You are on page 1of 9
PSV DESIGN REVALIDATION REPORT DESIGN CALCULATIONS FOR AIR RECEIVER (INSTALLED ON AIR RECEIVER - C) z et 4 > ee For Reference only. q H ehueit Sq 3 Beit Rev Date Papandey | cheakea sy —[ varied oy Huntsman internation (Pre ta. Project No. P1887 Project Name PSV Validation Location Baroda, Gujarat 1 10 " 2 % 6 16 SSRV Mounted on Equipment Namey No. Name of System “Type of Equipment Ouside Diameter Height of Vessel (TL. toTL) Diched End Height of he Vessel ‘service Frid tobe Reeves Molecular Weight Operating Pressure (As proved by HPL) ‘Set Pressure (ks proves by HPL) Operating Temperature ‘Vessel Wall Temperature Density as per Sat Constion fe. @ocatam) Density Calculated as per Set Condition (is. @27'¢& 73am) MOC of Equipment DESIGN DATA Air Receiver ‘is Receiver -C Rev. No. :03 Date :3tt Decembee2015 (Cynara, Vertical wth top & bottom dished end or mm +940 mm 210mm ir ‘500.00 CFM 2096 8.5 ko!on25 8.00 kgiem*ag are 503°C. 1.28 Kyims 8.58 Koins Carbon Stee! (CS) 249.5 75 kolon2(0) 8.0 kglem"2(a) oR 1559°R (Provided by HPL) (As per Calealation) (Noted at ite) For Reference only. rota Huntsman international) Pvt Ltd. Project No. P1687, Project Name. PSV Vaidtion Location Baroda, Gujarat, Date 31st December2015 » 2 a 4 9 8 7 3 9 ‘CALCULATION FOR SAFETY RELIEF VALVE, Caso 1: Five Safe Case (Overpressure resuting inthe Recover fom fre exposure) (As per AP-S21 Sith Eaton, January 2014) Outside Ciameter Height of Vessel (TL, to.) Dished End Height ofthe Vessel Vessel Wall Temperature Operating Temperature Operating Pressure ‘Set Pressure = MAWP =Design Pressure Pormited Overpressure Percentage Permited Accumulation Pressure 10) Upstream Reeving Pressure 11) Back Pressure 12) Ratio of Specie heats (C,/,) 13) Coefficient ofthe rato of spect neat of Gas @ S14. Condiion 14) Coefcient of Discharge on. Dut 1. Tr Py P PB 17mm 1940. mm 210mm 593°C 7598 8.0kg/em*2(9) 10% Set Pressure x 10% 11.3787 PSI) 0917 mm 4.94.0 021mm 1550°R 54°R 107-145 PSKA) 119.787 Pig) ‘Sot Pressure + Accumulation Pressure + 14.7 PSIA s19.767 + 113787 +147 139.888 PSI) 0.0 kglem"2(a) 14 oss oP SIA) [For Reference only Page 2018 Huntsman iterations () Pt Lt Projet No. P1657 Project Name : PSV Vadation Location Baroda, Gujrat Rev. No.:03 Date : ata December2015 18) Gas Temperature @ upstream pressure uy Tereore, Regd. effective discharge ofce area (A), [As per API 526, effective ofice area A un. Reqd. cacharge enfice ai (uP) xT (130.268 107.145 )x5408 708:694°R xa & oon cxke oT 277g (1889.4 705.604) "1.25, 356%0.975 705.604 "0.6508, 0.0289 Surtace area of Shel + 2 Nos, Surface area of ished Ends (70.0. x) + (1.084(0.0 (9.14 x0.917 x 1.96) + (2x 1.084x0.917%) 74119 mi ooziax tat [reas 0.0185 Sain. 1068 Samm 0.11 Sqinch 70.87 Sqmm SORT (70.968 x4/.14) 951 mm For Reference only. Page gots Huntsman international) Pvt Lt, Project No P-1687, Project Name = PSV Validation Location Baroda, Gujarat Rev. No.0 Reqd. SRV orifice designation ‘Standard SRV Inlet Size as per API-526 for Samm Orifice Standard SAV Outlet Size as per AP-526 for Samm Orifice Roquired Nozzle size on Air Receiver Outlot for SRV Roquired SRV Size as per API-S26 for 1D2 Avaiable Nozzle Size on Air Receiver Outlet for SRV Provided SRV Size on Ai Receiver Outlet net Outer For Reference only. (based on orice area) 4o"= 25NB s0NB, 258 «one. «ons Not Known Page 48 Huntsman International) Pvt Ltd. 697 Project Name : PSV Validation Location : Baroda, Gujarat 1) Operating Temperature 3) Permited Overpressure Percentage 4) Permited Accumulation Pressure 5). Upstream Reliving Pressure 8) Back Pressure 17). Ratio of Specifc heats (Cy/C.) 8) Coefcent ofthe rato of specific heat of Gas @ Std. Condition 8) Creal Flow Pressure bbe as per Critical Flow [For Reference only. 2), Set Pressure = MAWP =Design Pressure Th Ps B P, Page Sofa Rev. No. :02| Date : 31st Decomber2015 FETY RELIEF VALVE (Gate 1: Blocked Outlet (Qverpressure resuting inthe Receiver fem Backed Outet) (8s per API-520 Seventh Eaton, January 2000) are - 5a1R S0kgiem'2@) «113.787 PSS) 10% Set Pressure x 10% 11.3787 Pile) ‘Set Pressure + Accumulation Pressure + 14.7 PSIA s1g797 + 11.3787 +147 ‘ya.a66 PSA) 2.okgfem'2(9) = oPsis) 14 388 () ~ (:)~ 73.889 PIA) ‘Since the downstream pressure is less than the Critical Flow pressure, so the sizing of PSV will Huntsman International () Pvt. Lt, Project No. P-1697 Project Name : PSV Validation Location : Baroda, Gujarat ‘Sizing for Critical Flow 10) Effective Coefficient of Discharge 11), Capacity corecton factor due to Back pe. 12) Combination Corection Factor 18) Compressbilty Factor 14) Moelcular Weight of ir 9 Ratio of Coetcent 18) Density 2s per Set Condon where, “Therefore, Reqd, effective dscharge once area (A), i. “Thorofore, Read. efectwe dlacharge orice area (A), 097s 2098 520 Rev. No.: 03, Date :2tst December2015 (Pherae what Rupe Ok) (Since Compressibiy is rot vaitsee) Kp 2 ke 380.1 1.20KgIn3 w eKeP ky Tz Reqd, flow through the valve in Ibs. 249.5 mie 2495x129 2415.92 the 1095.88 Kgihe For Reference only. Page 6 of 8 Huntsman international) Pvt. Lt Project No. P-1887 Project Name : PSV Validation Location Baroda, Gujarat Rev. No.: 03 Date : 21st December2015 Ae ce a A Min, Regd. discharge once da, : Regd. SRV orifice designation : ‘Standard SRY Inlet Size as per APL-S26 for Sq.mm Orifice Standard SRV Outlet Size as per APL-S26 for Sq.mm Orficr 1d Nozzle size on Receiver Outlet for SRV Rogui Roqulred SRV Size as por API-826 for 1 F 2 Avallale Nozzle Size on Reever ute for SRV Provided SRV Size on Receiver Outlet niet. outlet [For Reference only. KEP KK) 2a15.022 woext sss sxosrsctseacociet \f 28.96 0.2149 Sqinch. 13868 Samm 0.207 Sqincn 198.07 Sqmm ‘SORT (198,085 «4/3.14) 1588 mm F ——(asedon orifice 28) = tore 25NB = 207= SNE = 25NB “one = aN = Not Know Page 7 of 8 Huntsman nomationa PL Projet. Projet ame PSV aati {esion: Bards, Guise, SUMMARY Eran Ha For Calcaaton Pressure Reet | Presure Prossre Rl ws resure_| Presue Pressure tet | _Presure Be] ce |oomaton| nntate | metarvave | Pressure | Pressure Reet | ‘ave n Pressure Rae! Ve con heave [ate nt oiton Vive Oats, | Rete valve conncettctve| “once” | Reet net canes ceive | Vanes | Rote vabe | ence se Cane | Ostgnion ‘caren 9 nner + [cue Jbatkaom) —notkaoan | stknom | ntknon | ANB eLxNa | OSES TOO oo inn ° oo | =NeInason coon) AONE Inlet X Not | (ONerPressure resulting in -25NB Inlet X 50 NB 2 | cea |potkrom| —natkaonn | wetknom | nxn | 46 a Dye tem Boss” | 0307 Sich r 1 inet x sia ‘Outiot) eee Cancion 1) _Twocaeisanvsned or ort evi ai going 2) Cote under conan vapeur esting in te Rea om fe exponue & Bcd Outlet 3) tng Rtg coe at town, 4) Cons nde Gover: Ovepeseue eng ihe At Rese em che Cute 5) le S20 roe by HPL tie. owe, HPL fer crfmaon xt 2 dec ae oe tk [For Reference only.

You might also like