
19 Material and thickness
20 Anchor, type and material
21 Hot face design temperature, C
22 Cold face design temperature, C
Combustion Air Ducts:
23 Location
24 Lining (internal of external)
25 Material and thickness
26 Anchor, type and material
27 Hot face design temperature, C
Header Boxes:
28 Location
Design
PROCEDIMIENTO DE INGENIERIA
PDVSA
PDVSA LTP2.7
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
REVISION
FECHA
SEP.96
Pgina 10
Indice volumen
Service
Unit
Type
Owner
Purchaser
Vendor
Date
Indice norma
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page
6 of
C.A.
Location
Dampers:
8 Location
9 Material of blade
10 Material of shaft
* 11 Bearing type
12 Multiple or single blade
13 Description of provision for operation
14 Location and type of operator
Miscellaneous:
Platforms:
Access
From
By
Location/No.
Width
Length/Arc
Stairs / Ladder
15
16
17
18
19
20 Type of flooring, etc.
Doors:
21 Access
22
Number
Location
Size
Hinged or bolted
23
24
25 Observation
26
27 Tube removal
28 Inspection
29
30
31
Number
Size
Type
PROCEDIMIENTO DE INGENIERIA
PDVSA
PDVSA LTP2.7
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
FECHA
SEP.96
Pgina 11
Indice volumen
Service
Unit
Type
Owner
Purchaser
Vendor
Date
REVISION
Indice norma
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page
7 of
* 2 Galvanizing requirements
* 4 Fireproofing requirements
Location / orientation
No.
Normal
Maximum
Vertical
Fuel
Sootblowers:
13
14
15
16
Location
Manufacturer and type
Number
Maximum cleaning radius
Vertical
Fuel pressure
PROCEDIMIENTO DE INGENIERIA
PDVSA
PDVSA LTP2.7
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
FECHA
SEP.96
Pgina 12
Indice volumen
Service
Unit
Type
Owner
Purchaser
Vendor
Date
REVISION
Indice norma
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page
8 of
Model No.
Air Side
Design
Maximum
Design
Maximum
Minimum
Performance:
4 Flow entering, kg/s
5 Bypass quantity, kg/s
6 Flow leaving, kg/s
7 Hot air recirculation, kg/s
8 Leakage, porcent
9 Temperature entering, C
10 Temperature leaving, C
(uncorrected)
11 Temperature leaving, C (corrected)
12 Mix temperature (after bypass), C
13 Pres. entering/leaving, kpa
14 Pressure drop (allowable), kPa
15 Pressure drop (calculated), kPa
16 Heat exchanged, MW
17 Transfer rate (clean), W/m2 C
18 MTD (uncorrected), C
19 Surface area, m2
20 Tube side fluid
* 21 Minimum allowable flue gas temp. C
22 Minimum metal temp. of flue gas side: allowable, C
23 Upper limit flue gas temperature, C
Utilities and Miscellaneous:
* 24 Plant air pressure, kPa
* 25 Steam: pressure, kPa
* 26 Water: pressure, kPa
* 27 Structural wind load, kg/m2
* 28 Elevation, m above sea level
29 Other
30
31
32
33
Construction:
Regenerative type:
34 Horizontal shaft: Air inlet (left, right, above, below)
Vertical shaft: Air flow (up, down)
35 Internal air bypass (yes, no) and type of operator
36 Main drive
Baskets:
37 Cold end
38 Intermediate
39 Hot end
Auxiliary drive
Gage
Material
Depth (min)
Description
PROCEDIMIENTO DE INGENIERIA
PDVSA
PDVSA LTP2.7
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
FECHA
SEP.96
Pgina 13
Indice volumen
Service
Unit
Type
Owner
Purchaser
Vendor
Date
REVISION
Indice norma
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page
9 of
3 Materials of construction
4 Intermediate air crossover duct: Included (yes, no)
Bolted or welded
With/without insulation
Heat Pipe:
5 Tube material
Outside diameter, mm
6 Air side fins (solid/segmented): Width, mm
Thickness, mm
7 Gas side fins (solid/segmented): Width, mm
8 Thickness, mm
No.
A.W./M.W.,mm
Height, mm
No. per inch
Material
Height, mm
Material
Pitch
Square, triangular
Flue gas side
IndirectCirculating type:
12 Air heater coil: material
Outside diameter, mm
13 Fin description
No.
Effective length
A.W./M.W.,mm
Pitch
Square, triangular
Pumps
17
Accessories:
18 Soot blowers
19 Water wash
20 Fire extinguisher system
21 Controls
22 Insulation: external
23 Corrosion protection
24 Expansion provisions
25 External cold air bypass (yes/no)
26 External hot air recirculation (yes/no)
Internal
Fans:
27
28
29
30
31
32
33
34
35
Design
Induced Draft
Normal
Design
PROCEDIMIENTO DE INGENIERIA
PDVSA
PDVSA LTP2.7
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
Indice volumen
Service
Unit
Type
Owner
Purchaser
Vendor
Date
REVISION
FECHA
SEP.96
Pgina 14
Indice norma
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page 10 of
* 5 Special requirements (noise limits, inlet screens, rain hoode, guide vanes, etc.)
Drivers:
Electric Motors:
6 Manufacture and type
7 Horsepower
8 Voltage/herthz/phase
9 Revolutions per minute
Forced Draft
Induced Draft
Turbines:
15 Manufacturer and type or designation
16 Horsepower, normal condition
17 Horsepower, design condition
18 Water rate, normal condition, kg/s/W
19 Water rate, design condition, kg/s/W
20 Revolutions per minute, normal condition
21 Revolutions per minute, design condition
*23 Steam conditions, inlet
*23 Steam conditions, outlet
24 Governor
25 Bearings, type and tube
*26 Special requirements
Forced Draft
Induced Draft
Transmission:
Forced Draft
Induced Draft
* 10
11
* 12
13
* 14
27
28
*29
30
31
*32
Enclosure
Insulation
Service factor
Bearings (type and tube)
Special requirements
PROCEDIMIENTO DE INGENIERIA
PDVSA
.Men Principal
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
Indice manual
PDVSA LTP2.7
REVISION
FECHA
SEP.96
Pgina 15
Indice volumen
Indice norma
PROCEDIMIENTO DE INGENIERIA
PDVSA
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
Indice volumen
Service
Unit
Type
Owner
Purchaser
Vendor
Date
2
* 12 Average radiant flux density (allowable), Btu/hrft
2
Btu/hrft
Average
radiant
flux
density
(calculated),
13
* 14 Average convection flux density (allowable), Btu/hrft2
Inlet Conditions:
* 20 Temperature F
* 21 Pressure, psi (psi)
* 22 Liquid flow, lb/hr
* 23
* 24
* 25
* 26
* 27
* 28
* 29
* 30
* 31
Viscosity, vapor, cP
Specific heat, liquid, Btu/lb F
Specific heat, vapor, BTU/lb F
Thermal conductivity, liquid, Btu/hrft2F/in
Thermal conductivity, vapor,, Btu/hrft2F/in
Outlet Conditions:
* 32
* 33
* 34
* 35
* 36
* 37
* 38
* 39
* 40
* 41
* 42
* 43
PDVSA LTP2.7
Temperature, F
Pressure, psig (psig)
Liquid flow, lb/hr
Vapor, flow, lb/hr
Gravity, liquid, API (specific gravity at 15F)
Vapor, molecular weight
Viscosity, liquid, cP
Viscosity, vapor, cP
Specific heat, liquid, Btu/lb F
Specific heat, vapor, Btu/lb F
Thermal conductivity, liquid, Btu/hrft2F/in
Thermal conductivity, vapor, Btu/hrft2F/in
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page
1 of
REVISION
FECHA
SEP.96
Pgina 16
Indice norma
PROCEDIMIENTO DE INGENIERIA
PDVSA
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
Indice volumen
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page
2 of
Type
Owner
Purchaser
Vendor
Date
Alternates
* 20 Type of fuel
* 21 Heating value (LVH), Btu/lb
* 22 Heating value (LHV), Btu/sci
or API
* 23 Specific gravity at 60 F
* 26
* 27
* 28
* 29
Viscosity, @
Total salts, ppm
Vanadium, ppm
Sodium, ppm
* 30
* 31
* 32
* 33
* 34
* 35
* 36
* 37
* 38
* 39
* 40
Noise limitations
PDVSA LTP2.7
REVISION
FECHA
SEP.96
Pgina 17
Indice norma
PROCEDIMIENTO DE INGENIERIA
PDVSA
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
Indice volumen
Service
Unit
Type
Owner
Purchaser
Vendor
Date
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page
3 of
Wind occurrence
Seismic zone
Heater Section:
Coil Design:
*4 Design basis for tube wall thickness (code or specification)
*5 Design basis for rupture strength (minimum or average)
*6 Design life, hr
*7 Elastic design pressure, psig
*8 Rupture design pressure, psig
*9 Temperature allowance, F
*10 Corrosion allowance, ln
*11 Stress relieve (yes or no)
*12 Weld inspection requirements, Xray or other (no. of Welds and degree of
coverage)
13 Hydrostatic test pressure, kPa
14 Maximum tube metal temperature (clean), F
15 Design tube metal temperature, F
16 Inside film coefficient, Btu/hrFft2
Coil Configuration:
17 Tubes(vertical or horizontal)
18 No. of flow passes / tubes per row
19 Effective tube length, ft
20 Bare tubes, number
21 Bare tubes, total exposed surface, ft2
22 Extended surface tubes, number
23 Extended surface tubes, total exposed surface, ft2
24 Tube spacing, centertocenter (staggered) (inline), in
Tubes:
*25 Material (ASTM specifications and grade)
26 Outside diameter, mm
27 Wall thickness (minimum) (average), mm
28 Overall tube length, lt
29 No. of intermediate welds
29A Distance from center line of tube to wall, inch
Description of Extended Surface:
30 Type (stude, segmented line, or solid line)
31 Material
32 Dimensions (height x diameter / thickness), in
33 Spacing
34 Maximum tip temperature, F
35 Extension ratio
Return Bends:
*41
Location (header box or firebox)
42
Material (ASTM specification and grade)
PDVSA LTP2.7
REVISION
FECHA
SEP.96
Pgina 18
Indice norma
PROCEDIMIENTO DE INGENIERIA
PDVSA
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Para llenar el formato, haga click AQUI
FIRED HEATER DATA SHEET
CUSTOMARY UNITS
Indice manual
Indice volumen
Service
Unit
Type
Owner
Purchaser
Vendor
Date
PDVSA LTP2.7
REVISION
FECHA
SEP.96
Pgina 19
Indice norma
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page
4 of
Design
Temperature
35
36
Design
Temperature
PROCEDIMIENTO DE INGENIERIA
PDVSA
PDVSA LTP2.7
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Para llenar el formato, haga click AQUI
FIRED HEATER DATA SHEET
CUSTOMARY UNITS
Indice manual
Indice volumen
Service
Unit
Type
Owner
Purchaser
Vendor
Date
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page
5 of
Design
Temperature
Arch:
5 Lining: thickness
Hot face temperature: calculated
6
Materials / thickness / service temperature
7
Anchor (type and materials)
8 Casing: Materials and thickness
Design
Temperature
Convection Walls:
9 Lining: Thickness
Hot face temperature: calculated
10
Material / thickness / service temperature
Design
11
Temperature
Breeching:
13 Lining: Thickness
Hot face temperature: calculated
14
Materials / thickness / service temperature
15
Anchor (type and materials)
16 Casing: Materials and thickness
Flue Gas Ducts:
17 Location
18 Lining (internal of external)
19 Material and thickness
20 Anchor, type and material
21 Hot face design temperature, F
22 Cold face design temperature, F
Combustion Air Ducts:
23 Location
24 Lining (internal of external)
25 Material and thickness
26 Anchor, type and material
27 Hot face design temperature, F
Header Boxes:
28 Location
Design
REVISION
FECHA
SEP.96
Pgina 20
Indice norma
PROCEDIMIENTO DE INGENIERIA
PDVSA
PDVSA LTP2.7
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
FECHA
SEP.96
Pgina 21
Indice volumen
Service
Unit
Type
Owner
Purchaser
Vendor
Date
REVISION
Indice norma
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page
6 of
Material
C.A.
Extent of lining
Location
Dampers:
8
9
10
*11
Location
Material of blade
Material of shaft
Bearing type
Access
From
By
Location/No.
Width
Length/Arc
Stairs / Ladder
Location
Size
Hinged or bolted
15
16
17
18
19
20 Type of flooring, etc.
Doors:
Number
21 Access
22
23
24
25 Observation
26
27 Tube removal
28 Inspection
29
30
31
Instrument and Auxiliary Connections:
32 Process fluid temperature
33 Flue gas fluid combustion air temp.
34 Flue gas fluid combustion air press
35 Flue gas fluid combustion/O2 analyzer
36 Snuffing steam
37 Purge
38
39
40
Vents / drains
Tubeskin thermocouples
Number
Size
Type
PROCEDIMIENTO DE INGENIERIA
PDVSA
PDVSA LTP2.7
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
FECHA
SEP.96
Pgina 22
Indice volumen
Service
Unit
Type
Owner
Purchaser
Vendor
Date
REVISION
Indice norma
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page
7 of
*2 Galvanizing requirements
*4 Fireproofing requirements
5 Manufacture / type
6 Designation / size
7 Heat release (mm BTU per bumer) at design excess air:
Maximum
No.
Normal
Maximum
Type of ignition
*12 Special requirements (flame detection devices, safety interlocks, etc.)
Sootblowers:
13
14
15
16
17
18
*19
*20
21
22
*23
Location
Manufacturer and type
Number
Maximum cleaning radius
Lane dimension (minimum clearance)
Orientation (horizontal or vertical)
Cleaning medium
Supply pressure / temperature
Flow rate per blower, kg/s
Materials of construction
Driver type (manual, air, or electric motor)
*24 Control system type (auto or manual; sequential, local, or remote panel; etc.)
Fuel pressure
PROCEDIMIENTO DE INGENIERIA
PDVSA
PDVSA LTP2.7
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
REVISION
FECHA
SEP.96
Pgina 23
Indice volumen
Indice norma
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page 8
of
Service
Unit
Type
Owner
Purchaser
Vendor
Date
Mechanical Design Conditions (continued)
Model No.
Air Side
Performance:
Design
4
5
6
7
8
Maximum
Minimum
Design
Maximum
Minimum
9 Temperature entering, F
10 Temperature leaving, F
(uncorrected)
11 Temperature leaving, F (corrected)
12 Mix temperature (after bypass), F
13 Pres. entering/leaving, in H2O gage
14 Pressure drop (allowable), in H2O
15 Pressure drop (calculated), in H2O
16 Heat exchanged, mm Btu/hr
17 Transfer rate (clean), Btu/hrft2F
18 MTD (uncorrected), F
19 Surface area, ft2
20 Tube side fluid
*21 Minimum allowable fire gas temp. F
22 Minimum metal temp. of flue gas side: allowable, F
23 Upper limit flue gas temperature, F
Construction:
Regenerative type:
34 Horizontal shaft: Air inlet (left, right, above, below)
Vertical shaft: Air flow (up, down)
35 Internal air bypass (yes, no) and type of operator
36 Main drive
Baskets:
37 Cold end
38 Intermediate
39 Hot end
Auxiliary drive
Gage
Material
Depth (min)
Description
PROCEDIMIENTO DE INGENIERIA
PDVSA
PDVSA LTP2.7
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
FECHA
SEP.96
Pgina 24
Indice volumen
Indice norma
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page 9
of
Service
Unit
Type
Owner
Purchaser
Vendor
Date
REVISION
3 Materials of construction
4 Intermediate air crossover duct: Included (yes, no)
With/without insulation
Bolted or welded
Heat Pipe:
5 Tube material
Outside diameter, in
6 Air side fins (solid/segmented): width, in
Thickness, in
7 Gas side fins (solid/segmented): Width, in
8 Thickness, in
9 Tubes per row
10 Effective length: Air side
11 Maximum allowable soaking temperature, F
No.
A.W./M.W., in
Height, in
Material
Height, in
No. per inch
Material
No. of rows
Square, triangular
Pitch
Flue gas side
No.
A.W./M.W., in
Effective length
Square, triangular
Pitch
Pumps
Other Type:
16
17
Accessories:
18 Soot blowers
19 Water wash
20 Fire extinguisher system
21 Controls
22 Insulation: external
23 Corrosion protection
24 Expansion provisions
25 External cold air bypass (yes/no)
26 External hot air recirculation (yes/no)
Internal
Forced Draft
Induced Draft
Fans:
27
28
29
30
31
32
33
34
35
Normal
Design
Normal
Design
PROCEDIMIENTO DE INGENIERIA
PDVSA
PDVSA LTP2.7
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
FECHA
SEP.96
Pgina 25
Indice volumen
Indice norma
Equipment No.
Plant Location
No. Required
Reference No.
Reference No.
Reference No.
Page 10 of
Service
Unit
Type
Owner
Purchaser
Vendor
Date
REVISION
Fans (continued):
1
2
3
4
Forced Draft
Induced Draft
5 Special requirements (noise limits, inlet screens, rain hoode, guide vanes, etc.)
Drivers:
Electric Motors:
Forced Draft
Induced Draft
Forced Draft
Induced Draft
Forced Draft
Induced Draft
Enclosure
Insulation
Service factor
Bearings (type and tube)
Special requirements
Turbines:
15
16
17
18
19
20
Transmission:
27
28
*29
30
31
*32
PROCEDIMIENTO DE INGENIERIA
PDVSA
.Men Principal
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
Indice manual
Indice volumen
FIRED HEATERS
CHECKLIST
(FORMATO 3)
PDVSA LTP2.7
REVISION
FECHA
SEP.96
Pgina 26
Indice norma
PROCEDIMIENTO DE INGENIERIA
PDVSA
PDVSA LTP2.7
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
Indice volumen
REVISION
FECHA
SEP.96
Pgina 27
Indice norma
Paragraph
1.6.2
Item
Requirement
1.7.1.3
1.7.2, 1.9
Yes
No
1.9
Yes
No
2.3.6
Corbels acceptable
Yes
No
Baffles acceptable
Yes
No
3.2.1
Yes
No
Solid fins
Yes
No
Segmented fins
Yes
No
3.2.3
Gas
Oil
5.1.4
Yes
No
Yes
No
Yes
No
Yes
No
Yes
Yes
No
No
Yes
No
5.2
6.3.2
7.1.1
7.4.5, 7.5.7
8.1.2, 9.2.2
8.1.5, 9.2.8
8.2.5
8.2.7
PROCEDIMIENTO DE INGENIERIA
PDVSA
PDVSA LTP2.7
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
Indice volumen
REVISION
FECHA
SEP.96
Pgina 28
Indice norma
Item
Requirement
8.4.4
8.5.2
9.1.11
9.5.4
Yes
No
Yes
No
Yes
No
Yes
No
Spiral spoilers
9.6.1
9.6.2
10.1.4
Yes
No
10.1.5
Yes
No
10.2.1
Yes
No
Rotaryautomatic
Yes
No
Rotarymanual
Yes
No
Stainless shrouds
Yes
No
Hightduty brick
Yes
No
Castable refractory
Yes
No
Open
Close
10.2.5
10.3.5
10.4.1
11.1.3.4
11.2.1
Yes
No
11.2.2
Yes
No
11.3.3.2
Yes
No
Convection
Yes
No
Galvanizing
Yes
No
Zinccoating
Yes
No
11.4
12.1.1
12.2.5.1
12.3.1
12.3.3
12.4.3
PROCEDIMIENTO DE INGENIERIA
PDVSA
PDVSA LTP2.7
HORNOS DE PROCESO
REQUISICION, ANALISIS DE OFERTAS Y
DETALLES DE COMPRA
.Men Principal
Indice manual
Indice volumen
REVISION
FECHA
SEP.96
Pgina 29
Indice norma
12.5.6.2
No
Water spray
Yes
No
Resin membrane
Yes
No
Yes
No
13.3.1.1
13.3.1.2