Problem 1, a,b,c,d,e
Problem 4 (a), 1,2,3,4
Problem 5 a, b, c, d (balance on Min. CT)
1. t=18 minutes
OT = 450 minutes/day
tasks = 17
longest task time = 2.4 minutes
a. minimum cycle time = 2. 4 minutes
maximum cycle time = 18 minutes
b. what range of output is possible?
Output Capacitymin cycle time = OT
cycle time
= 450 minutes
2.4 minutes
= 187.5 units
125
125
CT = 450 = 3.6 minutes
125
e. What output potential will result if
cycle time is (1) 9 minutes (2) 15
minutes?
Output Capacity = OT
cycle time
= 450 minutes = 50 units
9 minutes
Output Capacity = OT
cycle time
= 450 minutes
15 minutes
= 30 units
Problem 4
a(1) draw the precedence diagram
.2
.4
.3
1.3
.1
.3
1.2
.8
Work Station #1
CT = 1.3 minutes
a -.2
1.1 minutes
b -.4
.7 minutes
c -.3
.4 minutes
e -.1
.3 minutes Idle Time
Work Station #2
CT = 1.3 minutes
d -1.3
0 minutes Idle Time
Work Station #3
CT = 1.3 minutes
f -.8
.5 minutes
g -.3
Problem 5
(ignore desired output of 240 units per
day, balance on min. CT)
a. draw the precedence diagram
a
c
f
-1.2
0 minutes Idle Time
Work Station #4
CT = 1.2 minutes
g -1.0
.2 minutes Idle Time
e. compute % Idle time
Total Idle time = .2 minutes
% Idle time = Idle time per cycle * 100
Nactual * Cycle time
= .2 minutes
*
100
4 WS * 1.2 minutes
= .2 * 100
4.8
= .041666 * 100 = 4.16%