You are on page 1of 1

Inspection & Test Record

for Alignment of Belt-driven Rotating


Equipment
Client:

Subcontractor:

Project No.:

Subcontract P.O. No.:

Project Name:

Additional information:

P.O. No.:

Vendor:

Reference Document:

Items to inspect

Subcontractor
inspected
initials/date

1.0

Company
Hold
Point

Record No.:

Remarks

inspected*
initials/date

Pulley alignment
Feeler gauge/straight edge on pulley faces

Straight edge
A1

A2

A3

View from top


A1 ................................................1/100
A2 ..................................................1/100
A3 ..................................................1/100
A4 ..................................................1/100

2.0

A4

mm
mm
mm
mm

Belt tension

Adjust C to vendors recommendation


C.........................................mm

H - Companys presence is mandatory for all activities in section.

Attachments, No. of pages:

h - Companys presence is mandatory.

Accepted for Subcontractor


Name:

Signature:
Date:

Accepted for Company


Name:

Signature:

Date:

Accepted for Client


Name:

Signature:

Date:

* Company only initials for holdpoint

C:\RB_Forms\RB26P03.DOT\

www.red-bag.com

You might also like