Nome ‘Year 12 Mathematics A
Unit 17.3, Worksheet 2 Slack Time
1 Use the project network below to find the slack time for activity:
a cee, bH a chp 6 aF2 eMName: ‘Yea 12 Mathematics A
Modelling and problem solving
43 8. Draw a project network for assembling and using a ft-pack” barbecue.
‘A | Revd hs ianetons 3
| Unpack th pes om ow «
T | Ser te mel proper [AB
D | Pact welron se
| Sao ie woken parr ame |
| Pace the ea bein he ay a |e
G_| File gone TE
[aes the 2 [a
1] hh te koe aia a isa
7 [Papa tend ao Nowe
| Conk tie food is
ind the greatest delay possible in each of he following activites without ateting the
ime for completion ofthe project.
1 Reading the instructions (-S-|_ i Puting te wheels on 121° 0
fi Placing the heat beads inthe tay iv Preparing the food (5-20 4
S3-34=19