Nome ‘Year 12 Mathematics A Unit 17.3, Worksheet 2 Slack Time 1 Use the project network below to find the slack time for activity: a cee, bH a chp 6 aF2 eM Name: ‘Yea 12 Mathematics A Modelling and problem solving 43 8. Draw a project network for assembling and using a ft-pack” barbecue. ‘A | Revd hs ianetons 3 | Unpack th pes om ow « T | Ser te mel proper [AB D | Pact welron se | Sao ie woken parr ame | | Pace the ea bein he ay a |e G_| File gone TE [aes the 2 [a 1] hh te koe aia a isa 7 [Papa tend ao Nowe | Conk tie food is ind the greatest delay possible in each of he following activites without ateting the ime for completion ofthe project. 1 Reading the instructions (-S-|_ i Puting te wheels on 121° 0 fi Placing the heat beads inthe tay iv Preparing the food (5-20 4 S3-34=19