You are on page 1of 4

1

64
10

demand/minggu
lead time (minggu)

2
35
13

l
sl
sl2

d2xsl2
lxsd2
v((d2xsl2)+(lxsd2))
MIN (SS)
ROP
EOQ
MAX (EOQ+SS)

lead time dan dem

1
64
10

demand/minggu
lead time (minggu)

2
35

sdl=

sd x leadtime
MIN (SS)
ROP
EOQ
MAX (EOQ+SS)

lead time konstant, d

3
15
12

12.5333333333
8.2363884827
67.8380952381

4
38
9

5
98
5

d
sd
d2
sd2

6
28
8

7
62
9

8
45
13

9
58
10

10
40
11

6
28

7
62

8
45

9
58

10
40

50
24.489065
2500
599.71429

169,595.24
7,516.42
420.85
694.40
1,321.06
1,253
1,947.73

z =1,645

lead time dan demand variabel

3
15

10

77.44
127.78
627.78
1,000
1,128

4
38

5
98

d
sd

50
24.489065

z =1,645

lead time konstant, demand variabel

11
100
15

12
30
11

13
60
9

14
49
12

15
28
41

total
750

11
100

12
30

13
60

14
49

15
28

total
750

th
5
6
7
8
9

sdl=

d(tahun)
98
101
84
83
84
d
sd
l
sd x vl
MIN(ss)
SS
ROP
MAX

d (bulan)
8.166667
8.416667
7
6.916667
7
7.5
0.728869
4
1.457738
2.397979
3
33
63