Slab

CONCRETE (SLAB)
DESCRIPTION

1st floor

NOS

S1
S2
S3
S4
S5
S3
S3

1
1
1
1
1
1
1

2450
5520
2454
2836
5425
1975
1975

5520
6020
3720
3720
4200
3220
2070

130
160
130
130
150
130
130

S7
S10
S11
S6
S5
S4
S6
S6
S3
S9
S9
S8
S10

1
1
1
1
1
1
1
1
1
1
1
1
1
2
4
2
3
6
3

6710
1995
1995
1230
3975
2760
1230
4465
2030
1535
1765
4950
6710
1755
1755
1755
1710
1710
1710

4965
5290
6400
5020
5020
2965
1230
1230
2965
2915
1535
4910
4680
1290
1245
1360
1290
1245
1360

170
130
130
130
150
130
130
130
130
130
130
150
160
100
100
100
100
100
100

S21
HB
S22
S23
S24
S22
S23

1
-1
1
1
1
1
1

6020
450
3720
3720
4325
3220
2070

5520
5520
2360
2840
5520
1850
1850

170
170
130
130
150
130
130

S22
S29
S30
S25
S25
S25
S27
S26

1
1
1
1
1
1
1
1

2075
2075
4895
5290
6400
2760
1230
3975

1925
2770
4335
1995
1995
1995
5025
5025

130
150
150
130
130
130
130
150

1st & Last Bay

Middle Bays

2nd Floor

Page 1

2nd Floor
Slab
S28
S28
S31
S27
S27
S31
S33
S32
HB
HB

1
1
1
1
1
1
1
1
-2
-2

2965
2965
2760
1230
1230
3530
6710
6710
6710
5900

2760
2030
3680
1230
4485
2760
1000
5900
450
450

130
130
140
130
130
140
130
190
190
190

S10
S41
S42
S42
S6
S42
Terrace Floor
S42
S44
S42
S42
S42
S42

1
1
1
1
1
1
1
1
1
1
1
1

1230
5520
3720
3720
4325
3220
2070
2760
2150
1995
1995
1995

5520
4565
2455
2840
5520
1845
1845
5060
1925
6290
6400
2760

130
170
130
130
150
130
130
150
130
130
130
130

TOTAL

CONCRETE (StairCase)
DESCRIPTION

NOS

1
1

2760
5050

4990
2760

230
230

ST 1st floor
ST 2nd Floor

TOTAL

Page 2

Slab

QUANTITY
1.76
5.32
1.19
1.38
3.42
0.83
0.54
5.67
1.38
1.66
0.81
3
1.07
0.2
0.72
0.79
0.59
0.36
3.65
5.03
0.46
0.88
0.48
0.67
1.28
0.7

5.65
-0.43
1.15
1.38
3.59
0.78
0.5
0.52
0.87
3.19
1.38
1.66
0.72
0.81
3
Page 3

Slab
1.07
0.79
1.43
0.2
0.72
1.37
0.88
7.53
-1.15
-1.01

0.89
4.29
1.19
1.38
3.59
0.78
0.5
2.1
0.54
1.64
1.66
0.72

99.72

m3

QUANTITY
3.17
3.21

6.38

m3

Page 4

Foundation

CONCRETE (Foundation)
DESCRIPTION
PCC

NOS
1

L
16827

B
2900

D
100

16827

2400

230

16677

185000

16827

50

370

5915

8580

100

8380

5115

230

7780

2715

230

8380

157250

8380

50

370

6844

2900

100

6844

2400

230

6844

185000

6844

50

370

15723

2900

100

13023

2400

230

12873

185000

12873

50

370

4039

2900

100

6939

2400

230

6939

185000

6939

50

370

PCC

1380

2900

100

PCC

6682

5820

100

7862

5020

230

7780

2620

230

7862

157250

7862

50

370

PCC

PCC

PCC

PCC

Page 5

Foundation

PCC

PCC

PCC

PCC

11129

2900

100

11329

2400

230

11329

185000

11329

50

370

5182

2900

100

5182

2400

230

5182

185000

5182

50

370

5194

9997

100

10127

4394

230

7480

1994

230

9977

157250

9977

50

370

5680

2900

100

5680

2500

230

5530

194250

5530

50

370

FC1 & FC2 Footing


FC1 & FC2 PCC

2
2

2150
2350

2150
2350

300
100

TOTAL

CONCRETE (Beams)
1

Page 6

102139

300

1350

Foundation

TOTAL

Page 7

Foundation

)
QUANTITY
4.88
9.29
6.18
0.63
5.08
9.86
4.86
2.64
0.32
1.99
3.78
2.54
0.26
4.56
7.19
4.77
0.48
1.18
3.84
2.57
0.26
0.41
3.89
9.08
4.69
2.48
0.3
Page 8

Foundation

3.23
6.26
4.2
0.42
1.51
2.87
1.92
0.2
5.2
10.24
3.44
3.14
0.37
1.65
3.27
2.15
0.21
2.78
1.11

147.30

m3

41.37

Page 9

Foundation

41.37

m3

Page 10

UG Tanks

CONCRETE ( SEPTIC TANK )


Description
PCC
Base Slab
Side Walls
Side Walls
Baffle Wall 1
Baffle Wall 2
Top Slab

Nos.

L
1
1
2
2
1
1
1

B
6560
6360
2500
5460
2500
2500
6360

D
4060
3860
230
230
115
115
3860

150
400
3125
3125
2000
1700
400

TOTAL

Quantity
4
9.82
3.6
7.85
0.58
0.49
9.82

36.16

CONCRETE ( UG TANK )
Description
PCC
Base Slab
Side Walls
Side Walls
Top Slab

Nos.

L
1
1
2
2
1

B
7160
6960
2000
5460
2460

D
3260
3060
230
230
5460

100
300
1800
1800
200

TOTAL

Page 11

Quantity
2.34
6.39
1.66
4.53
2.69

17.61

UG Tanks

m3

m3

Page 12

Summary
S

REINFORCEMENT QUANT

CONCRETE QUANTITY

Sr. No.
1
2
3
4
5
6
7
8
9
10

Description
Plinth Beams
1st Floor Bems
2nd Floor Beams
Terrace Beams
All Slabs
Staircase
Foundation Footing
Foundation - Beams
Septic Tank
UGWT

Quantty
27.55
37.15
26.55
13.24
99.72
6.38
147.30
41.37
36.16
17.61

TOTAL

453.03 m3

Page 13

Sr. No.
1
2
3
4
5
6
7
8
9
10

Summary

FORCEMENT QUANTITY

Description
Plinth Beams
1st Floor Bems
2nd Floor Beams
Terrace Beams
All Slabs
Staircase
Foundation Footing
Foundation - Beams
Septic Tank
UGWT

TOTAL

Quantty
3484.19
6494.74
5506.63
2185.45
6481.80
414.70
6628.50
4964.40
2712.00
1761.00

40633.41 KG